26-014R WRWWTF Electrical Building Design-Build Entity Volume of Work Form.docx
DOCX document 21 KB Posted
- Solicitation number
- RFP 720 WUD 26-014R 1
- Issued by
- Palm Beach County, Florida
About this file
This is a Design-Build Entity Volume of Previous Work Form used by a Florida county for the WRWWTF Electrical Building Progressive Design-Build project. The form requires proposing firms to document their previous construction management (CM) contracts awarded or funded by the county over the preceding six years, with dollar amounts listed for each year and a calculated total. The volume of previous work calculation includes only CM contracts that have been awarded or funded by the county as of the proposal submission date, explicitly excluding hard bid awards and CM work for which firms have been selected but contracts have not yet been executed.
Firms must provide their legal name, the printed name and signature of an authorized representative, the representative's title, and the submission date on the form. The calculation methodology is limited to verifiable county-awarded or county-funded CM contracts, establishing a baseline metric for evaluating the design-build entity's prior experience and capacity with similar county projects. This documentation supports the county's assessment of proposer qualifications and experience relevant to the electrical building design-build scope of work.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN-BUILD ENTITY
VOLUME OF PREVIOUS WORK FORM
Firm Name:
Date:
Year (list previous 6 years)
Dollar Amount of CM Contracts Awarded or Funded by the County
Year 1: 20__
Year 2: 20__
Year 3: 20__
Year 4: 20__
Year 5: 20__
Year 6: 20__
TOTAL
The Volume of Previous Work calculation shall be based only on CM contracts of the firm awarded or funded by the County as of the submittal date (hard bid awards are not included). CM work for which a firm has been selected but a contract has not yet been awarded shall not be included in the calculation.
PROPOSER (firm name):
PRINT NAME OF AUTHORIZED REPRESENTATIVE:
SIGNATURE OF AUTHORIZED REPRESENTATIVE:
TITLE: DATE: __
File details come from the government source that posted it. Updated .