26 Lincoln Ave-Bathroom Renovation-REV 3-19-26.pdf
PDF 2 MB Posted
- Attached to
- BM25052 Sidney Bathroom
- Solicitation number
- 2137070
- Issued by
- Broome County, New York
About this file
Summary
This is a design plan and specification document for a bathroom renovation project at 26 Lincoln Ave in Sidney, New York, prepared by Lakeside Engineering for the Broome Office of People with Developmental Disabilities (OPWDD). The project involves a complete gut renovation and remodel of an existing bathroom, including demolition of all existing finishes and fixtures down to the studs. The scope of work includes installation of new flooring consisting of 2x2 Florida Tile Serendipity unglazed porcelain mosaics with a 4-inch tile base, new wall finishes with 5/8-inch green moisture-resistant gypsum board in non-shower areas and Schluter Kerdi board with waterproofing membrane in shower areas, and 12x24-inch Florida Tile mosaic wall tile. New plumbing fixtures include an American Standard Cadet 12-inch elongated ADA-compliant toilet, a rectangular single-hole ceramic sink with Delta Kayra faucet, and a Kohler shower head and hand-held wand kit. The project also requires installation of grab bars, a recessed toilet paper dispenser, a 14-inch plate glass mirror with wall-mounted light fixture, a 24-inch by 12-inch linen cabinet above the toilet, a new 3-foot by 6-foot 8-inch rated interior door with frame and kick plate, replacement of the exhaust fan with a minimum 150 CFM Broan Smart Fan, and replacement of light fixtures with recessed wafer LED fixtures. The contract term is 60 days from award, with a mandatory site visit on July 22, 2026, at 10:00 a.m., and quotes are due on or before 5:00 p.m. on July 30, 2026.
The project is subject to prevailing wage requirements as it is classified as a Public Works project. All vendors and sub-contractors must be registered with the New York State Department of Labor, with certificates of registration required to be submitted with quotes. The Broome OPWDD is requesting quotes pursuant to discretionary purchasing authority rather than issuing a formal Invitation for Bids (IFB), and intends to award the contract to the most responsible and responsive vendor providing the lowest cost that meets the detailed scope of work requirements. The awarded vendor must submit certificates of liability insurance and workers' compensation insurance, complete lobbying law forms, and sign Appendix A. The project location is in Delaware County, Town of Sidney, and quotes must include itemized materials and labor cost breakdowns submitted on the official bid form provided by the agency. Broome OPWDD reserves the right to reject all quotes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BRM RFQ Form Sidney Bathroom.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"UNAUTHORIZED ALTERATION OR ADDITION TO PLANS BEARING
A LICENSED ENGINEER'S OR ARCHITECTS SEAL, IS A VIOLATION
OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW"
PROJECT NO:
DATE:
SCALE: AS SHOWN
20250605.1
10/20/2025
REVISIONS
MARK DATE DESCRIPTION
L
IN
C
O
LN
A
VE
S
ID
N
EY
BA
TH
R O
O M
R
EN
O
VA
TI
O
N
BR
O
O M
E O
PW
D
D
G
LE
N
W O
O D
R O
AD
BI
N G
H
AM
TO
N
, N Y
LAKESIDE ENGINEERING
Robert G. Harner, PE, PLLC
83 Fall Street Seneca Falls, NY 13148
Robert@LakesideEng.com www.LakesideEng.com
607-725-5824
1 03/19/26 GENERAL REVISIONS
BATHROOM
RENOVATION
CLIENT:
BROOME OPWDD
249 GLENWOOD ROAD
BINGHAMTON, NY 13905
26 LINCOLN AVE
SIDNEY, NY 13838
GENERAL/CIVIL DRAWINGS INDEX
SHEET NUMBER SHEET NAME
T-100 TITLE SHEET
G-001 GENERAL INFORMATION
A-100 DEMOLITION & PROPOSED FLOOR PLANS
A-200 INTERIOR ELEVATIONS
A-300 DETAILS
A-400 WALL & DOOR DETAILS
ENGINEER:
LAKESIDE ENGINEERING
83 FALL STREET
SENECA FALLS, NY 13148
AERIAL VIEW
PROJECT LOCATION
NONE
VICINITY MAP
T-100
TITLE SHEET
26 LINCOLN AVE
SIDNEY, NY
DELAWARE COUNTY
OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW"
PROJECT NO:
DATE:
SCALE: AS SHOWN
20250605.1
10/20/2025
REVISIONS
MARK DATE DESCRIPTION
L
IN
C
O
LN
A
VE
S
ID
N
EY
BA
TH
R O
O M
R
EN
O
VA
TI
O
N
BR
O
O M
E O
PW
D
D
G
LE
N
W O
O D
R O
AD
BI
N G
H
AM
TO
N
, N Y
LAKESIDE ENGINEERING
Robert G. Harner, PE, PLLC
83 Fall Street Seneca Falls, NY 13148
Robert@LakesideEng.com www.LakesideEng.com
607-725-5824
1 03/19/26 GENERAL REVISIONS
G-001
GENERAL
INFORMATION
GENERAL INFORMATION
ACT ACOUSTICALCEILINGTILE LAB. LABORATORY
A.F.F. ABOVEFINISHEDFLOOR LAM. LAMINATE
ALT. ALTERNATE LAV. LAVATORY
APPROX.. APPROXIMATE LT. LIGHT
ARCH. ARCHITECTURAL
MAX. MAXIMUM
BLDG.. BUILDING MECH. MECHANICAL
B.W. BOTHWAYS MEMO. MEMBRANE
MAR. MANUFACTURER
C.G. CORNERGUARD M.H. MANHOLE
CJ. CONTROLJT. MIN. MINIMUM
CLG. CEILING MISC. MISCELLANEOUS
CLKG. CAULKING M.O. MASONRYOPENING
CLR. CLEAR MTL METAL
C.M.U. CONCRETEMASONRYUNIT MUL MULLION
COL. COLUMN
CONC. CONCRETE N NORTH
CONSTR. CONSTRUCTION N.I.C. NOTINCONTRACT
CONT. CONTINUOUS NO. NUMBER
CPT. CARPET NOM. NOMINAL
C.T. CERAMICTILE N.T.S. NOTTOSCALE
NYS NEWYORKSTATE
DEG. DEGREE
D.F. DRINKING FOUNTAIN o.c. ONCENTER
DIAG. DIAGONAL O.D. OUTSIDEDIAMETER
DIA. DIAMETER OH. OVERHEAD
DN. DOWN OPG. OPENING
D.O.T. DEPARTMENTOFTRANSPORTATION OPP. OPPOSITE
DS. DOWNSPOUT
DWG. DRAWING PCT. PRE-CAST
PF PREFINISHED
E EAST P_L PROPERTY LINE
EA. EACH P.LAM. PLASTICLAMINATE
E.J. EXPANSIONJOINT PLAS. PLASTER
E.I.F.S. EXTERIOR INSULATION PLYWD. PLYWOOD
ANDFINISH SYSTEM PR. PAIR
ELEC. ELECTRICAL PNT PAINT
ELEV. ELEVATION
EMER EMERGENCY Q.T. QUARRYTILE
ENCL. ENCLOSURE R. RISER
EQ. EQUAL R.D. ROOFDRAIN
EQUIP. EQUIPMENT REF. REFRIGERATOR
E.W. EACHWAY REINF. REINFORCED
E.W.C. ELECTRICWATERCOOLER REQ'D. REQUIRED
EXP. EXPANSION RM ROOM
EXT. EXTERIOR R.O. ROUGHOPENING
F.A. FIREALARM s SOUTH F.D. FLOORDRAIN s.c. SOLIDCORE
F.D.C. FIREDEPARTMENTCONNECTION S.F. SQUAREFOOT
FDN. FOUNDATION SHT. SHEET
F.E. FIREEXTINGUISHER SIM. SIMILAR
F.E.C. FIREEXTINGUISHERCABINET SPEC. SPECIFICATION
F.F. FINISHFLOOR SQ. SQUARE
FIN. FINISH S-5. STAINLESSSTEEL
FLR. FLOOR STAGG. STAGGERED
FND. FOUNDATION STD. STANDARD
Ff. FOOTORFEET STN STAIN FfG. FOOTING STL STEEL
STRUC. STRUCTURAL
GA. GAUGE SUSP. SUSPENDED
GALV_ GALVANIZED
G.C. GENERALCONTRACTOR TR TREAD
GR. GRADE T&B TOPANDBOTTOM
GWB GYPSUMWALLBOARD TER. TERRAZZO
GYP. GYPSUM T&G TONGUE&GROOVE
H.B. HOSEBIBB THK. THICK
H.C. HOLLOWCORE 1YP. 1YPICAL
H/C HANDICAPPED
HDPB HIGHDENSITYPARTICLEBOARD U.N.O. UNLESSNOTEDOTHERWISE
HPDL HIGH PRESS.DECORATIVELAMINATE VCT VINYLCOMPOSITIONTILE
HDWD. HARDWODD VER VERIFY
HDWE. HARDWARE VERT_ VERTICAL
H.M. HOLLOWMETAL V.I.F. VERIFYINTHEFIELD
HT. HEIGHT
HVAC HEATING,VENTILATIONAND w WEST
AIRCONDITIONING W/ WITH
w.c. WATERCLOSET
INSUL. INSULATION WD. WOOD
INT. INTERIOR W/0 WITHOUT
JAN. JANITOR
JNT. JOINT
JST. JOIST
ABBREVIATIONS
PROJECT SUMMARY
LEGEND
SYMBOLS
PROPERTY LINES
EASEMENT
PROPOSED BUILDING
ELECTRIC UTILITYELEC ELEC
SANITARY LINESAN SAN
PROPOSED CONCRETE
W W W WATERLINE
PROPOSED GRASS AREAS
PROPOSED ASPHALT PARKING
GAS LINEGAS GAS
STORMWATER LINEST ST
LANDSCAPING
PARKING
GYPSUM WALL BOARD
INTERIOR WALL
RIGID INSULATION
CONCRETE (CMU) BLOCK
BATT INSULATION
CIVIL ARCHITECTURAL/STRUCTURAL
BRICK
EARTH
CONCRETE
STEEL
WOOD BLOCKING
GLASS
LOCATION
X'-X"
X A00
X A00
DETAIL
DETAIL #
SHEET #
SECTION
DETAIL #
SHEET #
ELEVATION TAG
COLUMN LINE1
CENTER LINECL
STONE/GRAVEL
X NEW WORK TAG
X WINDOW TAG
X
A00
INTERIOR ELEVATION
ELEVATION LETTER
SHEET #
X X
X
3/0DOOR TAG
ROOM TAG
REVISION
X
ADDRESS: 26 LINCOLN AVE
CITY/STATE: SIDNEY, NY
COUNTY: DELAWARE
MUNICIPALITY: TOWN OF SIDNEY
ZONING: RESIDENTIAL
SUMMARY:
OFFICE
1. THE GENERAL NOTES ARE PROVIDED AS PART OF THESE PLANS AND SPECIFICATIONS AND SHALL
BE COMPLIED WITH IN ALL RESPECTS.
2. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING SITE CONDITIONS AND DIMENSIONS PRIOR
TO THE START OF WORK. ANY DISCREPANCIES DISCOVERED SHALL BE SHARED WITH THE
ENGINEER FOR REVIEW AND COMMENT.
3. THE CONTRACTOR SHALL VERIFY ALL APPLICABLE MUNICIPAL APPROVALS AND PERMITS HAVE
BEEN APPROVED PRIOR TO THE START OF WORK.
4. THE CONTRACTOR SHALL PERFORM WORK IN ACCORDANCE WITH THE NEW YORK STATE BUILDING CODE, RULES & REGULATIONS, AND GENERAL REQUIREMENTS OF THE LOCAL AUTHORITY HAVING
JURISDICTION.
5. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION AND SCHEDULING OF REQUIRED
INSPECTIONS AS DIRECTED BY THE LOCAL AUTHORITY HAVING JURISDICTION.
6. THE CONTRACTOR SHALL FURNISH ALL MATERIALS AND PROVIDE METHODS OF CONSTRUCTION
THAT ARE IN CONFORMANCE TO INDUSTRY STANDARDS AND THE NEW YORK STATE BUILDING
CODE.
7. THE CONTRACTOR SHALL SUBMIT ALL MATERIAL SELECTIONS TO THE ENGINEER AND OWNER FOR
REVIEW AND APPROVAL PRIOR TO THE PROCUREMENT OF SUCH MATERIALS.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACTS AND ACTIONS OF THEIR EMPLOYEES
AND/OR SUB-CONTRACTORS DURING CONSTRUCTION.
9. THE CONTRACTOR SHALL PERFORM WORK IN A PROFESSIONAL WORKMANSHIP MANNER
ACCEPTABLE TO INDUSTRY STANDARDS.
10. THE CONTRACTOR IS RESPONSIBLE FOR PROPERLY CLEANING AND MAINTAINING THE PROPERTY
DURING CONSTRUCTION AND LEAVE THE PREMISES CLEAN, NEAT, AND ORDERLY.
THE PROPERTY LOCATED AT 26 LINCOLN AVE IN SIDNEY, NY IS PLANNING TO UNDERGO A RENOVATION
OF A BATHROOM WITHIN THE FACILITY.
THE BATHROOM WILL CONSIST OF A FULL GUT AND REMODEL INCLUDING NEW FLOORING, WALL, AND CEILING FINISHES. THE BATHROOM WILL BE OUTFITTED WITH NEW PLUMBING FIXTURES INCLUDING
TOILET, SINK, AND SHOWER.
GENERAL NOTES
DEMOLITION TAGX
1. THE OWNER IS RESPONSIBLE TO COMPLETE A LIMITED SURVEY FOR HAZARDOUS MATERIALS, IN WHICH NO ACMs WERE FOUND. COPIES OF THE SURVEY AND THE ASBESTOS REMOVAL SPECIFICATIONS CAN BE OBTAINED FROM BROOME OPWDD PROJECT MANAGER. IF SUSPECT MATERIALS THAT HAVE NOT BEEN TESTED ARE ENCOUNTERED, NOTIFY THE BROOME OPWDD PROJECT MANAGER WHO WILL ARRANGE FOR ADDITIONAL TESTING AND/OR PROVIDE DIRECTION. DO NOT DISTURB
SUSPECT MATERIALS.
2. DEMOLITION DRAWINGS AND NOTES ARE A GENERAL GUIDE TO THE EXTENT OF REMOVALS, BUT THEY ARE NOT COMPREHENSIVE. THE CONTRACTOR SHALL SURVEY THE WORK PRIOR TO SUBMITTING A PROPOSAL AND DETERMINE THE FULL EXTENT OF REMOVALS, THE WORK INCLUDES ALL REMOVALS REQUIRED TO PROPERLY INSTALL THE NEW WORK.
3. THE EXISTING BUILDING WILL BE OCCUPIED DURING THE COURSE OF THIS WORK. THE CONTRACTOR SHALL MAINTAIN EXISTING EXITS (PROVIDE OVERHEAD PROTECTION WHERE NECESSARY, REGULATE NOISE AND TRAFFIC) AS WELL AS
SECURE THE SPACE AS NECESSARY.
4. THE CONTRACTOR SHALL PHASE THE SCOPE OF WORK TO MAINTAIN PROPER EGRESS THROUGHOUT THE BUILDING AND COORDINATED WITH THE BROOME OPWDD FIELD REPRESENTATIVE. THE WORK SCHEDULE SHALL BE COORDINATED WITH BROOME OPWDD REPRESENTATIVE AT LEAST 7 DAYS PRIOR TO COMMENCEMENT OF EACH PHASE OF WORK.
5. THE CONTRACTOR SHALL FIELD VERIFY ALL WORK AND DIMENSIONS PRIOR TO COMMENCEMENT OF THIS WORK. NOTIFY THE
BROOME OPWDD REPRESENTATIVE OF ANY DISCREPANCIES.
6. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR DAMAGE TO EXISTING CONDITIONS THAT RESULT FROM THE COURSE
OF THIS WORK.
7. THE CONTRACTOR SHALL BE RESPONSIBLE TO SECURE AND PROTECT ALL AREAS (INTERIOR AND EXTERIOR), DURING THE
COURSE OF THIS WORK.
8. THE CONTRACTOR SHALL COORDINATE WITH BROOME OPWDD FIELD REPRESENTATIVE AND/OR THE FACILITY SITE MANAGER REPRESENTATIVES FOR LOCATION OF THE STAGING AREAS FOR THE DUMPSTER, CONSTRUCTION TRAILERS AND
CONSTRUCTION MATERIALS.
9. THE CONTRACTOR SHALL ENSURE ALL WORK IS PROTECTED 24 HOURS A DAY, 7 DAYS A WEEK TO PREVENT WATER LEAKS AND DAMAGE TO THE OCCUPIED HOME. ADDRESS ANY DAMAGED WORK AREAS AND INTERIOR AREAS DUE TO LEAKS DURING
THE COURSE OF THIS WORK.
10.THE CONTRACTOR SHALL PROPERLY CLEAN SITE OF ANY AND ALL CONSTRUCTION DEBRIS (ESPECIALLY NAILS) FROM THE
WORK SITE EACH DAY,.
11.THE CONTRACTOR SHALL COMPLY WITH THE OPWDD SAFETY PLAN.
12.THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE BROOME OPWDD.
13.THE CONTRACTOR SHALL INSTALL MATERIALS WITH COLORS AS NOTED ON THE PLANS OR AS SELECTED BY THE BROOME
OPWDD REPRESENTATIVE(S).
14.THE CONTRACTOR SHALL ADDRESS ANY DAMAGED WORK AREAS AND INTERIOR AREAS DUE TO LEAKS DURING THE COURSE
OF THIS WORK AT NO ADDITIONAL COST TO THE OWNER.
L
L
L
SS
L
L
S L
GFI
"UNAUTHORIZED ALTERATION OR ADDITION TO PLANS BEARING
A LICENSED ENGINEER'S OR ARCHITECTS SEAL, IS A VIOLATION
OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW"
PROJECT NO:
DATE:
SCALE: AS SHOWN
20250605.1
10/20/2025
REVISIONS
MARK DATE DESCRIPTION
L
IN
C
O
LN
A
VE
S
ID
N
EY
BA
TH
R O
O M
R
EN
O
VA
TI
O
N
BR
O
O M
E O
PW
D
D
G
LE
N
W O
O D
R O
AD
BI
N G
H
AM
TO
N
, N Y
LAKESIDE ENGINEERING
Robert G. Harner, PE, PLLC
83 Fall Street Seneca Falls, NY 13148
Robert@LakesideEng.com www.LakesideEng.com
607-725-5824
1 03/19/26 GENERAL REVISIONS
A-100
DEMOLITION &
PROPOSED
FLOOR PLANS
SCALE: 1/2"=1'-0"
EXISTING BATHROOM & REMOVAL PLANA1
KEYED DEMOLITION NOTES:
REMOVE AND DISPOSE OF ALL WALL/WAINSCOT TILE AND GYPSUM BOARD DOWN TO
THE EXISTING STUDS.
3 REMOVE ALL PLUMBING FIXTURES SUCH AS TOILET, SINKS, AND SHOWER FIXTURES.
COORDINATE SALVAGING OF FIXTURES WITH THE OWNER.
5 REMOVE AND DISPOSE OF CABINETRY AND STORING SHELVING IN ITS ENTIRETY.
6 REMOVE DRAIN CAP AND PROVIDE MAINTENANCE TO DRAIN AND BRING DRAIN TO
WORKING CONDITION. COORDINATE WITH NEW FLOORING WORK.
7 REMOVE AND DISPOSE OF FLOOR TILE AND PREPARE SUBSTRATE FOR NEW WORK.
REMOVE DOOR AND FRAME IN ITS ENTIRETY. COORDINATE WITH OWNER FOR ANY
DOORS AND FRAMES TO BE SALVAGED.
FURNISH AND INSTALL NEW FLOOR FINISH SYSTEM TO BE 2x2 FLORIDATILE
SERENDIPITY UNGLAZED PORCELAIN MOSAICS WITH 4" TILE BASE OR APPROVED
EQUAL. PROVIDE SCHLUTER KERDI WATERPROOFING MEMBRANE AT SHOWER
LOCATION. TILE AND BASE COLOR AS SELECTED BY THE OWNER. GROUT COLOR AS
SELECTED BY THE OWNER. INSTALLATION PER MANUFACTURER INSTRUCTIONS.
FURNISH AND INSTALL NEW WALL FINISHES TO BE 5/8" GREEN (MOIST. RESISTANT) GYP.
BOARD IN NON-SHOWER AREAS WITH SCHULTER KERDI BOARD AND WATERPROOFING
MEMBRANE AT SHOWER WALL LOCATIONS. FURNISH AND INSTALL 12"x24" FLORIDATILE
MOSAIC WALL TILE OR APPROVED EQUAL. TILE AND GROUT COLOR AS SELECTED BY
THE OWNER. INSTALL AS PER MANUFACTURER INSTRUCTIONS. PRIME AND PAINT GYP.
BOARD AREAS. COLOR AS SELECTED BY THE OWNER.
FURNISH AND INSTALL SHOWER HEAD AND HAND HELD WAND KIT TO BE KOHLER
MODEL K-76471-Y OR APPROVED EQUAL. FURNISH AND INSTALL NEW PLUMBING TO
RELOCATE SHOWER SYSTEM FROM EXISTING LOCATION. FURNISH AND INSTALL
BLOCKING, MOUNTING, AND BRACKETS AS PER MANUFACTURER INSTRUCTIONS.
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS, DIMENSIONS AND PROPOSED
NEW WORK TO PROVIDE ALL REMOVALS REQUIRED TO INSTALL NEW WORK. REMOVALS
SHOWN ARE APPROXIMATE AND ONLY INDICATE THE GENERAL SCOPE OF WORK. NOTIFY
THE ARCHITECT OF ANY DISCREPANCIES PRIOR TO SUBMITTING A BID.
2. COORDINATE WITH THE OPWDD REPRESENTATIVE AND/OR HOUSE MANAGER THE
LOCATION OF STAGING AREA FOR MATERIALS, TRAILERS, ETC.
3. ALL WORK SHALL BE COORDINATED WITH OPWDD OFFICIALS.
4. BE RESPONSIBLE TO SECURE AND PROTECT ALL AREAS (INTERIOR AND EXTERIOR), DURING
THE COURSE OF THIS WORK.
5. BE RESPONSIBLE TO REPAIR DAMAGE TO EXISTING CONDITIONS THAT RESULT FROM THE
COURSE OF THIS WORK AT NO ADDITIONAL COST TO THE OWNER.
6. MODIFY EXISTING DOMESTIC WATER SUPPLY AND SANITARY SEWER PIPING AS
NECESSARY TO CONNECT NEW PLUMBING FIXTURES TO COMPLETE THE INSTALLATION.
PROVIDE NEW 3/4'' TYPE L COPPER PIPING FOR SUPPLY PIPING AND 1/2" TYPE L COPPER
PIPING FOR RUN-OUTS TO THE FIXTURES. PROVIDE AP ARMAFLEX ELASTOMERIC PIPE
INSULATION WITH AP SEAL FOR NEW DOMESTIC WATER SUPPLY PIPING AS MANUFACTURED
BY ARMACELL OR APPROVED EQUAL PROVIDE NEW SCHEDULE 40 PVC PIPING FOR NEW
SANITARY AND VENT PIPING, SLOPE 1/4'' PER FOOT. INSTALL IN ACCORDANCE WITH
MANUFACTURER'S WRITTEN INSTRUCTIONS.
KEYED NEW WORK NOTES:
REMOVE ALL ACCESSORIES SUCH AS MIRROR/LIGHT, GRAB BARS, PADDING, AND
DISPENSERS. SALVAGE GRAB BARS FOR OWNER'S USE.
SCALE: 1/2"=1'-0"
PROPOSED BATHROOM PLANA2
B
A200A C
D
FURNISH AND INSTALL NEW SCHLUTER KERDI SYSTEM FLOOR DRAIN. FLOOR DRAIN
DISCHARGE TO MATCH EXISTING SANITARY PIPING DIAMETER. CONNECT NEW FLOOR
DRAIN TO EXISTING SANITARY PIPING SYSTEM. MODIFY EXISTING SANITARY PIPING
SYSTEM AS NECESSARY TO COMPLETE THE INSTALLATION. SEE DETAIL ON A-300.
FURNISH AND INSTALL NEW WALL MOUNTED SINK TO BE RECTANGULAR SINGLE HOLE
CERAMIC (CERASTYLE) OR APPROVED EQUAL. FURNISH AND INSTALL FAUCET TO BE
DELTA KAYRA OR APPROVED EQUAL. ADJUST PLUMBING AND TRAP AS NECESSARY TO
ACCOMMODATE LOCATION OF NEW SINK. CAULK AROUND ALL EDGES OF INSTALLED
SINK. INSTALL AS PER MANUFACTURER INSTRUCTIONS.
FURNISH AND INSTALL NEW TOILET TO BE AMERICAN STANDARD "CADET" 12"
ELONGATED ADA COMPLIANT OR APPROVED EQUAL. ADJUST FLANGE LOCATION AND
ASSOCIATED PLUMBING AS NECESSARY TO ACCOMMODATE INSTALLATION. INSTALL
AS PER MANUFACTURER INSTRUCTIONS.
FURNISH AND INSTALL INSTALL GRAB BARS WITH FULL BLOCKING AND TO BE OF
SIMILAR MAKES AS MOEN, BOBRICK, BRADLEY OR APPROVED EQUAL. FURNISH AND
INSTALL RECESSED TOILET PAPER DISPENSER TO BE FRANKLIN BRUSHED NICKEL OR
APPROVED EQUAL.
FURNISH AND INSTALL 14" PLATE GLASS MIRROR WITH WALL MOUNTED LIGHT FIXTURE
CENTERED ABOVE.
REMOVE AND DISPOSE OF GYP. BOARD CEILING IN ITS ENTIRETY. LIGHTING,
MECHANICAL, AND DETECTORS LOCATIONS TO REMAIN.
FURNISH AND INSTALL ACCESSORIES SUCH AS RECESSED TOILET DISPENSER, SOAP
DISPENSER, AND PAPER TOWEL DISPENSER. COORDINATE WITH OWNER ON FINAL
LOCATIONS OF THESE ACCESSORIES. MAKE AND MODEL TO MATCH SIMILAR
ACCESSORIES USED WITHIN THE FACILITY.
FURNISH AND INSTALL A 24"Wx12D LINEN CABINET ABOVE TOILET TO BE KRAFTMAID
ADA "PASSPORT" SERIES OR APPROVED EQUAL. INSTALL CABINETS AS PER
MANUFACTURER INSTRUCTIONS.10
FURNISH AND INSTALL NEW 3'-0"X6'-8" RATED DOOR AND FRAME. FRAME TO BE RATED
STEELCRAFT OR APPROVED EQUAL. DOOR TO BE WOOD WITH STEEL KICK PLATE.
INSTALL DOOR AND FRAME AS PER MANUFACTURER INSTRUCTIONS. FURNISH AND
INSTALL NEW THRESHOLD AT DOORWAY. REFER TO DETAIL A3/A-400.
EXISTING WINDOW TO REMAIN. FURNISH AND INSTALL NEW TRIM AND PREPARE TRIM
TO BE PAINTED. REMOVE VENT PLATE BELOW WINDOW, PAINT, AND REINSTALL,
FURNISH AND INSTALL NEW CEILING WITH 5/8" GREEN (MOIST. RESISTANT) GYP.
BOARD TAPES, PRIMED, AND PAINED. EXISTING LIGHTING, EXHAUST FAN, DETECTORS,
AND MECHANICAL LOCATIONS TO REMAIN. REPLACE EXHAUST FAN WITH MIN. 150 CFM
BROAN SMART FAN/EXHAUST OR APPROVED EQUAL. REPLACE LIGHT FIXTURE WITH
RECESSED WAFER LED FIXTURE LITHONIA OR APPROVED EQUAL.
MODIFY ELECTRICAL COMPONENTS SUCH AS OUTLETS AND SWITCHES AS NECESSARY
TO ACCOMMODATE NEW WORK. PROVIDE GFI OUTLETS AS REQUIRED. ALL WORK
SHALL COMPLY WITH STANDARD CODES. REPLACE LIGHT OVER SHOWER WITH NEW
EXHAUST FAN BROAN SMART FAN/EXHAUST OR APPROVED EQUAL. REPLACE LIGHT
FIXTURE WITH RECESSED WAFER LED FIXTURE LITHONIA OR APPROVED EQUAL.
SCALE: 1/2"=1'-0"
PROPOSED CEILING PLANA3
MATERIAL SELECTIONS:
ITEM MANUFACTURER/PATTERN COLOR/TYPE REMARKS
FLORIDATILE/SERENDIPITY1 2"X2" MOSAIC- INTUITION TOBACCO FLOOR TILE
FLORIDATILE/SERENDIPITY2 12"X24" MOSAIC- INTUITION TOBACCO WALL TILE
FLORIDATILE/BLISS3 12"X12" MOSAIC- CAPPUCCINO ACCENT WALL TILE
FLORIDATILE/SERENDIPITY4 3"X24" MOSAIC- INTUITION TOBACCO WAINSCOT BULLNOSE
ARDEX5 APPLE BUTTER FLOOR TILE GROUT
ARDEX6 IRISH CREAM WALL TILE GROUT
7 SHERWIN WILLIAMS EGRET WHITE SW7570-EGGSHELL WALL PAINT
8 SHERWIN WILLIAMS MATCH EXISTING CEILING & DOOR FRAME
A3 A300
A3 A400
A2 A300
7'
11'-3"
3'-9"
4 5
EXT. MECHANICAL
TO REMAIN
EXT. SPRINKLER HEAD
AND PIPING TO REMAIN.
PROTECT DURING
CONSTRUCTION.
EXT. MECHANICAL
TO REMAIN
11'-3"
4'
7'-3"
7'
2'
11'-3"
1'-5"
3'-10"
4'-01 2"
A1 A400
A1 A400
A3 A300
7'
3'-9"
11'-3"
7'
OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW"
PROJECT NO:
DATE:
SCALE: AS SHOWN
20250605.1
10/20/2025
REVISIONS
MARK DATE DESCRIPTION
L
IN
C
O
LN
A
VE
S
ID
N
EY
BA
TH
R O
O M
R
EN
O
VA
TI
O
N
BR
O
O M
E O
PW
D
D
G
LE
N
W O
O D
R O
AD
BI
N G
H
AM
TO
N
, N Y
LAKESIDE ENGINEERING
Robert G. Harner, PE, PLLC
83 Fall Street Seneca Falls, NY 13148
Robert@LakesideEng.com www.LakesideEng.com
607-725-5824
1 03/19/26 GENERAL REVISIONS
A-200
INTERIOR
ELEVATIONS
SCALE: 3/4"=1'-0"
ELEVATION-AA1
SCALE: 3/4"=1'-0"
ELEVATION-CA3
SCALE: 3/4"=1'-0"
ELEVATION-BA2
SCALE: 3/4"=1'-0"
ELEVATION-DA4
NEW TOILET AT EXISTING LOCATION.
VERIFY IN FIELD. ADJUST FLANGE AND
ASSOCIATED PLUMBING IF NECESSARY.
36" HORIZONTAL GRAB BAR. REFER TO
SHEET A-300 FOR MOUNTING DETAILS.
PROVIDE BLOCKING AS PER
MANUFACTURER INSTRUCTIONS
24" HORIZONTAL GRAB BAR. REFER TO SHEET
A-300 FOR MOUNTAIN DETAILS. PROVIDE
BLOCKING AS PER MANUFACTURER
INSTRUCTIONS.
TOILET DISPENSER AS PER SPECIFICATIONS
48" HEIGHT SOLID SURFACE WAINSCOT AS
PER SPECIFICATIONS.
24"WX12"X24"H LINEN CABINET AS PER
SPECIFICATIONS
4" TILE BASE AS PER SPECIFICATIONS.
WALL MOUNTED LIGHT BAR
CENTERED OVER MIRROR
5/8" GREEN BOARD BOARD TO BE TAPED,
PRIMED, AND PAINTED.
5/8" GREEN BOARD BOARD
TO BE TAPED, PRIMED, AND
PAINTED.
SHOWER TILE AS PER SPECIFICATION
OVER 1/2" SCHLUTER KERDI BOARD
AND WATERPROOFING MEMBRANE
SHOWER ASSEMBLY WITH HEAD AND
WAND AS PER SPECIFICATIONS.
RELOCATE PLUMBING FOR EXISTING
LOCATION TO NEW.
36" HORIZONTAL GRAB BAR. REFER TO
SHEET A-300 FOR MOUNTAIN DETAILS.
PROVIDE BLOCKING AS PER
MANUFACTURER INSTRUCTIONS.
4" TILE BASE AS PER SPECIFICATIONS.
42" HORIZONTAL GRAB BAR. REFER TO
SHEET A-300 FOR MOUNTING DETAILS.
PROVIDE BLOCKING AS PER
MANUFACTURER INSTRUCTIONS
4" TILE BASE AS PER SPECIFICATIONS.
SHOWER ASSEMBLY WITH HEAD AND
WAND AS PER SPECIFICATIONS.
RELOCATE PLUMBING FOR EXISTING
LOCATION TO NEW.
24" HORIZONTAL WITH 24" VERTICAL
COMBINATION GRAB BAR. REFER TO SHEET
A-300 FOR MOUNTAIN DETAILS. PROVIDE
BLOCKING AS PER MANUFACTURER
INSTRUCTIONS.
