26ROB0204 Proposal.pdf
PDF 405 KB Posted
- Contract number
- 24-416CMS-BOPM4-P-56652
- Issued by
- Illinois
About this file
This document is a Unified Power proposal for a coolant flush service at the Robinson Correctional Facility, located at 13423 E 115th Ave, Robinson, IL 62454. The proposal is issued by Unified Power, a company based in Terrell, TX, and is specifically addressed to the Robinson Correctional Facility as both the invoiced entity and end user.
The proposal details a service to perform a coolant flush on all 4 generators on-site, with labor charged at $237.00 per hour (12 hours total), and includes 40 units of coolant at $10.33 per unit, totaling $413.20. An additional charge of $137.36 is included for a 55-gallon empty drum for waste removal. The total site service cost is $3,394.56, with tax bringing the final total to $3,428.98. The proposal is dated 3/18/2025 and carries a proposal number of 181839, with the service to be performed during normal business hours.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .