This Request for Qualifications (RFQ) is issued by Rockdale County Government, Georgia, through its Finance Department Procurement Office, seeking statements of professional qualifications from experienced architectural and engineering firms to establish Indefinite Delivery Contracts for design services on various county building projects. The solicitation is divided into two design service categories: (1) Architectural Design Services including mechanical, electrical, or structural engineering as needed, and (2) Civil Engineering or Land Surveying Services. Firms may submit qualification statements for one or both categories, with separate sealed proposals required for each category if applying for multiple services. Potential services include engineering studies, pre-design and pre-construction activities, detailed design services, project management, and contract administration. No minimum or maximum amount of work is guaranteed, and work will be procured on an as-needed basis. Sealed qualifications must be received by 2:00 p.m. local time on Thursday, January 29, 2026, at the Rockdale County Finance Department, Procurement Division, 958 Milstead Avenue, Conyers, Georgia 30012. Questions and clarifications must be submitted by 2:00 p.m. on Thursday, January 22, 2026. The contract term is one year with options to renew for two additional one-year terms, unless cancelled in writing 30 days before the end of the current term.

Evaluation will be conducted on a past performance/quality/price trade-off basis with weightings of 40 percent for staffing and availability, 20 percent for experience and performance, and 40 percent for organization and staffing. All proposals must be submitted on one USB Flash Drive in Adobe PDF format and include completed affidavits, financial statements demonstrating stability, three project references with similar experience, proof of current business license, and completed Equal Business Opportunity Program documentation. Proposers must comply with the Illegal Immigration Reform and Enforcement Act of 2011 and provide evidence of E-Verify registration. Professional liability insurance with minimum limits of $1,000,000 is required, along with workers' compensation, general liability, and automobile liability coverage. The County reserves the right to reject any or all proposals, conduct interviews with selected firms, and award contracts based on best value determination. Rockdale County participates in an Equal Business Opportunity Program requiring good faith efforts to utilize Historically Underutilized Businesses and Small Business Enterprises for contracts valued at $100,000 or more. Post-award utilization reports must be submitted monthly by the 15th day of each month to the EBO Administrator.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RREEQQUUEESSTT FFOORR QQUUAALLIIFFIICCAATTIIOONNSS

RRFFQQ ##2255--3300

RROOCCKKDDAALLEE CCOOUUNNTTYY,, GGEEOORRGGIIAA

DDeecceemmbbeerr 3311,, 22002255

ARCHITECTURAL AND ENGINEERING

SERVICES FOR VARIOUS COUNTY PROJECTS

ROCKDALE COUNTY FINANCE DEPARTMENT

PROCUREMENT OFFICE

958 Milstead Avenue

CONYERS, GA 30012

770-278-7552

RFQ No.25-30

INTRODUCTION:

Rockdale County Government is seeking statements of professional qualifications from experienced and qualified architectural/engineering firms for the purpose of establishing Indefinite Delivery Contracts for design services needed for various County building projects. No minimum or maximum amount of work is guaranteed under this solicitation, and work will be procured on an as-need basis. Two design categories will be utilized for these services. Firms may submit qualification statements on one or more services. If submitting for more than one category, a separate, sealed proposal shall be submitted for each category. Categories shall include:

1. Architectural Design Services to include mechanical, electrical, or structural engineering as needed.

2. Civil Engineering or Land Surveying Services

Services to be provided under the solicitation may include, but not be limited to, engineering studies, pre-design and pre-construction activities, detailed design services, project management, contract administration, contract management and other related services. Whenever services are requested by the County, the design firm will submit a written proposal for the specific project. The County reserves the right to accept or reject proposals, and to accept the proposal that serves the best interest of the County. The County reserves the right to seek the services of other design firms not included in this agreement for projects requiring specialized or unique services.

Rockdale County provides equal opportunity for all businesses and does not discriminate against any person or business because of race, color, religion, sex, national origin, handicap or veterans’ status. This policy ensures all segments of the business community have access to supplying the goods and services needed by Rockdale County.

PURCHASING CONTACT FOR THIS REQUEST:

All questions concerning this RFQ and all questions arising subsequent to award are to be addressed to the Purchasing Division via email to Adrienne Brown, Buyer & Compliance Specialist, at Adrienne.m.brown@rockdalecountyga.gov.

Rockdale County Finance Department Purchasing Division

Attn: Adrienne Brown 958 Milstead Avenue Conyers, GA 30012

Phone: (770) 278-7557 E-mail: Adrienne.m.brown@rockdalecountyga.gov

To maintain a “level playing field”, and to assure that all Consultants receive the same information, Consultants are requested NOT to contact anyone other than the contact above until after the award of the contract. Doing so could result in disqualification of the Consultant.

STATEMENT OF QUALIFICATION COPIES FOR EVALUATION:

One (1) USB Flash Drive in Adobe PDF format will be required for review purposes. Flash Drives that are blank or have incorrect information on them will not be acceptable and may be justification for disqualification. Check your Flash Drive(s) to ensure that they have the appropriate material on it before submitting.

The RFQ number and vendors name must be clearly written on the outside of the envelope. Incomplete, incorrect, unsealed, unmarked, or improperly submitted proposals may be rejected.

CONTRACT TERM:

The Contract Term will be (1) year with the option to renew two (2) additional one-year terms, unless cancelled in writing 30 days before the end of current term.

DUE DATE:

Sealed qualifications will be received at the Rockdale County Finance Department, Procurement Division, 958 Milstead Avenue, Conyers, GA 30012 no later than 2:00 P.M., local time, Thursday, January 29, 2026. Request for Qualifications received after this time will not be accepted.

mailto:Adrienne.m.brown@rockdalecountyga.gov

QUESTIONS AND CLARIFICATIONS:

All questions and requests for clarifications concerning this RFQ must be submitted to the Purchasing Division via email to Adrienne.m.brown@rockdalecountyga.gov no later than 2:00 p.m., local time, on Thursday, January 22, 2026. It shall be the consultant’s responsibility to seek clarification as early as possible prior to the due date and time. Written responses from the County to the questions it receives will be in an addendum and posted to the County’s website at www.rockdalecountyga.gov, under Bid Opportunities. Questions or requests for clarifications received after this deadline will not receive a response.

ADDENDA:

Answers to questions submitted that materially change the conditions and specifications of this RFQ will be issued in an addendum and posted to the County’s website at www.rockdalecountyga.gov, Bid Opportunities. Any discussions or documents will be considered non-binding unless incorporated and issued in an addendum.

It is the proposer’s responsibility to check the Rockdale County website at www.rockdalecountyga.gov, Bid Opportunities for any addenda that may be issued, prior to submitting a SOQ for this RFQ.

EQUAL BUSINESS OPPORTUNITY POLICY:

This RFP qualifies for Rockdale County Government EBO program. For questions regarding the EBO program, please contact Adrienne Brown at Adrienne.m.brown@rockdalecountyga.gov or 770-278-7557.

OPEN RECORDS

The contents of the qualifications will not be made public until after an award and contract has been executed.

QUALIFICATIONS OF OFFERORS:

Proposers must have a current business license from their home-based jurisdiction and provide a copy of that license with the submittal of their proposal response.

Proposals from any offeror that is in default on the payment of any taxes, license fees, or other monies due to Rockdale County will not be accepted.

Any vendor submitting a Proposal must complete the Contractor’s Qualification Statement and Questionnaire if provided in this package.

In evaluating Proposals, the County may seek additional information from any vendor concerning such vendor’s proposal or its qualifications.

Proposers are to submit at least three (3) references from projects with similar experience using the materials and process in this RFQ.

DEBRIEFINGS:

In lieu of Post-Award debriefings, Rockdale County will provide the final evaluation Score Sheet. The Score Sheet will include the scores for all firms who responded and will typically be provided with a PDF file and e-mailed.

FINANCIAL STABILITY

The Offeror will provide financial information that would allow proposal evaluators to ascertain the financial stability of the firm.

• If a public company, the Offeror will provide their most recent audited financial report.

• If a private company, the Offeror will provide a copy of their most recent internal financial statement, and/or a letter from their financial institution, on the financial institution’s letterhead, stating the Offeror is in good standing with that financial institution.

http://www.rockdalecountyga.gov/ http://www.rockdalecountyga.gov/ http://www.rockdalecountyga.gov/

SELECTION PROCESS:

The Rockdale County Procurement Office and Evaluation Committee makes a recommendation for award. The Board of Commissioners will make the actual award of the contract and has the authority to award the contract to a company different than the company recommended by the Procurement Office and/or Evaluation Committee.

This is a past performance/quality/price trade-off source selection in which competing offeror’s past and present performance history and product quality will be evaluated on a basis approximately equal to price. Award will be made to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors listed below. Rockdale County Board of Commissioners may reject any or all proposals and to waive any technicalities or informalities if such action is in the county’s interest.

Rockdale County may evaluate proposals and award a contract without discussions with offerors. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. The County reserves the right to conduct discussions if the County later determines them to be necessary.

Proposers will be evaluated based on the following criteria and may be called in for an interview.

The County intends to award the contract to the responsible and responsive contractor whose proposal is determined in writing to be the most advantageous to the County taking into consideration all of the evaluation criteria.

AWARD OF CONTRACT

The Rockdale County Procurement Office and Evaluation Committee makes a recommendation for award. The Board of Commissioners will make the actual award of the contract and has the authority to award the contract to a consultant different than the consultant recommended by the Procurement Office and/or Evaluation Committee.

ILLEGAL IMMIGRATION REFORM AND ENFORCEMENT ACT OF 2011

Vendors submitting a Qualification package in response to this RFQ must complete the Contractor Affidavit under O.C.G.A. §13-10-91(b)(1) which is provided with the RFQ package to verify compliance with the Illegal Immigration Reform and Enforcement Act of 2011.

A. The form must be signed by an authorized officer of the contractor or their authorized agent.

B. The form must be notarized.

C. The contractor will be required to have all subcontractors and sub-subcontractors who are engaged to complete physical performance of services under the final contract executed between the County and the contractor complete the appropriate subcontractor and sub-subcontractor affidavits and return them to the County a minimum of five (5) days prior to any work being accomplished by said subcontractor or sub-subcontractor. Format for this affidavit can be provided to the contractor if necessary.

EVALUATION CRITERIA:

Offerors will be evaluated based on the following criteria and may be called in for an interview.

