27-06 RRC Rooftop HVAC Installation.pdf
PDF 3 MB Posted
- Solicitation number
- 39119
- Issued by
- Fairfield County, Connecticut
About this file
Summary
This is a Request for Bid (RFB) document issued by the Town of Ridgefield, Connecticut for the replacement of rooftop HVAC equipment at the Ridgefield Recreation Center. The project involves the demolition of one existing roof-mounted air handling unit (RTU-6) and installation of one new roof-mounted air handling unit, including associated ductwork, piping, insulation, controls, gas piping, roofing work as required, air balancing, and coordination with the owner's building management system (BMS) controls contractor. The work also includes duct smoke detector installation, as-built drawings, and operating and maintenance manuals. A mandatory pre-bid site meeting is scheduled for Wednesday, October 7, 2026 at 9:00 AM at 195 Danbury Road, Ridgefield, CT. Requests for information (RFIs) are due by Thursday, October 15, 2026 at 11:00 AM. Sealed bids are due by Thursday, October 22, 2026 at 11:00 AM EDT via email to purchasing@ridgefieldct.gov. The work shall be completed during an appropriate window during spring 2027, with exact scheduling to be coordinated with the Department of Parks and Recreation. The contractor will be selected based on project cost, schedule, qualifications, experience, references, and subcontractor information.
The Town of Ridgefield has not specified a project budget in this RFB. Connecticut prevailing wage rates apply to this project. The project is not subject to State of Connecticut SBE/MBE set-aside or contract compliance requirements, and bonds are not required. Contractors must provide comprehensive general liability insurance with minimum limits of $1,000,000 per occurrence, workers' compensation insurance at statutory limits, and comprehensive auto liability insurance with minimum limits of $1,000,000 per occurrence, with the Town named as an additional insured. Connecticut sales tax is not applicable to this purchase. All work must comply with the latest editions of Federal and State of Connecticut regulations, the Connecticut State Building Code, International Mechanical Code, ASHRAE standards, NFPA standards, and local Town of Ridgefield standards. The contractor must provide a 12-month warranty on all materials and workmanship from the date of final acceptance and must transfer all equipment warranties to the owner.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 39119_Sep_23_26_solicitation_doc.pdf | ||
| 39119_Sep_28_26_solicitation_doc.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L E G A L N O T I C E
The Town of Ridgefield invites all interested parties to submit sealed bids on the following:
BID DUE DATE: October 22, 2026
BID DUE TIME: 11:00 am EDT
BID ITEM: Ridgefield Rec Center Rooftop HVAC Replacement
BID NUMBER: 27-06
Terms and conditions as well as the description of items being bid are stated in the specifications. Specifications may be obtained at the following address:
Town of Ridgefield David McFate 400 Main Street Ridgefield, CT. 06877
(203) 431-2720
Bids must be received no later than the date and time stated above by the Purchasing Director’s office via email. For further information, please call David McFate at (203) 431-2720 or email at purchasing@ridgefieldct.gov
Results may be viewed at https://www.ridgefieldct.gov/departments/ purchasing/bid_notices.php after the bid opening.
Bids shall be submitted via email to the following:
purchasing@ridgefieldct.gov SUBJECT: 27-06 (Company Name) Bid Package https://www.ridgefieldct.gov/node/24703
TOWN OF RIDGEFIELD
CONNECTICUT
BOARD OF SELECTMEN
INSTRUCTIONS TO BIDDERS
1. Bids shall be submitted via email to purchasing@ridgefieldct.gov. The time stamp of the email shall be on or before the bid due date.
2. Withdrawals of or amendments to bids received later than the time and date specified for bid opening will not be considered.
3. The Board of Selectpersons of the Town of Ridgefield reserves the right to accept or reject any or all options, bids or proposals; to waive any technicality in any bid or part thereof, and to accept any bid deemed to be in the best interest of the Town of Ridgefield, Connecticut.
4. Bidders may be present at the opening of bids.
5. Bids may be held by the Town of Ridgefield for a period not to exceed sixty (60) days from the opening of bids for the purpose of reviewing the bids and investigating the qualifications of bidders prior to the awarding of the contract.
6. Insurance requirements: must be submitted with the bid. This includes any Hold Harmless requirements as well as Certificates of Insurance for the full amounts specified. Unauthorized changes to these forms, i.e.
adding, striking out and/or changing any words, language or limits will cause the bidder to be disqualified.
a. Please Note: Prior to the start of work, the Town of Ridgefield and/or the Board of Education shall be endorsed on the Contractor’s policies of insurance as additional insured. The Contractor shall obtain a policy of insurance, with minimum limits of liability as specified containing an endorsement that covers this agreement to indemnify, defend and hold harmless the Town/City and/or Board of Education or any of their officers, employees, agents, servants and volunteers. The Contractor shall obtain an mailto:purchasing@ridgefieldct.org endorsement to said insurance policy stating that the Contractor’s insurance is primary and any insurance obtained, or self insurance provided, by the Town of Ridgefield and/or Board of Education is excess. The Contractor’s insurance carrier will waive all rights of subrogation against the Town of Ridgefield and/or Board of Education, and all of their respective officers, employees, agents, servants and volunteers. The Contractor shall furnish a copy of the insurance policy that meets all of the above requirements before any work or use of the property commences. Failure to do so will result in disqualification of the Bid. There will be no exceptions.
7. Permits: It is the Contractor’s responsibility to obtain any necessary permits prior to the start of construction. All work shall be completed in compliance with the latest edition of the prevailing Federal and State of Connecticut regulations, Town of Ridgefield Standards, or as set forth in these specifications. Any local (Town of Ridgefield) permits will have the permit fee waived.
8. Emergency Work: The Contractor shall file with the Project Manager a telephone number of a person authorized by them who may be contacted regarding emergency work at the job site that may be required during non-working hours for reasons of public safety. The person shall be readily available and have full authority to deal with any emergency that may occur.
9. Sales Tax: In accordance with the provisions of Special Act No. 77-98, as amended, and Section 12-412(a) of the Connecticut General Statutes, sales of tangible personal property and services to the Town are not subject to the Connecticut Sales and Use Tax, and such tax shall not be included as part of the bid.
10.Contractor’s Qualification Statement: The Contractor’s Qualification Statement must be filled out as part of the bid package and the experience and references listed therein will be one to the determining factors in the awarding of the bid.
11.Hold Harmless Agreement: In order for the bid to be considered valid, the Contractor must sign the enclosed hold harmless agreement. Bids submitted without the signed hold harmless agreement will be rejected.
12.Prevailing Wage Rates: This project is subject to the State of Connecticut prevailing wage rate requirements.
13. SBE/MBE and Contract Compliance Requirements: This project is not subject to State of Connecticut SBE/MBE set aside and contract compliance requirements.
14. Bonds: Bonds are not required for this project.
15. Time of Completion: Work shall be completed during appropriate window during spring 2027. Awarded contractor shall coordinate exact scheduling details with the Department of Parks and Recreation.
16. Weather Delays: Weather delays shall be determined by the Town based upon conditions unsuitable for proper preparation or application.
17. Project Location: The project is located at the Ridgefield Recreation Center, 195 Danbury Rd, Ridgefield CT. Contractors intending to submit a bid must familiarize themselves with the project location. Contractors wishing to submit a bid must attend the MANDATORY pre-bid site meeting.
18. Bid Schedule:
a. RFB Issued: September 22, 2026
b. Mandatory Pre-bid Meeting: Wednesday October 7, 2026 at
9:00, 195 Danbury Rd, Ridgefield CT
c. RFI’s Due: Thursday October 15, 2026 at 11:00 AM
d. Proposals Due: Thursday October 22, 2026 at 11:00 AM
19. RFB Submissions: The following items shall be submitted for a RFB to be considered complete:
(a) Project Cost and Schedule
(b) Hold Harmless Agreement
(c) Contractor’s Qualification Statement
(d) Contractor’s List of Subcontractors
(e) Contractor's Certificates of Insurance
20. Requests for Information: Questions or requests for information must be submitted in writing. All questions or requests for information shall be submitted to David McFate, Purchasing and Finance Manager, at purchasing@ridgefieldct.gov.
mailto:purchasing@ridgefieldct.gov mailto:purchasing@ridgefieldct.gov
GENERAL CONDITIONS GC-1
GENERAL CONDITIONS
1. CONTRACTOR'S UNDERSTANDING:
It is understood and agreed that the Contractor has, by careful examination, satisfied himself as to the nature and location of the work, the conformation of the ground, the character quality and quantity of materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work, the general and local conditions, and all other matters which can in any way affect the work under this Contract. No verbal agreement or conversation with any officer, agent or employee of the Owner, either before or after the execution of this contract, shall affect or modify any of the terms or obligations herein contained.
2. DEFINITIONS:
OWNER:
PROJECT MANAGER:
CONTRACTOR:
The word "Owner" when it appears in the Contract Documents shall mean The Town of Ridgefield, Connecticut.
The title "Project Manager" when it appears in the contract Documents shall mean: Denis DiPinto, Director of Parks and Recreation, or his specifically designated Agent.
The word "Contractor" when it appears in the Contract Documents shall mean the party to whom the Contract has been awarded.
3. MATERIALS, APPLIANCES AND EMPLOYEES:
Unless otherwise stipulated, the Contractor shall provide and pay for all materials, labor, water, tools, equipment, light, power, transportation and other facilities necessary for the execution and completion of the work. Unless otherwise specified, all materials shall be new and both workmanship and materials shall be of good quality. The Contractor shall, if required, furnish satisfactory evidence as to the kind and quality of materials.
The Contractor shall at all times endorse strict discipline and good order among their employees, and shall not employ on the work any unfit person or any one not skilled in the work assigned to him.
GENERAL CONDITIONS GC-2
4. PROTECTION OF WORK AND PROPERTY:
The Contractor shall continuously maintain adequate protection of all their work from damage and shall protect the Owner's property from injury or loss arising in connection with this Contract. They shall make good any such damage, injury or loss, except such as may be directly due to errors in the Contract Documents or caused by agents or employees of the Owner. They shall adequately protect adjacent property as provided by law and the Contract Documents. They shall provide and maintain all passageways, guard fences, lights and other facilities for protection required by public authority or local conditions.
In an emergency affecting the safety of life or of the work or of adjoining property, the Contractor, without special instruction or authorization from the Project Manager, is hereby permitted to act at their discretion, to prevent such threatened loss or injury, and they shall so act, without appeal, it so instructed or authorized. Any compensation claimed by the Contractor on account of emergency work, shall be determined by agreement or arbitration.
5. CHANGES IN THE WORK:
The Owner, without invalidating the Contract, may order extra work or make changes by altering, adding to or deducting from the work, the Contract Sum being adjusted accordingly. All such work shall be executed under the conditions of the original Contract except that any claim for extension of time caused thereby shall be adjusted at the time of ordering such change.
In giving instructions, the Project Manager shall have authority to make minor changes in the work, not involving extra cost, and not inconsistent with the purposes of the work, but otherwise, except in an emergency, endangering life or property, no extra work or change shall be made unless in pursuance of a written order by the Project Manager, and no claim for an addition to the Contract Sum shall be valid unless so ordered.
The value of any such extra work or change shall be determined in one or more of the following ways:
(a) By estimate and acceptance in a lump sum.
(b) By unit prices named in the Contract subsequently agreed upon.
(c) By cost and percentage or by cost and a fixed fee.
If none of the above methods is agreed upon, the Contractor, provided they receive an order as above, shall proceed with the work. In such case, and also under case (c), they shall keep and present in such form as the Project Manager may direct, a correct account of the net cost of labor and materials, together with
GENERAL CONDITIONS GC-3
vouchers. In any case, the Project Manager shall certify to the amount, including reasonable allowance for overhead and profit, due to the Contractor.
Pending final determination of value, payments on account of changes shall be made on the Engineer's estimate.
6. CLAIMS FOR EXTRA COST:
If the Contractor claims that any instructions by drawings or otherwise involve extra cost under this Contract, they shall give the Project Manager written notice thereof within a reasonable time after the receipt of such instructions and in any event before proceeding to execute the work, except in emergency endangering life or property, and the procedure shall then be as provided for changes in the work. No such claim shall be valid unless so made.
7. SUSPENSION OF WORK:
The Owner may at any time suspend the work, or any part thereof by giving 24 hours notice to the Contractor in writing. The work shall be resumed by the Contractor within ten (10) days after the date fixed in the written notice from the owner to the Contractor to do so. The Owner shall reimburse the Contractor for expense incurred by the Contractor in connection with the work under this contract as a result of such suspension.
8. THE OWNER'S RIGHT TO DO WORK:
If the Contractor should neglect to prosecute the work properly or fail to perform any provision of this Contract, the Owner, after three days written notice to the Contractor may, without prejudice to any other remedy they may have, make good such deficiencies and may deduct the cost thereof from the payment then or thereafter due the Contractor.
9. PAYMENTS WITHHELD:
The Owner may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any certificate to such extent as may be necessary to protect him from loss on account of the following:
(a) Defective work not remedied.
(b) Claims filed or reasonable evidence indicating probable filing of claims.
(c) Failure of the Contractor to make payments properly to subcontractors or for material or labor.
(d) A reasonable doubt that the Contract can be completed for the balance then unpaid.
(e) Damage to another Contractor.
When the above grounds are removed, payment shall be made for amount withheld because of them.
GENERAL CONDITIONS GC-4
10. CONTRACTOR'S LIABILITY INSURANCE:
The Contractor shall maintain such insurance as will protect him from claims under workmen’s compensation acts and from any other claims for damages for personal injury, including death, which may arise from operations under this Contract, whether such operations be by himself or by any subcontractor or anyone directly or indirectly employed by either of them. Certificates of such insurance shall be filed with the Project Manager, if they so require and shall be subject to their approval for adequacy of protection.
11. INDEMNITY:
The Contractor shall indemnify and save harmless the Owner from and against all losses and all claims, demands, payments, suits, actions, recoveries and judgments of every nature and description brought or recovered against him, by reason of any act or omission of the said Contractor, their agents or employees, in the execution of the work or in the guarding of it.
The Contractor shall, and is hereby authorized to maintain and pay for such insurance, issued in the name of the Owner, as will protect the Owner from their contingent liability under this Contract, and the Owner’s right to force against the Contractor any provision of this article shall be contingent upon the full compliance by the Owner with the terms of such insurance policy or policies, a copy of which shall be deposited with the Owner.
12. DAMAGES:
Any claim for damage arising under this Contract shall be made in writing to the party liable within a reasonable time of the first observance of such damage and not later than the time of final payment, except as expressly stipulated otherwise in the case of faulty work or materials, and shall be adjusted by agreement or arbitration.
13. ASSIGNMENT:
Neither party to the Contract shall assign the Contract or sublet it as a whole without the written consent of the other, nor shall the Contractor assign any moneys due to or to become due to him hereunder, without the previous written consent of the Project Manager.
14. PROJECT MANAGER'S STATUS:
The Project Manager shall have general supervision and direction of the work. He has authority to stop the work whenever such stoppage may be necessary to insure the proper execution of the Contract. He shall also have authority to reject all work and materials which do not conform to the Contract, to direct the application of forces to any portion of the work, as in his judgment is required, and to order the force increased or diminished, and to decide questions which arise in the execution of the work.
