2609-087 RFP CMAR Frisco Fire Station No. 11.pdf

PDF 1018 KB Posted

Attached to
CMAR for Frisco Fire Station No. 11
Solicitation number
2609-087
Issued by
Collin County, Garland City, Texas

About this file

This is a Request for Proposal (RFP) issued by the City of Frisco, Texas for Construction Manager at Risk (CMAR) services for Frisco Fire Station No. 11. The City seeks qualified construction management firms to provide pre-construction and construction services for a new fire station project. The facility will be approximately 10,000 to 10,500 square feet, single-story building located off Lebanon Road and Hunters Creek Trail in Frisco, Texas. Program elements include dormitory capacity for eight firefighters, dayroom, kitchen/dining, storm shelter, two drive-through apparatus bays approximately 78 feet deep, fueling station with canopy, and parking for staff and public. The project architect is Komatsu Architecture/Parkhill. Pre-construction services are anticipated to commence immediately following contract award in December 2026. The deadline for submitting questions is October 8, 2026 at 4:00 PM Central Time, with RFP responses due October 15, 2026 at 2:00 PM Central Time. Interviews may be conducted in late October or early November 2026. Proposals must be submitted as original hard copies plus digital copies on CD or flash drive, or through the Bonfire portal.

The total estimated construction budget for this project shall not exceed $9,000,000. Proposers must provide pre-construction services fees, a general conditions not-to-exceed dollar amount or per-month cost, construction phase services fees, performance and payment bond costs, and liability insurance premiums. The City will enter into a fixed-sum contract with the selected CMAR, with a guaranteed maximum price likely required at the 60 to 70 percent construction document phase. Selection will be based on experience of the proposer (35 points), proposed personnel and management team (25 points), financial strength (10 points), and compensation structure (30 points). Proposers must submit audited financial statements, proof of bonding ability, resumes for proposed personnel, and references from comparable CMAR fire station projects. The City reserves the right to reject any or all proposals and to award the contract without interviews. AIA Document A133-2019 will serve as the Owner/Contractor Agreement, and a payment and performance bond for 100 percent of the construction budget is required within ten days of contract execution.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF FRISCO REQUEST FOR PROPOSAL NO. 2609-087

CONSTRUCTION MANAGER AT RISK

FOR FRISCO FIRE STATION NO. 11

PROPOSALS ARE DUE TO THE OFFICE OF

THE PURCHASING MANAGER PRIOR TO:

October 15, 2026

@ 2:00PM CT

NO LATE SUBMITTALS WILL BE ACCEPTED.

VIRTUAL BID OPENING

Microsoft Teams meeting Join:

https://teams.microsoft.com/meet/27 3304303970042?p=iJsINJRrSwBFqQAv yW Meeting ID: 273 304 303 970 042 Passcode: K8GJ23o7 Dial in by phone +1 469-445-0737,,970127321# United States, Dallas

(877) 366-1298,,970127321# United States (Toll-free) Phone conference ID: 970 127 321#

Questions are to be sent to purchasing@friscotexas.gov prior to:

October 8, 2026 @ 4:00PM CT

Proposals must be supplied on CD or flash drive along with an original or submitted electronically via Bonfire, https://friscotexas.bonfirehub.com.

For CD/flash drive and hard copy submittals, deliver or mail to:

CITY OF FRISCO

STEVE CONE

PURCHASING MANAGER

6101 FRISCO SQUARE BLVD

FRISCO, TX 75034

For additional information concerning this RFP please contact:

Steve Cone, NIGP-CPP, CPPB Purchasing Manager scone@friscotexas.gov 972 292 5542

Daniel Ford Director of Administrative Services dford@friscotexas.gov 972 292 5545 https://teams.microsoft.com/meet/273304303970042?p=iJsINJRrSwBFqQAvyW https://teams.microsoft.com/meet/273304303970042?p=iJsINJRrSwBFqQAvyW https://teams.microsoft.com/meet/273304303970042?p=iJsINJRrSwBFqQAvyW tel:+14694450737,,970127321 tel:8773661298,,970127321 mailto:purchasing@friscotexas.gov https://friscotexas.bonfirehub.com/portal mailto:scone@friscotexas.gov mailto:dford@friscotexas.gov

REQUEST FOR PROPOSAL 2609-087

CONSTRUCTION MANAGER AT RISK FOR FRISCO FIRE STATION

NO. 11

PROPOSER MUST SUBMIT ORIGINAL PROPOSAL PLUS DIGITAL COPY ON CD OR

FLASHDRIVE TO FACILITATE EVALUATION UNLESS SUBMITTING ELECTRONICALLY

THROUGH BONFIRE.

It is the policy of the City to involve small businesses and qualified minority/woman owned businesses to the greatest extent possible in the procurement of goods, equipment, services, and construction projects.

The solicitation documents are available through Bonfire and vendors may register at https://friscotexas.bonfirehub.com/portal. Note that proposals must be received on Bonfire by the due date and time in order to be considered. Any proposal that is not received on time will not be considered. Submitting proposals via the Bonfire website is not mandatory, hard copy and cd/flash drive submittal in accordance with these solicitation specifications will also be accepted. Proposal submissions and registration are free of charge, for more information on being a vendor visit the vendor portal at the link provided above.

PROPOSALS MUST BE RECEIVED ON OCTOBER 15, 2026, BY 2:00 PM CENTRAL TIME

(CT) BY THE PURCHASING MANAGER. NO PROPOSAL WILL BE ACCEPTED AFTER THAT

DATE AND TIME. ALL PROPOSALS RECEIVED AFTER THIS DATE AND TIME WILL BE

CONSIDERED NON-RESPONSIVE.