Respondents will have their submissions evaluated and scored. Submissions will be evaluated to assess the respondent's ability to provide anticipated services for Rockdale County. Rockdale County shall be the sole judge of the quality and the applicability of all statements of qualifications. Approach, scope, overall quality, local facilities, terms, and other pertinent considerations will be taken into account in determining acceptability.

Selection Committee shall evaluate and rank the statements of qualifications based on the following criteria:

• Staffing and Availability – Evaluation of the list of personnel specifically assigned to the proposed project, including their qualifications, overall experience, and recent experience on projects of similar nature and complexity to the proposed project. (40%)

• Experience/Performance – Review of personnel qualifications and experience. Management approach to projects, past performance on projects of similar nature and complexity as the proposed project. Evaluation of client references including but not limited to references submitted in qualification response; overall responsiveness to County’s needs. Provider financial capability, qualifications, and experience. (20%)

• Organization and Staffing – Evaluation of the workload of the firm and the staffing to be assigned to the proposed project; time schedule of the Proposer in relation to that of the proposed project; location of the offices or facilities from which the services are to be provided. (40%)

INTERVIEWS

Interviews may be scheduled. Interviews will be informal and will provide respondents with an opportunity to answer any questions the selection team may have on a submission.

INSURANCE:

Before starting any work, the successful consultant must furnish to Rockdale County certificate(s) of insurance from companies doing business in Georgia. The Consultant shall maintain in full force and effect the following insurance during the term of the Agreement:

Coverages: Limits of Liability:

Workers’ Compensation Statutory Employers’ Liability $1,000,000.00 Bodily Injury Liability $1,000,000.00 each occurrence except Automobile $1,000,000.00 aggregate Property Damage Liability $1,000,000.00 each occurrence except Automobile $1,000,000.00 aggregate Personal & Advertising Injury Limit $1,000,000.00 Products / Completed Ops. $2,000,000.00 aggregate Automobile Bodily Injury $1,000,000.00 each person Liability $1,000,000.00 each occurrence Automobile Property Damage $1,000,000.00 each occurrence Liability Professional Liability/General Liability $1,000,000.00

All insurance shall be provided by an insurer(s) acceptable to the County and shall provide for thirty (30) days prior notice of cancellation to the County. Upon contract award, Consultant shall deliver to the County a certificate or policy of insurance evidencing Consultant’s compliance with this paragraph. Consultant shall abide by all terms and conditions of the insurance and shall do nothing to impair or invalidate the coverage.

Rockdale, GA shall be named as Additional Insured under any General Liability, Business Auto and Umbrella Policies using ISO Additional Insured Endorsement forms CG 2010 or its equivalent. Coverage shall apply as Primary and non-contributory with Waiver of Subrogation in favor of Rockdale County, Georgia.

The insurance carrier must have a minimum rating of A or higher as determined by the rating firm A.M. Best.

Certificates must contain policy number, policy limits, and policy expiration date of all policies. The Request for Qualifications (RFQ) number and project name must be inserted in the Description of Operations section of the certificate.

Certificates are to be issued to:

Rockdale County, Georgia 958 Milstead Avenue Conyers, GA 30012

GENERAL INFORMATION

No proposals received after said time or at any place other than the time and place as stated in the notice shall be considered. No responsibility shall attach to Rockdale County for the premature opening of a proposal not properly addressed and identified.

WITHDRAWAL OF PROPOSAL:

A proposer may withdraw his proposal before the proposal due date, without prejudice to the proposer, by submitting a written request of withdrawal to the Rockdale County Procurement Office.

REJECTION OF PROPOSAL:

Rockdale County may reject any and all proposals and must reject a proposal of any party who has been delinquent or unfaithful in any formal contract with Rockdale County. Also, the right is reserved to waive any irregularities or informalities in any proposal in the proposing procedure. Rockdale County shall be the sole judge as to which proposal is best, and in ascertaining this, will take into consideration the business integrity, financial resources, facilities for performing the work, and experience in similar operations of the various proposers.

STATEMENT OF EXPERIENCE AND QUALIFICATIONS:

The proposer may be required, upon request, to prove to the satisfaction of Rockdale County that he/she has the skill, experience, necessary facilities and ample financial resources to perform the contract(s) in a satisfactory manner and within the required time. If the available evidence of competency of any proposer is not satisfactory, the proposal of such proposer may be rejected. The successful proposer is required to comply with and abide by all applicable federal and state laws in effect at the time the contract is awarded.

NON-COLLUSION AFFIDAVIT:

By submitting a proposal, the proposer represents and warrants that such proposal is genuine and not sham or collusive or made in the interest or in behalf of any person not therein named, that the proposer has not directly or indirectly induced or solicited any other proposer to put in a sham proposal, or any other person, firm or corporation to refrain from proposing and that the proposer has not in any manner sought by collusion to secure to that proposer any advantage over any other proposer.

INTEREST OF:

By submitting a proposal, the proposer represents and warrants that a Commissioner, Administrator, employee, nor any other person employed by Rockdale County has, in any manner, an interest, directly or indirectly, in the proposal or in the contract which may be made under it, or in any expected profits to arise there from.

DOCUMENTS DEEMED PART OF THE CONTRACT:

The notice, invitation to proposers, general conditions, and instructions for proposers, special conditions, specifications, proposal, and addenda, if any, will be deemed part of the contract.

