Bid_schedule_updated_12-21-16.pdf

PDF 28 KB Posted

Attached to
Aerobic Wastewater Systems Project Federal contract opportunity
Solicitation number
246-17-Q-0004
Issued by
Department of Health and Human Services Indian Health Service

About this file

Revised bid Schedule answering Bidder questions.

View the file

Other files for this federal contract opportunity

Other files attached to Aerobic Wastewater Systems Project, newest first.
File Type Posted
Questions_12-21-16.pdf PDF
Creeknationaerobics_Questions.pdf PDF
Bid_schedule_updated_12-14-16.pdf PDF
Salem_Soil_Test.pdf PDF
Hanna_Soil_Test.pdf PDF
Misty_valley_soil_test.pdf PDF
Creek_Aerobic_Systems_Spec.pdf PDF
Creek_Aerobic_Systems_Spec.docx DOCX document
General_Decision_Number_OK160033_10-07-2016__OK33.pdf PDF
SOW.pdf PDF
Bid_schedule.pdf PDF
SF24-16.pdf PDF
ok10-s14-16_Drawings.pdf PDF
Aerobic_Project_OEH_Okmulgee_SF18_R1.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Name Hanna Num. OK 10-S14 OEH Okmulgee Service Area Tribe Muscogee (Creek) Nation BY D. Tompkins

ITEM

DESCRIPTION

Rock Removal

Imported Backfill

Service Contract I 3-Year (not used)

Service Contract II 2-Year

Aerobic Wastewater Treatment Unit

Liquid Chlorine Disinfection System

Spray Heads with Pressure Lines

Electrical Connection

Septic Tank Abandonment

QTY

UNIT

COST

TOTAL

COST

1 10 CY $ $

2 10 TONS $ $

3 0 LS $ $

4 7 LS $ $

5 7 LS $ $

6 7 EA $ $

7 14 EA $ $

8 7 EA $ $

9 4 EA $ $

10 Manhole Abandonment 3 EA $ $

11 ODEQ Permit 7 EA $ $

Subtotal $

Name Misty Valley

Num. OK 10-S15

COST

TOTAL

COST

1 Rock Removal 10 CY $ $

2 Imported Backfill 10 TONS $ $

Service Contract II 2-Year

Replaces Service Contract I 3- Year

3 LS $ $

4 Aerobic Wastewater Treatment Unit 3 LS $ $

5 Liquid Chlorine Disinfection System 3 EA $ $

6 Spray Heads with Pressure Lines 6 EA $ $

7 Electrical Connection 3 EA $ $

8 Septic Tank 1,000 gallons 2 EA $ $

9 Solid Sewer Pipe 137 LF $ $

10 Chambers 950 LF $ $

11 Two-way Clean Out 2 EA $ $

12 Septic Tank Abandonment 3 EA $ $

11 ODEQ Permit 5 EA $ $

Construction Subtotal $

Name Salem Num. OK 10-S16

COST

TOTAL

COST

1 Rock Removal 10 CY $ $

2 Imported Backfill 10 CY $ $

Service Contract II 2-Year replaces Service Contract I 3-Year

Aerobic Wastewater Treatment Unit

Liquid Chlorine Disinfection

System Spray Heads with Pressure Lines

Electrical Connection

6 LS $ $

4 6 LS $ $

5 6 EA $ $

6 12 EA $ $

7 6 EA $ $

8 Septic Tank Abandonment 3 EA $ $

9 Manhole Abandonment 3 EA $ $

10 ODEQ Permit 6 EA $ $

Construction Subtotal $

Construction Total $

Company Name

Prepared By Date

File details come from the government source that posted it. Updated .