Proposals will be publicly opened and read aloud at the Frisco City Hall located at 6101 Frisco Square Blvd., Frisco, Texas 75034 Room C116 on October 15, 2026, at 2:05 PM CT or online via Microsoft Teams.

Write the request for proposal number, 2609-087, name of bid, CONSTRUCTION MANAGER AT RISK FOR FRISCO FIRE STATION NO. 11, and the name of your organization on the outer envelope.

Proposals are to be submitted in accordance with the attached City specifications and the “General Conditions of Bidding” attached hereto. Each proposer is required to fill in every blank;

failure to do so may be used as a basis for rejection of a bid. The City reserves the right to reject any or all bids, to waive formalities, or to proceed otherwise when in the best interest of the City.

The City will have the right and option to terminate the contract upon thirty (30) days written notice.

The successful proposer may be required to execute a written contract.

https://friscotexas.bonfirehub.com/portal

GENERAL CONDITIONS OF PROPOSER

1. INSTRUCTIONS: These instructions apply to all proposals and become a part of the terms and conditions of any proposal submitted and any agreement entered into subsequent thereto, unless exception is taken in writing by proposer when submitting proposal.

PROPOSALS

2. FORM: Proposer must submit original hard copy and a digital copy on CD or Flashdrive of the sealed Proposal/written quote/proposal or submit electronically via bonfire to the Director of Administrative Services prior to response due date/time. Failure to submit the additional copies may result in the Proposal being declared non responsive to specification and may not be further evaluated.

3. PRICING: Price(s) quoted must be held firm for a minimum of ninety (90) days from the date of Proposal closing. In the case of estimated requirement contract Proposal, the prices must remain firm for the period as specified in the Proposal. “Discount from list” Proposals are not acceptable unless specifically requested in the Proposal.

4. QUANTITIES: In the case of estimated requirements contract Proposal, quantities appearing are estimated as realistically as possible. However, the City reserves the right to increase, decrease or delete any item or items of material to be furnished while continuing to pay the price quoted on this Proposal regardless of quantity. The successful Proposer shall have no claim against the City for anticipated profits for the quantities called for, diminished, or deleted.

5. ERROR-QUANTITY: Proposals must be submitted on units of quantity specified, extended, and show total. In the event of discrepancies in extension, the unit prices shall govern.

6. F F.O.B./DAMAGE: Quotations shall be proposed F.O.B. delivered to the designated

Municipal Facility, Frisco, Texas and shall include all delivery and packaging costs. The City assumes no liability for goods delivered in damaged or unacceptable condition. The successful Proposer shall handle all claims with carriers, and in case of damaged goods, shall ship replacement goods immediately upon notification by the City.

7. DELIVERY PROMISE-PENALTIES: Proposals MUST show the number of calendar days required to place the material in the possession of the City. Do not quote shipping dates.

When delivery delay can be foreseen, the Proposer shall give prior written notice to the City, who shall have the right, in its sole discretion, to extend the delivery date if reasons for delay appear acceptable. Default in promised delivery, without acceptable reasons, or failure to meet specifications, authorizes the City to purchase the goods elsewhere, and charge any increase in cost and handling to the defaulting Proposer.

8. PROPOSER SHALL PROVIDE: With this Proposal response, the Proposer shall provide all documentation required. Failure to provide this information may result in rejection of Proposal

9. ALTERING/WITHDRAWAL OF PROPOSALS: Proposals cannot be altered or amended after submission deadline. The signer of the Proposal, guaranteeing authenticity, must initial any interlineations alteration, or erasure made before opening time. No Proposal may be withdrawn after opening time without first submitting a written reason to the Director of Administrative Services and obtaining the Director of Administrative Services’ approval.

10. PRESENTATION OF PROPOSALS: No oral, telegraphic, telephonic, e-mailed, or facsimile Proposals will be considered at this time. All Proposals must be submitted in a sealed envelope.

11. CORRESPONDENCE: This Proposal number must appear on ALL correspondence, inquiries, Proposal submittal documents, etc. pertaining to this Invitation for Proposal.

12. ADDENDA: Any interpretations, corrections or changes to this Invitation for Proposal and specifications will be made by addenda. Sole issuing authority of addenda shall be vested in the City of Frisco Purchasing Division. An attempt will be made to mail, fax, or e-mail any addenda to all who are known to have received a copy of this Invitation for Proposal.

Proposers shall acknowledge receipt of all addenda in the designated area on the Proposal document. It is the responsibility of the Proposer to ensure receipt of all addenda and to include the changes in this Proposal document.

13. LATE PROPOSALS: Proposals received by the City after submission deadline shall be returned unopened and will be considered void and unacceptable. The City is not responsible for lateness of mail, carrier, etc.

14. PROPOSAL OPENINGS: All Proposals submitted will be read at the City’s regularly scheduled Proposal opening for the designated project. However the reading of a Proposal at Proposal opening should not be construed as a comment on the responsiveness of such Proposal or as any indication that the City accepts such Proposal as responsive.

The City will make a determination as to the responsiveness of Proposals submitted based upon compliance with all applicable laws, City of Frisco Purchasing Guidelines, and project documents, including but not limited to the project specifications and contract documents. The City will notify the successful Proposer upon award of the contract and according to state law; all Proposals received will be available for inspection at that time, unless otherwise provided by law.

