26DIX0836 DIX Required Hood Work.pdf

PDF 64 KB Posted

Attached to
Open Market Small Purchase IL|27-426DOC-DIXON-P-98701
Contract number
27-426DOC-DIXON-P-98701
Issued by
Illinois

About this file

Dixon Correctional Center Required Kitchen Hood Work - Scope of Work Summary

This document is a scope of work for maintenance services at Dixon Correctional Center, a state correctional facility. The work involves three Ansul fire suppression systems installed in the facility's kitchen hood infrastructure, specifically serving the North Production Hood (15-gallon system), Culinary Hood (6-gallon system), and South Production Hood (3-gallon system).

The scope of work encompasses full 12-year hydrostatic testing and maintenance on all three Ansul systems, which are overdue for this required service cycle as they were last tested in 2014. The work includes removal, hydrostatic testing, and reinstallation of system tanks; replacement of cartridges, O-rings, and burst discs; replacement of eighteen aluminum link holders with stainless steel UL-listed components; replacement of four clogged duct nozzles; reconfiguration of griddle nozzle drops; installation of bursting disc union assemblies on the System #1 manifolded tank sets; and full system reassembly, testing, and commissioning. Upon completion, all systems must be verified to operate in accordance with manufacturer specifications, UL 300 requirements, and applicable NFPA standards.

View the file

Other files

File Type Posted
IL Standard-Terms-and-Conditions v23.2~2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dixon Correctional Center Required Kitchen Hood Work

System Details:

System #1: Ansul 15-Gallon – North Production Hood

System #2: Ansul 6-Gallon – Culinary Hood

System #3: Ansul 3-Gallon – South Production Hood

Services:

Perform full 12-year hydrostatic testing and maintenance on all three (3) Ansul systems. All Ansul systems are due for their 12-year hydrostatic test & maintenance. Last hydro tested in 2014.

Scope of work includes:

- Removal, hydrostatic testing, and reinstallation of system tanks

- Replacement of required cartridges, O-rings, and burst discs

- Replacement of all eighteen (18) aluminum link holders with stainless steel UL-listed components

- Replacement of four (4) clogged duct nozzles

- Reconfiguration of griddle nozzle drops to ensure proper appliance coverage

- Installation of bursting disc union assemblies on manifolded tank sets for System #1

- Full system reassembly, testing, and commissioning upon completion

Upon completion, all systems must be returned to service and verified to be operating in accordance with manufacturer specifications, UL 300 requirements, and applicable NFPA standards.