STANDARD INSTRUCTIONS

1. The instructions contained herein shall be construed as a part of any proposal invitation and/or specifications issued by Rockdale County and must be followed by each proposer.

2. The written specifications contained in this proposal shall not be changed or superseded except by written addendum from Rockdale County. Failure to comply with the written specifications for this proposal may result in disqualification by Rockdale County.

3. All goods and materials shall be F.O.B. Destination Conyers, Georgia and no freight or postage charges will be paid by Rockdale County unless such charges are included in the proposal price.

4. The following number, RFQ No. 25-30, must be written clearly on the outside of USB Flash Drive proposal envelope in order to avoid prior opening in error.

5. All USB Flash Drive proposals must be received and in-hand at proposal due date and time. Each proposer assumes the responsibility for having his/her proposal received at the designated time and place of proposal due date. USB Flash Drive Proposals received after the stated time and date may be subject to rejection without consideration, regardless of postmark. Rockdale County accepts no responsibility for mail delivery.

6. Unless otherwise stated, all proposals submitted shall be valid and may not be withdrawn for a period of 120 days from the due date.

7. The Proposal Form submitted on the USB Flash Drive must be the first page and include the name of the business, mailing address, the name, title and signature of the person submitting the proposal.

8. Rockdale County reserves the right to accept a proposal that is not the lowest price if, in the County's judgment, such proposal is in the best interest of the County and the public. The County reserves the right to reject any and all proposals.

9. Telephone, Emailed or Facsimile proposals will not be accepted.

10. No sales tax will be charged on any orders except for contracts that include construction materials being purchased through a third party.

i. Federal I.D. #58-6000882

ii. Sales Tax Exempt #308750008

11. If applicable, completed questionnaires must be signed manually. Rockdale County reserves the right to accept or reject any proposal on the basis of incomplete or inaccurate answers to the questionnaire.

12. If applicable, warranty information shall be provided.

13. Proposers shall state delivery time after receiving order.

14. Proposers shall identify any subcontractors and include an explanation of the service or product that they may provide.

PROPOSAL FORM RFQ #25-30

Instructions: Complete BOTH parts of this bid form.

PART I: Addenda Acknowledgements (if applicable) Each vendor is responsible for determining that all addenda issued by the Rockdale County Finance Department – Purchasing Division have been received before submitting a bid.

PART II: Vendor Information:

Company Name Address Telephone E-Mail Representative (print name) Signature of Representative Date Submitted

Addenda Date Vendor Received Initials “1” “2” “3” “4” “5” “6”

ROCKDALE COUNTY BOARD OF COMMISSIONERS

NON-COLLUSION AFFIDAVIT OF VENDOR

State of ____________________)

County of ____________________)

___________________________________________, being first duly sworn, deposes and says that:

(1) He is____________________________________ (owner, partner officer, representative, or agent) of ___________________________, the Vendor that has submitted the attached RFQ;

(2) He is fully informed respecting the preparation and contents of the attached RFQ and of all pertinent circumstances respecting such RFQ;

(3) Such RFQ is genuine and is not a collusive or sham RFQ;

(4) Neither the said Vendor nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affidavit, has in any way colluded, conspired, connived or agreed, directly or indirectly with any other Vendor, firm or person to submit a collusive or sham RFQ in connection with the Contract for which the attached RFQ has been submitted or refrain from proposing in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Vendor, firm or person to fix the price or prices in the attached RFQ or of any other Vendor, or to fix any overhead, profit or cost element of the proposing price or the proposing price of any other Vendor, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against Rockdale County or any person interested in the proposed Contract; and

(5) The price or prices quoted in the attached RFQ are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Vendor or any of its agents, representatives, owners, employees, or parties in interest, including this affidavit.

(Signed)

(Title)

Subscribed and Sworn to before me this ___________ day of _____________, 202__

Name__________________________________________________

Title__________________________________________________ My commission expires (Date)

ROCKDALE COUNTY BOARD OF COMMISSIONERS

NON-COLLUSION AFFIDAVIT OF SUB-CONTRACTOR

State of ____________________)

County of ____________________)

___________________________________________, being first duly sworn, deposes and says that:

(1) He/She is____________________________________ (owner, partner officer, representative, or agent) of ___________________________, the sub-contractor that has submitted the attached RFQ;

(2) He is fully informed respecting the preparation and contents of the attached RFQ and of all pertinent circumstances respecting such RFQ;

(3) Such RFQ is genuine and is not a collusive or sham RFQ;

(4) Neither the said sub-contractor nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affidavit, has in any way colluded, conspired, connived or agreed, directly or indirectly with any other Vendor, firm or person to submit a collusive or sham RFQ in connection with the Contract for which the attached RFQ has been submitted or refrain from proposing in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Vendor, firm or person to fix the price or prices in the attached RFQ or of any other Vendor, or to fix any overhead, profit or cost element of the proposing price or the proposing price of any other Vendor, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against Rockdale County or any person interested in the proposed Contract; and

(5) The price or prices quoted in the attached RFQ are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the sub-contractor or any of its agents, representatives, owners, employees, or parties in interest, including this affidavit.

(Signed)

(Title)

Subscribed and Sworn to before me this ___________ day of _____________, 202__.