GENERAL CONDITIONS GC-5
15. METHOD OF PAYMENT:
At the end of each calendar month, the Contractor shall submit to the Project Manager a requisition for payment which requisition shall be based upon the actual amount of the work performed during the previous month. The requisition may include materials stored on the site but not installed. The Project Manager shall, within ten (10) days, check the requisition against their review of the work which has been done and submit it to the Owner, a written statement as to the validity of the requisition. The Owner shall then pay to the Contractor one hundred percent (100%) of the amount stated in the Engineer's report.
In the event that this contract is subject to the State of Connecticut SBE/MBE set aside and contract compliance requirements, the Contractor’s attention is directed to Appendix “B”, State of Connecticut SBE/MBE requirements regarding the withholding of 2% of the State Funded portion of the contract value each month if the contract value exceeds $500,000, pending the review and approval of the Contractor’s Affirmative Action Plan by CHRO.
16. FINAL PAYMENT:
When the Contract has been completed, the Contractor shall notify the Project Manager in writing. Upon receipt of this notification, the Project Manager shall proceed to make final measurements of the work done under the provisions of this Contract. The Project Manager shall then submit to the Owner a written statement setting forth these final measurements and the amount due the Contractor consistent with the unit prices and lump sum bid in the bid. The Owner shall within sixty (60) days pay to the Contractor this sum except that they may deduct any moneys which are to be retained under the terms of the Contract for repairs or otherwise.
17. ORDER OF THE WORK:
The order of the work shall be subject to the approval of the Project Manager in all cases. The Contractor may be required to submit a work schedule in writing to the Project Manager for his approval.
18. PROTECTION TO PUBLIC:
The Contractor shall conduct the work in such a manner as to offer minimum disturbance to the public. They shall not close off traffic without specific permission of the Project Manager and shall provide flagmen if such becomes necessary, in the opinion of the Project Manager. Proper barricades, lights, and other protective devices shall be supplied at the Contractor’s expense and properly maintained during the entire course of the work.
GENERAL CONDITIONS GC-6
20. GUARANTEE:
The Contractor guarantees that the work to be done under this Contract and the materials furnished by him and used in the construction of the project are free from defects or flaws. The guarantee is for a term of one (1) year from and after the date upon which the final estimate of the Project Manager is formally approved by the party of the first part. It is hereby agreed and understood that this guarantee shall not include any repairs made necessary by any cause or causes other than defective materials furnished by or defective work done by the Contractor. Where warranty requirements conflict, the project-specific warranty requirements shall govern.
21. RATE OF PROGRESS AND TIME OF COMPLETION:
The Contractor shall commence work as coordinated with the Project Manager. Subsequent treatment shall be completed within the approved treatment window and in accordance with the schedule submitted by the Contractor and approved by the Project Manager. Weather and regulatory conditions shall be considered in establishing the annual treatment schedule.
22. EXTENSION OF TIME:
The Contractor expressly covenants and agrees that, in undertaking to complete the work within the time specified, they have taken into consideration and made allowance for all of the ordinary delays and hindrances incident to such work, whether growing out of delays in securing materials, workmen, or otherwise. Should the Contractor, however, be substantially delayed in the prosecution and completion of the work by any changes, additions, or omissions therein ordered in writing by the Project Manager, or by fire, lightning, earthquake, tornado, cyclone, riot, insurrection of war, or by the abandonment of the work by the workmen engaged therein, through no fault of the Contractor, or by the discharge of all or any material number of workmen in consequence of difficulties arising between the Contractor and such workmen, or by the neglect, delay, or default it of any other contractor of the town, then the Contractor may, within five (5) days after the occurrence of the delay for which they claim allowance, notify the Project Manager in writing, and thereupon, and otherwise, the Contractor shall be allowed such additional time for the completion of the work, as the Project Manager in his discretion shall award in writing, and his decision shall be final and conclusive upon the parties. Such additional time shall be the sole and exclusive remedy for any delay claimed by the Contractor.
23. SALES TAX:
In accordance with the provisions of Special Act No. 77-98, as amended, and Section 12-412(a) of the Connecticut General Statutes, sales of tangible personal property and services to the Town are not subject to the Connecticut Sales and Use Tax, and such tax shall not be included as part of the bid.
GENERAL CONDITIONS GC-7
24. TERMINATION OF CONTRACT
If the Owner fails to make payment thereon for a period of 30 days, the Contractor may, upon seven additional days written notice to the Owner, terminate the Contract and recover from the Owner payment for work executed and for proven loss with respect to materials, equipment tools, and construction equipment and machinery, including reasonable overhead, profit and damages applicable to the project.
If the contractor defaults or persistently fails or neglects to carry out the work in accordance with the Contract Documents or fails to perform a provision of the Contract, the Owner, after seven days written notice to the Contractor and without prejudice to any other remedy the Owner may have, may make good such deficiencies and may deduct the cost thereof, including compensation for the Engineer’s services and expenses made necessary thereby, from the payment then or thereafter due the Contractor. Alternatively, at the Owner’s option, and upon certification by the Project Manager that sufficient cause exists to justify such action, the Owner may terminate the Contract and take possession of the site and of all materials, equipment, tools, and construction equipment and machinery thereon owned by the Contractor and may finish the Work by whatever method the Owner may deem expedient. If the unpaid balance of the Contract Sum exceeds costs of finishing the Work, including compensation for the Engineer’s services and expenses made necessary thereby, such excess shall be paid to the Contractor, but if such costs exceed such unpaid balance, the Contractor shall pay the difference to the Owner.
Town of Ridgefield
CONTRACTOR’S QUALIFICATION STATEMENT Q-1
CONTRACTOR’S QUALIFICATION STATEMENT
List below references for similar projects, including all information requested. This page must be completed and submitted with the bid.
1. Client: _____________________________________________________________
Project Address: _________________________________________________________
Approximate Value: ____________ Date: Started __________Completed __________
Contact: Name _______________________________________Telephone ___________
2. Client: ______________________________________________________________
Project Address: _________________________________________________________
Approximate Value: ____________ Date: Started __________Completed __________
Contact: Name _______________________________________Telephone ___________
3. Client: _______________________________________________________________
Project Address: _________________________________________________________
Approximate Value: ____________ Date: Started __________Completed __________
Contact: Name _______________________________________Telephone ___________
4. Client: _______________________________________________________________
Project Address: _________________________________________________________
Approximate Value: ____________ Date: Started __________Completed __________
Contact: Name _______________________________________Telephone ___________
Company: ___________________________ Bid Title: _____________________
Street: ______________________________ Bid No.: ______________________
City, State: __________________________Telephone No.: ________________
Firm Address Point of Contact Name Point of Contact Number Type of Work Performed
CONTRACTOR'S LIST OF SUBCONTRACTORS
List below the subcontractors intended to be utilized for this project. This page must be completed and submitted with the bid.
General Contractor: ____________________________________
Address: ____________________________________________
Phone Number: _______________________________________
Bid Number: _______________
INSURANCE REQUIREMENTS IR-1
Purchasing Department, Town of Ridgefield,400 Main Street, Ridgefield,CT.
06877
203-431-2720 & purchasing@ridgefieldct.gov
APPENDIX - INSURANCE REQUIREMENTS
Each bidder shall carry and maintain the following insurance coverage during the period of the contract : The Certificate of Insurance for the Limits of Liability stated below should be submitted with your bid to the Purchasing Department at Town Hall. Bidders may not perform any work until all insurance requirements are met.
1. Comprehensive General Liability Insurance as will protect him, the Town, and any subcontractor performing work covered by this Contract, from claims for damages for personal injury, including accidental or wrongful death, as well as claims for property damages, which may arise from operations under this Contract whether such operations be by himself or by any subcontractor or by anyone directly or indirectly employed by either of them. Liability insurance shall include premises and operations, products, contractual, owners, and contractors protective. The minimum amounts of such insurance shall be as follows:
Bodily Injury Liability and Property Damage Liability:
$1,000,000 each occurrence.