4" TILE BASE AS PER SPECIFICATIONS.
WALL HUNG SINK FACET AS PER
SPECIFICATIONS. ADJUST FOR
NEW LOCATION AS NECESSARY.
24"Wx42"H PLATE GLASS
MIRROR MIRROR
HAND TOWEL DISPENSER. FINAL
LOCATION AS SELECTED BY THE
OWNER SOAP DISPENSER. FINAL LOCATION
AS SELECTED BY THE OWNER
24" HORIZONTAL WITH 24" VERTICAL
COMBINATION GRAB BAR. REFER TO SHEET
A-300 FOR MOUNTAIN DETAILS. PROVIDE
BLOCKING AS PER MANUFACTURER
INSTRUCTIONS.
WALL HUNG SINK FACET AS PER
SPECIFICATIONS. ADJUST FOR
NEW LOCATION AS NECESSARY.
WALL MOUNTED LIGHT BAR
CENTERED OVER MIRROR
24"Wx42"H PLATE GLASS
MIRROR MIRROR
HAND TOWEL & SOAP DISPENSERS.
FINAL LOCATION AS SELECTED BY
THE OWNER
5/8" GREEN BOARD
BOARD TO BE TAPED,
PRIMED, AND PAINTED.
48" HEIGHT SOLID SURFACE
WAINSCOT AS PER
SPECIFICATIONS.
4" TILE BASE AS PER SPECIFICATIONS.
EXISTING WINDOW TO REMAIN.
FURNISH AND INSTALL NEW TRIM.
REMOVE, PAINT, AND REPLACE
EXISTING VENT PLATE.
NEW TOILET AT EXISTING LOCATION.
VERIFY IN FIELD. ADJUST FLANGE AND
ASSOCIATED PLUMBING IF NECESSARY.
REMOVE EXISTING PADDING AND
SALVAGE DURING CONSTRUCTION.
RE-INSTALL AS PER DIRECTIONS BY THE
OWNER.
24" HORIZONTAL GRAB BAR. REFER TO SHEET
A-300 FOR MOUNTAIN DETAILS. PROVIDE
BLOCKING AS PER MANUFACTURER
INSTRUCTIONS.
TOILET DISPENSER AS PER SPECIFICATIONS
5/8" GREEN BOARD BOARD TO BE TAPED,
PRIMED, AND PAINTED.
48" HEIGHT SOLID SURFACE WAINSCOT AS
PER SPECIFICATIONS.
4" TILE BASE AS PER SPECIFICATIONS.
36" GAB BAR AS PER. REFER TO SHEET A-300
FOR MOUNTING DETAILS. PROVIDE BLOCKING
AND PER MANUFACTURER INSTRUCTIONS.
EXISTING SPRINKLER HEAD TO REMAIN
AND BE PROTECTED DURING
CONSTRUCTION
4" TILE BASE AS PER SPECIFICATIONS.
NEW 3'-0"x6'-8" INTERIOR DOOR
AND FRAME WITH KICK PLATE
48" HEIGHT SOLID SURFACE WAINSCOT AS
PER SPECIFICATIONS.
FLOOR DRAIN. REFER TO DETAIL
A3 ON SHEET A-300.
48"
SHOWER WALL
8' ± 8' ±
7'
SHOWER WALL
7'
8' ±
48"
33"-36"33"-36"33"-36"
11'-3"
11'-3"
8'
48"
SHOWER WALL
SCHLUTER KERDI WATERPROOFING
MEMBRANE. TILE OVER SYSTEM AS
PER MANUFACTURER
ALUMINUM SCHULTER STRIP WITH
RONDEC CORNER AND END PIECES
OR APPROVED EQUAL WITH
ALUMINUM SCHULTER STRIP WITH
RONDEC CORNER AND END PIECES
OR APPROVED EQUAL WITH
ALUMINUM SCHULTER STRIP WITH
RONDEC CORNER AND END PIECES
OR APPROVED EQUAL WITH
ALUMINUM SCHULTER STRIP WITH
RONDEC CORNER AND END PIECES
OR APPROVED EQUAL WITH
ALUMINUM SCHULTER STRIP WITH
RONDEC CORNER AND END PIECES
OR APPROVED EQUAL WITH
SCHLUTER KERDI WATERPROOFING
MEMBRANE. TILE OVER SYSTEM AS
PER MANUFACTURER
SHOWER TILE AS PER SPECIFICATION
OVER 1/2" SCHLUTER KERDI BOARD
AND WATERPROOFING MEMBRANE
SHOWER TILE AS PER SPECIFICATION
OVER 1/2" SCHLUTER KERDI BOARD
AND WATERPROOFING MEMBRANE
SHOWER TILE AS PER SPECIFICATION
OVER 1/2" SCHLUTER KERDI BOARD
AND WATERPROOFING MEMBRANE
OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW"
PROJECT NO:
DATE:
SCALE: AS SHOWN
20250605.1
10/20/2025
REVISIONS
MARK DATE DESCRIPTION
L
IN
C
O
LN
A
VE
S
ID
N
EY
BA
TH
R O
O M
R
EN
O
VA
TI
O
N
BR
O
O M
E O
PW
D
D
G
LE
N
W O
O D
R O
AD
BI
N G
H
AM
TO
N
, N Y
LAKESIDE ENGINEERING
Robert G. Harner, PE, PLLC
83 Fall Street Seneca Falls, NY 13148
Robert@LakesideEng.com www.LakesideEng.com
607-725-5824
1 03/19/26 GENERAL REVISIONS
SCALE: 3/4"=1'-0"
STANDARD BATHROOM MOUNTING A1
A-300
DETAILS
1'-0" 3'-6"
1'-6"
3'-4"
2'-0"
17" MIN.
9"36" 3'-4"
1-1/4" Ø STAINLESS STEEL
GRAB BARS WITH SOLID
BLOCKING
TOILET PAPER DISPENSER
LUXURY VINYL
TILE FLOORING
VINYL BASE
TOILET (TYP)
8' +/- V.I.F.
TOILET (TYP)
1-1/4" Ø STAINLESS STEEL
GRAB BARS WITH SOLID
BLOCKING
17"
17" MIN.
17"
33"
2'-0"
3'-0"
NOTES:
1. DEPICTION OF BATHROOM IS NOT ACCURATE TO EXACT BATHROOM LAYOUT. DEPICTION
ABOVE IS FOR STANDARD MOUNTING DETAILS.
2. REFER TO SHEET A-200 FOR APPLICABLE INTERIOR ELEVATIONS OF THE BATHROOM LAYOUT.
SWING-UP GRAB
BAR SEE DETAIL
A2/A300
SCALE: NTS
TYP. BLOCKINGA2
2X BLOCKING
5/8" GREEN BOARD
BED OF SILICONE
GRAB BAR
ANCHOR GRAB BAR INTO STUDS
OR SOLID BLOCKING
SILICONE SEALANT BEHIND
MOUNTING HOLES
WALL FINISH
SCALE: NTS
TYP. FLOOR DRAINA3
NEW KERDI SYSTEM FLOOR DRAIN. TIE INTO
EXISTING SANITARY PIPING. INSTALLATION
PER MANUFACTURER INSTRUCTIONS
KERDI SYSTEM MEMBRANE OVER
SUBFLOOR MATERIAL
SLOPE 1/4" PER FOOT
EXT. FLOOR JOISTS
CONNECT TO EXISTING SANITARY PIPING
KERDI MEMBRANE FLANGE
SCHLUTER KERDI SHOWER SYSTEM
2"x2" MOSAIC FLOOR TILE. COLOR
AS SELECTED BY THE OWNER
17"
INTERIOR DOOR HEAD INTERIOR DOOR JAMB
EXISTING FINISH FLOOR
"UNAUTHORIZED ALTERATION OR ADDITION TO PLANS BEARING
A LICENSED ENGINEER'S OR ARCHITECTS SEAL, IS A VIOLATION
OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW"
PROJECT NO:
DATE:
SCALE: AS SHOWN
20250605.1
10/20/2025
REVISIONS
MARK DATE DESCRIPTION
L
IN
C
O
LN
A
VE
S
ID
N
EY
BA
TH
R O
O M
R
EN
O
VA
TI
O
N
BR
O
O M
E O
PW
D
D
G
LE
N
W O
O D
R O
AD
BI
N G
H
AM
TO
N
, N Y
LAKESIDE ENGINEERING
Robert G. Harner, PE, PLLC
83 Fall Street Seneca Falls, NY 13148
Robert@LakesideEng.com www.LakesideEng.com
607-725-5824
1 03/19/26 GENERAL REVISIONS
A-400
WALL & DOOR
DETAILS
SCALE: NTS
TILE WAINSCOT WALL SECTIONA1
EXT. WALL FRAMING
EXT. SILL PLATE
SCALE: NTS
DOOR DETAILA2
D O
O R
H
EI
G H
T
AS
P
ER
P
LA
N
DOOR WIDTH
AS PER PLAN
WOOD DOOR (STAIN AS SELECTED)
14 GA. HOLLOW METAL KNOCK
DOWN FRAME (PAINTED)
HIGH KICK PLATE ON PUSH SIDE
2"2"
4"
SCALE: NTS
DOOR DETAILS (JAMB, THRESHOLD)A3
EXISTING DOOR HEADER
WALL (TYP)
SEALANT AROUND
PERIMETER OF FRAME
DOOR FRAME (TYP)
DOOR PER PLAN
DIMENSION PER WALL
WIDTH TO PROVIDE WRAP
AROUND WALL
SEALANT AROUND
PERIMETER OF FRAME
DOOR FRAME (TYP)
DOOR PER PLAN
WALL (TYP)
DIMENSION PER WALL
WIDTH TO PROVIDE WRAP
AROUND WALL
GROUT
CERAMIC FLOOR TILE
MORTAR SETTING BED
8 MIL BONDED WATERPROOFING
MEMBRANE, BOND TO
SUBSTRATE WITH THIN SET
MORTAR
SUBFLOOR
EXISTING FLOOR FRAMING
DOOR AND FRAME AS
PER PLAN
MARBLE THRESHOLD OR
APPROVED EQUAL
5/8" GREEN GYP. BOARD IN NON-SHOWER
WALL AREAS.
1/2" KERDI BOARD SYSTEM ON SHOWER
WALLS WITH KERDI WATERPROOFING
MEMBRANE
ALUMINUM SCHULTER STRIP WITH
RONDEC CORNER AND END PIECES OR
APPROVED EQUAL WITH
5/8" GREEN BOARD
CERAMIC WALL TILE
SCHLUTER KERDI WATERPROOFING
MEMBRANE AT SHOWER WALL
LOCATIONS (FULL WALL HEIGHT)
MORTAR SET
GROUT
S.S. COVE BASE
2"x2" MOSAIC FLOOR TILE
SCHLUTER KERDI WATERPROOFING
MEMBRANE AT SHOWER FLOOR
LOCATIONS
| Sheets and Views |
| 26 Lincoln Ave-Bathroom Renovation-T-100 |
| 26 Lincoln Ave-Bathroom Renovation-G-001 |
| 26 Lincoln Ave-Bathroom Renovation-A-100 |
| 26 Lincoln Ave-Bathroom Renovation-A-200 |
| 26 Lincoln Ave-Bathroom Renovation-A-300 |
| 26 Lincoln Ave-Bathroom Renovation-A-400 |
File details come from the government source that posted it. Updated .