Name_________________________________________________

Title_________________________________________________ My commission expires (Date)

Contractor Affidavit under O.C.G.A. § 13-10-91(b)(l)

The undersigned contractor ("Contractor") executes this Affidavit to comply with O.C.G.A § 13-10-91 related to any contract to which Contractor is a party that is subject to O.C.G.A. § 13-10-91 and hereby verifies its compliance with O.C.G.A. § 13-10-91, attesting as follows:

a) The Contractor has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program;

b) The Contractor will continue to use the federal work authorization program throughout the contract period, including any renewal or extension thereof;

c) The Contractor will notify the public employer in the event the Contractor ceases to utilize the federal work authorization program during the contract period, including renewals or extensions thereof;

d) The Contractor understands that ceasing to utilize the federal work authorization program constitutes a material breach of Contract;

e) The Contractor will contract for the performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the Contractor with the information required by O.C.G.A. § 13-10-91(a), (b), and (c);

f) The Contractor acknowledges and agrees that this Affidavit shall be incorporated into any contract(s) subject to the provisions of O.C.G.A. § 13-10- 91 for the project listed below to which Contractor is a party after the date hereof without further action or consent by Contractor; and

g) Contractor acknowledges its responsibility to submit copies of any affidavits, drivers' licenses, and identification cards required pursuant to O.C.G.A. § 13-10-91 to the public employer within five business days of receipt.

Federal Work Authorization User Identification Number Date of Authorization

Name of Contractor Name of Project

Name of Public Employer

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on _________, _____, 20_____ in _______________ (city), __________ (state).

Signature of Authorized Officer or Agent

Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME

ON THIS THE _______ DAY OF _____________, 20______.

NOTARY PUBLIC

My Commission Expires: _____________________________

Subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(3)

By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with (name of contractor) on behalf of (name of public employer) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the subcontractor with the information required by O.C.G.A. § 13-10-91(b). Additionally, the undersigned subcontractor will forward notice of the receipt of an affidavit from a sub-subcontractor to the contractor within five business days of receipt. If the undersigned subcontractor receives notice that a sub-subcontractor has received an affidavit from any other contracted sub-subcontractor, the undersigned subcontractor must forward, within five business days of receipt, a copy of the notice to the contractor.

Subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization User Identification Number Date of Authorization Name of Subcontractor Name of Project Name of Public Employer

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on ______, ___, 202__ in _____(city), ______(state).

Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME

ON THIS THE ______ DAY OF ______________,202__.

NOTARY PUBLIC

My Commission Expires:

Sub-subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(4)

By executing this affidavit, the undersigned sub-subcontractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract for (name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract) and (name of contractor) on behalf of (name of public employer) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned sub-subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned sub-subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the sub-subcontractor with the information required by O.C.G.A. § 13-10-91(b). The undersigned sub-subcontractor shall submit, at the time of such contract, this affidavit to (name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract).

Additionally, the undersigned sub-subcontractor will forward notice of the receipt of any affidavit from a sub-subcontractor to (name of subcontractor or sub-subcontractor with whom such sub-subcontractor has privity of contract).

Sub-subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization User Identification Number Date of Authorization Name of Sub-subcontractor Name of Project Name of Public Employer

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on ______, ___, 202__ in _____(city), ______(state).

Signature of Authorized Officer or Agent Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME

ON THIS THE ______ DAY OF ______________,202__.

NOTARY PUBLIC

Affidavit Verifying Status for County Public Benefit Application

By executing this affidavit under oath, as an applicant for the award of a contract with Rockdale, County Georgia, I __________________________. [Name of natural person applying on behalf of individual, business, corporation, partnership, or other private entity] am stating the following as required by O.C.G.A. Section 50-36-1:

1) ______ I am a United States citizen

OR

2) ______ I am a legal permanent resident 18 years of age or older or I am an otherwise qualified alien or non-immigrant under the Federal Immigration and Nationality Act 18 years of age or older and lawfully present in the United States.*

In making the above representation under oath, I understand that any person who knowingly and willfully makes a false, fictitious, or fraudulent statement or representation in an affidavit shall be guilty of a violation of Code Section 16-10-20 of the Official Code of Georgia.

Signature of Applicant: Date

Printed Name:

Alien Registration number for non-citizens

SUBSCRIBED AND SWORN

BEFORE ME ON THIS THE

DAY OF , 202 .

Notary Public My commission Expires:

*Note: O.C.G.A. § 50-36-1(e)(2) requires that aliens under the federal Immigration and Nationality Act, Title 8 U.S.C., as amended, provide their registration number. Because legal permanent residents are included in the federal definition of “alien”, legal permanent residents must also provide their alien registration number. Qualified aliens that do not have an alien registration number may supply another identifying number below.

Certification of Absence of Conflict of Interest For Development of Specifications or Scope of Work

Required for each contract or arrangement to prepare or develop specifications or requirements

(O.C.G.A. § 36-80-28)

The undersigned Consultant, who is entering into a contract or arrangement with Rockdale County to prepare or develop specifications or requirements for an invitation for bids, request for proposals, purchase order, or any other type of solicitation for said Rockdale County certifies that:

1. Consultant shall avoid any appearance of impropriety and shall follow all policies and procedures of Rockdale County, as may be related to the project.

