25012_COL_Abatement_Design_Fire_Station_#4.pdf

PDF 736 KB Posted

Attached to
Kitchen Renovations at Fire Station 4
Solicitation number
2026-RFP-087
Issued by
Polk County, Florida

About this file

This is an Asbestos Abatement Design specification document prepared by A-C-T Environmental & Infrastructure for the City of Lakeland's Facilities Maintenance Division regarding Fire Station #4 located at 215 N. Brunnell Parkway, Lakeland, Florida. The design addresses the removal of asbestos-containing joint compound found in the kitchen and day room wallboard systems, with approximately 400-500 square feet of wallboard containing 2% chrysotile asbestos currently in good condition. The project requires full compliance with Florida Administrative Code Chapter 62-257, OSHA Asbestos Standards (29 CFR 1926.1101), EPA NESHAP regulations (40 CFR Part 61, Subpart M), and Florida Statutes Chapter 469. The work scope includes removal of the asbestos-containing joint compound along with wallboard, tape, and associated fasteners, with all debris to be containerized in labeled, leakproof packaging and transported by licensed haulers to approved asbestos landfills. Critical containment measures include establishing regulated work areas with warning signage, installing two layers of 6-mil polyethylene barriers, implementing negative pressure containment with HEPA filtration providing minimum 4 air changes per hour, and conducting continuous pressure monitoring to prevent visible emissions.

The specification mandates wet removal methods exclusively, with dry removal prohibited, and requires workers to hold valid asbestos training certifications and wear minimum P100 respirators or PAPRs with disposable Tyvek protective suits. Air monitoring during work includes OSHA personal exposure monitoring and contractor compliance monitoring, with clearance sampling to be performed by an independent consultant using PCM criteria of 0.01 fibers/cc or aggressive TEM analysis as specified. Project closeout deliverables include waste shipment records, daily logs, air monitoring data, and notification confirmation to be furnished to the City. The document was submitted on April 29, 2026, and no specific contract value, award date, or project completion timeline is identified in the design specification itself, though the related contract opportunity indicates proposal submissions were due September 2, 2026.

View the file

Other files

File Type Posted
Kitchen_Renovations_at_Fire_Station_4_(Addendum_#2_Revision).pdf PDF
Kitchen_Renovations_at_Fire_Station_4_(Addendum_#1_Revision).pdf PDF
Pre-Proposal_Meeting_Sign_In_Sheet.pdf PDF
Pre-Proposal_Meeting_Sign_In_Sheet.pdf PDF
Kitchen_Renovations_at_Fire_Station_4.pdf PDF
25012_COL_Abatement_Design_Fire_Station_#4.pdf PDF
25012_COL_Abatement_Design_Fire_Station_#4.pdf PDF
25012_Fire_Station_4_-_Bid_Set_06-03-26.pdf PDF
25012_Fire_Station_4_-_Bid_Set_06-03-26.pdf PDF
25012_Fire_Station_4_-_Bid_Set_06-03-26.pdf PDF
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
Indemnification_2026_Vendor.doc DOC document
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Consultant.doc DOC document
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
Indemnification_2026_Vendor.doc DOC document
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Indemnification_2026_Vendor.doc DOC document
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Indemnification_2026_Contractor.doc DOC document
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
PSM_-_Contractor_Audit_Form.pdf PDF
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Indemnification_2026_Consultant.doc DOC document
Indemnification_2026_Consultant.doc DOC document
Indemnification_2026_Contractor.doc DOC document
PSM_-_Contractor_Audit_Form.pdf PDF
Indemnification_2026_Contractor.doc DOC document
PSM_-_Contractor_Audit_Form.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CCOORRPPOORRAATTEE OOFFFFIICCEE

11887755 WWeesstt MMaaiinn SSttrreeeett ·· BBaarrttooww,, FFLL 3333883300 wwwwww..AA--CC--TT..ccoomm

886633..553333..22000000

VISION · SOLUTIONS · PERFORMANCE

April 29, 2026

Ms. Erin Warner email: erin.warner@lakelandgov.net City of Lakeland-Facilities Maintenance 900 East Rose Street Lakeland, FL 33801

SUBJECT: ASBESTOS PROJECT DESIGN

CITY OF LAKELAND FIRE STATION #4

215 N. BRUNNELL PARKWAY, LAKELAND, FLORIDA

Dear Ms. Warner, A-C-T Environmental & Infrastructure (ACT) is pleased to submit the abatement design for the City of Lakeland Fire Station #4 located at 215 N. Brunnell Parkway in Lakeland, Florida.