The Town shall be named as an Additional Insured This MUST be stated explicitly on the Certificate or you will be disqualified
2. for all of his employees, employed at the site and in case any work is sublet, the Contractor shall require the subcontractor similarly to provide Work Compensation Insurance for all employees of the later unless such employees are covered by the protection afforded by the Contractor.
Statutory Limits
3. Comprehensive Auto Liability Insurance:
Bodily Injury Insurance and Property Damage Insurance covering the operation of all Motor Vehicles owned, hired and/or non-owned by the Contractor, or used by the Contractor in the Prosecution of the work
INSURANCE REQUIREMENTS IR-2
under the Contract, shall be in the minimum of $1,000,000 each occurrence.
All policies relating to this Contract shall be so written so that the Town shall be notified of cancellation or change at least thirty (30) days prior to the effective date for each policy and type of coverage except for nonpayment which shall be ten (10 ) days prior to the cancellation. Renewal certificate covering the renewal of all policies expiring during the life of the Contract shall be filed with the Town not less than ten (10) days before the expiration of such policies. Failure to do so will result in work stoppage and possible contract cancellation.
HOLD HARMLESS AGREEMENT
The undersigned covenants and agrees to and shall at all times indemnify, protect and save harmless the Town of Ridgefield from and against all costs or expenses resulting from any and all losses, damages, detriments, claims, demands, cost and charges including attorneys fees the Town of Ridgefield may directly or indirectly suffer, sustain or be subjected to by reason or on account of the work to be performed pursuant to this Contract or any activities in connection with said Contract whether such losses and damages be suffered or sustained by the Town of Ridgefield directly or by its employees, licensees or invitees or be suffered or sustained by other persons or corporations who may seek to hold the Town of Ridgefield liable therefore.
The Contractor shall comply with the Provisions of the Immigration Reform and
Control Act of 1986 effective and enforceable as of June 6, 1987 which Act makes unlawful the hiring for employment or subcontracting individuals failing to provide documentation of legal eligibility to work in the United States. The
Contractor shall hold the Town of Ridgefield harmless for the failure of the
Contractor to comply with the provisions of said Act.
IN WITNESS WHEREOF, the parties hereto have set their hand and seal this on the_________________ day of_____________
Signed, Sealed and Delivered in the
Presence of:
Signed:
Notary Public
MECHANICAL DRAWING LIST
M-100 - MECHANICAL SPECIFICATIONS
M-200 - MECHANICAL DEMOLITION ROOF PLAN
M-300 - MECHANICAL CONSTRUCTION ROOF PLAN
M-301 - MECHANICAL FIRST FLOOR PLAN
M-400 - MECHANICAL SCHEDULES, DETAILS AND CONTROLS
PIPE PITCHED DOWN IN
DIRECTION OF ARROW.
NUMBER INDICATES
INCHES OF PITCH PER
FOOT (WHEN SHOWN).
P 1/4
HVAC PIPING ABBREVIATIONS AND SYMBOLS
LPS(S/R) LOW PRESSURE STEAM
(SUPPLY/RETURN)
DR DRAIN PD PUMP DISCHARGE
PS PRESSURE SWITCHBFP BACKFLOW PREVENTER
FS FLOW SWITCHGPM GALLONS PER MINUTE
CWS(R) CONDENSER WATER
SUPPLY (RETURN)
HWS(R) HOT WATER SUPPLY
(RETURN)
CHWS(R) CHILLED WATER SUPPLY
(RETURN)
BALL VALVE ELECTRIC ACTUATOR
GATE VALVE SOLENOID ACTUATOR
GLOBE VALVE
PLUG VALVE
PRESSURE REDUCING
VALVE
BUTTERFLY VALVE
PNEUMATIC ACTUATOR
CONCENTRIC REDUCER
ECCENTRIC REDUCERBALANCING VALVE
FLOW LIMITING VALVE
PUMPSAFETY RELIEF VALVE
PRESSURE GAUGE
CHECK VALVE
STRAINER W/ BLOWDOWN
VALVE
THERMOMETER
3-WAY VALVE
THERMOWELL
EXPANSION JOINT
UNION
PIPE GUIDE
MANUAL AIR VENT (AUTO)
FLEXIBLE CONNECTION
BOTTOM CONNECTION
ELBOW DOWN
ELBOW UP
CONTROL VALVE & TRIM
TOP CONNECTION
MECHANICAL SPECIFICATIONS:
1.0 GENERAL
1. REFER TO SPECIFICATIONS FOR ADDITIONAL PROJECT REQUIREMENTS AND
WORK RELATED TO OTHER TRADES. IMMEDIATELY NOTIFY THE ENGINEER
OF ANY CONFLICTS AND PROVIDE WRITTEN REQUEST FOR
INFORMATION.
1.1 SCOPE OF WORK
A.THE WORK UNDER THIS SECTION OF THE SPECIFICATIONS INCLUDES ALL
LABOR, MATERIALS, EQUIPMENT AND SERVICES FOR AIR HANDLING
SYSTEMS REPLACEMENT AND CONTROLS UPGRADE AND OTHER WORK AS
SHOWN ON THE CONTRACT DRAWINGS. WORK SHALL BE IN ACCORDANCE
WITH THESE SPECIFICATIONS AND THE CONTRACT DRAWINGS AND
SUBJECT TO THE TERMS AND CONDITIONS OF THE CONTRACT. THE WORK
IN GENERAL CONSISTS OF, BUT IS NOT LIMITED TO, THE FOLLOWING:
1. DEMOLITION OF ONE (1) ROOF MOUNTED AIR HANDLING UNIT.
2. INSTALLATION OF ONE (1) NEW ROOF MOUNTED AIR HANDLING UNIT.
3. RIGGING.
4. GAS PIPING.
5. ROOFING AS REQUIRED.
6. DUCTWORK, PIPING, INSULATION AND ASSOCIATED WORK.
7. COORDINATION WITH OWNERS DDC CONTROLS CONTRACTOR FOR
INSTALLATION & START-UP
8. INSTALLATION OF DUCT SMOKE DETECTORS AND ASSOCIATED FIRE
ALARM WORK.
9. AIR BALANCING.
10. RECORD AS-BUILT DRAWINGS AND OPERATING AND MAINTENANCE
MANUALS FOR EQUIPMENT PROVIDED BY THIS CONTRACTOR.
11. ELECTRICAL: SUBCONTRACT WITH ELECTRICAL CONTRACTOR TO
PROVIDE ALL REQUIRED ELECTRICAL SERVICES, INCLUDING
DISCONNECTION OF EXISTING AND RECONNECTION OF NEW UNIT,
UPGRADING BREAKER/FEEDER SIZES, AND DISCONNECTION &
RECONNECTION OF LIGHTNING PROTECTION SIZES AS REQUIRED.
12. THE CONTROLS FOR THE ROOF TOP UNIT ARE TO BE SELF CONTAINED.
THE BUILDINGS CONTROL VENDOR (ECS) WILL INTERFACE WITH THE
UNIT VIA BACNET TO PROVIDE REMOTE MONITORING AND CONTROL.
THE MECHANICAL CONTRACTOR SHALL INCLUDE IN HIS BID,
COOPERATE WITH BUILDING CONTROL VENDOR, UNIT MANUFACTURER
SHALL FURNISH BACNET COMPATIBLE SYSTEMS AND PROVIDE
ASSISTANCE WITH THE MAPPING AND ACCESS TO INPUT AND OUTPUT
POINTS.
B. THE CONTRACTOR (MECHANICAL) SHALL ACT AS THE PRIME CONTRACTOR
FOR THIS PROJECT AND CONTACT AND COORDINATE WORK WITH OTHER
TRADES INCLUDING G.C. ROOFING, RIGGING, PLUMBER, ELECTRICAL, FIRE
ALARM AND CONTROLS. FOR THIS PROJECT.
