Cooley Sports Complex Phase 1, Bid Package #2 - Site Improvements Specifications

This is a detailed specification document for site improvement work at Detroit Public Schools Community District's Cooley Sports Complex Phase 1, Bid Package #2, located in Detroit, Michigan. The project is overseen by Hamilton Anderson Associates (Architect), AECOM (Owner's Representative), and JIMA Studio as project consultants. The scope of work encompasses extensive site improvements including temporary erosion and sediment control, utility line removal, earthwork and grading, fill placement, trenching and backfilling, aggregate base courses, asphalt paving, concrete paving with curbs and gutters, cast-in-place concrete site improvements, textured acrylic color surfacing for pickleball courts, site furnishings installation, soil preparation, turf and grass establishment, plant material installation, and utility structure modifications. The bid date is March 13, 2026, with specifications addressing material standards, installation procedures, quality assurance requirements, and field quality control protocols throughout all construction phases.

The specifications detail comprehensive material requirements and performance standards across all work divisions, referencing MDOT Standard Specifications, ASTM standards, and local Detroit engineering standards. Quality assurance provisions require independent testing agencies for soil compaction, concrete strength, asphalt density, and other construction activities, with specific testing frequencies and acceptance criteria established for each trade. Contractor responsibilities include obtaining all required permits (including Act 451 Part 91 erosion control and NPDES permits), maintaining erosion and sediment controls throughout construction, providing proof rolling and compaction testing, and establishing satisfactory turf and plant material within specified maintenance periods. The document specifies detailed material sourcing, sample submission requirements, and closeout documentation including maintenance data for Owner operations, with particular emphasis on environmental compliance, worker safety, and protection of existing utilities and site features not designated for removal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hamilton Anderson Associates Detroit Public Schools Community District Project No. 2025049.00 Cooley Sports Complex Phase 1, Bid Package # 2 - 03/13/2026 Detroit, Michigan

Project Title Page 00 01 01 - 1

SECTION 00 01 01

PROJECT TITLE PAGE

PROJECT MANUAL

FOR

COOLEY SPORTS COMPLEX

PHASE 1, BID PACKAGE #2 - SITE IMPROVEMENTS

OWNER:

DETROIT PUBLIC SCHOOLS COMMUNITY DISTRICT

3011 W. GRAND BLVD. DETROIT, MICHIGAN 48202

(313) 240-4377

OWNERS REPRESENTATIVES:

AECOM

4219 WOODWARD AVENUE SUITE 200 DETROIT, MICHIGAN 48291

(313) 989-1800

JIMA STUDIO

1401 VERMONT ST. SUITE 220 DETROIT, MICHIGAN 48216

(313) 262-6880

ARCHITECT:

HAMILTON ANDERSON ASSOCIATES

1435 RANDOLPH, SUITE 200 DETROIT, MICHIGAN 48226

(313) 964-0270

HAA PROJECT NO. 2025049.00

PHASE 1, BID PACKAGE #2

MARCH 13, 2026

END OF SECTION

This page intentionally left blank

Table of Contents 00 01 10 - 1

SECTION 00 01 10

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS

1.01 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS

A. 00 01 01 - Project Title Page B. 00 01 10 - Table of Contents C. 00 01 15 - List of Drawing Sheets

SPECIFICATIONS

2.01 DIVISION 01 -- GENERAL REQUIREMENTS

A. 01 57 13 - Temporary Erosion and Sediment Control

2.02 DIVISION 02 -- EXISTING CONDITIONS

A. 02 41 13.23 - Utility Line Removal

2.03 DIVISION 03 -- 30 NOT USED

2.04 DIVISION 31 -- EARTHWORK

A. 31 00 00 - Earthwork B. 31 10 00 - Site Clearing C. 31 22 13 - Rough Grading D. 31 23 23 - Fill E. 31 23 23.33 - Flowable Fill F. 31 23 33 - Trenching and Backfilling

2.05 DIVISION 32 -- EXTERIOR IMPROVEMENTS

A. 32 11 23 - Aggregate Base Courses B. 32 12 16 - Asphalt Paving C. 32 13 13 - Concrete Paving, Walks, Curbs and Gutters D. 32 16 16 - Cast-in-Place Concrete E. 32 18 23 - Textured Acrylic Color Surfacing F. 32 33 00 - Site Furnishings G. 32 91 13 - Soil Preparation H. 32 92 00 - Turf and Grasses I. 32 93 00 - Plants

2.06 DIVISION 33 -- UTILITIES

A. 33 05 13 - Manholes and Structures B. 33 05 13.13 - Manhole Grade Adjustment C. 33 05 16.53 - Rebuilding Utility Structures D. 33 41 00 - Storm Utility Drainage Piping

List of Drawing Sheets 00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

1.01 AS INDICATED ON BID PACKAGE #2, DATED 03-13-2026

SEE DRAWINGS LIST ON SHEET CS-1.

PEA Group Detroit Public Schools Community District

Project No. 25-1488 Cooley Sports Complex

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

TEMPORARY EROSION AND SEDIMENT CONTROL 01 57 13 - 1

SECTION 01 57 13

TEMPORARY EROSION AND SEDIMENT CONTROL

PART 1 GENERAL

1.01 SECTION INCLUDES

A. This section includes requirements related to the contractor�s responsibility to furnish all labor, equipment, and materials associated with erosion and sediment control required by permits and required to complete the work as shown on the engineering drawings and specified herein.

1.02 SCOPE

A. This work includes the installation and maintenance of erosion and sedimentation controls required to prevent or minimize soil erosion and sedimentation from impacting the water resources of the State of Michigan and adjacent properties.

1.03 COORDINATION

A. The Contractor shall conduct work so that all soils, fuels, oils, bituminous materials, chemicals, sanitary sewage, debris and other unsuitable materials, resulting from the construction of the project, are confined within the project limits. These materials shall be properly disposed of to prevent them from leaving the project site and from entering watercourses, rivers, lakes, streams, reservoirs, wetlands or ground water beyond project limits.

B. Governing Standards

1. All erosion and sediment control work shall comply with applicable requirements of governing authorities having jurisdiction, including, but not limited to:

2. Act 451 of 1994, Natural Resources and Environmental Protection Act, Part 91, Michigan Soil Erosion and Sedimentation Control (formerly PA 347 of 1972, as amended).

3. Michigan Department of Transportation (MDOT) Standard Specifications for Construction.

4. Wayne County Department of Public Services Engineering Division, Erosion and Sedimentation Control Standard Plan, dated April 17,1997.

5. Wayne County Department of Public Services Engineering Division, Special Provision for Erosion Controls, dated April 24, 1997.

6. Oakland County Department of Public Works, Erosion Control Manual.

1.04 QUALITY ASSURANCE

A. Soil Erosion and Sedimentation Control measures shall be installed and maintained in accordance with the requirements of all Federal, State and Local laws and regulations regarding soil erosion and sedimentation control. Failure by the Contractor to install and maintain adequate soil erosion controls may result in project shutdown and/or possible fines from the MDEQ. The Contractor is required to obtain an Act 451, Part 91 permit from the local soil erosion agency, as applicable and all other applicable Federal, State and local permits when work disturbs more than 1 acre (4047

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

TEMPORARY EROSION AND SEDIMENT CONTROL 01 57 13 - 2

m2) of land or is within 500 feet (152.4 m) of a lake or stream. Local Agency Act 451, Part 91 requirements may be more restrictive.

B. When conflict exists the more stringent requirement shall govern unless it adversely conflicts with agency having jurisdiction for which Engineer shall make the final determination.

C. The Contractor shall maintain permanent and temporary pollution control facilities and devices for the duration of the Contract or for that length of time construction activities create the particular pollutant. Onsite areas that are subject to severe erosion, and offsite areas that are especially vulnerable to damage from erosion and/or sedimentation, shall be identified and receive special attention.

D. All erosion and sediment control work shall comply with applicable requirements of governing authorities having jurisdiction.

E. All land-disturbing activities shall be planned and conducted to minimize the size of the area to be exposed at any one time and the length of the time of exposure. Surface water runoff originating upgradient of exposed areas shall be controlled to reduce erosion and sediment loss during the period of exposure.

F. All land-disturbing activities shall be planned and conducted to minimize offsite sedimentation.

G. Same-day stabilization will be required in many locations adjacent to natural resources.

1.05 SUBMITTALS

A. Even if a soil erosion permit is not required, Act 451, Part 91 requires a Soil Erosion and Sediment Control Plan be prepared as a part of the overall plan that will effectively reduce soil erosion and off-site sedimentation. The soil erosion and sedimentation control plan shall be implemented prior to commencing construction and shall contain at a minimum, the following information:

1. A map showing the site location, physical limits of each earth change activity, predominant land features including lakes, streams and wetlands, and contour intervals or slope information.

2. Soils information.

3. Location of existing and proposed drainage patterns.

4. Timing and sequence of each proposed earth change.

5. Description of all temporary and permanent erosion and sedimentation control measures.

6. A schedule for maintaining all control measures.

7. Any other information required by the permitting agency.

B. The Soil Erosion and Sediment Control Plan shall be in accordance with both the MDOT Standard Specifications for Construction and requirements of Agency having jurisdiction.

C. On projects requiring stream crossing or wetland permits from the MDEQ, the Engineer shall notify the regional MDEQ office of the anticipated construction start date. At project completion, the

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

TEMPORARY EROSION AND SEDIMENT CONTROL 01 57 13 - 3

completion notification card attached to the permit must be submitted to the MDEQ. For projects requiring U.S. Army Corp of Engineers or U.S. Coast Guard permits, the Engineer shall follow the notification procedures listed on those permits.

D. Contractor shall be responsible for proper implementation of erosion control measures with regard to construction timing and sequence of operations. Erosion control measures shall be repeated as often as necessary to satisfy permit conditions, Agency having jurisdiction and Engineer�s requirements.

E. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.

1. Soil Erosion and Sedimentation Control Permit

2. Soil Erosion and Sedimentation Control Plan

3. Soil Erosion and Sedimentation Control Inspection Logs

4. Stormwater Pollution Prevention Plan (SWPPP)

5. Stormwater Notice of Intent for Construction Activities

6. Stormwater Notice of Termination for Construction Activities

1.06 EROSION AND SEDIMENT CONTROL

A. Soil Erosion and Sedimentation Control (SESC) Plan

1. The Contractor shall comply with all requirements of the SESC Plan. Maintain an approved copy of the SESC Plan at the construction site and continually update, as regulations require, reflecting current site conditions.

2. The Contractor will be responsible for obtaining a Soil Erosion and Sedimentation Control Permit as prescribed by Part 91 of Act 451, The Natural Resources and Environmental Protection Act, and implementing it. The Contractor shall understand the terms and conditions of the permit and is responsible for the maintenance of the sediment control measures until permanent stabilization is established.

B. Stormwater Pollution Prevention Plan

1. The Contractor shall at all times provide Stormwater Pollution Prevention in accordance with the following:

a. Comply with terms of the EPA general permit for stormwater discharges from construction activities. Provide SWPPP in accordance with EPA requirements. Per EPA guide Developing your Stormwater Pollution Prevention Plan located at http://water.epa.gov/polwaste/npdes/stormwater/Stormwater-Pollution-Prevention-Plans-for-Construction-Activities.cfm.

b. Furnish and install BMPs from EPA Fact Sheets located at http://water.epa.gov/polwaste/npdes/swbmp/Construction-Site-StormWater -Run-Off- Control.cfm or in accordance with applicable state or local requirements.

c. Include a completed copy of the Notice of Intent, BMP Inspection Report Template, and Stormwater Notice of Termination, except for the effective date.

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

TEMPORARY EROSION AND SEDIMENT CONTROL 01 57 13 - 4

2. Stormwater Notice of Intent for Construction Activities

a. Prepare and submit the Notice of Intent for NPDES coverage under the general permit for construction activities to the Contracting Officer for review and approval.

b. Submit the approved NOI and appropriate permit fees onto the appropriate federal or state agency for approval. No land disturbing activities may commence without permit coverage.