Should you have any questions or require additional information regarding the services provided, please call me at our Bartow office at 863-533-2000 x 238.

We appreciate the opportunity to be of service in this regard.

Respectfully submitted, Eric Jonsson, Certified Industrial Hygienist, LAC

AMERICAN COMPLIANCE TECHNOLOGIES, INC.

mailto:erin.warner@lakelandgov.net

ASBESTOS ABATEMENT SPECIFICATION

1.0 General Requirements

All work shall comply with the Florida Administrative Code (Chapter 62‑257, F.A.C.) governing asbestos removal notification and fee requirements (Rule 62‑257.301) as well as 40 CFR 61, Subpart M (NESHAP).

2.0 Regulatory Compliance

The contractor shall submit a Notice of Demolition or Asbestos Renovation to the Florida

Department of Environmental Protection (FDEP) in accordance with Rule 62‑257.301. All definitions applicable to asbestos work must follow Rule 62‑257.200, F.A.C.

All work shall comply with the most current versions of:

• EPA NESHAP (40 CFR Part 61, Subpart M)

• OSHA Asbestos Standard (29 CFR 1926.1101)

• Florida Administrative Code (FAC):

o 62-257 – Asbestos Program requirements

• Florida Statutes:

o Chapter 469 – Asbestos Removal and Licensing

• FDOT / Local Air Program Requirements (if applicable)

3.0 Scope of Work

The joint compound associated with the wallboard system in the kitchen and day room was found to contain 2% chrysotile asbestos. Approximately 400-500 square feet of wallboard is present in the proposed renovation area and is currently in good condition. Removal includes asbestos-containing joint compound as well as the wallboard, tape, and associated fasteners.

All Category II non‑friable ACM that becomes friable during removal shall be managed as regulated ACM in accordance with Chapter 62‑257 and NESHAP requirements.

4.0 Work Area Preparation

4.1 Regulated Area

• Establish a regulated area per OSHA

• Post warning signs:

DANGER: ASBESTOS – CANCER AND LUNG DISEASE HAZARD

4.2 Utilities

• Shut down HVAC systems in the work area

• Seal vents with 6-mil poly

4.3 Critical Barriers

• Install two layers of 6-mil polyethylene over:

o Doors o Floors o Windows

Full critical containment with 6‑mil poly and negative pressure (>0.02 in. WC) is required through HEPA filtered negative air machines providing a minimum of 4 air changes per hour.

The contractor should monitor the pressure differential with a continuous pressure monitor.

Containment must prevent visible emissions in accordance with NESHAP and FDEP enforcement guidelines.

In event of a containment breach:

• Stop work immediately

• Evacuate non-essential personnel

• Repair containment

• Perform cleanup

• Notify appropriate authorities if required

5.0 Work Practices

Wet methods must be used. Dry removal is prohibited. Wallboard containing the ACM joint compound shall be removed intact when feasible. All debris must be containerized in labeled, leak‑tight packaging consistent with FDEP and NESHAP requirements.

6.0 Worker Protection

Workers must hold valid asbestos training and follow OSHA 29 CFR 1926.1101.

Workers shall wear:

• Respiratory Protection:

o Half-mask or full-face respirators (minimum P100 filters) o Upgrade to PAPRs if required by exposure levels

• Protective Clothing:

o Disposable Tyvek suits o Gloves

7.0 Air Monitoring

7.1 During Work

• OSHA personal exposure monitoring

• Contractor compliance monitoring

7.2 Clearance Sampling

Performed by an independent consultant:

• PCM clearance criteria: ≤ 0.01 fibers/cc

• Or aggressive TEM if specified

• Visual inspection required prior to sampling

8.0 Waste Handling & Disposal

• Bag ACM in 6-mil labeled asbestos waste bags

• Double-bagging required

• Label per OSHA and DOT requirements

Transport:

• Use licensed hauler

• Maintain waste shipment records (WSR)

Disposal:

• Deliver to approved asbestos landfill following FDEP requirements and 40 CFR 61.150.

9.0 Cleanup Procedures

• HEPA vacuum all surfaces

• Wet wipe all surfaces

• Repeat until no visible debris remains

10.0 Project Closeout

Contractor shall furnish to the City the following project documents:

• Waste shipment records

• Daily logs

• Air monitoring data

• Notification confirmation

1.0 General Requirements
2.0 Regulatory Compliance
3.0 Scope of Work
4.0 Work Area Preparation
5.0 Work Practices
6.0 Worker Protection
7.0 Air Monitoring
8.0 Waste Handling & Disposal
9.0 Cleanup Procedures
10.0 Project Closeout

File details come from the government source that posted it. Updated .