C. THIS CONTRACTOR SHALL ENGAGE GENERAL CONTRACTORS TO PROVIDE
PROTECTION OF EXISTING ROOFTOP AND ALL WORK AREAS.
D. THIS CONTRACTOR SHALL HIRE AND ENGAGE RIGGING CONTRACTOR TO
REMOVE EXISTING RTU AND INSTALL NEW INCLUDING:
1. OBTAIN ALL PERMITS AND CITY APPROVALS FOR CRANE AND
RIGGING WORK, INCLUDE ALL TRAFFIC CONTROL MEASURES, WORK
ONLY AT TIME APPROVED BY LOCAL AUTHORITIES.
2. SUBMIT RIGGING PLAN TO TOWN FOR APPROVAL.
3. COORDINATE RIG WITH TOWN, STORE UNIT UNTIL APPROVAL
RIGGING DATE.
1.2 BIDDING
A. CONTRACTOR SHALL VISIT THE JOB AND FULLY FAMILIARIZE THEMSELVES
WITH THE EXISTING CONDITIONS PRIOR TO SUBMISSION OF BIDS.
B. CONTRACTOR SHALL COORDINATE THE REQUIREMENTS OF ANY AND ALL
DRAWINGS INCLUDING MECHANICAL, ELECTRICAL AND CONTROLS. ANY
CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER
DURING THE BIDDING PERIOD.
C. CONTRACTOR IS TO OBTAIN A COPY OF THE BUILDING RULES AND
REGULATIONS PRIOR TO BID SUBMISSION TO DETERMINE THE
REQUIREMENTS AND THE EXTENT OF PREMIUM TIME WORK REQUIRED BY
THE BUILDING.
1.3 GENERAL REQUIREMENTS
A. ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE FEDERAL,
STATE AND LOCAL BUILDING CODES AND ALL BUILDING OWNER RULES AND
REGULATIONS INCLUDING USE OF BUILDINGS ROOFING CONTRACTOR AND
BMS CONTRACTOR.
B. CONTRACTOR SHALL PAY ALL FEES AND TAXES, OBTAIN ALL PERMITS AND
APPROVALS, FILE THE REQUIRED DOCUMENTS. SCHEDULE AND PAY ALL
FEES FOR ALL BUILDING AND FIRE DEPARTMENT INSPECTIONS.
C. THE CONTRACTOR SHALL WARRANTY ALL WORK FOR A PERIOD OF 12
MONTHS FROM ACCEPTANCE BY OWNER. DURING THIS WARRANTY PERIOD,
CONTRACTOR SHALL RESPOND TO ALL CALLS FOR SERVICE, REPAIRS AND
ADJUSTMENTS REQUIRED BY OWNER. CONTRACTOR SHALL INSTALL
REPLACEMENT PARTS AND MATERIAL REQUIRED AT NO COST TO THE
OWNER. ALL EQUIPMENT WARRANTIES SHALL BE TRANSFERRED TO OWNER
AND SERVICED BY CONTRACTOR AS PART OF THIS CONTRACT.
D. CONTRACTOR SHALL COORDINATE WITH OTHER CONTRACTORS INCLUDING,
ELECTRICAL, PLUMBING, FIRE PROTECTION, CONTROLS AND GENERAL
CONTRACTOR. CONTRACTOR SHALL PARTICIPATE IN DEVELOPMENT OF
COORDINATED SHOP DRAWINGS.
E. CONTRACTOR SHALL PROVIDE PROTECTION TO ALL ROOF SURFACES
THROUGHOUT THE CONSTRUCTION PROCESS. THIS CONTRACTOR SHALL
REPAIR AND REPLACE ANY SECTIONS OF ROOFING DAMAGED BY THE
INSTALLATION OF NEW WORK. ALL REPAIRS TO BE PERFORMED BY
ROOFERS BONDED TO WORK ON EXISTING ROOF, AS APPROVED BY OWNER.
F. CONTRACTOR SHALL INFORM PROJECT MANAGER IMMEDIATELY UPON
DISCOVERY OF ANY ASBESTOS OR OTHER HAZARDOUS MATERIAL THAT
WILL BE DISTURBED DUE TO THIS WORK.
G. DEMOLITION AND OTHER WORK WHICH MAY CREATE A DISTURBANCE MUST
BE COORDINATED WITH THE OWNER. THE DELIVERY, HANDLING AND
INSTALLATION OF MATERIALS, EQUIPMENT AND REMOVAL OF DEBRIS MUST
BE ARRANGED TO AVOID ANY INCONVENIENCE AND ANNOYANCE TO
OWNER. THE CONTRACTOR SHALL DISPOSE OF ALL DEMOLITION AND
UNUSED MATERIALS.
H. THOROUGHLY BRUSH AND CLEAN UP WORK AT THE END OF EACH DAY.
REMOVE ALL DEBRIS FROM INSIDE AND OUTSIDE OF ALL DUCTWORK,
PIPING AND EQUIPMENT. PAINTED EXPOSED WORK, SOILED OR DAMAGED,
SHALL BE CLEANED OR REPAINTED TO MATCH ADJOINING WORK BEFORE
FINAL ACCEPTANCE.
I. SUBSTITUTIONS FOR THE SPECIFIED EQUIPMENT SHALL NOT BE PERMITTED
WITHOUT APPROVAL FROM THE ENGINEER. THE ASSOCIATED CHANGE IN
THE CONTRACT PRICE SHALL BE INCLUDED WITH ANY PROPOSED
SUBSTITUTIONS AT THE TIME OF BID.
J. SEISMIC MOUNTING AND BRACING OF ALL EQUIPMENT, PIPING ETC. SHALL
BE IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. THE SEISMIC
REQUIREMENTS SHALL BE BASED ON A USE TYPE [3]
K. THE CONTRACTOR SHALL COORDINATE WITH EQUIPMENT MANUFACTURER'S
SERVICE REPRESENTATIVE TO ENSURE PROPER INSTALLATION, PIPING AND
SERVICE CLEARANCE REQUIREMENTS ARE MET.
L. LAYOUT SYSTEMS TO MAINTAIN ACCESS AND SERVICE CLEARANCES FOR
INSTALLED EQUIPMENT, VALVES, CONTROLS, VOLUME DAMPERS,
FIRE/SMOKE DAMPERS AND ALL COMPONENTS REQUIRING ACCESS.
SERVICE ACCESS SHALL BE AS RECOMMENDED BY MANUFACTURER OR AS
REQUIRED BY CODE WHICHEVER IS GREATER.
M. IF BUILDING REMAINS OPEN DURING CONSTRUCTION (TBD), MAINTAIN
OPERATION OF BUILDING SYSTEMS DURING CONSTRUCTION. ANY
REQUIRED SHUTDOWNS OF BUILDING SYSTEMS MUST BE COORDINATED
WITH THE OWNER.
N. UNLESS OTHERWISE SPECIFIED, THE MOST RECENT VERSIONS OF THE
FOLLOWING CODES AND STANDARDS APPLY AND ARE MADE A PART OF
THIS SPECIFICATION
1. CT STATE BUILDING CODE.
2. INTERNATIONAL MECHANICAL CODE (IMC).
3. INTERNATIONAL ENERGY CONSERVATION CODE (IECC).
4. UNDERWRITER'S LABORATORIES, INC. (UL).
5. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA).
6. AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME).
7. AMERICAN NATIONAL STANDARD INSTITUTE (ANSI).
8. OSHA - FEDERAL STANDARDS
9. AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR
CONDITIONING ENGINEERS, INC. (ASHRAE).
10. AIR CONDITIONING & REFRIGERATION INSTITUTE (ARI).
11. AMERICAN WELDING SOCIETY (AWS).
12. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM).
13. SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL
ASSOCIATION (SMACNA)
1.4 COORDINATION WITH BUILDING MANAGEMENT
A. THIS CONTRACTOR IS RESPONSIBLE FOR ADHERING TO THE BUILDING
OWNER'S RULES AND REGULATIONS. ANY DISCREPANCIES BETWEEN THE
CONTRACTOR DOCUMENTS AND THE BUILDING RULES AND REGULATIONS
SHALL BE SUBMITTED IN WRITING TO THE ARCHITECT/ENGINEER FOR
REVIEW, WITH BID SUBMISSION.
B. COORDINATE WITH BUILDING OWNER FOR ANY SERVICE INTERRUPTION OF
EXISTING SYSTEMS AND GIVE NOTICE AS REQUIRED BY BUILDING RULES
AND REGULATIONS OR A MINIMUM OF TWO (2) DAYS PRIOR TO ANY WORK,
WHICHEVER IS MORE STRINGENT. CONTRACTOR IS TO PERFORM WORK ON
PREMIUM TIME, IF SO DIRECTED BY BUILDING OWNER, SO AS NOT TO
INTERRUPT BUILDING SERVICES DURING OCCUPIED PERIODS.
1.5 SUBMITTALS
A. SHOP DRAWINGS OF THE FOLLOWING SHALL BE SUBMITTED FOR REVIEW
PRIOR TO PURCHASE AND INSTALLATION.
1. MANUFACTURER'S SUBMITTAL DATA FOR ALL EQUIPMENT SUPPLIED.
SUBMITTALS SHALL CLEARLY INDICATE SPECIFIC ITEMS PROPOSED
AND WHERE EACH ITEM IS TO BE APPLIED.
2. EQUIPMENT SOUND POWER DATA BROKEN INTO OCTAVE BANDS.
3. DIMENSIONED AND DETAILED PIPING, EQUIPMENT AND DUCTWORK
LAYOUT AT 3/8" = 1'-0" SCALE, MINIMUM. THIS MUST BE COORDINATE
WITH OTHER TRADES.
4. SHOP STANDARDS AND INSTALLATION DETAILS FOR DUCTWORK,
PIPING, INSULATION, STRUCTURAL SUPPORTS, VIBRATION ISOLATION,
AND SEISMIC SUPPORT.
5. PIPE CLEANING AND FLUSHING PROCEDURE.
6. AIR BALANCING REPORTS.
7. OTHER SUBMITTAL DATA NOTED ELSEWHERE.
B. SUBMITTAL QUANTITIES AND METHODS SHALL BE AS OUTLINED IN THE
GENERAL PROVISIONS OF THE CONTRACT DOCUMENTS AS APPLICABLE.
OTHERWISE A MINIMUM OF TWO HARD COPIES AND ONE "PDF" COPY SHALL
BE SUBMITTED.
C. SUBMIT DETAILED PROJECT SCHEDULE, WITHIN TWO (2) WEEKS OF
CONTRACT AWARD.
1.6 RECORD DRAWINGS
A. MAINTENANCE MANUALS, AS-BUILT DRAWINGS SHOWING ALL DUCTWORK,
PIPING AND EQUIPMENT AND TEST AND BALANCING REPORTS SHALL BE
SUBMITTED TO THE OWNER AT THE COMPLETION OF THE WORK. THE
AS-BUILT DRAWINGS SHALL ALSO SHOW EXISTING WORK WITHIN THE
WORK AREA INCLUDING DUCTS AND PIPING THAT WAS CAPPED, REROUTED
AND REMAINING IN WORK AREA.
B. RECORD DOCUMENTS TO BE ISSUED IN "PDF" AND TWO PRINTED COPIES.
1.7 GUARANTEE
A. ALL MATERIALS AND WORKSMANSHIP SHALL BE GUARANTEED FOR A
PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE OF THIS WORK.
FINAL ACCEPTANCE SHALL BE DEFINED AS THE TIME AT WHICH THE
MECHANICAL WORK IS TAKEN OVER AND ACCEPTED BY THE OWNER, AND IS
UNDER CARE, CUSTODY, AND CONTROL OF THE OWNER. ENGAGE THE
SERVICES OF VARIOUS MANUFACTURERS SUPPLYING THE EQUIPMENT FOR
THE PROPER STARTUP AND OPERATION OF ALL SYSTEMS INSTALLED.
INSTRUCT THE OWNER'S PERSONNEL IN THE PROPER OPERATION AND
SERVICING OF THE SYSTEM.
B. THE CONTRACTOR SHALL GUARANTEE TO REPLACE OR REPAIR PROMPTLY
AND ASSUME RESPONSIBILITY FOR ALL EXPENSES INCURRED FOR ANY
WORKMANSHIP AND EQUIPMENT IN WHICH DEFECTS DEVELOP WITHIN THE
GUARANTEE PERIOD. THIS WORK SHALL BE DONE AS DIRECTED BY THE
OWNER. THIS GUARANTEE SHALL INCLUDE RESPONSIBILITY FOR ALL
EXPENSES INCURRED IN REPAIRING AND REPLACING WORK OF OTHER
TRADES AFFECTED BY DEFECTS, REPAIRS OR REPLACEMENTS, IN
EQUIPMENT SUPPLIED BY THIS CONTRACTOR.
C. ALL EQUIPMENT WARRANTIES SHALL BE TRANSFERRED TO OWNER AND
SERVICED BY CONTRACTOR AS PART OF THIS CONTRACT.
D. ALL AIR CONDITIONING UNIT COMPRESSORS AND REFRIGERATION
COMPONENTS SHALL HAVE A 5-YEAR WARRANTY.
2.0 DUCTWORK MATERIALS AND INSTALLATIONS
2.1 DUCTWORK
A. ALL DUCTWORK SHALL BE LOCK FORMING QUALITY G-90 GALVANIZED
STEEL SHEETS UNLESS OTHERWISE NOTED ON DRAWINGS. ALL
DUCTWORK SHALL CONFORM TO THE CONSTRUCTION DETAILS AND
RECOMMENDATIONS IN THE LATEST ISSUES OF THE ASHRAE GUIDE, NFPA
BULLETINS 90A, B & C AND THE SMACNA DUCT MANUAL. INSTALLATION OF
DUCTWORK SHALL BE AS RECOMMENDED BY THE ABOVE. NOTE THAT SOME
DUCTWORK IS LARGE, AND DUCT MUST BE CONSTRUCTED TO PREVENT "TIN
CANNING". ALL DUCT SEAMS SHALL BE SEALED WITH DUCT SEALANT.
DUCT LEAKAGE SHALL NOT EXCEED VALUES SET BY THE SMACNA
STANDARDS, AND RECOMMENDATIONS BY ASHRAE, AND IN NO CASE SHALL
BE MORE THAN 5 PERCENT.
B. PRESSURE CLASSIFICATIONS SHALL BE MINIMUM OF 2" W.G. EXCEPT AS
INDICATED BELOW AND AS INDICATED ON DRAWINGS. ALL SYSTEM
COMPONENTS SHALL BE SELECTED AND INSTALLED TO ACHIEVE THE
PRESSURE RATINGS.
SERVICE PRESSURE RATING
ALL DUCTWORK 2" IN. W.G
C. ALL 90 DEGREE MITER ELBOWS SHALL HAVE DOUBLE THICKNESS AIR FOIL
TYPE TURNING VANES AS DETAILED IN THE SMACNA STANDARDS. ALL
OTHER ELBOWS SHALL HAVE A MINIMUM TURNING RADIUS OF ONE DUCT
WIDTH AS MEASURED FROM THE CENTER LINE. ALL DUCT SUPPORTS SHALL
CONFORM TO SMACNA STANDARDS.
D. DUCT DIMENSIONS SHOWN ON DRAWINGS SHALL BE CLEAR INSIDE
DIMENSIONS.
2.2 DUCT AND AIR SYSTEMS INSULATION
A. DUCTWORK INSULATION SHALL CONFORM TO MAXIMUM FLAME
SPREAD/SMOKE DEVELOPMENT/FUEL CONTRIBUTION RATINGS OF 25 FLAME
SPREAD, 50 SMOKE DEVELOPED AND 50 FUEL CONTRIBUTED IN
ACCORDANCE WITH ASTM E84, WITH "K" VALUE OF 0.29 AT 75 DEGREES F.
INSULATION SHALL PROVIDE CONTINUOUS, VAPOR BARRIER AND JOINTS
SHALL BE SECURED WITH PRESSURE SENSITIVE TAPE. MOISTURE VAPOR
TRANSMISSION PER ASTM E96, 1.3 PERM. MINIMUM DUCTWORK
INSULATION R VALUES SHALL BE AS FOLLOWS:
B. DUCT AND PLENUM INSULATION SCHEDULE.
SERVICE THICKNESS
WITHIN COND. AREA OUTDOORS AND
UNCOND. AREA
CONDITIONED SUPPLY 1-1/2" 2" (R-12)
CONDITIONED RETURN 1-1/2" 2" (R-12)
C. DUCTS AND PLENUMS IN EXPOSED LOCATIONS: 3.0 LBS/CF DENSITY, RIGID
GLASS FIBER BOARD INSTALLED ON EXTERIOR OF DUCTS AND PLENUMS:
OUTSIDE AIR DUCTS AND PLENUMS, MIXED AIR PLENUMS, AND SUPPLY
DUCTS WITHIN MECHANICAL ROOMS AND OTHER EXPOSED LOCATIONS.
D. DUCTS AND PLENUMS IN CONCEALED (ACCESSIBLE) LOCATIONS: 1.5
LBS/CF DENSITY, FLEXIBLE GLASS FIBER WRAP.
E. SCHEDULE - ACOUSTICAL LINING
SERVICE THICKNESS DISTANCE-FEET
UPTREAM AND DOWNSTREAM 1" 15
OF FANS AND AHUS
F. PROVIDE 1", CLOSED CELL ELASTOMERIC, MICROBIAL RESISTANT DUCT
LINER, K-FLEX DUCT LINER OR EQUIVALENT, FOR A MINIMUM OF 15 FEET
UPSTREAM (RETURN) OF RETURN FANS AND AIR HANDLING UNITS AND
OTHER LOCATIONS WHERE INDICATED ON THE DRAWINGS. COAT LINER
WITH MANUFACTURERS RECOMMENDED COATING. LINED DUCTWORK MUST
MEET AN R-12 INSULATION VALUE AND MAY REQUIRE EXTERNAL DUCT
INSULATION.
G. INSULATION SHALL BE INSTALLED PER MANUFACTURER'S
RECOMMENDATIONS AND SMACNA GUIDELINES.
H. EXTERIOR DUCT INSULATION: PROVIDE JOHNS MANSVILLE JM XSPECT AND
3M VENTURECLAD DUCT JACKETING. INSTALL INSULATION AND JACKETING
IN STRICT COMPLIANCE WITH MANUFACTURERS INSTALLATION
INSTRUCTIONS.
I. EXTERIOR DUCTS AND INSULATION MUST BE PROTECTED AGAINST DAMAGE
AND WEATHER WITH A COVERING IN COMPLIANCE WITH IMC (603.15,
603.16, 604.12) AND SMACMA STANDARDS. PROVIDE POLYGUARD
PRODUCTS, INC. ALUMAGUARD ALL WEATHER, OR APPROVE EQUAL,
WEATHERPROOF JACKETING FOR ALL EXPOSED DUCTWORK ON THE ROOF.
2.3 AIR SYSTEM - VIBRATION ISOLATION
A. PROVIDE VIBRATION ISOLATION FOR ALL FANS WHERE NOT INTERNALLY
ISOLATED.
B. WHERE FANS ARE NOT PROVIDED WITH INTERNALLY ISOLATED FANS
-PROVIDE NEOPRENE FLEXIBLE CONNECTIONS IN DUCTWORK AT FAN
CONNECTIONS TO DUCTWORK.
3.0 PIPING MATERIALS AND INSTALLATION
3.1 GENERAL
A. PRESSURE RATINGS FOR PRESSURIZED PIPING SHALL BE AS INDICATED
BELOW AND AS NOTED ON THE DRAWINGS. ALL SYSTEM MATERIALS AND
COMPONENTS SHALL BE SELECTED AND INSTALLED TO ACHIEVE THE
PRESSURE RATINGS AS FOLLOWS:
SERVICE PRESSURE RATING
ALL PIPING 125 PSI
3.1 PIPE AND FITTINGS
A. PROVIDE PIPING AS INDICATED ON SCHEDULE BELOW AND INDICATED ON
DRAWINGS.
SERVICE PIPING JOINTS
AC CONDENSATE PVC
GAS PIPING STEEL SEE BELOW
B. STEEL PIPING: ASTM 53 SCHEDULE 40 SEAMLESS STEEL. ASTM SCHEDULE
80 SEAMLESS STEEL. FITTINGS SHALL BE ANSI/ASTM B16.3 THREADED
[B16.5 WELDED] MALLEABLE IRON CLASS [150], OR ASTM B234, FORGED
STEEL CLASS [150]. ALL JOINTS FOR PIPING 2" AND LESS TO BE SCREWED
AND PIPING 2-1/2" AND LARGER SHALL BE WELDED OR FLANGED. REDUCER
FITTINGS SHALL BE ECCENTRIC TYPE. ALL TURNS AND BRANCHES IN
PIPING SHALL BE MADE USING FITTINGS EXCEPT WELDOLETS MAY BE USED
WHEN THE SIZE OF THE BRANCH PIPING IS 1/2 THE SIZE OR LESS OF THE
MAIN BRANCH.
C. JOINTS: SCREWED FOR PIPE 2 INCH AND UNDER; ANSI/AWS D1.1 WELDED
FOR PIPE OVER 2 INCH.
D. FLANGES, UNIONS, AND COUPLINGS: PIPE SIZE 2 INCHES AND UNDER:
SERVICE 150 PSI WORKING PRESSURE MALLEABLE IRON UNIONS FOR
THREADED FERROUS PIPING. PIPE SIZE OVER 2 INCHES: SERVICE 150 PSI
WORKING PRESSURE FORGED STEEL SLIP-ON FLANGES FOR FERROUS
PIPING.
E. CONDENSATE DRAIN PIPING SHALL BE PVC.
F. PROVIDE DIELECTRIC FITTINGS AT THE JOINING OF ALL DISSIMILAR
METALS.
G. PROVIDE SUFFICIENT HANGERS, SUPPORTS, ANCHORS AND MOUNTING
DEVICES TO SUPPORT ALL PIPING INSTALLED UNDER THIS CONTRACT
WITHOUT SAGGING OR INTERFERENCE, PROPERLY PITCHED AND SO
LOCATED AND ARRANGED AS TO PERMIT FREE EXPANSION AND
CONTRACTION.
3.2 VALVES AND PIPING SPECIALTIES
A. ALL VALVES SHALL BE OF A DESIGN WHICH THE MANUFACTURER LISTS FOR
THE SERVICE AND SHALL BE OF MATERIALS ALLOWED BY THE LATEST
EDITION OF THE ASME CODE FOR PRESSURE PIPING, FOR THE MAXIMUM
OPERATING PRESSURE AND TEMPERATURE, UNLESS A HIGHER GRADE OR
QUALITY IS HEREIN SPECIFIED. ALL VALVES SHALL BE OF THE SAME
MANUFACTURER, EXCEPT FOR SPECIAL APPLICATIONS.
B. EACH VALVE SHALL HAVE THE MAKER'S NAME OR BRAND, THE FIGURE OR
LIST NUMBER AND THE GUARANTEED WORKING PRESSURE CAST ON THE
BODY AND CAST OR STAMPED ON THE BONNET, OR SHALL BE PROVIDED
WITH OTHER MEANS OF EASY IDENTIFICATION.
C. BALL VALVES UP TO 2-1/2 INCHES: BRONZE TWO PIECE BODY, STAINLESS
STEEL FULL PORT BALL, TEFLON SEATS AND STUFFING BOX RING, LEVER
HANDLE SOLDER ENDS.
D. ALL VALVES 2 INCHES IN DIAMETER AND SMALLER SHALL BE ALL BRONZE
WITH BRONZE BODIES. VALVES 2-1/2 INCHES IN DIAMETER AND LARGER
SHALL HAVE IRON BODIES WITH BRONZE MOUNTINGS UNLESS OTHERWISE
SPECIFIED.
E. ALL VALVES AND SPECIALTIES SHALL BE SO PLACED AS TO PERMIT EASY
OPERATION AND ACCESS.
F. ALL VALVES UP TO 2 INCHES IN DIAMETER SHALL HAVE SWEAT OR SCREW
ENDS, 2-1/2" IN DIAMETER AND OVER SHALL HAVE FLANGED ENDS.
3.3 PIPING SYSTEMS INSTALLATION
A. DIELECTRIC FITTINGS MUST BE USED AT JOINTS CONNECTING DISSIMILAR
METAL PIPE OR VALVE MATERIALS.
B. ROUTE PIPING IN ORDERLY MANNER, PLUMB AND PARALLEL TO BUILDING
STRUCTURE, AND MAINTAIN SPECIFIED GRADIENTS.
C. ALL VALVES AND SPECIALTIES SHALL BE SO PLACED AS TO PERMIT EASY
OPERATION AND ACCESS.
D. PROVIDE VALVES IN ALL APPARATUS; SO LOCATED, ARRANGED AND
OPERATED AS TO GIVE COMPLETE SHUTOFF.
E. PREPARE PIPING CONNECTIONS TO EQUIPMENT WITH FLANGES OR UNIONS.
F. PROVIDE CLEARANCE FOR ACCESS TO VALVES AND FITTINGS.
G. INSTALL VALVES WITH STEMS UPRIGHT OR HORIZONTAL, NOT INVERTED.
3.4 PIPING SYSTEMS HANGERS, ANCHORS AND SUPPORTS
A. ATTACHMENTS FOR PIPING 2" AND SMALLER WITH LOADS ONLY UP TO 250
LBS. IS TO BE ACCOMPLISHED BY DRILLED-IN EXPANSION SHIELD TYPE
ANCHORS.
B. BUILDING FIRE PROOFING SHALL BE RESTORED WHERE DISTURBED
C. WHERE PIPING IS RUN NEAR THE FLOOR AND NOT HUNG FROM THE CEILING
CONSTRUCTION, BUT IS SUPPORTED FROM THE FLOOR OR IN A TRENCH,
SUCH SUPPORTS SHALL BE OF PIPE STANDARDS WITH BASE FLANGE AND
ADJUSTABLE TOP YOKE.
4.0 IDENTIFICATION
A. PROVIDE IDENTIFICATION OF PIPING USING SPRAY PAINT AND TEMPLATES
OR WITH PLASTIC STRAP ON MARKERS AS MANUFACTURED BY SETON NAME
PLATE COMPANY. COLORS AND LETTERING SHALL MATCH EXISTING.
PIPING SHALL BE LABELED A MINIMUM OF EVERY 30 FEET AND WHERE
PIPING PASSES THROUGH WALLS.
B. ALL EQUIPMENT MUST HAVE THE MANUFACTURER'S NAMEPLATE VISIBLE
AND SHALL NOT BE PAINTED OVER, INSULATED OR LOCATED WHERE
DIFFICULT TO VIEW.
5.0 TESTING AND BALANCING
A. SUBCONTRACT WITH AN INDEPENDENT AGENCY FOR THE TESTING,
ADJUSTMENT, AND BALANCING OF THE AIR SYSTEM. AGENCY SHALL BE
COMPANY SPECIALIZING IN THE ADJUSTING AND BALANCING OF SYSTEMS
SPECIFIED IN THIS SECTION WITH MINIMUM 5 YEARS EXPERIENCE,
CERTIFIED BY AABC. PERFORM WORK UNDER SUPERVISION OF REGISTERED
PROFESSIONAL ENGINEER. TOTAL SYSTEM BALANCE SHALL BE PERFORMED
IN ACCORDANCE WITH AABC NATIONAL STANDARDS FOR FIELD
MEASUREMENT AND INSTRUMENTATION, TOTAL SYSTEM BALANCE.
B. ADJUST FLOW TO WITHIN 10 PERCENT OF DESIGN REQUIREMENTS.
PREPARE AND SUBMIT A BALANCING REPORT. INCLUDE DESIGN VALUES
FOR THE SAME. REPORT TO INCLUDE ACTUAL ELECTRICAL
CHARACTERISTICS OF EACH PIECE OF EQUIPMENT TO BE BALANCED (RPM,
AMPS, BHP, ETC.) AS WELL AS ELECTRICAL NAMEPLATE
CHARACTERISTICS.
C. SEQUENCE WORK TO COMMENCE AFTER COMPLETION OF SYSTEMS AND
SCHEDULE COMPLETION OF WORK BEFORE SUBSTANTIAL COMPLETION OF
PROJECT. BEFORE COMMENCING WORK, VERIFY THAT SYSTEMS ARE
COMPLETE AND OPERABLE. ENSURE THE EQUIPMENT IS OPERABLE AND IN A
SAFE AND NORMAL CONDITION, THE TEMPERATURE CONTROL SYSTEMS ARE
INSTALLED COMPLETE AND OPERABLE AND PROPER THERMAL OVERLOAD
PROTECTION IS IN PLACE FOR ELECTRICAL EQUIPMENT. BEGINNING OF
WORK MEANS ACCEPTANCE OF EXISTING CONDITIONS.
D. REPORT ANY DEFECTS OR DEFICIENCIES NOTED DURING PERFORMANCE OF
SERVICES TO ENGINEER. PROMPTLY REPORT ABNORMAL CONDITIONS IN
MECHANICAL SYSTEMS OR CONDITIONS WHICH PREVENT SYSTEM BALANCE.
E. PERMANENTLY MARK SETTINGS OF DAMPERS AND OTHER ADJUSTMENT
DEVICES ALLOWING SETTINGS TO BE RESTORED. SET AND LOCK MEMORY
STOPS. AFTER ADJUSTMENT, TAKE MEASUREMENTS TO VERIFY BALANCE
HAS NOT BEEN DISRUPTED OR THAT SUCH DISRUPTION HAS BEEN
RECTIFIED.
F. LEAVE SYSTEMS IN PROPER WORKING ORDER, CLOSING DOORS TO
ELECTRICAL SWITCH BOXES, AND RESTORING THERMOSTATS TO SPECIFIED
SETTINGS.
NEW WORK
OR S.F.
DRAWING NOTE
A
GENERAL DRAWING ABBREVIATIONS & SYMBOLS
W/ WITH W/O WITHOUT
TYP TYPICAL NIC NOT IN CONTRACT
AD ACCESS DOOR
AFF ABOVE FINISH FLOOR
DWG DRAWING
DN DOWN
VIF VERIFY IN FIELD
C/L CENTER LINE
UON UNLESS OTHERWISE NOTEDN NEW
SQFT SQUARE FOOTD…
This is the start of the file's text. The full file is on GovTribe.