15. PROPOSAL TABULATION: Proposers desiring a copy of the proposal tabulation may request it by emailing Purchasing@friscotexas.gov and referencing the request for proposal number. RESULTS WILL NOT BE GIVEN BY TELEPHONE. You can also download a copy through Bonfire or on our website, www.friscotexas.gov. If you have any questions, please contact the City of Frisco, Purchasing Division, at purchasing@friscotexas.gov.

16. PROTESTS: All protests regarding the Proposal solicitation process must be submitted in writing to the City within five (5) working days following the opening of Proposals. This includes all protests relating to advertising of Proposal notices, deadlines, Proposal mailto:Purchasing@friscotexas.gov http://www.friscotexas.gov/ mailto:purchasing@friscotexas.gov opening, and all other related procedures under the Local Government Code, as well as any protests relating to alleged improprieties or ambiguities in the specifications.

This limitation does not include protests relating to staff recommendations as to award of this Proposal. Protests relating to staff recommendations may be directed to the Director of Administrative Services within five (5) days of the staff recommendation memo. Unless otherwise provided by law, all staff recommendations will be made available for public review prior to consideration by the City Council.

17. PROPOSAL AWARD: The City reserves the right to award a separate contract to separate Proposers for each item/group or to award one contract for the entire Proposal.

Unless stipulated in the attached Proposal specifications, the contract will be awarded to the lowest responsible Proposer or to the Proposer who provides the goods or services specified herein at the best value for the City in compliance with Texas Local Government Code, Section 252.043.

18. CHANGE ORDERS: No oral statement of any person shall modify or otherwise change, or affect the terms, conditions or specifications stated in the resulting contract. All change orders to the contract will be made in writing by the City.

PERFORMANCE

19. MINIMUM STANDARDS FOR RESPONSIBLE PROSPECTIVE BIDDERS: A prospective bidder must affirmatively demonstrate bidder's responsibility. A prospective bidder must meet the following requirements:

A. Have adequate financial resources or the ability to obtain such resources as required;

B. Be able to comply with the required or proposed delivery schedule;

C. Have a satisfactory record of performance;

D. Have a satisfactory record of integrity and ethics; and E. Be otherwise qualified and eligible, as determined by the City, to receive an award.

The City may request representation and other information sufficient to determine Proposer's ability to meet these minimum standards listed above.

20. ASSIGNMENT: The successful Proposer shall not sell, assign, transfer or convey this contract in whole or in part, without the prior written consent of the City.

21. SPECIFICATION-SAMPLES: Any catalog, brand name, or manufacturer's reference used is considered to be descriptive, not restrictive, and is indicative of the type and quality the City desires to purchase. Proposals on brands of like nature and quality may be considered unless specifically excluded. If proposing on other than reference, Proposal must certify article offered is equivalent to specifications and it is subject to approval by the using department and the Purchasing Division. Samples, if required, shall be furnished free of expense to the City. SAMPLES SHOULD NOT BE ENCLOSED WITH

PROPOSAL UNLESS REQUESTED.

22. TESTING: An agent so designated, by the City, without expense to the City, may perform testing at the request of the City or any participating entity.

23. PACKAGING: Unless otherwise indicated, items will be new, unused, and in first class condition in containers suitable for damage-free shipment and storage.

24. DELIVERY: Deliveries will be acceptable only during normal working hours at the designated City Municipal Facility. The place of delivery shall be set forth in the purchase order. The terms of this agreement are “no arrival, no sale”.

25. TITLE AND RISK OF LOSS: The title and risk of loss of goods shall not pass to the City until the City actually receives and takes possession of the goods at the point(s) of delivery.

26. PATENT RIGHTS: The Proposer agrees to indemnify and hold the City harmless from any claim involving patent right infringement or copyrights on goods supplied.

PURCHASE ORDERS AND PAYMENT

27. PURCHASE ORDERS: A purchase order(s) shall be generated by the City Director of

Administrative Services to the successful Proposer. The purchase order number must appear on all itemized invoices and packing slips. The City will not be held responsible for any work orders placed and/or performed without a valid current purchase order number. Payment will be made for all services rendered and accepted by the contract administrator for which a valid invoice has been received.

28. PROPOSAL SECURITY/BOND REQUIREMENTS: If required, Proposal security shall be submitted in the same manner as your proposal. Any electronic submittals will require the vendor to provide the original hard copy within three (3) business days of the notification of intent to award. Any Proposal submitted without bond or cashiers/certified check, where required, shall be considered non-responsive and will not be considered for award.

Performance and/or payment bonds, when required, shall be submitted to the City, prior to commencement of any work pursuant to the agreement provisions.

29. FUNDING: The City is a home-rule municipal corporation operated and funded on an

October 1 to September 30 basis, accordingly, the City reserves the right to terminate, without liability to the City, any contract for which funding is not available.

30. TAXES: The City is exempt from Federal Manufacturer's Excise, and State sales taxes.

TAX MUST NOT BE INCLUDED IN PROPOSAL PRICING. Tax exemption certificates will be executed by the City and furnished upon request by the Finance Division.

31. PAYMENT TERMS: Payment terms are Net 30 unless otherwise specified by the City in this document. Prompt payment discounts may be used by the City in determining the lowest responsible Proposer.

32. INVOICES: Invoices must be submitted by the successful Proposer to:

accountspayable@friscotexas.gov

CONTRACT

33. CONTRACT PERIOD/RENEWAL OPTIONS: In the case of an annual contract, the contract shall be for a predetermined period as specified in the Invitation for Proposals. If mailto:accountspayable@friscotexas.gov a clause for option to renew for additional period(s) is (are) included, renewal(s) will be based solely upon the option and written agreement between both the City and the Contractor. Either party dissenting will terminate the contract in accordance with its initial specified term.

34. INTERLOCAL AGREEMENT: Successful bidder agrees to extend prices to all entities that have entered into or will enter into joint purchasing Interlocal Cooperation Agreements with the City. The City is a participating member of the Collin County Governmental Purchasing Forum (the “Forum”). As such, the City has executed Interlocal Agreements, as permitted under Section 791.025 of the Texas Government Code with certain other governmental entities in Collin County authorizing participation in a cooperative purchasing program. The successful bidder may be asked to provide products/services, based upon bid price, to any other participant in the Forum.

35. AUDIT: The City reserves the right to audit the records and performance of successful Proposer during the term of the contract and for three (3) years thereafter.

36. SUCCESSFUL PROPOSER SHALL: Defend, indemnify and save harmless the City and all its officers, Managers and employees and all entities, their officers, Managers and employees who are participating in this contract from all suits, actions or other claims of any character, name and description brought for or on account of any injuries, including death, or damages received or sustained by any person, persons, or property on account of any negligent act or fault of the successful Proposer, or of any Manager, officer, director, representative, employee, subcontractor or supplier in the execution of, or performance under, any contract which may result from Proposal award. Successful Proposer shall pay any judgment with cost which may be obtained against the City and participating entities growing out of such injury or damages.

37. TERMINATION FOR DEFAULT: The City reserves the right to enforce the performance of this contract in any manner prescribed by law or deemed to be in the best interest of the City in the event of breach or default of this contract. The City reserves the right to terminate the contract immediately in the event the successful Proposer fails to: (1) meet delivery schedules; or (2) otherwise performs in accordance with these specifications.

Breach of contract or default authorizes the City to, among other things, award to another Proposer, purchase elsewhere and charge the full increase in cost and handling to the defaulting successful Proposer.

38. ACCEPTABILITY: All articles enumerated in the Proposal shall be subject to inspection by a City officer or employee designated for the purpose. If found inferior to the quality called for, or not equal in value to the specifications, deficient in workmanship or otherwise, this fact shall be certified to the Director of Administrative Services who shall have the right to reject the whole or any part of the same. Work determined to be contrary to specifications must be replaced by the Proposer and at its expense. All disputes concerning quality of supplies utilized in the performance of this Proposal will be determined solely by the City Director of Administrative Services or designated representative.

39. REMEDIES: The successful Proposer and the City agree that each party has all rights, duties, and remedies available as stated in the Uniform Commercial Code and any other available remedy, whether in law or equity.

40. VENUE: This contract will be governed and construed according to the laws of the State of Texas. This contract is performable in Collin County, Texas.

41. SILENCE OF SPECIFICATION: The apparent silence of these specifications as to any detail or to the apparent omission from it of a detailed description concerning any point shall be regarded as meaning that only the best commercial practices are to prevail. All interpretations of these specifications shall be made on the basis of this statement.

42. NO PROHIBITED INTEREST: The Proposer acknowledges and represents they are aware of the laws and City Charter regarding conflicts of interest. The City Charter states in part that "No officer, whether elected or appointed, or any employee, whether full or part time, of the City shall have a substantial financial interest, direct or indirect, in any contract, other than employment contracts, with the City; or have a substantial financial interest, direct or indirect in the sale to the City of any land, materials, supplies or services."

43. FORCE MAJEURE: If, by reason of Force Majeure, either party hereto shall be rendered unable wholly or in part to carry out its obligations under this contract, then such party shall give notice and full particulars of such Force Majeure in writing to the other party within a reasonable time after occurrence of the event or cause relied upon, and the obligation of the party giving such notice, so far as it is affected by such Force Majeure, shall be suspended during the continuance of the inability then claimed, except as hereinafter provided, but for no longer period, and such party shall endeavor to remove or overcome such inability with all reasonable dispatch. The term Force Majeure as employed herein, shall mean acts of God, strikes, lockouts, or other industrial disturbances, act of public enemy, orders of any kind of government of the United States or the State of Texas or any civil or military authority, insurrections, riots, epidemics, landslides, lightning, earthquake, fires, hurricanes, storms, floods, washouts, droughts, arrests, restraint of government and people, civil disturbances, explosions, breakage or accidents to machinery, pipelines, or canals, or other causes not reasonable within the control of the party claiming such inability.

It is understood and agreed that the settlement of strikes and lockouts shall be entirely within the discretion of the party having the difficulty, and that the above requirement that any Force Majeure shall be remedied with all reasonable dispatch shall not require the settlement of strikes and lockouts by acceding to the demands of the opposing party or parties when such settlement is unfavorable in the judgment of the party having the difficulty.

44. DISCLOSURE OF CERTAIN RELATIONSHIPS: Effective January 1, 2006, Chapter 176 of the Texas Local Government Code requires that any vendor or person considering doing business with a local government entity disclose in the Questionnaire Form CIQ, the vendor or person’s affiliation or business relationship that might cause a conflict of interest with a local government entity. By law, this questionnaire must be filed with the records administrator of the City of Frisco not later than the 7th business day after the date the person becomes aware of facts that require the statement to be filed. See Section 176.006, Local Government Code. A person commits an offense if the person violates Section 176.006, Local Government Code. An offense under this section is a Class C misdemeanor. Chapter 176 and the questionnaire may be found at www.friscotexas.gov.

