26ROB0205 Proposal.pdf

PDF 408 KB Posted

Attached to
Release Competitive Sealed Bidding IL|24-416CMS-BOPM4-P-56652
Contract number
24-416CMS-BOPM4-P-56652
Issued by
Illinois

About this file

This document is a proposal and service agreement from Unified Power for a Block Heater Replacement project at Robinson Correctional Facility, located at 13423 E 1150th Ave, Robinson, IL 62454. The proposal is issued by Unified Power, headquartered in Terrell, TX, and is specifically addressed to Aaron Spencer, with contact information provided.

The proposal details labor and equipment replacement for two generators on-site, with a total project cost of $2,623.62. Specific line items include: 9 hours of labor at $237.00 per hour (totaling $2,133.00), 2 block heaters at $105.21 each (totaling $210.42), and 1 heater hose at $230.20, plus $50.00 for ground shipping. The project has a two-week lead time and includes applicable taxes of $30.87, bringing the final total to $2,654.29. The work involves replacing block heaters on generators during normal business hours at the correctional facility.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .