26 Lincoln Ave-Bathroom Renovation-REV 3-19-26.pdf

PDF 2 MB Posted

Attached to
BM25052 Sidney Bathroom
Solicitation number
2137070
Issued by
Broome County, New York

About this file

Summary

This is a design plan and specification document for a bathroom renovation project at 26 Lincoln Ave in Sidney, New York, prepared by Lakeside Engineering for the Broome Office of People with Developmental Disabilities (OPWDD). The project involves a complete gut renovation and remodel of an existing bathroom, including demolition of all existing finishes and fixtures down to the studs. The scope of work includes installation of new flooring consisting of 2x2 Florida Tile Serendipity unglazed porcelain mosaics with a 4-inch tile base, new wall finishes with 5/8-inch green moisture-resistant gypsum board in non-shower areas and Schluter Kerdi board with waterproofing membrane in shower areas, and 12x24-inch Florida Tile mosaic wall tile. New plumbing fixtures include an American Standard Cadet 12-inch elongated ADA-compliant toilet, a rectangular single-hole ceramic sink with Delta Kayra faucet, and a Kohler shower head and hand-held wand kit. The project also requires installation of grab bars, a recessed toilet paper dispenser, a 14-inch plate glass mirror with wall-mounted light fixture, a 24-inch by 12-inch linen cabinet above the toilet, a new 3-foot by 6-foot 8-inch rated interior door with frame and kick plate, replacement of the exhaust fan with a minimum 150 CFM Broan Smart Fan, and replacement of light fixtures with recessed wafer LED fixtures. The contract term is 60 days from award, with a mandatory site visit on July 22, 2026, at 10:00 a.m., and quotes are due on or before 5:00 p.m. on July 30, 2026.

The project is subject to prevailing wage requirements as it is classified as a Public Works project. All vendors and sub-contractors must be registered with the New York State Department of Labor, with certificates of registration required to be submitted with quotes. The Broome OPWDD is requesting quotes pursuant to discretionary purchasing authority rather than issuing a formal Invitation for Bids (IFB), and intends to award the contract to the most responsible and responsive vendor providing the lowest cost that meets the detailed scope of work requirements. The awarded vendor must submit certificates of liability insurance and workers' compensation insurance, complete lobbying law forms, and sign Appendix A. The project location is in Delaware County, Town of Sidney, and quotes must include itemized materials and labor cost breakdowns submitted on the official bid form provided by the agency. Broome OPWDD reserves the right to reject all quotes.

View the file

Other files

File Type Posted
BRM RFQ Form Sidney Bathroom.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"UNAUTHORIZED ALTERATION OR ADDITION TO PLANS BEARING

A LICENSED ENGINEER'S OR ARCHITECTS SEAL, IS A VIOLATION

OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW"

PROJECT NO:

DATE:

SCALE: AS SHOWN

20250605.1

10/20/2025

REVISIONS

MARK DATE DESCRIPTION

L

IN

C

O

LN

A

VE

S

ID

N

EY

BA

TH

R O

O M

R

EN

O

VA

TI

O

N

BR

O

O M

E O

PW

D

D

G

LE

N

W O

O D

R O

AD

BI

N G

H

AM

TO

N

, N Y

LAKESIDE ENGINEERING

Robert G. Harner, PE, PLLC

83 Fall Street Seneca Falls, NY 13148

Robert@LakesideEng.com www.LakesideEng.com

607-725-5824

1 03/19/26 GENERAL REVISIONS

BATHROOM

RENOVATION

CLIENT:

BROOME OPWDD

249 GLENWOOD ROAD

BINGHAMTON, NY 13905

26 LINCOLN AVE

SIDNEY, NY 13838

GENERAL/CIVIL DRAWINGS INDEX

SHEET NUMBER SHEET NAME

T-100 TITLE SHEET

G-001 GENERAL INFORMATION

A-100 DEMOLITION & PROPOSED FLOOR PLANS

A-200 INTERIOR ELEVATIONS

A-300 DETAILS

A-400 WALL & DOOR DETAILS

ENGINEER:

LAKESIDE ENGINEERING

83 FALL STREET

SENECA FALLS, NY 13148

AERIAL VIEW

PROJECT LOCATION

NONE

VICINITY MAP

T-100

TITLE SHEET

26 LINCOLN AVE

SIDNEY, NY

DELAWARE COUNTY

OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW"

PROJECT NO:

DATE:

SCALE: AS SHOWN

20250605.1

10/20/2025

REVISIONS

MARK DATE DESCRIPTION

L

IN

C

O

LN

A

VE

S

ID

N

EY

BA

TH

R O

O M

R

EN

O

VA

TI

O

N

BR

O

O M

E O

PW

D

D

G

LE

N

W O

O D

R O

AD

BI

N G

H

AM

TO

N

, N Y

LAKESIDE ENGINEERING

Robert G. Harner, PE, PLLC

83 Fall Street Seneca Falls, NY 13148

Robert@LakesideEng.com www.LakesideEng.com

607-725-5824

1 03/19/26 GENERAL REVISIONS

G-001

GENERAL

INFORMATION

GENERAL INFORMATION

ACT ACOUSTICALCEILINGTILE LAB. LABORATORY

A.F.F. ABOVEFINISHEDFLOOR LAM. LAMINATE

ALT. ALTERNATE LAV. LAVATORY

APPROX.. APPROXIMATE LT. LIGHT

ARCH. ARCHITECTURAL

MAX. MAXIMUM

BLDG.. BUILDING MECH. MECHANICAL

B.W. BOTHWAYS MEMO. MEMBRANE

MAR. MANUFACTURER

C.G. CORNERGUARD M.H. MANHOLE

CJ. CONTROLJT. MIN. MINIMUM

CLG. CEILING MISC. MISCELLANEOUS

CLKG. CAULKING M.O. MASONRYOPENING

CLR. CLEAR MTL METAL

C.M.U. CONCRETEMASONRYUNIT MUL MULLION

COL. COLUMN

CONC. CONCRETE N NORTH

CONSTR. CONSTRUCTION N.I.C. NOTINCONTRACT

CONT. CONTINUOUS NO. NUMBER

CPT. CARPET NOM. NOMINAL

C.T. CERAMICTILE N.T.S. NOTTOSCALE

NYS NEWYORKSTATE

DEG. DEGREE

D.F. DRINKING FOUNTAIN o.c. ONCENTER

DIAG. DIAGONAL O.D. OUTSIDEDIAMETER

DIA. DIAMETER OH. OVERHEAD

DN. DOWN OPG. OPENING

D.O.T. DEPARTMENTOFTRANSPORTATION OPP. OPPOSITE

DS. DOWNSPOUT

DWG. DRAWING PCT. PRE-CAST

PF PREFINISHED

E EAST P_L PROPERTY LINE

EA. EACH P.LAM. PLASTICLAMINATE

E.J. EXPANSIONJOINT PLAS. PLASTER

E.I.F.S. EXTERIOR INSULATION PLYWD. PLYWOOD

ANDFINISH SYSTEM PR. PAIR

ELEC. ELECTRICAL PNT PAINT

ELEV. ELEVATION

EMER EMERGENCY Q.T. QUARRYTILE

ENCL. ENCLOSURE R. RISER

EQ. EQUAL R.D. ROOFDRAIN

EQUIP. EQUIPMENT REF. REFRIGERATOR

E.W. EACHWAY REINF. REINFORCED

E.W.C. ELECTRICWATERCOOLER REQ'D. REQUIRED

EXP. EXPANSION RM ROOM

EXT. EXTERIOR R.O. ROUGHOPENING

F.A. FIREALARM s SOUTH F.D. FLOORDRAIN s.c. SOLIDCORE

F.D.C. FIREDEPARTMENTCONNECTION S.F. SQUAREFOOT

FDN. FOUNDATION SHT. SHEET

F.E. FIREEXTINGUISHER SIM. SIMILAR

F.E.C. FIREEXTINGUISHERCABINET SPEC. SPECIFICATION

F.F. FINISHFLOOR SQ. SQUARE

FIN. FINISH S-5. STAINLESSSTEEL

FLR. FLOOR STAGG. STAGGERED

FND. FOUNDATION STD. STANDARD

Ff. FOOTORFEET STN STAIN FfG. FOOTING STL STEEL

STRUC. STRUCTURAL

GA. GAUGE SUSP. SUSPENDED

GALV_ GALVANIZED

G.C. GENERALCONTRACTOR TR TREAD

GR. GRADE T&B TOPANDBOTTOM

GWB GYPSUMWALLBOARD TER. TERRAZZO

GYP. GYPSUM T&G TONGUE&GROOVE

H.B. HOSEBIBB THK. THICK

H.C. HOLLOWCORE 1YP. 1YPICAL

H/C HANDICAPPED

HDPB HIGHDENSITYPARTICLEBOARD U.N.O. UNLESSNOTEDOTHERWISE

HPDL HIGH PRESS.DECORATIVELAMINATE VCT VINYLCOMPOSITIONTILE

HDWD. HARDWODD VER VERIFY

HDWE. HARDWARE VERT_ VERTICAL

H.M. HOLLOWMETAL V.I.F. VERIFYINTHEFIELD

HT. HEIGHT

HVAC HEATING,VENTILATIONAND w WEST

AIRCONDITIONING W/ WITH

w.c. WATERCLOSET

INSUL. INSULATION WD. WOOD

INT. INTERIOR W/0 WITHOUT

JAN. JANITOR

JNT. JOINT

JST. JOIST

ABBREVIATIONS

PROJECT SUMMARY

LEGEND

SYMBOLS

PROPERTY LINES

EASEMENT

PROPOSED BUILDING

ELECTRIC UTILITYELEC ELEC

SANITARY LINESAN SAN

PROPOSED CONCRETE

W W W WATERLINE

PROPOSED GRASS AREAS

PROPOSED ASPHALT PARKING

GAS LINEGAS GAS

STORMWATER LINEST ST

LANDSCAPING

PARKING

GYPSUM WALL BOARD

INTERIOR WALL

RIGID INSULATION

CONCRETE (CMU) BLOCK

BATT INSULATION

CIVIL ARCHITECTURAL/STRUCTURAL

BRICK

EARTH

CONCRETE

STEEL

WOOD BLOCKING

GLASS

LOCATION

X'-X"

X A00

X A00

DETAIL

DETAIL #

SHEET #

SECTION

DETAIL #

SHEET #

ELEVATION TAG

COLUMN LINE1

CENTER LINECL

STONE/GRAVEL

X NEW WORK TAG

X WINDOW TAG

X

A00

INTERIOR ELEVATION

ELEVATION LETTER

SHEET #

X X

X

3/0DOOR TAG

ROOM TAG

REVISION

X

ADDRESS: 26 LINCOLN AVE

CITY/STATE: SIDNEY, NY

COUNTY: DELAWARE

MUNICIPALITY: TOWN OF SIDNEY

ZONING: RESIDENTIAL

SUMMARY:

OFFICE

1. THE GENERAL NOTES ARE PROVIDED AS PART OF THESE PLANS AND SPECIFICATIONS AND SHALL

BE COMPLIED WITH IN ALL RESPECTS.

2. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING SITE CONDITIONS AND DIMENSIONS PRIOR

TO THE START OF WORK. ANY DISCREPANCIES DISCOVERED SHALL BE SHARED WITH THE

ENGINEER FOR REVIEW AND COMMENT.

3. THE CONTRACTOR SHALL VERIFY ALL APPLICABLE MUNICIPAL APPROVALS AND PERMITS HAVE

BEEN APPROVED PRIOR TO THE START OF WORK.

4. THE CONTRACTOR SHALL PERFORM WORK IN ACCORDANCE WITH THE NEW YORK STATE BUILDING CODE, RULES & REGULATIONS, AND GENERAL REQUIREMENTS OF THE LOCAL AUTHORITY HAVING

JURISDICTION.

5. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION AND SCHEDULING OF REQUIRED

INSPECTIONS AS DIRECTED BY THE LOCAL AUTHORITY HAVING JURISDICTION.

6. THE CONTRACTOR SHALL FURNISH ALL MATERIALS AND PROVIDE METHODS OF CONSTRUCTION

THAT ARE IN CONFORMANCE TO INDUSTRY STANDARDS AND THE NEW YORK STATE BUILDING

CODE.

7. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL SELECTIONS TO THE ENGINEER AND OWNER FOR

REVIEW AND APPROVAL PRIOR TO THE PROCUREMENT OF SUCH MATERIALS.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACTS AND ACTIONS OF THEIR EMPLOYEES

AND/OR SUB-CONTRACTORS DURING CONSTRUCTION.

9. THE CONTRACTOR SHALL PERFORM WORK IN A PROFESSIONAL WORKMANSHIP MANNER

ACCEPTABLE TO INDUSTRY STANDARDS.

10. THE CONTRACTOR IS RESPONSIBLE FOR PROPERLY CLEANING AND MAINTAINING THE PROPERTY

DURING CONSTRUCTION AND LEAVE THE PREMISES CLEAN, NEAT, AND ORDERLY.

THE PROPERTY LOCATED AT 26 LINCOLN AVE IN SIDNEY, NY IS PLANNING TO UNDERGO A RENOVATION

OF A BATHROOM WITHIN THE FACILITY.

THE BATHROOM WILL CONSIST OF A FULL GUT AND REMODEL INCLUDING NEW FLOORING, WALL, AND CEILING FINISHES. THE BATHROOM WILL BE OUTFITTED WITH NEW PLUMBING FIXTURES INCLUDING

TOILET, SINK, AND SHOWER.

GENERAL NOTES

DEMOLITION TAGX

1. THE OWNER IS RESPONSIBLE TO COMPLETE A LIMITED SURVEY FOR HAZARDOUS MATERIALS, IN WHICH NO ACMs WERE FOUND. COPIES OF THE SURVEY AND THE ASBESTOS REMOVAL SPECIFICATIONS CAN BE OBTAINED FROM BROOME OPWDD PROJECT MANAGER. IF SUSPECT MATERIALS THAT HAVE NOT BEEN TESTED ARE ENCOUNTERED, NOTIFY THE BROOME OPWDD PROJECT MANAGER WHO WILL ARRANGE FOR ADDITIONAL TESTING AND/OR PROVIDE DIRECTION. DO NOT DISTURB

SUSPECT MATERIALS.

2. DEMOLITION DRAWINGS AND NOTES ARE A GENERAL GUIDE TO THE EXTENT OF REMOVALS, BUT THEY ARE NOT COMPREHENSIVE. THE CONTRACTOR SHALL SURVEY THE WORK PRIOR TO SUBMITTING A PROPOSAL AND DETERMINE THE FULL EXTENT OF REMOVALS, THE WORK INCLUDES ALL REMOVALS REQUIRED TO PROPERLY INSTALL THE NEW WORK.

3. THE EXISTING BUILDING WILL BE OCCUPIED DURING THE COURSE OF THIS WORK. THE CONTRACTOR SHALL MAINTAIN EXISTING EXITS (PROVIDE OVERHEAD PROTECTION WHERE NECESSARY, REGULATE NOISE AND TRAFFIC) AS WELL AS

SECURE THE SPACE AS NECESSARY.

4. THE CONTRACTOR SHALL PHASE THE SCOPE OF WORK TO MAINTAIN PROPER EGRESS THROUGHOUT THE BUILDING AND COORDINATED WITH THE BROOME OPWDD FIELD REPRESENTATIVE. THE WORK SCHEDULE SHALL BE COORDINATED WITH BROOME OPWDD REPRESENTATIVE AT LEAST 7 DAYS PRIOR TO COMMENCEMENT OF EACH PHASE OF WORK.

5. THE CONTRACTOR SHALL FIELD VERIFY ALL WORK AND DIMENSIONS PRIOR TO COMMENCEMENT OF THIS WORK. NOTIFY THE

BROOME OPWDD REPRESENTATIVE OF ANY DISCREPANCIES.

6. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR DAMAGE TO EXISTING CONDITIONS THAT RESULT FROM THE COURSE

OF THIS WORK.

7. THE CONTRACTOR SHALL BE RESPONSIBLE TO SECURE AND PROTECT ALL AREAS (INTERIOR AND EXTERIOR), DURING THE

COURSE OF THIS WORK.

8. THE CONTRACTOR SHALL COORDINATE WITH BROOME OPWDD FIELD REPRESENTATIVE AND/OR THE FACILITY SITE MANAGER REPRESENTATIVES FOR LOCATION OF THE STAGING AREAS FOR THE DUMPSTER, CONSTRUCTION TRAILERS AND

CONSTRUCTION MATERIALS.

9. THE CONTRACTOR SHALL ENSURE ALL WORK IS PROTECTED 24 HOURS A DAY, 7 DAYS A WEEK TO PREVENT WATER LEAKS AND DAMAGE TO THE OCCUPIED HOME. ADDRESS ANY DAMAGED WORK AREAS AND INTERIOR AREAS DUE TO LEAKS DURING

THE COURSE OF THIS WORK.

10.THE CONTRACTOR SHALL PROPERLY CLEAN SITE OF ANY AND ALL CONSTRUCTION DEBRIS (ESPECIALLY NAILS) FROM THE

WORK SITE EACH DAY,.

11.THE CONTRACTOR SHALL COMPLY WITH THE OPWDD SAFETY PLAN.

12.THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE BROOME OPWDD.

13.THE CONTRACTOR SHALL INSTALL MATERIALS WITH COLORS AS NOTED ON THE PLANS OR AS SELECTED BY THE BROOME

OPWDD REPRESENTATIVE(S).

14.THE CONTRACTOR SHALL ADDRESS ANY DAMAGED WORK AREAS AND INTERIOR AREAS DUE TO LEAKS DURING THE COURSE

OF THIS WORK AT NO ADDITIONAL COST TO THE OWNER.

L

L

L

SS

L

L

S L

GFI

"UNAUTHORIZED ALTERATION OR ADDITION TO PLANS BEARING

A LICENSED ENGINEER'S OR ARCHITECTS SEAL, IS A VIOLATION

OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW"

PROJECT NO:

DATE:

SCALE: AS SHOWN

20250605.1

10/20/2025

REVISIONS

MARK DATE DESCRIPTION

L

IN

C

O

LN

A

VE

S

ID

N

EY

BA

TH

R O

O M

R

EN

O

VA

TI

O

N

BR

O

O M

E O

PW

D

D

G

LE

N

W O

O D

R O

AD

BI

N G

H

AM

TO

N

, N Y

LAKESIDE ENGINEERING

Robert G. Harner, PE, PLLC

83 Fall Street Seneca Falls, NY 13148

Robert@LakesideEng.com www.LakesideEng.com

607-725-5824

1 03/19/26 GENERAL REVISIONS

A-100

DEMOLITION &

PROPOSED

FLOOR PLANS

SCALE: 1/2"=1'-0"

EXISTING BATHROOM & REMOVAL PLANA1

KEYED DEMOLITION NOTES:

REMOVE AND DISPOSE OF ALL WALL/WAINSCOT TILE AND GYPSUM BOARD DOWN TO

THE EXISTING STUDS.

3 REMOVE ALL PLUMBING FIXTURES SUCH AS TOILET, SINKS, AND SHOWER FIXTURES.

COORDINATE SALVAGING OF FIXTURES WITH THE OWNER.

5 REMOVE AND DISPOSE OF CABINETRY AND STORING SHELVING IN ITS ENTIRETY.

6 REMOVE DRAIN CAP AND PROVIDE MAINTENANCE TO DRAIN AND BRING DRAIN TO

WORKING CONDITION. COORDINATE WITH NEW FLOORING WORK.

7 REMOVE AND DISPOSE OF FLOOR TILE AND PREPARE SUBSTRATE FOR NEW WORK.

REMOVE DOOR AND FRAME IN ITS ENTIRETY. COORDINATE WITH OWNER FOR ANY

DOORS AND FRAMES TO BE SALVAGED.

FURNISH AND INSTALL NEW FLOOR FINISH SYSTEM TO BE 2x2 FLORIDATILE

SERENDIPITY UNGLAZED PORCELAIN MOSAICS WITH 4" TILE BASE OR APPROVED

EQUAL. PROVIDE SCHLUTER KERDI WATERPROOFING MEMBRANE AT SHOWER

LOCATION. TILE AND BASE COLOR AS SELECTED BY THE OWNER. GROUT COLOR AS

SELECTED BY THE OWNER. INSTALLATION PER MANUFACTURER INSTRUCTIONS.

FURNISH AND INSTALL NEW WALL FINISHES TO BE 5/8" GREEN (MOIST. RESISTANT) GYP.

BOARD IN NON-SHOWER AREAS WITH SCHULTER KERDI BOARD AND WATERPROOFING

MEMBRANE AT SHOWER WALL LOCATIONS. FURNISH AND INSTALL 12"x24" FLORIDATILE

MOSAIC WALL TILE OR APPROVED EQUAL. TILE AND GROUT COLOR AS SELECTED BY

THE OWNER. INSTALL AS PER MANUFACTURER INSTRUCTIONS. PRIME AND PAINT GYP.

BOARD AREAS. COLOR AS SELECTED BY THE OWNER.

FURNISH AND INSTALL SHOWER HEAD AND HAND HELD WAND KIT TO BE KOHLER

MODEL K-76471-Y OR APPROVED EQUAL. FURNISH AND INSTALL NEW PLUMBING TO

RELOCATE SHOWER SYSTEM FROM EXISTING LOCATION. FURNISH AND INSTALL

BLOCKING, MOUNTING, AND BRACKETS AS PER MANUFACTURER INSTRUCTIONS.

GENERAL NOTES

1. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS, DIMENSIONS AND PROPOSED

NEW WORK TO PROVIDE ALL REMOVALS REQUIRED TO INSTALL NEW WORK. REMOVALS

SHOWN ARE APPROXIMATE AND ONLY INDICATE THE GENERAL SCOPE OF WORK. NOTIFY

THE ARCHITECT OF ANY DISCREPANCIES PRIOR TO SUBMITTING A BID.

2. COORDINATE WITH THE OPWDD REPRESENTATIVE AND/OR HOUSE MANAGER THE

LOCATION OF STAGING AREA FOR MATERIALS, TRAILERS, ETC.

3. ALL WORK SHALL BE COORDINATED WITH OPWDD OFFICIALS.

4. BE RESPONSIBLE TO SECURE AND PROTECT ALL AREAS (INTERIOR AND EXTERIOR), DURING

THE COURSE OF THIS WORK.

5. BE RESPONSIBLE TO REPAIR DAMAGE TO EXISTING CONDITIONS THAT RESULT FROM THE

COURSE OF THIS WORK AT NO ADDITIONAL COST TO THE OWNER.

6. MODIFY EXISTING DOMESTIC WATER SUPPLY AND SANITARY SEWER PIPING AS

NECESSARY TO CONNECT NEW PLUMBING FIXTURES TO COMPLETE THE INSTALLATION.

PROVIDE NEW 3/4'' TYPE L COPPER PIPING FOR SUPPLY PIPING AND 1/2" TYPE L COPPER

PIPING FOR RUN-OUTS TO THE FIXTURES. PROVIDE AP ARMAFLEX ELASTOMERIC PIPE

INSULATION WITH AP SEAL FOR NEW DOMESTIC WATER SUPPLY PIPING AS MANUFACTURED

BY ARMACELL OR APPROVED EQUAL PROVIDE NEW SCHEDULE 40 PVC PIPING FOR NEW

SANITARY AND VENT PIPING, SLOPE 1/4'' PER FOOT. INSTALL IN ACCORDANCE WITH

MANUFACTURER'S WRITTEN INSTRUCTIONS.

KEYED NEW WORK NOTES:

REMOVE ALL ACCESSORIES SUCH AS MIRROR/LIGHT, GRAB BARS, PADDING, AND

DISPENSERS. SALVAGE GRAB BARS FOR OWNER'S USE.

SCALE: 1/2"=1'-0"

PROPOSED BATHROOM PLANA2

B

A200A C

D

FURNISH AND INSTALL NEW SCHLUTER KERDI SYSTEM FLOOR DRAIN. FLOOR DRAIN

DISCHARGE TO MATCH EXISTING SANITARY PIPING DIAMETER. CONNECT NEW FLOOR

DRAIN TO EXISTING SANITARY PIPING SYSTEM. MODIFY EXISTING SANITARY PIPING

SYSTEM AS NECESSARY TO COMPLETE THE INSTALLATION. SEE DETAIL ON A-300.

FURNISH AND INSTALL NEW WALL MOUNTED SINK TO BE RECTANGULAR SINGLE HOLE

CERAMIC (CERASTYLE) OR APPROVED EQUAL. FURNISH AND INSTALL FAUCET TO BE

DELTA KAYRA OR APPROVED EQUAL. ADJUST PLUMBING AND TRAP AS NECESSARY TO

ACCOMMODATE LOCATION OF NEW SINK. CAULK AROUND ALL EDGES OF INSTALLED

SINK. INSTALL AS PER MANUFACTURER INSTRUCTIONS.

FURNISH AND INSTALL NEW TOILET TO BE AMERICAN STANDARD "CADET" 12"

ELONGATED ADA COMPLIANT OR APPROVED EQUAL. ADJUST FLANGE LOCATION AND

ASSOCIATED PLUMBING AS NECESSARY TO ACCOMMODATE INSTALLATION. INSTALL

AS PER MANUFACTURER INSTRUCTIONS.

FURNISH AND INSTALL INSTALL GRAB BARS WITH FULL BLOCKING AND TO BE OF

SIMILAR MAKES AS MOEN, BOBRICK, BRADLEY OR APPROVED EQUAL. FURNISH AND

INSTALL RECESSED TOILET PAPER DISPENSER TO BE FRANKLIN BRUSHED NICKEL OR

APPROVED EQUAL.

FURNISH AND INSTALL 14" PLATE GLASS MIRROR WITH WALL MOUNTED LIGHT FIXTURE

CENTERED ABOVE.

REMOVE AND DISPOSE OF GYP. BOARD CEILING IN ITS ENTIRETY. LIGHTING,

MECHANICAL, AND DETECTORS LOCATIONS TO REMAIN.

FURNISH AND INSTALL ACCESSORIES SUCH AS RECESSED TOILET DISPENSER, SOAP

DISPENSER, AND PAPER TOWEL DISPENSER. COORDINATE WITH OWNER ON FINAL

LOCATIONS OF THESE ACCESSORIES. MAKE AND MODEL TO MATCH SIMILAR

ACCESSORIES USED WITHIN THE FACILITY.

FURNISH AND INSTALL A 24"Wx12D LINEN CABINET ABOVE TOILET TO BE KRAFTMAID

ADA "PASSPORT" SERIES OR APPROVED EQUAL. INSTALL CABINETS AS PER

MANUFACTURER INSTRUCTIONS.10

FURNISH AND INSTALL NEW 3'-0"X6'-8" RATED DOOR AND FRAME. FRAME TO BE RATED

STEELCRAFT OR APPROVED EQUAL. DOOR TO BE WOOD WITH STEEL KICK PLATE.

INSTALL DOOR AND FRAME AS PER MANUFACTURER INSTRUCTIONS. FURNISH AND

INSTALL NEW THRESHOLD AT DOORWAY. REFER TO DETAIL A3/A-400.

EXISTING WINDOW TO REMAIN. FURNISH AND INSTALL NEW TRIM AND PREPARE TRIM

TO BE PAINTED. REMOVE VENT PLATE BELOW WINDOW, PAINT, AND REINSTALL,

FURNISH AND INSTALL NEW CEILING WITH 5/8" GREEN (MOIST. RESISTANT) GYP.

BOARD TAPES, PRIMED, AND PAINED. EXISTING LIGHTING, EXHAUST FAN, DETECTORS,

AND MECHANICAL LOCATIONS TO REMAIN. REPLACE EXHAUST FAN WITH MIN. 150 CFM

BROAN SMART FAN/EXHAUST OR APPROVED EQUAL. REPLACE LIGHT FIXTURE WITH

RECESSED WAFER LED FIXTURE LITHONIA OR APPROVED EQUAL.

MODIFY ELECTRICAL COMPONENTS SUCH AS OUTLETS AND SWITCHES AS NECESSARY

TO ACCOMMODATE NEW WORK. PROVIDE GFI OUTLETS AS REQUIRED. ALL WORK

SHALL COMPLY WITH STANDARD CODES. REPLACE LIGHT OVER SHOWER WITH NEW

EXHAUST FAN BROAN SMART FAN/EXHAUST OR APPROVED EQUAL. REPLACE LIGHT

FIXTURE WITH RECESSED WAFER LED FIXTURE LITHONIA OR APPROVED EQUAL.

SCALE: 1/2"=1'-0"

PROPOSED CEILING PLANA3

MATERIAL SELECTIONS:

ITEM MANUFACTURER/PATTERN COLOR/TYPE REMARKS

FLORIDATILE/SERENDIPITY1 2"X2" MOSAIC- INTUITION TOBACCO FLOOR TILE

FLORIDATILE/SERENDIPITY2 12"X24" MOSAIC- INTUITION TOBACCO WALL TILE

FLORIDATILE/BLISS3 12"X12" MOSAIC- CAPPUCCINO ACCENT WALL TILE

FLORIDATILE/SERENDIPITY4 3"X24" MOSAIC- INTUITION TOBACCO WAINSCOT BULLNOSE

ARDEX5 APPLE BUTTER FLOOR TILE GROUT

ARDEX6 IRISH CREAM WALL TILE GROUT

7 SHERWIN WILLIAMS EGRET WHITE SW7570-EGGSHELL WALL PAINT

8 SHERWIN WILLIAMS MATCH EXISTING CEILING & DOOR FRAME

A3 A300

A3 A400

A2 A300

7'

11'-3"

3'-9"

4 5

EXT. MECHANICAL

TO REMAIN

EXT. SPRINKLER HEAD

AND PIPING TO REMAIN.

PROTECT DURING

CONSTRUCTION.

EXT. MECHANICAL

TO REMAIN

11'-3"

4'

7'-3"

7'

2'

11'-3"

1'-5"

3'-10"

4'-01 2"

A1 A400

A1 A400

A3 A300

7'

3'-9"

11'-3"

7'

OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW"

PROJECT NO:

DATE:

SCALE: AS SHOWN

20250605.1

10/20/2025

REVISIONS

MARK DATE DESCRIPTION

L

IN

C

O

LN

A

VE

S

ID

N

EY

BA

TH

R O

O M

R

EN

O

VA

TI

O

N

BR

O

O M

E O

PW

D

D

G

LE

N

W O

O D

R O

AD

BI

N G

H

AM

TO

N

, N Y

LAKESIDE ENGINEERING

Robert G. Harner, PE, PLLC

83 Fall Street Seneca Falls, NY 13148

Robert@LakesideEng.com www.LakesideEng.com

607-725-5824

1 03/19/26 GENERAL REVISIONS

A-200

INTERIOR

ELEVATIONS

SCALE: 3/4"=1'-0"

ELEVATION-AA1

SCALE: 3/4"=1'-0"

ELEVATION-CA3

SCALE: 3/4"=1'-0"

ELEVATION-BA2

SCALE: 3/4"=1'-0"

ELEVATION-DA4

NEW TOILET AT EXISTING LOCATION.

VERIFY IN FIELD. ADJUST FLANGE AND

ASSOCIATED PLUMBING IF NECESSARY.

36" HORIZONTAL GRAB BAR. REFER TO

SHEET A-300 FOR MOUNTING DETAILS.

PROVIDE BLOCKING AS PER

MANUFACTURER INSTRUCTIONS

24" HORIZONTAL GRAB BAR. REFER TO SHEET

A-300 FOR MOUNTAIN DETAILS. PROVIDE

BLOCKING AS PER MANUFACTURER

INSTRUCTIONS.

TOILET DISPENSER AS PER SPECIFICATIONS

48" HEIGHT SOLID SURFACE WAINSCOT AS

PER SPECIFICATIONS.

24"WX12"X24"H LINEN CABINET AS PER

SPECIFICATIONS

4" TILE BASE AS PER SPECIFICATIONS.

WALL MOUNTED LIGHT BAR

CENTERED OVER MIRROR

5/8" GREEN BOARD BOARD TO BE TAPED,

PRIMED, AND PAINTED.

5/8" GREEN BOARD BOARD

TO BE TAPED, PRIMED, AND

PAINTED.

SHOWER TILE AS PER SPECIFICATION

OVER 1/2" SCHLUTER KERDI BOARD

AND WATERPROOFING MEMBRANE

SHOWER ASSEMBLY WITH HEAD AND

WAND AS PER SPECIFICATIONS.

RELOCATE PLUMBING FOR EXISTING

LOCATION TO NEW.

36" HORIZONTAL GRAB BAR. REFER TO

SHEET A-300 FOR MOUNTAIN DETAILS.

PROVIDE BLOCKING AS PER

MANUFACTURER INSTRUCTIONS.

4" TILE BASE AS PER SPECIFICATIONS.

42" HORIZONTAL GRAB BAR. REFER TO

SHEET A-300 FOR MOUNTING DETAILS.

PROVIDE BLOCKING AS PER

MANUFACTURER INSTRUCTIONS

4" TILE BASE AS PER SPECIFICATIONS.

SHOWER ASSEMBLY WITH HEAD AND

WAND AS PER SPECIFICATIONS.

RELOCATE PLUMBING FOR EXISTING

LOCATION TO NEW.

24" HORIZONTAL WITH 24" VERTICAL

COMBINATION GRAB BAR. REFER TO SHEET

A-300 FOR MOUNTAIN DETAILS. PROVIDE

BLOCKING AS PER MANUFACTURER

INSTRUCTIONS.

4" TILE BASE AS PER SPECIFICATIONS.

WALL HUNG SINK FACET AS PER

SPECIFICATIONS. ADJUST FOR

NEW LOCATION AS NECESSARY.

24"Wx42"H PLATE GLASS

MIRROR MIRROR

HAND TOWEL DISPENSER. FINAL

LOCATION AS SELECTED BY THE

OWNER SOAP DISPENSER. FINAL LOCATION

AS SELECTED BY THE OWNER

24" HORIZONTAL WITH 24" VERTICAL

COMBINATION GRAB BAR. REFER TO SHEET

A-300 FOR MOUNTAIN DETAILS. PROVIDE

BLOCKING AS PER MANUFACTURER

INSTRUCTIONS.

WALL HUNG SINK FACET AS PER

SPECIFICATIONS. ADJUST FOR

NEW LOCATION AS NECESSARY.

WALL MOUNTED LIGHT BAR

CENTERED OVER MIRROR

24"Wx42"H PLATE GLASS

MIRROR MIRROR

HAND TOWEL & SOAP DISPENSERS.

FINAL LOCATION AS SELECTED BY

THE OWNER

5/8" GREEN BOARD

BOARD TO BE TAPED,

PRIMED, AND PAINTED.

48" HEIGHT SOLID SURFACE

WAINSCOT AS PER

SPECIFICATIONS.

4" TILE BASE AS PER SPECIFICATIONS.

EXISTING WINDOW TO REMAIN.

FURNISH AND INSTALL NEW TRIM.

REMOVE, PAINT, AND REPLACE

EXISTING VENT PLATE.

NEW TOILET AT EXISTING LOCATION.

VERIFY IN FIELD. ADJUST FLANGE AND

ASSOCIATED PLUMBING IF NECESSARY.

REMOVE EXISTING PADDING AND

SALVAGE DURING CONSTRUCTION.

RE-INSTALL AS PER DIRECTIONS BY THE

OWNER.

24" HORIZONTAL GRAB BAR. REFER TO SHEET

A-300 FOR MOUNTAIN DETAILS. PROVIDE

BLOCKING AS PER MANUFACTURER

INSTRUCTIONS.

TOILET DISPENSER AS PER SPECIFICATIONS

5/8" GREEN BOARD BOARD TO BE TAPED,

PRIMED, AND PAINTED.

48" HEIGHT SOLID SURFACE WAINSCOT AS

PER SPECIFICATIONS.

4" TILE BASE AS PER SPECIFICATIONS.

36" GAB BAR AS PER. REFER TO SHEET A-300

FOR MOUNTING DETAILS. PROVIDE BLOCKING

AND PER MANUFACTURER INSTRUCTIONS.

EXISTING SPRINKLER HEAD TO REMAIN

AND BE PROTECTED DURING

CONSTRUCTION

4" TILE BASE AS PER SPECIFICATIONS.

NEW 3'-0"x6'-8" INTERIOR DOOR

AND FRAME WITH KICK PLATE

48" HEIGHT SOLID SURFACE WAINSCOT AS

PER SPECIFICATIONS.

FLOOR DRAIN. REFER TO DETAIL

A3 ON SHEET A-300.

48"

SHOWER WALL

8' ± 8' ±

7'

SHOWER WALL

7'

8' ±

48"

33"-36"33"-36"33"-36"

11'-3"

11'-3"

8'

48"

SHOWER WALL

SCHLUTER KERDI WATERPROOFING

MEMBRANE. TILE OVER SYSTEM AS

PER MANUFACTURER

ALUMINUM SCHULTER STRIP WITH

RONDEC CORNER AND END PIECES

OR APPROVED EQUAL WITH

ALUMINUM SCHULTER STRIP WITH

RONDEC CORNER AND END PIECES

OR APPROVED EQUAL WITH

ALUMINUM SCHULTER STRIP WITH

RONDEC CORNER AND END PIECES

OR APPROVED EQUAL WITH

ALUMINUM SCHULTER STRIP WITH

RONDEC CORNER AND END PIECES

OR APPROVED EQUAL WITH

ALUMINUM SCHULTER STRIP WITH

RONDEC CORNER AND END PIECES

OR APPROVED EQUAL WITH

SCHLUTER KERDI WATERPROOFING

MEMBRANE. TILE OVER SYSTEM AS

PER MANUFACTURER

SHOWER TILE AS PER SPECIFICATION

OVER 1/2" SCHLUTER KERDI BOARD

AND WATERPROOFING MEMBRANE

SHOWER TILE AS PER SPECIFICATION

OVER 1/2" SCHLUTER KERDI BOARD

AND WATERPROOFING MEMBRANE

SHOWER TILE AS PER SPECIFICATION

OVER 1/2" SCHLUTER KERDI BOARD

AND WATERPROOFING MEMBRANE

OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW"

PROJECT NO:

DATE:

SCALE: AS SHOWN

20250605.1

10/20/2025

REVISIONS

MARK DATE DESCRIPTION

L

IN

C

O

LN

A

VE

S

ID

N

EY

BA

TH

R O

O M

R

EN

O

VA

TI

O

N

BR

O

O M

E O

PW

D

D

G

LE

N

W O

O D

R O

AD

BI

N G

H

AM

TO

N

, N Y

LAKESIDE ENGINEERING

Robert G. Harner, PE, PLLC

83 Fall Street Seneca Falls, NY 13148

Robert@LakesideEng.com www.LakesideEng.com

607-725-5824

1 03/19/26 GENERAL REVISIONS

SCALE: 3/4"=1'-0"

STANDARD BATHROOM MOUNTING A1

A-300

DETAILS

1'-0" 3'-6"

1'-6"

3'-4"

2'-0"

17" MIN.

9"36" 3'-4"

1-1/4" Ø STAINLESS STEEL

GRAB BARS WITH SOLID

BLOCKING

TOILET PAPER DISPENSER

LUXURY VINYL

TILE FLOORING

VINYL BASE

TOILET (TYP)

8' +/- V.I.F.

TOILET (TYP)

1-1/4" Ø STAINLESS STEEL

GRAB BARS WITH SOLID

BLOCKING

17"

17" MIN.

17"

33"

2'-0"

3'-0"

NOTES:

1. DEPICTION OF BATHROOM IS NOT ACCURATE TO EXACT BATHROOM LAYOUT. DEPICTION

ABOVE IS FOR STANDARD MOUNTING DETAILS.

2. REFER TO SHEET A-200 FOR APPLICABLE INTERIOR ELEVATIONS OF THE BATHROOM LAYOUT.

SWING-UP GRAB

BAR SEE DETAIL

A2/A300

SCALE: NTS

TYP. BLOCKINGA2

2X BLOCKING

5/8" GREEN BOARD

BED OF SILICONE

GRAB BAR

ANCHOR GRAB BAR INTO STUDS

OR SOLID BLOCKING

SILICONE SEALANT BEHIND

MOUNTING HOLES

WALL FINISH

SCALE: NTS

TYP. FLOOR DRAINA3

NEW KERDI SYSTEM FLOOR DRAIN. TIE INTO

EXISTING SANITARY PIPING. INSTALLATION

PER MANUFACTURER INSTRUCTIONS

KERDI SYSTEM MEMBRANE OVER

SUBFLOOR MATERIAL

SLOPE 1/4" PER FOOT

EXT. FLOOR JOISTS

CONNECT TO EXISTING SANITARY PIPING

KERDI MEMBRANE FLANGE

SCHLUTER KERDI SHOWER SYSTEM

2"x2" MOSAIC FLOOR TILE. COLOR

AS SELECTED BY THE OWNER

17"

INTERIOR DOOR HEAD INTERIOR DOOR JAMB

EXISTING FINISH FLOOR

"UNAUTHORIZED ALTERATION OR ADDITION TO PLANS BEARING

A LICENSED ENGINEER'S OR ARCHITECTS SEAL, IS A VIOLATION

OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW"

PROJECT NO:

DATE:

SCALE: AS SHOWN

20250605.1

10/20/2025

REVISIONS

MARK DATE DESCRIPTION

L

IN

C

O

LN

A

VE

S

ID

N

EY

BA

TH

R O

O M

R

EN

O

VA

TI

O

N

BR

O

O M

E O

PW

D

D

G

LE

N

W O

O D

R O

AD

BI

N G

H

AM

TO

N

, N Y

LAKESIDE ENGINEERING

Robert G. Harner, PE, PLLC

83 Fall Street Seneca Falls, NY 13148

Robert@LakesideEng.com www.LakesideEng.com

607-725-5824

1 03/19/26 GENERAL REVISIONS

A-400

WALL & DOOR

DETAILS

SCALE: NTS

TILE WAINSCOT WALL SECTIONA1

EXT. WALL FRAMING

EXT. SILL PLATE

SCALE: NTS

DOOR DETAILA2

D O

O R

H

EI

G H

T

AS

P

ER

P

LA

N

DOOR WIDTH

AS PER PLAN

WOOD DOOR (STAIN AS SELECTED)

14 GA. HOLLOW METAL KNOCK

DOWN FRAME (PAINTED)

HIGH KICK PLATE ON PUSH SIDE

2"2"

4"

SCALE: NTS

DOOR DETAILS (JAMB, THRESHOLD)A3

EXISTING DOOR HEADER

WALL (TYP)

SEALANT AROUND

PERIMETER OF FRAME

DOOR FRAME (TYP)

DOOR PER PLAN

DIMENSION PER WALL

WIDTH TO PROVIDE WRAP

AROUND WALL

SEALANT AROUND

PERIMETER OF FRAME

DOOR FRAME (TYP)

DOOR PER PLAN

WALL (TYP)

DIMENSION PER WALL

WIDTH TO PROVIDE WRAP

AROUND WALL

GROUT

CERAMIC FLOOR TILE

MORTAR SETTING BED

8 MIL BONDED WATERPROOFING

MEMBRANE, BOND TO

SUBSTRATE WITH THIN SET

MORTAR

SUBFLOOR

EXISTING FLOOR FRAMING

DOOR AND FRAME AS

PER PLAN

MARBLE THRESHOLD OR

APPROVED EQUAL

5/8" GREEN GYP. BOARD IN NON-SHOWER

WALL AREAS.

1/2" KERDI BOARD SYSTEM ON SHOWER

WALLS WITH KERDI WATERPROOFING

MEMBRANE

ALUMINUM SCHULTER STRIP WITH

RONDEC CORNER AND END PIECES OR

APPROVED EQUAL WITH

5/8" GREEN BOARD

CERAMIC WALL TILE

SCHLUTER KERDI WATERPROOFING

MEMBRANE AT SHOWER WALL

LOCATIONS (FULL WALL HEIGHT)

MORTAR SET

GROUT

S.S. COVE BASE

2"x2" MOSAIC FLOOR TILE

SCHLUTER KERDI WATERPROOFING

MEMBRANE AT SHOWER FLOOR

LOCATIONS

Sheets and Views
26 Lincoln Ave-Bathroom Renovation-T-100
26 Lincoln Ave-Bathroom Renovation-G-001
26 Lincoln Ave-Bathroom Renovation-A-100
26 Lincoln Ave-Bathroom Renovation-A-200
26 Lincoln Ave-Bathroom Renovation-A-300
26 Lincoln Ave-Bathroom Renovation-A-400

File details come from the government source that posted it. Updated .