270 Ft Legare SOW MDE Exhaust Insulation Removal Contract Services 2124404Y61A3799003.doc

DOC document 45 KB Posted

Attached to
MDE EXHAUST INSULATION REMOVAL
Solicitation number
70Z04024Q61160Y00
Issued by

About this file

This document is a Statement of Work (SOW) for the removal of exhaust insulation blankets and pads on the U.S. Coast Guard Cutter (USCGC) 270' Legare. The contractor will be required to remove an estimated 40 linear feet of exhaust insulation, including irregular shaped pads on expansion joints, manometer connection points, exhaust drain piping, fittings, and flanges. The work must be completed within 1-2 days as soon as possible.

The related Federal Contract Opportunity is a combined synopsis/solicitation for the MDE Exhaust Insulation Removal, solicitation number 70Z04024Q61160Y00. The U.S. Coast Guard, Surface Forces Logistics Center (SFLC) intends to award a Firm Fixed Price Purchase Order on a Lowest Priced Technically Acceptable basis. Quotes must be received by August 19, 2024 at 12:00 PM Eastern. No down payments or advanced payments will be made, and payment will be made by Government Purchase Order (Net 30) after delivery and acceptance by the U.S. Coast Guard.

View the file

Other files

File Type Posted
270 Ft MDE Exhaust Insulation Drawings Highlighted SoW.pdf PDF
FAR Clauses.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT of WORK

For

Exhaust Insulation Blanket Removal Procurement Request: 2124404Y61A3799003

USCGC 270’ LEGARE

Yard POC: Keith Hare (410) 636-7603 Tentative Start Date: As Soon as Possible Period of Performance: 1-2 days The exhaust insulation blankets and pads are required to be removed and disposed of:

The Coast Guard requires a contractor to remove an estimated 40 linear feet of Exhaust Insulation accordance with the SOW. The contractor will be required to remove various irregular shaped pads on items such as Expansion Joints, Manometer Connection points, Exhaust drain piping, fittings and flanges. In addition, the contractor shall provide all materials, personal and equipment needed to perform the removal of Both #1 and #2 MDE Exhaust Insulation from the Flowerpot assembly on top of Both MDEs, to the underside of the existing MDE Silencers.