By submitting a response to this request, vendor represents that it is in compliance with the requirements of Chapter 176 of the Texas Local Government Code.

http://www.friscotexas.gov/

By submitting a response to this request, vendor represents that it is in compliance with the requirements of Chapter 176 of the Texas Local Government Code.

45. PREVAILING WAGE RATES: Contractors are required to pay not less than the rates determined using the prevailing wage rate as determined by the United States Department of Labor in accordance with the Davis-Bacon Act (40 U.S.C. Section 276a et seq.), and its subsequent amendments, to a worker employed by it in the execution of a contract for the construction of a public work, including a building, highway, road, excavation, and repair work or other project development or improvement, paid for in whole or in part from public funds, without regard to whether the work is done under public supervision or direction.. Contractors are required to comply with Texas Government Code, Chapter 2258, Prevailing Wage Rates. A worker is employed on a public work if the worker is employed by the contractor or any subcontractor in the execution of the contract for the project.

46. APPLICABLE LAW: Contractor shall comply with all federal, state and Frisco laws, statutes, ordinances, regulations and policies, as they exist, may be amended or in the future arising, applicable to Contractor and its work in or around the Facility. Contractor shall ensure that its officers, employees, agents, contractors and other parties performing services for or on behalf of Contractor comply with all applicable laws, statutes, ordinances, regulations and policies.

47. STORMWATER REQUIREMENTS: Contractor shall implement best management practices (BMPs) to prevent storm water pollution to the maximum extent practicable in accordance with the current City of Frisco Storm water Ordinance (11-11-52). These BMPs include:

• Performing regular inspections and maintenance on vehicles and equipment to prevent fluid leaks.

• Implementing standard operating procedures (SOPs) for spill prevention and cleanup.

• Training and equipping all employees who are present on City property in appropriate actions in accordance with the SOP.

• Implementing proper material handling BMPs for transportation and storage.

• Implementing proper waste disposal BMPs.

48. CERTIFICATE OF INTERESTED PARTIES (FORM 1295): In 2015, the Texas Legislature adopted House Bill 1295, which added section 2252.908 of the Government Code. The law states that a governmental entity or state agency may not enter into certain contracts with a business entity unless the business entity submits a disclosure of interested parties to the governmental entity or state agency at the time the business entity submits the signed contract to the governmental entity or state agency. The law applies only to a contract of a governmental entity or state agency that either (1) requires an action or vote by the governing body of the entity or agency before the contract may be signed or (2) has a value of at least $1 million. The disclosure requirement applies to a contract entered into on or after January 1, 2016.

The Texas Ethics Commission was required to adopt rules necessary to implement that law, prescribe the disclosure of interested parties form, and post a copy of the form on the commission’s website. The commission adopted the Certificate of Interested Parties form.

http://www.legis.state.tx.us/tlodocs/84R/billtext/html/HB01295F.htm

(Form 1295) on October 5, 2015. The commission also adopted new rules (Chapter 46) on November 30, 2015, to implement the law.

Filing Process:

Within ten days of being notified of award of a contract by the City of Frisco, the successful vendor (business entity) must use the Texas Ethics Commission’s web application, https://www.ethics.state.tx.us/File/, to enter the required information on Form 1295 and print a copy of the completed form, which will include a certification of filing that will contain a unique certification number. An authorized agent of the business entity must sign the printed copy of the form and have the form notarized. The completed Form 1295 with the certification of filing must be provided to the City of Frisco Purchasing division (within 10 days of being notified of award of a contract).

The City of Frisco is required to notify the commission, using the commission’s filing application, of the receipt of the filed Form 1295 with the certification of filing not later than the 30th day after the date the contract binds all parties to the contract. The commission will post the completed Form 1295 to its website within seven business days after receiving notice from the governmental entity or state agency.

49. CHAPTER 2270 CERTIFICATION

In accordance with Chapter 2270 of the Texas Government Code, Consultant hereby certifies that Consultant (a) does not boycott Israel; and (b) will not boycott Israel during the term of any contract with City, including during the term of this Agreement.

50. PROPRIETARY DATA - Bidder may, by written request, indicate as confidential any portion(s) of a bid that contain proprietary information, including manufacturing and/or design processes exclusive to the vendor. The City of Frisco will protect from public disclosure such portions of a bid unless directed otherwise by legal authority including the existing Texas Public Information Act.

https://www.ethics.state.tx.us/File/

CITY OF FRISCO CONTRACTOR INSURANCE REQUIREMENTS

Contractors providing good, materials and services for the City of Frisco shall, during the term of the contract with the City or any renewal or extension thereof, provide and maintain the types and amounts of insurance set forth herein. All insurance and certificate(s) of insurance shall contain the following provisions:

1. Name the City, its officers, agents, representatives, and employees as additional insureds as to all applicable coverage with the exception of workers compensation insurance.

2. Provide for at least thirty (30) days prior written notice to the City for cancellation, non-renewal, or material change or modification of any policies, evidenced by return receipt or United States Mail. The words “endeavor to” and “but failure” (to end of sentence) are to be eliminated from the Notice of Cancellation provision on standard ACORD certificates.

3. Provide for a waiver of subrogation against the City for injuries, including death, property damage, or any other loss to the extent the same is covered by the proceeds of insurance.

4. Endorsement applicable to each policy provided.

Insurance Company Qualification: All insurance companies providing the required insurance shall be authorized to transact business in Texas and rated at least “A” by A.M. Best’s Key Rating Guide, or other equivalent rating service(s).

Certificate of insurance: A certificate of insurance evidencing the required insurance shall be submitted after award. If the contract is renewed or extended by the City, a certificate of insurance shall also be provided to the City prior to the date the contract is renewed or extended.

Type of Contract Type and amount of Insurance

Special Events General Liability insurance for personal injury

(including death) and property damage with a minimum of $1 Million Dollars per occurrence and $2 Million Dollars aggregate, including coverage for advertising injury and products coverage

Statutory Workers compensation insurance as required by state law

(If the contractor serves alcoholic beverages) Liquor Liability with a minimum of $1 Million Dollars per Occurrence and $2 Million Aggregate.

(If high risk or dangerous activities) Umbrella Coverage or Liability Excess Coverage of $ 2 Million Dollars

(If automobile or limousine service is involved even if volunteers)

Automobile Liability with a minimum of $1 Million Dollars combined single limit.

Public Works and Construction General Liability insurance for personal injury

(including death) and property damage with a minimum of $2 Million Dollars per occurrence and $4 Million Dollars aggregate, including advertising injury, products coverage and (XCU) Explosion, collapse and underground (If high risk or dangerous activities) Umbrella Coverage or Excess Liability Coverage of $4 Million Dollars

Statutory Workers compensation insurance as required by state law

Professional Services Professional Liability Insurance with a minimum of

$1 Million Dollars per occurrence and $2 Million Dollars aggregate.

(If size or scope of project warrant) Umbrella Coverage or Excess Liability Coverage of $2 Million Dollars

Statutory Workers compensation insurance as required by state law

SAMPLE ON FOLLOWING PAGE

Supplemental Information

Texas Government Code Section 2252.002 Non-resident Bidders A governmental entity may not award a governmental contract to a nonresident bidder unless the nonresident underbids the lowest bid submitted by a responsible resident bidder by an amount that is not less than the amount by which a resident bidder would be required to underbid the nonresident bidder to obtain a comparable contract in the state in which the nonresident’s principal place of business is located.

In order to make this determination, please answer the following questions:

1. Address and phone number of your principal place of business:

2. Name and address of principal place of business, and phone number of your company's majority owner:

3. Name and address of principal place of business, and phone number of your company's ultimate parent company:

MINORITY/WOMAN-OWNED BUSINESS PARTICIPATION

It is the policy of the City of Frisco to involve small businesses and qualified minority/women-owned businesses to the greatest extent possible in the procurement of goods, equipment, services and construction projects. To assist us in our record keeping, please list below the names of the minority or woman-owned firms you would be utilizing in this bid, and note the monetary involvement:

NAME OF FIRM TELEPHONE # $ INVOLVEMENT

SUPPLEMENTAL INFORMATION

Please provide the following information for contract development.

Is your firm?

1. Sole Proprietorship YES NO

2. Partnership YES NO

3. Corporation YES NO

If company is a sole proprietorship, list the owner's full legal name:

If company is a partnership, list the partner's full legal name(s):

If company is a corporation, list the full legal name as listed on the corporate charter:

Is this firm a minority, or woman-owned business enterprise?

NO YES If yes, specify ( ) MBE ( ) WBE

Has this firm been certified as a minority/woman-owned business enterprise by any governmental agency? NO YES

If yes, specify governmental agency:

Date of certification:

Authorized Signatory (Officer or representative vested with the powers to commit the organization to a binding agreement):

Name: ____________________________ Title: ____________________________

AFFIDAVIT OF NO PROHIBITED INTEREST

THE STATE OF _____________ §

THE COUNTY OF ___________ §

I, __________________, a member of the Contractor team, make this affidavit and hereby under oath state the following:

I, and/or a person or persons related to me, have the following interest in a business entity that would be affected by the work or decision on the Project (Check all that apply):

Ownership of ten percent (10%) or more of the voting shares of the business entity.

Ownership of Twenty Five Thousand and 00/100 Dollars ($25,000) or more of the fair market value of the business entity.

Funds received from the business entity exceed ten percent (10%) of my income for the previous year.

Real property is involved, and I have an equitable or legal ownership with a fair market value of at least Twenty Five Thousand and 00/100 Dollars

($25,000).

A relative of mine has a substantial interest in the business entity or property that would be affected by my business decision of the public body which I am a member.

Other:

None of the Above.

Upon filing this affidavit with the City of Frisco, Texas, I further affirm that no relative of mine, in the first degree by consanguinity or affinity, as defined in Chapter 573, TEX. GOV’T CODE, as amended, is a member of a public body which took action on the agreement.

Signed this __ day of ______________, __________.

Signature of Official/Title

BEFORE ME, the undersigned authority, this day personally appeared _____________________, and on oath stated that the facts hereinabove stated are true to the best of his/her knowledge or belief.

Sworn to and subscribed before me on this day of ___________, 2026.

Notary Public in and for the State of _____________

My commission expires: ______________________

Contract Risk Assessment Questionnaire Required Submittals

1. Has your business/company/organization filed for bankruptcy within the last five (5) years?

Yes No If so, please enclose details.

2. Has your business/company/organization ever had a contract for the general type of services/product sought by the City terminated for non-compliance or inadequate performance?

Yes No If yes, please enclose details.

3. Has your business/company/organization ever defaulted on a contract for the general type of services/product being sought by the City?

4. In the last five (5) years has there been or is there now pending any litigation, arbitration, governmental proceeding or regulatory proceeding involving claims in excess of $100,000 with respect to the performance of any services or the provision of any product by your business/company/organization?

5. Has your business/company/organization fulfilled all of its obligations relating to the payment of City taxes, fees, or other obligations if applicable?

Yes No If no, please enclose details.

6. In the last five (5) years, has your business/company/organization, been or currently involved in any action, audit or investigation brought by any federal government agency or authority or by any state or local governmental agency?

7. In the last five (5) years, has your business/company/organization been debarred or suspended for any reason by any federal, state or local government or has refrained from bidding on a project due to an agreement with such governmental agency?

Yes No If yes, please attach a full explanation.

8. In the past five (5) years, has your business/company/organization had its surety called upon to complete any contract, whether government or private sector?

9. In the past five (5) years, has your business/company/organization had a revocation, suspension or disbarment of any business or professional permit and/or license?

10. Has your firm or any of its owners, officers or partners ever been convicted of a federal or state crime of fraud, theft, or any other act of dishonesty?

Yes No If “yes,” identify on a separate signed page the person or persons convicted, the court (the City if a state court, the district or location of the federal court), the year and the criminal conduct.

11. In accordance with Chapter 2270 of the Texas Government Code, do you certify that your business/company/organization (a) does not boycott Israel; and (b) will not boycott Israel during the term of any contract with City?

Yes No

12. In accordance with Chapter 809 of the Texas Government Code, do you certify that your business/company/organization (a) does not boycott energy companies; and

(b) will not boycott energy companies during the term of any contract with City?

Yes No

13. In accordance with Chapter 2274 of the Texas Government Code, do you certify that your business/company/organization does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (b) will not discriminate against a firearm entity or firearm trade association during the term of any contract with the City? Yes No

Signature

THE UNDERSIGNED HEREBY CERTIFIES THAT THE RESPONSES PROVIDED ARE

CORRECT AND TRUTHFUL TO THE BEST OF MY KNOWLEDGE AND FOR THOSE

RESPONSES GIVEN WHICH ARE BASED ON INFORMATION AND BELIEF, THOSE

RESPONSES ARE TRUE AND CORRECT BASED ON MY PRESENT BELIEF AND

INFORMATION. THE UNDERSIGNED HEREBY AGREES ON BEHALF OF HIS/HER

BUSINESS/COMPANY/ORGANIZATION THAT THE CERTIFICATIONS SET FORTH IN

SECTIONS 11-13 ABOVE SHALL BE INCORPORATED INTO ANY CONTRACT WITH THE

CITY.

Dated this ______ day of __________________ , 2026.

Name of organization: _____________________________________________

Signature: _______________________________________________________

Printed name and title: _____________________________________________

PROPOSERS REMINDER LIST:

REQUESTED DOCUMENTATION INCLUDED?

ORIGINAL PLUS DIGITAL COPY INCLUDED, UNLESS SUBMITTING THROUGH BONFIRE?

ALL BLANKS COMPLETED ON THIS FORM?

COMPLETED COMPANY PROFILE/REFERENCES?

COMPLETED SIGNATURES?

Schedule of Events

Public Notification/Advertisement September 18, 2026

September 25, 2026

Deadline for Submitting Questions October 8, 2026 4:00PM CT

RFP Responses Due October 15, 2026 2:00PM CT

Questions concerning this RFP are due in writing via e-mail to purchasing@friscotexas.gov before the deadline for submitting questions stated above.

mailto:purchasing@friscotexas.gov

REQUEST FOR PROPOSALS 2609-087

CONSTRUCTION MANAGER AT RISK FOR FRISCO FIRE

STATION NO. 11

INTRODUCTION

The City of Frisco is seeking proposals from qualified construction management firms. This Request for Proposal (“RFP”) is a one-step process. Services to be provided include customary Construction Manager at Risk (“CMAR”) services, to include pre-construction services, for Frisco Fire Station No. 11.

This project includes an approximately 10,000 – 10,500 square foot single-story building. The program elements include dormitory capacity for eight firefighters, dayroom, kitchen/dining, storm shelter, two drive-through apparatus bays (~78’ deep), and a fueling station with canopy. Parking spaces for the staff and the public will be designed similar to Station No. 9, which is a non-voting site.

The total estimated construction budget for this project is not to exceed $9,000,000.

PROJECT DESCRIPTION

Site

Fire Station No. 11 will be located off Lebanon Rd and Hunters Creek Trail, Frisco, TX 75036.

The fire station will be approximately 10,000 SF to 10,500 SF, single-story, building. The dormitory capacity is 8 persons (1 Officer and 7 firefighters); dayroom, kitchen and dining, a storm shelter, 2 drive-through apparatus bays (~78’ deep), and a fueling station with canopy.

Parking spaces for the staff and the public will be designed, similar to Station #9, which is a non-voting site.

The architect for the project is:

Komatsu Architecture/Parkhill Ryan Brantley, AIA 3880 Hulen Street, Suite 300 Fort Worth, TX 76107

One CMAR will be selected for the project to provide both pre-construction and construction services. Pre-construction services will be required immediately following award of a contract; this is currently anticipated for December 2026.

The City reserves the right to waive any informality and to reject any or all proposals. When the City selects a proposer, the City may discuss with the selected proposer options for cost reduction or other negotiations. If the City is unable to reach a contract with the selected proposer, the City will terminate further discussions and proceed to the next proposer in the order of the selection ranking until a contract agreement is reached or all proposals are rejected.

Proposals are to include the information requested in the Response Section below in the sequence and format prescribed. In addition to and separate from the requested information, supplementary materials may be provided to further delineate a proposal. However, any such supplemental information must be behind all required information.

Project Schedule

Proposal Questions Deadline October 8, 2026 4:00pm CT

RFP Submission Due Date October 15, 2026 2:00pm CT

CMAR Interviews (if necessary) Late October/ Eary November 2026

All firms shortlisted by the review committee will be notified with a time for their participation in the CMAR Interviews. The City reserves the right to award the RFP without interviewing any respondents.

The Review Committee may be made up of representatives from the City of Frisco and the Architect.

REQUEST FOR PROPOSALS RESPONSE

Please provide all the following information in the sequence and format prescribed by this response section. Supplemental materials providing additional information may be attached, if limited to ten (10) pages and at the back of the submittal package. The information requested below is to be provided in this format.

1. Firm Information

A. General Information:

• Name of Firm

• Address of Principal Office

• Phone

• Fax

• Primary Individual to Contact to include Contact Information (include email)

• Form of Business Organization (Corporation, Partnership and type, Individual, Joint

Venture, Other)

• Year Founded

• State of Organization

• Number of years the organization has been in business in construction in its current capacity.

B. Experience

• List the firm’s major projects that have been completed over the last five years in the construction of projects of comparable size and complexity under the CM at Risk (“CMAR”) method. Emphasis should be placed on Fire Stations under the CMAR process. For each project, provide the name, nature of the project/function of the building, size (SF), location, cost, substantial completion date, owner, and architect.

Also provide contact information for the architect and owner for each listed project.

• List the major construction projects your organization has in progress, giving the name and location of project, owner, architect, contract amount, percent complete and scheduled completion date. Also provide contact information for the architect and owner for each listed project.

• Identify all projects listed above that included your organization providing pre-construction services.

• Describe your organization’s concepts for working in a team relationship with the Owner and Architect during the design and construction of major projects. Which (one or more) of your projects listed above best exemplify these concepts and experience?

• It is anticipated that cost estimating will be critical at multiple points in the design process. Describe your organization’s methods for estimating costs, and for scheduling, during the design/document’s phases. Include information on any special software tools your organization utilizes to complete cost estimating and ease of estimating based on changes to program elements within a facility. The guaranteed maximum price will likely be required at the 60-70% construction document phase. Please explain any possible issues with meeting these requirements.

C. Financial

• Attach an audited financial statement including your organization’s latest balance sheet and income statements showing the following items:

a. Current assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory, and prepaid expenses.)

b. Noncurrent assets (e.g., net fixed assets, other assets).

c. Current liabilities (e.g., accounts payable, notes payable (current), accrued expenses, provision for income taxes, advances, accrued salaries and accrued payroll taxes).

d. Noncurrent liabilities (e.g., notes payable).

e. Capital accounts and retained earnings (e.g., capital, capital stock, authorized and outstanding shares par value, earned surplus and retained earnings).

• Please provide the Current Ratio (Current Assets/Current Liabilities), New Working

Capital (Current Assets – Current Liabilities), and Debt to Equity Ratio (Total Liabilities/Total Stockholders’ Equity) for the latest audited financial statement.

a. Name and address of firm preparing attached financial statement and date thereof.

b. Is the attached financial statement for the identical organization named in 1A above? If not, explain the relationship and financial responsibility of the organization whose financial statement is provided (e.g., parent subsidiary).

c. Will the organization whose financial statement is attached act as guarantor of the contract for construction?

d. Surety: Name of bonding company, name and address of agent. A payment and performance bond for 100% of the construction budget will be required within 10 days of contract execution. Proof of ability of bond is required.

2. Timeline and Fees

It is anticipated that the City will enter into a fixed sum contract with the CMAR. For purposes of calculating fees below, an estimated GMP of $9 million should be used.

A. Timeline: Provide an estimated schedule for construction assuming an $9,000,000 GMP and notice to proceed.

B. Pre-Construction Services Fees

To include personnel expenses, project cost estimating services (Note: multiple will be required), preliminary project schedules, value engineering and constructability reviews, overhead and profit through the Design Phase of the project.

C. General Conditions

The Respondent shall identify a General Conditions not-to-exceed dollar amount of the construction budget. If necessary, the vendor may instead choose to provide the General Conditions Fee as an estimated “per month” cost. Please only provide ONE fee amount.

Estimated General Conditions Fee $ ___________________________

OR

Estimated Per-Month General Conditions Fee $ ___________________________

D. Construction Phase Services

To include overhead and profit to administer the project construction.

The fee quoted will not include direct project management expenses (on-site personnel expenses) or direct project expenses. These items will be negotiated as part of the selection\contract process requiring a detailed list of all General Conditions and will be included as a part of the guaranteed maximum price.

E. Savings: Describe your organization’s concept for the disposition of savings realized during construction. Owner expects the return of the full amount of the savings to the Owner, is this acceptable?

F. Contingencies: Describe your organization’s philosophy related to the designation, authorization, and use of contingencies.

G. Performance and Payment Bond: Identify the premium for 100% Performance and Payment Bond.

H. Liability Insurance: Identify the premium for General Liability, Automobile Liability, Umbrella Liability Insurance, and Builders Risk.

I. Personnel: Given the scope and schedule of the Project, identify the Project Manager, Estimator, and Field Operations personnel who would work on the project. Provide a resume and references for each individual. Owner expects the personnel included within your proposal will have experience on projects constructing facilities similar in type and size to the Project, and such personnel will be the exact same team that is assigned to the project being committed through completion of the project.

J. References: Provide references for all projects listed as experience in this proposal where the projects were constructed under the CMAR delivery method, Fire Stations preferred.

3. Owner/Contractor Agreement

The City will use AIA Document A133-2019 as the Owner/Contractor Agreement for this project. Proposers should become familiar with the document to reduce the need for negotiations.