2. Consultant discloses below any material transaction or relationship currently known to Consultant that reasonably could be expected to give rise to a conflict of interest, including, but not limited to, that of the Consultant, or the Consultant’s employees, agents or subsidiaries (Include past, present, or known prospective engagements, involvement in litigation or other dispute, client relationships, or other business or financial interest):

3. Consultant shall immediately disclose any material transaction or relationship subsequently discovered during the pendency of the contract or arrangement.

4. Consultant acknowledges that any violation or threatened violation of the agreement may cause irreparable injury to the Rockdale County, entitling Rockdale County to seek injunctive relief in addition to all other legal remedies.

Signature of Contractor’s Authorized Official

Printed Name & Title of Authorized Official

Date

CONTRACTOR’S QUALIFICATION STATEMENT AND QUESTIONNAIRE

NAME OF PROPOSED CONTRACTOR: _______________________________________

I. INSTRUCTIONS

A. All questions are to be answered in full. If copies of other documents will answer the question completely, they may be attached and clearly labeled. If additional space is needed, additional pages may be attached and clearly labeled.

B. The owner, Rockdale County, Georgia, its agents, and representatives, shall be entitled to contact each and every reference listed in response to this questionnaire, and each entity referenced in any response to any question in this questionnaire. By completing this questionnaire, the contractor expressly agrees that any information concerning the contractor in possession of said entities and references may be made available to the owner.

C. Only complete and accurate information shall be provided by the contractor. The contractor hereby warrants that, to the best of its knowledge and belief, the responses contained herein are true, accurate, and complete. The contractor also acknowledges that the owner is relying on the truth and accuracy of the responses contained herein. If it is later discovered that any material information given in response to a question was provided by the contractor, knowing it was false, it shall constitute grounds for immediate termination or rescission by the owner of any subsequent agreement between the owner and the contractor. The owner shall also have and retain any other remedies provided by law.

D. The completed form shall be submitted with contractor’s proposals.

E. This form, its completion by the contractor, and its use by the contractor, and its use by the owner, shall not give rise to any liability on the part of the owner to the contractor or any third party or person.

II. GENERAL BACKGROUND

A. Current address of contractor: _____________________________________

B. Previous Name or address of contractor: _____________________________________

C. Current president or CEO and years in position: _____________________________________

D. Number of permanent employees: _____________________________________

E. Name and address of affiliated companies: _____________________________________

III. FINANCIAL STATUS

A. Please attach financial statements for the past three years for which they are complete. If such statements are not available, please furnish the following information:

1. LAST COMPLETE FISCAL YEAR:

A. Revenues (Gross) B. Expenditures (Gross)

C. Overhead & Admin (Gross) D. Profit (Gross)

2. YEAR PRIOR TO “1” ABOVE:

3. YEAR PRIOR TO “2” ABOVE:

B. BANKRUPTCIES

1. Has the Contractor, or any of its parents or subsidiaries, ever had a Bankruptcy Petition filed in its name, voluntarily or involuntarily? (If yes, specify date, circumstances, and resolution).

2. Has any Majority Shareholder ever had a Bankruptcy Petition filed in his/her name, voluntarily or involuntarily? (If yes, specify date, circumstances, and resolution).

C. BONDING

1. What is the Contractor’s current bonding capacity? ____________

2. What is the value of the Contractor’s work currently under contract? ____________

IV. COMPANY EXPERIENCE – SIMILAR PROJECTS

A. List three projects of reasonably similar nature, scope, and duration performed by your company in the last five years, specifying, where possible, the name and last known address of each owner of those projects:

Project #1:

Name and Address: ________________________________ Date of Project: ________________________________

Type of Project: ________________________________

Contract Price: ________________________________

Owner contact info: ________________________________

Architect/Engineer contact info: ________________________________ (if applicable) ________________________________ Project #2:

Name and Address: ________________________________ Date of Project: ________________________________

Type of Project: ________________________________

Contract Price: ________________________________

Owner contact info: ________________________________

Architect/Engineer contact info: ________________________________ (if applicable) ________________________________ Project #3:

Name and Address: ________________________________ Date of Project: ________________________________

Type of Project: ________________________________

Contract Price: ________________________________

Owner contact info: ________________________________

Architect/Engineer contact info: ________________________________ (if applicable) ________________________________

V ARBITRATIONS, LITIGATIONS, AND OTHER PROCEEDINGS

Has your company been involved in any construction _____________ arbitration demands filed by, or against, you in the last five years?

Has your company been involved in any construction-related _____________ lawsuits (other than labor or personal injury litigation) filed by, or against, you in the last five years?

Has your company been involved in any lawsuits, _____________ proceedings, or hearings initiated by the National Labor Relations Board or similar state agency in the past seven years?

Has your company been involved in any lawsuits, proceedings, _____________ or hearings initiated by the Occupational Safety and Health Administration concerning the project safety practices of the Contractor in the last seven years?

Has your company be involved in any lawsuits, proceedings, _____________ or hearings initiated by the Internal Revenue Service, or any state revenue department, concerning the tax liability of the Contractor (other than audits) in the last seven years?

Have any criminal proceedings or investigations been brought _____________ against the Contractor in the last ten years?