Maintain an approved copy of the SWPPP at the onsite construction office, and continually update as regulations require, reflecting current site conditions.

3. Inspection Reports

a. Submit �Inspection Reports� to the Contracting Officer in accordance with the EPA Construction General Permit.

4. Stormwater Pollution Prevention Plan Compliance Notebook

a. Create and maintain a three-ring binder of documents that demonstrate compliance with the Construction General Permit. Include a copy of the permit Notice of Intent, proof of permit fee payment, SWPPP and SWPPP update amendments, inspection reports and related corrective action records, copies of correspondence with the EPA State Permitting Agency, and a copy of the permit Notice of Termination in the binder. At project completion, the notebook becomes property of the Government. Provide the compliance notebook to the Contracting Officer.

5. Stormwater Notice of Termination for Construction Activities

a. Submit a Notice of Termination to the Contracting Officer for approval once construction is complete and final stabilization has been achieved on all portions of the site for which the permittee is responsible. Once approved, submit the Notice of Termination to the appropriate state or federal agency.

6. Erosion and Sediment Control Measures

a. Provide erosion and sediment control measures in accordance with state and local laws and regulations. Preserve vegetation to the maximum extent practicable.

b. Erosion control inspection reports may be compiled as part of a stormwater pollution prevention plan inspection reports.

c. Plan and execute construction by methods to control surface drainage from cuts and fills, from borrow and waste disposal areas. Prevent erosion and sedimentation.

d. Minimize surface area of bare soil exposed at one time.

e. Silt fences, silt socks, or other erosion control devices shall be installed as necessary to minimize and control erosion during and subsequent to construction. The Contractor shall:

1) Protect the work from erosion. Erosion of embankments, cuts, and natural slopes that occurs during construction of the project shall be repaired by the Contractor at his expense.

2) Protect downstream and adjacent properties, drainage channels, and streams from damage due to erosion resulting from project construction operations.

3) Implement controls that minimize the amount of waterborne silt entering the stream channel. Erosion controls shall remain in place during the entire construction period or as otherwise specified.

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

TEMPORARY EROSION AND SEDIMENT CONTROL 01 57 13 - 5

f. Provide temporary measures including berms, dikes, drains, and other devices to prevent water flow.

g. Construct fill and waste areas by selective placement to avoid surfaces and materials susceptible to erosion.

h. The excavation, grading, and moving of soil materials shall be scheduled to minimize to the extent practical, the size of areas that will be unprotected from erosion. Disturbed areas shall be restored according to the Contract Documents, as soon as is feasible.

i. Carry on construction work in a manner that will direct surface water away from adjoining properties.

j. Periodically inspect earthwork to detect evidence of erosion and sedimentation. Promptly apply corrective measures.

PART 2 PRODUCTS

2.01 MATERIALS

A. Coarse aggregate shall meet the requirements for 6A aggregate as specified in Section 902 of the 1996 MDOT Standard Specifications for Construction. Additional acceptable materials as specified in the MDOT Standard Specifications include but are not limited to geotextile fabrics, rip-rap boulders, wood stakes, steel stakes, bracing screening, sand bags and standard sized wire bounded straw bales.

2.02 SILT FENCE

A. Polypropylene geotextile fabric, resistant to common soil chemicals, mildew, and insects; non-biodegradable; in longest lengths possible; meeting the following requirements:

B. Average Opening Size: 30 U.S. Std. Sieve (600 µm), maximum; ASTM D4751.

C. Permittivity: 0.05 sec -1, minimum; ASTM D4491

D. Ultraviolet Resistance: Retaining at least 70 percent of tensile strength; ASTM D4355 after 500 hours exposure.

E. Tensile Strength: 100 lb-f (445 N) minimum, in cross-machine direction; 124 lb-f (551 N) minimum in machine direction; ASTM D4632

F. Elongation: 15 to 30 percent; ASTM D4632.

G. Tear Strength: 55 lb-f (244 N) minimum; ASTM D4533

H. Posts shall be 2 by 2-inch (50 mm x 50 mm) cross section hardwood stakes, minimum 3-feet (1.0

m) long.

2.03 DEWATERING DISCHARGE FILTER BAG

A. UV-stabilized, non-woven geotextile bag to filter sediment from water prior to discharging.

Geotextile fabric shall meet the following minimum average roll requirements:

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

TEMPORARY EROSION AND SEDIMENT CONTROL 01 57 13 - 6

B. Tensile Strength: 180 lb-f (200 N) minimum; ASTM D4632.

C. Elongation: 50 percent minimum; ASTM D4632

D. Puncture Strength: 105 lb-f (667 N) minimum; ASTM D4833

E. Mullen Burst: 350 psi (2413 kPa) minimum; ASTM D3786-87

F. Trapezoidal Tear: 70 lb-f (310 N) minimum; ASTM D4533

G. Flow Rate: 80 gal/min/sf. (54 l/s/m2) Minimum; ASTM D4491

H. Permittivity: 1.4 sec -1 minimum; ASTM D4491

I. Apparent Opening Size: 100 U.S. Std. Sieve (150 µm) maximum; ASTM D4751

J. UV Stability: 70% retained strength; ASTM D4355 after 500 hours. STM

2.04 TURBIDITY BARRIER

A. Geotextile fabric curtain suspended from flotation devices at the water surface and held in a vertical position by a ballast chain in the lower hem. Turbidity barrier curtain shall meet the following minimum requirements unless otherwise specified on the plans.

B. Consist of vinyl laminate on 1000 denier polyester fabric weighing 18 ounce per square yard (610 g/m2) minimum.

C. Tensile strength of fabric shall be 220 lbs (100 kg) minimum.

D. Edges of fabric to be reinforced with minimum 5/8-inch (16 mm) diameter polypropylene rope.

E. Ballast chain minimum 5/16-inch (8 mm) galvanized steel.

F. Buoyancy blocks providing buoyancy of 18lbs/l.f (27 kg/m).

G. Length of curtain (water depth) 5-feet (1.5 m).

2.05 EROSION CONTROL BLANKETS

A. Machine produced blanket with a consistent thickness of evenly distributed straw or coconut fiber as specified. Unless otherwise specified on the Plans, the erosion control blanket shall have the following minimum properties:

1. Double net 100% straw blanket.

2. Top and bottom photodegradable polypropylene netting, 1.64 lbs / 1,000 sft. (0.8 kg/ m2) approximate weight.

3. 100% agricultural straw 0.5 lbs. / sy. (.27 kg/m2)

4. Stitch spacing: 1.5 inches (40 mm) on centers

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

TEMPORARY EROSION AND SEDIMENT CONTROL 01 57 13 - 7

5. Pegs shall be 6-inch (150 mm) long, hardwood pegs

2.06 INLET FILTER FABRIC

A. The filter fabric shall be constructed of 100% continuous polyester needle-punched non-woven engineering fabric and follow the guidelines in the American Society for Testing and Materials (ASTM) D111799; Standard Guide for Evaluating Nonwoven Fabrics. The filter fabric shall be fabricated to provide a direct fit with the drainage structure cover. The filter fabric shall have the following minimum physical properties.

1. Tensile Strength: 80 lb-f (.355 kN) minimum; ASTM D4632

2. Elongation: 50 percent minimum; ASTM D4632

3. Puncture Strength: 45 lb-f (200 kN) minimum; ASTM D4833

4. Mullen Burst: 350 psi (2413 kPa) minimum; ASTM D3786-87

5. Trapezoidal Tear: 70 lb-f (310 N) minimum; ASTM D4533

6. Flow Rate: 80 gal/min/sf. (54 l/s/m2) Minimum; ASTM D4491

7. Permittivity: 1.4 sec -1 minimum; ASTM D4491

8. Apparent Opening Size: Opening Size: 100 U.S. Std. Sieve (150 µm) maximum;

9. UV-Stability: 70% retained strength; ASTM D4355 after 500 hours.

PART 3 EXECUTION

3.01 SERVICE CONDITIONS

A. Construction operations shall be conducted to prevent or minimize erosion and sedimentation.

Temporary or permanent erosion and sedimentation controls shall be constructed and maintained as specified by agency having jurisdiction prior to commencing any construction operations including clearing. Grading operations shall be performed as soon as possible after clearing operations. Temporary erosion and sedimentation controls as directed by the Engineer shall be installed to minimize potential problems, to correct conditions which develop during construction, or to stabilize inactive construction areas. The Contractor shall minimize the area of unstabilized land surface over which storm water must flow. Construction shall proceed from lower ground toward higher ground, whenever possible.

B. Steps shall be taken to minimize erosive loss and resultant offsite sedimentation from stored piles of excavated spoils, topsoil, sand, gravel, and aggregate. Control methods used by the Contractor may include remote storage, covering, temporary stabilization, compacting, diversion ditches, and silt fences, in total in any combination, as may be dictated by the size, type, location, season and anticipated duration of storage.

C. Soil erosion control techniques such as ground cover in the form of vegetation and seeding, compaction, rip rap, or aggregate cover shall be used as appropriate to control erosion over large

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

TEMPORARY EROSION AND SEDIMENT CONTROL 01 57 13 - 8

surface areas. Soil erosion control techniques such as weirs, check-dams, bank stabilization, sheet pilings, etc. shall be used to minimize soil erosion in streams and small waterways.

D. Provide suitable sedimentation control measures at affected connections to existing or new storm drains, to minimize deposition of sediment in the storm drains during the construction period.

Sedimentation control measures shall be provided prior to any significant clearing, grading or surface disruption of the tributary areas.

E. Pumped water from well points, dewatering wells, or excavations shall not discharge onto unstabilized areas. Such discharge shall be conveyed by pipe, hose or stabilized channel, to a settling basin or other suitable sedimentation control facility

F. Time Limitations: All graded areas shall be brought to final grade as soon as possible. Permanent erosion controls and stabilization for all slopes, channels, ditches and other disturbed areas shall be completed within 15 calendar days after final grading as required by law. Permanent restoration of all slopes and ditches within 164 ft. (50 m) of any lake, stream or wetland shall be done within 10 calendar days following final grading. Where it is not possible to permanently stabilize a disturbed area, appropriate temporary erosion and sedimentation controls shall be implemented within 15 calendar days after cessation of grading activity, or as directed, whether or not the area has been brought to final grade. All temporary soil erosion and sedimentation shall control measures be maintained until permanent soil erosion and sedimentation controls are in place and functional.

G. Area Limitations. The surface area of erodible earth material exposed at any one time will be limited to the minimum amount required for execution of the work. Typically, this is the length of water main or sewer line that can be laid and backfilled in one day for cleaning and grading operations, or the minimum area needed to perform general site work activities. The Engineer may reduce or increase the limits of exposed surface area dependent on the Contractor�s capability to keep current the finish grading, top soiling, seeding, mulching, and other temporary or permanent erosion and sedimentation control operations.

H. When the Contractor has completed the permanent restoration on a cut slope or embankment slope, or portions thereof, the completed slope will be approved by the Engineer.

I. The Contractor shall not disturb lands and waters outside the grading limits unless such work is found necessary and is approved by the Engineer. Restoration of areas that are disturbed beyond the plan or approved limits will be at the Contractor�s expense

J. Prior to site disturbance when work is conducted outside the right-of-way, such as borrow operations, at waste or disposal areas, haul roads, storage sites or other types, the Contractor shall obtain and provide the Engineer with copies of any permit required by agency having jurisdiction. These permits shall include, but are not limited to those required under Act 451, Part 91 (Soil Erosion and Sedimentation Control), Part 303 (Wetlands Protection, formerly Act 203), Part 301 (Inland Lakes and Streams, formerly Act 346), Part 31, (Water Resources Protection, Floodplain Regulatory Authority, formerly Act 245 as amended by Act 167), and Part 31 (Water Resources Protection). National Pollutant Discharge Elimination System (NPDES), Federal Section 404 and Clean Water Act, permits may also be required. Temporary and permanent erosion and sedimentation controls shall be provided by the Contractor as specified in the applicable permits.

3.02 CONSTRUCTION OF EROSION AND SEDIMENTATION CONTROLS.

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

TEMPORARY EROSION AND SEDIMENT CONTROL 01 57 13 - 9

A. Construction of temporary or permanent erosion and sedimentation controls shall meet the requirements as specified on the plans or as directed by Engineer.

B. If approved by the Engineer, and not prohibited by permit, broken concrete may be used for erosion and sedimentation controls provided all the reinforcing steel has been removed or flush cut. The use of bituminous material for check dams, weirs or riprap is prohibited.

C. Filter Bag: This work shall consist of furnishing, placing, and disposing of a minimum 269 ft2 (25 m2) filter bag constructed of geotextile blanket. Water pumped from construction operations shall be pumped into and allowed to filter through the filter bag before entering any watercourse. A separate silt fence shall be installed around the filter bag for additional protection in sensitive areas or where the filter bag is not effectively removing the sediment. Water being pumped may be discharged directly into the watercourse provided it remains silt free. The filter bag should be located on level ground above the banks of the stream channel. The location of the filter bag will be approved by the Engineer. The filter bag and its contents shall be properly disposed of by the Contractor.

D. Silt Fence: This work shall consist of furnishing, erecting, maintaining, removing, and disposing of a silt fence. Silt fencing consists of a post supported geotextile. Installation, including proper entrenching, shall be accomplished as specified or approved according to the manufacturer�s published recommended practice. Sections of silt fence shall be overlapped at least 3.3 ft (1 m). In areas where water ponds are located behind the silt fence, a stone filter may be needed to outlet the water and prevent failure.

E. Sediment Traps and Basins: This work shall consist of excavating, maintaining and filling in if directed, a sediment trap 176 ft3 (5 m3) or less in size or a sediment basin greater than 176 ft3 (5 m3) as shown on the plans or where directed.

1. The excavated material shall not be allowed to erode into a lake, watercourse, or wetland.

Check dams or weirs that are to be installed at the downstream side of the trap or basin should be installed prior to the excavation of the sediment trap or basin. Sediment traps shall be in place immediately prior to beginning construction or as directed by the Engineer.

F. Erosion Control Blankets. Shall consist of a machine produced mat of curled wood exterior of 80 percent 6 inch (15.2 cm) or longer fiber length with a consistent width of fiber evenly distributed throughout the mat. A photodegradable netting manufactured from extruded plastic mesh shall be used on the top side of the excelsior erosion control blankets, the blankets shall be smolder resistant with no chemical additives.

G. Check Dams and Weirs. This work shall consist of installing, maintaining and removing if directed, a check dam or weir across a ditch or watercourse. The cross section and installation shall be as shown on the plans or as directed. The check dam or weir shall extend at least 16 inch (40.6 cm) up the slope on both sides and shall include a 4 to 5 inch (10.16 to 12.7 cm) lower center channel spillway. Check dams shall be constructed as indicated on plans or immediately after grading in the area is completed. Weirs shall be constructed prior to any construction affecting the waterway is started.

H. Temporary Channel Liner. This work shall consist of furnishing, installing, maintaining, removing, and disposing of a temporary channel liner. The liner shall be either a plastic sheeting or a Polyvinyl Chloride (PVC) material. The PVC material must be used between November 15 and March 1 or when frozen conditions are expected. The temporary channel liner shall extend over the berm along the top of the temporary channel and be anchored. Sections of temporary channel

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

TEMPORARY EROSION AND SEDIMENT CONTROL 01 57 13 - 10

liner shall be overlapped 20 inches (500 mm) in the downstream direction and have a sufficient quantity of washed 6A stone placed in the overlap area to prevent undermining of the liner.

I. Stone or Gravel Filter at Inlet. The Stone or Gravel Filter shall be constructed immediately after the backfilling and grading adjacent to the inlet is completed. The number of sides of the filter may vary depending upon the location and type of intake structure.

3.03 MAINTENANCE OF EROSION AND SEDIMENTATION CONTROLS

A. The Contractor shall maintain all temporary erosion and sedimentation controls during the period that the temporary controls are required and all permanent erosion controls until the contract has been completed and accepted. Such maintenance shall consist of the repair of all damaged areas, replacement of lost facilities and periodic removal of sediment. Sediment traps and basins shall be cleaned out when they are half full or as directed. Sediment or debris shall be removed from in front of silt fence when it has accumulated to one half of the fence height. The removed sediment shall be disposed of according to Subsection 205.03.A.4 of MDOT 1996 Standard Specifications for Construction.

B. Any accumulation of sediment affecting the efficient operation of the erosion controls should be removed and stockpiled in a stabilized area so as to prevent the material from eroding back into the drainage course.

3.04 REMOVAL OF EROSION AND SEDIMENTATION CONTROL FACILITIES

A. Temporary erosion and sedimentation controls shall be removed or obliterated when the permanent controls are in place and approved, unless ordered to be left in place by the Engineer.

Temporary controls adjacent to lakes, watercourses, or wetlands shall be left in place until the adjacent slopes have turf establishment. Mulch placed for temporary erosion control shall be incorporated into the slope, or removed, prior to placement of topsoil, permanent seeding and fertilizing operations. Care shall be exercised during removal of erosion controls to minimize erosion or sedimentation into watercourses. Any damage caused during the removal operations shall be repaired at the Contractor�s expense.

B. After the upstream construction is completed and vegetation or a permanent lining has been established in the waterway, the sediment pit shall be filled, the sediment trap removed and the side slope area formerly occupied by the sediment trap sodded or riprapped, as directed by the Engineer.

C. After vegetation or a permanent lining has been successfully established in the ditches and/or swales, the check dams shall be removed and the area formerly occupied by the check dam shall be sodded as applicable.

D. After construction is completed and the waterway channel restored, the weirs shall be removed and the area formerly occupied by the weir shall be restored.

E. After vegetation or a permanent lining has been successfully established in the ditches or swales, the stone or gravel filter at inlet shall be removed and the area formerly occupied by the filter shall be sodded.

F. Sand filled bags must be disposed of at an upland site or as approved. If approved, stone from stone filled bags may be placed in the bottom of the watercourse if the stream hydraulics are not changed.

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

TEMPORARY EROSION AND SEDIMENT CONTROL 01 57 13 - 11

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

UTILITY LINE REMOVAL 02 41 13.23 - 1

SECTION 02 41 13.23

UTILITY LINE REMOVAL

PART 1 GENERAL

1.01 SCOPE

A. This work consists of removing, or abandoning, in whole or in part, sanitary and storm drainage structures, culverts, sanitary and storm sewers, fire hydrants, gate wells and water mains and other public or private utilities as required. Contractor shall coordinate with the appropriate public utility companies when removal of their appurtenances are required. Salvaging, storing, and disposing of removed materials, and the backfilling and compacting of the excavated sites is also included.

PART 2 PRODUCTS

2.01 MATERIALS

A. Concrete. Grade 30 P as per MDOT Standard Specifications for Construction.

B. Grout. A mixture of two parts sand to our part connector or similarly approved material.

C. Aggregate. 21AA as per MDOT Standard Specifications for Construction.

D. Caps. Mechanical Joint Caps conform to ANSI/AWWA/C110/A21.10 and be 350 psi (2413.16 kPa) pressure rated.

E. Restraint. The restraint shall be the series 1100 Megalug restraint as manufactured by EBBA Iron, Inc. or approved equal.

PART 3 EXECUTION

3.01 SEWER/CULVERT REMOVAL AND ABANDONMENT

A. When removing or abandoning a sanitary or a storm drainage structure, any live sewers connected to them shall be rebuilt and properly reconnected through the removal area. Services shall be maintained during these construction operations using bypass pumping.

B. If the plans call for abandoning a sanitary or a storm drainage structure, the existing frames, covers and grates shall be carefully removed to prevent damage and the structure broken down to 3 feet (91.4 cm) below the pavement subgrade or at least 3 feet (91.4 cm) below the final ground elevation outside the pavement area.

C. Existing castings shall be considered as salvaged castings. Salvaged castings not suitable for use and not required for structures to be adjusted, shall become the Contractor�s property and shall be promptly removed from the job site. When special catch basin abandonment is called for in the Proposal and at locations shown on the Plans, the catch basin line shall be plugged at the lateral sewer as detailed on the Standard Plans. This special abandonment shall be used in site clearance and urban areas where the lateral sewer is remaining in service.

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

UTILITY LINE REMOVAL 02 41 13.23 - 2

D. All pipe culverts specified to be removed, including all end treatments shall be completely removed.

E. Where existing culvert pipe is to be extended or the existing end treatment is to be replaced, only such portions of the existing culvert pipe shall be removed as to provide a proper connection to the new work. Care shall be taken to not damage any portion of the remaining culvert pipe.

F. All pipe culverts to be abandoned shall be bulkheaded as specified herein or by other approved methods. If the culvert is not in suitable condition for abandonment, in the judgment of the Engineer, alternate methods will be determined.

G. Culvert pipe designated to be abandoned, with top elevation within 6 feet (18.3 m) of the top of the pavement, shall be reviewed for removal.

H. Disposing of Materials. All excavated materials, together with all debris, stones, logs, stumps, roots, and other unsuitable materials, shall be removed from the site and disposed of by, and at the expense of, the Contractor.

I. Backfilling. Backfill the excavated areas with Aggregate 21AA. Backfilling shall be placed and compacted according to MDOT Controlled Density Method at least to 95 percent maximum weight.

J. All sewers (storm, sanitary, or combined) or parts thereof which are specified to be removed, or that interfere with the new construction, shall be removed.

K. Where existing sewers are to be extended or otherwise incorporated into the new work, only such part of the existing sewer shall be removed as to provide a proper connection to the new work.

The connecting edges shall be cut, chipped, and trimmed to the required lines and grades without weakening or damaging the parts of the sewer to be retained.

L. Backfilling Abandoned Sewers. All sewers to be abandoned shall be bulkheaded with Grade 30 P concrete or with brick block masonry. A bulkhead shall be constructed from the inner wall of the drainage structure a minimum of 2 foot (61.0 cm) into the pipe or other method. If the sewer is not in suitable condition for abandonment, in the judgment of the Engineer, an alternate treatment will be determined.

M. An alternate procedure for backfilling abandoned sewers is to fill the sewer with grade 30M concrete or with grout composed of 2 parts sand to 1 part cement or variations thereof as may be approved by the contracting officer.

N. Backfill concrete shall be deposited through drop pipes placed over the abandoned sewer and at locations approved by the Engineer. Drop-pipe holes shall be spaced at intervals that will ensure the proper and complete filling of the sewer. All drop holes shall be sleeved for their entire length with a metal casing. The casing shall extend completely through the wall of the sewer. The drop-pipe shall be fitted with suitable and sufficient baffles to ensure the re-mixing of the concrete rather than a separation of the materials. The size of the drop-pipe shall be adequate for the placing of the concrete mix.

O. When the drop holes are no longer needed and the Engineer orders their abandonment, the castings shall be removed so that adjacent structures, utilities, and pavement will not be damaged. The hole shall then be filled with a 1500 psi concrete mix to within 5 feet (1.5 m) of the

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

UTILITY LINE REMOVAL 02 41 13.23 - 3

surface. The upper portion of the hole shall be filled with compacted sand or sand-gravel and the surface replaced in kind to that originally found to the satisfaction of the Engineer

P. Grout shall be placed under a pressure adequate to fill completely the abandoned portion of the sewer. However, grout pressures shall not be so high as to cause leakage from the sewer and the filling of adjacent sewers, utilities and basements.

Q. All sewers designated to be abandoned, with top elevation within 5 feet (1.5 m) of the pavement, shall be reviewed for removal.

3.02 WATER MAIN AND APPURTENANCES REMOVAL

A. When removing or abandoning a water main, or appurtenances any live water connections to them shall be rebuilt and properly reconnected through the removal area. Services shall be maintained during these construction operations. Refer to the drawings for extent of removal and abandonment of water mains and appurtenances.

B. Disposing of Materials. All excavated materials, together with all debris, stones, logs, stumps, roots, and other unsuitable materials, shall be removed from the site and disposed of by, and at the expense of, the Contractor.

C. Backfilling. Backfill the excavated areas with Aggregate 21AA. Backfilling shall be placed and compacted according to MDOT controlled Density Method at least to 95 percent maximum weight.

D. Refer to the Drawings for details regarding removal and abandonment of other utilities and services.

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

EARTHWORK 31 00 00 - 1

SECTION 31 00 00

EARTHWORK

PART 1 GENERAL

1.01 SUMMARY

A. Section Includes:

1. Preparation of subgrade for building, slabs, walks, pavements, and other sitework.

2. Rough and finish grading.

3. Excavation for filling and grading.

4. Filling and subgrade preparation.

B. Related Sections:

1. Section 31 23 23 � Fill.

1.02 REFERENCES

A. American Society for Testing and Materials (ASTM):

1. ASTM C 136 - Method for Sieve Analysis of Fine and Coarse Aggregates.

2. ASTM D 698 - Test Methods for Moisture-Density Relations of Soils and Soil-Aggregate

Mixtures, Using 5.5 Pound Rammer and 12 Inch Drop.

3. ASTM D 1556 - Test Method for Density of Soil in Place by the Sand-Cone Method.

4. ASTM D 1557 - Test Methods for Moisture-Density Relations of Soils and Soil-Aggregate

Mixtures Using 10 Pound Rammer and 18 Inch Drop.

5. ASTM D 2167 - Test Method for Density and Unit Weight of Soil In-Place by the Rubber

Balloon Method.

6. ASTM D 2487 - Classification of Soils for Engineering Purposes (Unified Soil Classification

System).

7. ASTM D 2922 - Test Methods for Density of Soil and Soil- Aggregate in Place by Nuclear

Methods (Shallow Depth).

8. ASTM D 3017 - Test Method for Moisture Content of Soil and Soil-Aggregate in Place by

Nuclear Methods (Shallow Depth).

9. ASTM D 4318 - Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils.

B. American Association of State Highway and Transportation Officials (AASHTO):

1. AASHTO T 88 - Mechanical Analysis of Soils

1.03 DEFINITIONS

A. Building Area Subgrade Pad: Portion of site directly beneath and within a line 5 feet 0 inches beyond building and appurtenances including limits of any future building expansion areas indicated on Drawings.

1.04 QUALITY ASSURANCE

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

EARTHWORK 31 00 00 - 2

A. Qualifications: Earthwork Company specializing in performing the Work of this Section with minimum 5 years documented experience.

B. Regulatory Requirements: Perform earthwork in accordance with applicable requirements of governing authorities having jurisdiction.

1.05 PROJECT CONDITIONS OR SITE CONDITIONS

A. Existing Conditions:

1. Classification of Excavations: Contractor acknowledges that Contractor has investigated project site to determine type, quantity, quality, and character of excavation work to be performed.

2. Existing Utilities: Contact local utility companies and make arrangements to obtain utility company location and marking service prior to start of Earthwork operations.

a. Locate existing underground utilities in areas of Work. If utilities are to remain in place, provide means of support and protection during Earthwork operations.

b. Pothole and locate existing underground utilities at locations to ensure that no conflict with Work of this Contract will occur and required clearance is available to prevent damage to existing utilities.

c. Perform potholing a minimum of 10 days before start of excavation or underground work.

d. Should uncharted, or incorrectly charted, piping or other utilities be encountered during excavation, consult utility company and Engineer immediately for directions.

e. Coordinate with Engineer and utility companies to keep existing utility services and facilities in operation.

f. Repair damaged utilities to satisfaction of utility company, at no additional cost to Fiscal

Agent.

PART 2 PRODUCTS

2.01 MATERIALS

A. Subsoil:

1. Excavated and re-used material, Imported Borrow, Select or local borrow, Structural.

2. Graded.

3. Free of lumps larger than 3 inches, rocks larger than 3 inches, and debris.

4. Conforming to ASTM D 2487 CL, OL.

B. Aggregate:

1. Dense Graded Aggregate: Shall meet the requirements of MDOT 21AA.

2. Open Graded Aggregate: Shall meet the requirements of MDOT 34R.

3. Granular: Shall meet the requirements of MDOT Class II granular material.

4. Rip Rap: 8 to 10 inch diameter, natural cobblestone.

C. Topsoil: Excavated and reused material.

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

EARTHWORK 31 00 00 - 3

1. Approved by Testing Laboratory.

2. Graded.

3. Free of roots, rocks larger than 1/2 inch, subsoil, debris, large weeds, and foreign matter.

4. Conforming to ASTM D 2487 Group Symbol OH.

D. Topsoil: Imported borrow.

1. Approved by Testing Laboratory.

2. Graded.

3. Friable loam.

4. Free of roots, rocks larger than 1/2 inch, subsoil, debris, large weeds, and foreign matter.

5. Acidity range (pH) of 5.5 to 7.5.

6. Containing a minimum of 4 percent and a maximum of 25 percent organic matter.

7. Conforming to ASTM D 2487 Group Symbol OH.

8. Limit decaying matter to 10 percent of total content by volume.

E. Non-Woven Filter Fabric:

1. Mirafi 140NS or approved equal.

2.02 SOURCE QUALITY CONTROL

A. Testing and Analysis:

1. Soil: Perform in accordance with ASTM D 1557.

2. Aggregate: Perform in accordance with ASTM D 1557.

B. If tests indicate materials do not meet specified requirements, change material and retest.

C. Provide materials from same source throughout the Work.

PART 3 - EXECUTION

3.01 EXAMINATION

A. Verification of Conditions: Verify that field measurements, surfaces, substrates and conditions are as required, and ready to for earthwork operations to begin.

1. Verify quantity and type of each soil material before start of material installation.

2. Backfilling:

a. Verify imported fill and stockpiled fill to be reused is approved.

b. Verify foundation perimeter drainage installation has been inspected and approved.

c. Verify foundation or basement walls are braced to support surcharge forces imposed by backfilling operations.

d. Verify areas to be backfilled are free of debris, snow, ice, or water, and ground surfaces are not frozen.

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

EARTHWORK 31 00 00 - 4

3.02 PREPARATION

A. Identify required lines, elevations, levels, contours, grades, and datum necessary to perform earthwork operations as indicated on Drawings.

B. Verify that survey benchmark and intended elevations for Work are as indicated on Drawings.

Short form contour designations are intended to be a continuing of the long form bench mark.

C. Locate, identify, and protect existing utilities to remain and previously installed utilities that may be damaged by construction operations.

1. Notify utility company immediately of utilities, not indicated on Drawings, encountered.

2. Maintain existing utilities, active utilities, and drainage systems in operating condition.

3. Comply with utility company requirements to keep utilities in operation.

4. Repair damage to utilities.

D. Protect plant life, lawns, fences, existing structures, sidewalks, paving and curbs from earthwork operations, excavating equipment, and vehicular traffic.

E. Protect benchmarks, property corners, and other survey monuments from damage or displacement.

3.03 EXCAVATION FOR FILLING AND GRADING

A. Provide dewatering, drainage, and ground water management to control moisture of soils when performing grading operations during periods of wet weather.

B. Shore, brace, and drain excavations to maintain excavations safe, secure, and free of water at all times.

C. Provide protection for workers within trench areas in accordance with local, State, and Federal

Occupational Safety and Health requirements and regulations.

1. Slope, shore, sheet, or brace excavation side walls greater than 5 feet in depth.

2. Provide lateral travel distance to excavation exit ladder or steps maximum 25 feet for trenches minimum 4 feet in depth.

D. Unacceptable Fill Material for Building and Paving Areas: Excavated material containing rock or stone greater than 6 inches in largest dimension.

E. Acceptable Fill Material:

1. Rock or stone less than 3 inches in largest dimension as fill to within 24 inches of surface of proposed subgrade when mixed with suitable material.

2. Rock or stone less than 2 inches in largest dimension mixed with suitable material as fill within the upper 24 inches of proposed subgrade.

3.04 FILLING AND SUBGRADE PREPARATION

A. Fill areas to contours and elevations as indicated on Drawings with materials specified herein.

B. Place fill in continuous lifts as specified herein.

C. Refer to Section 31 23 23 � Fill, for filling requirements for structures, utilities, and pavements.

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

EARTHWORK 31 00 00 - 5

D. Areas Exposed by Excavation or Stripping:

1. Scarify areas exposed by excavation or stripping on which building subgrade preparations are to be performed to minimum 8 inch depth.

2. Compact to minimum 95 percent optimum density in accordance with ASTM D 1557 at minimum moisture content 1 percent below and maximum 3 percent above optimum moisture content.

3. Proof roll to detect any areas of insufficient compaction by making minimum of 2 complete passes with fully-loaded tandem-axle dump truck in each of two perpendicular directions under supervision and direction of Testing Laboratory.

4. Excavate and re-compact areas failing to meet specified requirements.

E. Fill Material Placement:

1. Place in 8 inch maximum lifts compacted minimum 95 percent optimum density in accordance with ASTM D 1557 at minimum moisture content of 1 percent below and maximum moisture content 3 percent above optimum moisture content.

3.05 MAINTENANCE OF SUBGRADE

A. Verify finished subgrades for conformance to elevations as indicated on Drawings and for specified conditions for subgrade.

B. Protect subgrade from excessive wheel loading during construction, including concrete trucks and dump trucks.

C. Remove areas of finished subgrade with compaction density below specified density to depth required as directed by Testing Laboratory. Fill removed areas and compact to specified compaction density.

D. Provide surface of subgrade after compaction hard, uniform, smooth, stable, and true to grade and cross-section.

3.06 FINISH GRADING

A. Grade areas other than paved areas and building pad areas to finish grade elevations or contours as indicated on Drawings including the following:

1. Excavated areas.

2. Filled and transition areas.

3. Landscaped areas.

B. Provide finish graded areas uniform and smooth, free from rocks, debris, or irregular surface changes with maximum tolerance of 0.10 feet above or below established finish subgrade elevation. Provide graded surfaces sloping uniformly between indicated elevations.

C. Provide drainage ditches graded with uniform slope to allow drainage without ponding, minimizing potential for erosion.

3.07 FIELD QUALITY CONTROL

A. The field quality control shall be performed by an independent testing agency employed by the contractor.

Phase 1, Bid Package #2 Detroit, Michigan

Bids 03/13/2026

EARTHWORK 31 00 00 - 6

B. Site Tests - Methods:

4. Perform tests on each type of existing on-site or imported off-site material used for compacted fill.

a. Moisture and Density Relationship: ASTM D 698 or ASTM D 1557.

b. Mechanical Analysis: AASHTO T-88

c. Plasticity Index: ASTM D 4318

1) One optimum moisture-maximum density curve for each type of soil encountered.

2) Report of actual unconfined compressive strength and bearing tests/results for each strata tested. Give "three-dimensional" description of each test location.

5. Perform field density tests for in-place materials in accordance to one of the following standards:

a. Sand-Cone Method: ASTM D 1556

b. Balloon Method: ASTM D 2167

c. Nuclear Method: ASTM D 2922 (Method B-Direct Transmission)

6. Perform a CBR (California Bearing Ratio) or LBR (Limerock Bearing Ratio) test for each type of imported off-site material in areas where pavement will be placed.

C. If tests indicate the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .