26379_RFP_Addendum1_1.pdf
PDF 4 MB Posted
- Solicitation number
- RFP 171 260000002510 2
- Issued by
- Michigan
About this file
This is a Request for Proposal Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget (DTMB), State Facilities Administration Design and Construction Division for the Handlon Correctional Facility Equipment Operator Vocational Program project (File Number 472/26379.SMD). The addendum extends the proposal due date to September 24, 2026, and includes a Pre-Proposal Meeting Attendance Record. The project is managed by Project Director Scott DeKorte and distributed through the SIGMA Vendor VSS system.
The addendum addresses proposer questions regarding cost inclusions for the project scope. Proposals must include reimbursable costs for ground penetrating radar services to clear soil boring areas prior to soil borings. Additionally, proposals shall include reimbursable costs for material testing services, specifically soil compaction testing and concrete testing for the slab for shed, slab for semi parking, and sidewalks. The addendum was approved on September 15, 2026, and incorporates these clarifications and cost requirements into the original Request for Proposal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LEIN Request 26379.pdf | ||
| 26379_RFP_Project Statement.pdf | ||
| 26379_RFP_Billable Rate.pdf | ||
| 26379_Overall Site Layouts.docx | DOCX document | |
| ME26PAU-26-p-tier-compact-excavator.pdf | ||
| SAMPLE Billable Rate Contract (Rev 04-25).pdf | ||
| Forklift Specs.pdf | ||
| 325 specs.pdf | ||
| Pup_Trailer_Details.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 2/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL
ADDENDUM NO. 1
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.
Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO:
ALL PROPOSERS / SOM SIGMA
DATE ISSUED
09.15.2026
PROJECT NAME
Handlon CF - Equipment Operator Vocational Program
FILE NUMBER
472/26379.SMD
PROJECT DIRECTOR
Scott DeKorte
PROPOSAL DUE
DATE: 09.24.2026
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
1. Proposal due date extended to: 09.24.2026
2. Pre-Proposal Meeting Attendance Record. Refer to image below.
Proposer questions / DTMB answers:
1. For the soil borings, shall a cost be included for ground penetrating radar to clear the soil boring area? Yes. Proposal shall include a reimbursable cost for the ground penetrating radar.
2. Should we include a cost for material testing for compaction and concrete testing (slab for shed, slab for semi parking, and sidewalks)? Yes. Proposal shall include a reimbursable cost for soil compaction and concrete testing.
http://www.buy4michigan.com/
APPROVED BY:
Scott DeKorte
PROJECT DIRECTOR DATE 09.15.2026
File details come from the government source that posted it. Updated .