If you answered yes to any of the questions above, please identify the nature of the claim, the amount in dispute, the parties, and the ultimate resolution of the proceeding (attach documentation if needed):

VI COMMENTS

Please list any additional information that you believe would assist the Owner in evaluating the possibility of using the Contractor on this Project. You may attach such additional information as an Exhibit to this Statement and Questionnaire.

I certify to the Owner that the information and responses provided on this Questionnaire are true, accurate and complete. The Owner, or its designated representative, may contact any entity or reference listed in this Questionnaire. Each entity or reference may make any information concerning the Contractor available to the Owner, or its designated representative.

Contractor:

Signature Date Title

Sworn to and subscribed before me This ______ day of __________

Signature

Notary Public

ROCKDALE COUNTY GOVERNMENT

EQUAL BUSINESS OPPORTUNITY PROGAM

Rockdale County Government Equal Business Opportunity (“EBO”) Program ordinance promotes opportunities for Historically Underutilized Businesses (“HUBs”) and Small Business Enterprises (“SBEs”) and protects all contracting applicants from unlawful discrimination. Under the EBO ordinance, bids for any project totaling $100,000 or more in value must demonstrate good faith efforts to make work available to HUBs and SBEs. The ordinance is aspirational and seeks to maximize contracting opportunities for HUBs and SBEs. Specific outreach and reporting requirements are detailed in the EBO Ordinance and accompanying EBO policy document adopted by the Rockdale County Board of Commissioners, both of which are attached here.

In accordance with the terms of the EBO ordinance, all contracting shall be awarded without regard to race, religion, color, creed, national origin, sex, age, or handicapping condition. No portion of the EBO ordinance requires contractors or subcontractors to make purchases of materials or equipment from HUBs who do not submit the lowest responsible, responsive bid.

Please refer to the attached EBO ordinance and EBO policy document for further details.

EBO PROGRAM

CONTRACT COMPLIANCE REQUIREMENTS

AFFIDAVIT – SCHEDULE OF INTENDED SUBCONTRACTOR UTILIZATION PLAN

(UTILIZATION PLAN)

The Utilization Plan is designed to enhance the utilization of a Historically Underutilized Business (HUB) or a Small Business Enterprise (SBE) by a bidder/proposer, contractor, or vendor. The bidder/proposer must outline a plan of action to encourage and achieve diversity and equality in the available procurement and contracting opportunities with bid/proposal.

DETERMINATION OF GOOD FAITH

The Prime Contractor must demonstrate that they have made reasonable, good faith efforts to ensure that certified firms have had a full and fair opportunity to compete and win subcontracts on this project. The Prime Contractor is required to include all outreach attempts that would demonstrate a “Good Faith Effort” in the solicitation of sub-consultants/subcontractors.

Documentation of efforts made by the Prime Contractor regarding this project should be documented using the Subcontractor Contact Form.

AFFIDAVIT – CONTRACTOR ONLY USAGE

A contractor that performs all the work under a contract with its own workforce may submit an affidavit.

UTILIZATION REPORTING (Post Award)

The successful bidder/proposer will be required to report all payments to subcontractors, sub-consultants, and suppliers (if applicable) by the 15th day of the month to the EBO Administrator.

AFFIDAVIT - SCHEDULE OF INTENDED SUBCONTRACTOR UTILIZATION

This form must be completed and submitted with the bid/proposal. All prime bidders/proposers must submit this form which lists all intended subcontractors/suppliers who will be utilized under the scope of work/services.

Prime Bidder/Proposer Company Name

ITB/RFP Name & Number:

1. My firm, as Prime Bidder/Proposer on this scope of work/service(s) is NOT□, is□ a Historically Underutilized Business or Small Business Enterprise.

Indicate below the portion of work, including, percentage of bid/proposal amount that your firm will carry out directly as the Prime Contractor:

$ Or %

2. This information below must be completed and submitted with the bid/proposal if a joint venture (JV) approach is to be undertaken. Please provide JV breakdown information below and attach a copy of the executed Joint Venture Agreement.

JV Partner(s) information:

Business Name Business Name

(a.) (b.)

% of JV % of JV

HUB or SBE Certified (Y or N)

HUB or

SBE

Certified (Y or N)

Certified Agency

Certified Agency

Date Certified

Date Certified

3. Lists all Sub-Contractor/suppliers participating on the project and provide a description of the work to be executed.

Total Dollar Value of Certified Subcontractors: ($)

Total Percentage of Certified Subcontractors: (%)

AFFIDAVIT - SCHEDULE OF INTENDED SUBCONTRACTOR UTILIZATION

(continued)

CERTIFICATION: The undersigned certifies that he/she has read, understands, and agrees to be bound by the Bid/Proposer provisions. The undersigned further certifies that he/she is legally authorized by the Bidder/Proposer to make the statement and representation and that said statements and representations are true and correct to the best of his/her knowledge and belief. The undersigned understands and agrees that if any of the statements and representations are made by the Bidder/Proposer knowing them to be false, or if there is a failure of the intentions, objectives and commitments set forth herein, then in any such event the Contractor’s acts or failure to act, as the case may be, shall constitute a material breach of the contract, entitling the County to terminate the Contract for default. The right to so terminate shall be in addition to, and in lieu of, any other rights and remedies the County may have for other defaults under the contract.

By submitting this form, it is understood that every firm listed as a subcontractor has been properly notified and will participate.

Signature: Title:

Business or Corporate Name:

Address:

Telephone: ( )

Fax Number: ( )

Email Address:

UTILIZATION REPORT – Post Award

The awarded vendor(s) are required to report all payments to the prime contractor, subcontractors, and sub-consultants (if applicable) during the project by the 15th day of the month to the EBO Administrator.

Subcontractor or Supplier information

ITB or RFP # Name Contact Name Contact Email

Address

Contact Phone

Payment amount

Date of payment

Payment Method

Issues:

Vendor Name: __________________________________

Printed Signature:

_________________________________ Date:

Title___________________________________

INTERNAL USE ONLY

Verified ________________________

Any Issues ________________________

Verified by ________________________

Subcontractor/Supplier Business Address Contact Name Contact Email Address Contact Phone Scope of Work Solicited for Project

HUB or SBE

Certification

Designation

Result of

Contact

Date of

Contact

Company Name: __________________________________ Project # & Title: ___________________________

Printed Signature: _________________________________ Date: ___________________________

Title___________________________________

INTERNAL USE ONLY

Date information verified ________________________

Any Issues ________________________

Verified by ________________________

ROCKDALE COUNTY GOVERNMENT

Subcontractor Contact Form

Good Faith Effort - Must also include evidence of all good faith efforts that were implemented, including any advertisements, solicitations, and evidence of other specific actions demonstrating recruitment and selection of Historically Underutilized Businesses or Small Business Enterprises.

PROPOSER’S CHECKLIST

__________ ONE (1) FLASH DRIVE (containing a copy in Adobe PDF format) of the following documents: all documents shall be fully completed, signed, and dated:

__________ Proposal Form (See Page 9)

__________ All Applicable Affidavit Forms (See Pages 10-15)

__________ Any Proposed Deviations from the Required Specifications, Including Necessary Explanations and Conditions (See Page 16)

__________ Contractor Statement of Qualifications (See Pages 17-20)

__________ Equal Business Opportunity Forms (See Pages 21-35)

__________ Proof of Business License

The purpose of this checklist is to remind proposers of the documents generally required for the SOQ submittal. It is the proposer’s responsibility to include additional documents requested in the RFQ that may not be shown on the checklist.

25-30 Architectural & Engineering Services for Various County Projects
25-30 Architectural & Engineering Services for Various County Projects.pdf
December 31, 2025
ROCKDALE COUNTY FINANCE DEPARTMENT
FINANCIAL STABILITY
ILLEGAL IMMIGRATION REFORM AND ENFORCEMENT ACT OF 2011
Vendors submitting a Qualification package in response to this RFQ must complete the Contractor Affidavit under O.C.G.A. §13-10-91(b)(1) which is provided with the RFQ package to verify compliance with the Illegal Immigration Reform and Enforcement Ac...
A. The form must be signed by an authorized officer of the contractor or their authorized agent.
B. The form must be notarized.
page 5.pdf
25-30 Architectural & Engineering Services for Various County Projects
25-30 Architectural & Engineering Services for Various County Projects.pdf
II. GENERAL BACKGROUND
III. FINANCIAL STATUS
IV. COMPANY EXPERIENCE – SIMILAR PROJECTS
V ARBITRATIONS, Litigations, and other proceedings
EBO Paperwork 8-29-24
EBO Paperwork 7-26-24
24-03 RFP Rockdale County's Planning & Development UDO Update with EBO Docs.pdf
24-03 RFP Rockdale County's Planning & Development UDO Update with EBO Docs
EBO Contract Compliance Requirements and Forms
24-03 RFP Rockdale County's Planning & Development UDO Update with EBO Docs.pdf
24-03 RFP Rockdale County's Planning & Development UDO Update with EBO Docs
EBO Subcontractor Contact Form_Fillable

24-03 RFP Rockdale County's Planning & Development UDO Update with EBO Docs

EBO Ordinance O-2024-11
EBO Amended Policy #2023-1-27

25-30 Architectural & Engineering Services for Various County Projects

Prime BidderProposer Company Name:
ITBRFP Name Number:
My firm as Prime BidderProposer on this scope of workservices is NOT: Off
is: Off
Business Name a:
of JV:
of JV_2:
HUB or SBE Certified Y or N:
HUB or SBE Certified Y or N_2:
Certified Agency:
Certified Agency_2:
Date Certified:
Date Certified_2:
Total Dollar Value of Certified Subcontractors:
Total Percentage of Certified Subcontractors:
Business Name:
Text2:
Business or Corporate Name:
Address 1:
Address 2:
undefined_3:
Email Address:
ITB or RFP Row1:
NameRow1:
Payment amountRow1:
Date of paymentRow1:
Payment MethodRow1:
ITB or RFP Row2:
NameRow2:
Payment amountRow2:
Date of paymentRow2:
Payment MethodRow2:
ITB or RFP Row3:
NameRow3:
Payment amountRow3:
Date of paymentRow3:
Payment MethodRow3:
Issues:
Vendor Name:
Title_2:
Any Issues:
undefined_4:
Verified by:
Text3:
SubcontractorSupplierRow1:
Business AddressRow1:
Contact NameRow1:
Contact Email AddressRow1:
Contact PhoneRow1:
Scope of Work Solicited for ProjectRow1:
HUB or SBE Certification DesignationRow1: