Bid_schedule_updated_12-14-16.pdf

PDF 48 KB Posted

Attached to
Aerobic Wastewater Systems Project Federal contract opportunity
Solicitation number
246-17-Q-0004
Issued by
Department of Health and Human Services Indian Health Service

About this file

Bid schedule update.

View the file

Other files for this federal contract opportunity

Other files attached to Aerobic Wastewater Systems Project, newest first.
File Type Posted
Questions_12-21-16.pdf PDF
Bid_schedule_updated_12-21-16.pdf PDF
Creeknationaerobics_Questions.pdf PDF
Salem_Soil_Test.pdf PDF
Hanna_Soil_Test.pdf PDF
Misty_valley_soil_test.pdf PDF
Creek_Aerobic_Systems_Spec.pdf PDF
Bid_schedule.pdf PDF
SF24-16.pdf PDF
Creek_Aerobic_Systems_Spec.docx DOCX document
General_Decision_Number_OK160033_10-07-2016__OK33.pdf PDF
SOW.pdf PDF
ok10-s14-16_Drawings.pdf PDF
Aerobic_Project_OEH_Okmulgee_SF18_R1.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Name Hanna Num. OK 10-S14 OEH Okmulgee Service Area Tribe Muscogee (Creek) Nation BY D. Tompkins

ITEM DESCRIPTION QTY UNIT

UNIT

COST

TOTAL

COST

1 Rock Removal 10 CY $ $

2 Imported Backfill 10 TONS $ $

3 Service Contract I 3-Year 6 LS $ $

4 Service Contract II 2-Year 1 LS $ $

5 Aerobic Wastewater Treatment Unit 7 LS $ $

6 Liquid Chlorine Disinfection System 7 EA $ $

7 Spray Heads with Pressure Lines 14 EA $ $

8 Electrical Connection 7 EA $ $

9 Septic Tank Abandonment 4 EA $ $

10 Manhole Abandonment 3 EA $ $

11 ODEQ Permit 7 EA $ $

Subtotal $

Name Misty Valley Num. OK 10-S15

ITEM DESCRIPTION QTY UNIT

UNIT

COST

TOTAL

COST

1 Rock Removal 10 CY $ $

2 Imported Backfill 10 TONS $ $

3 3-Year Service Contract 3 LS $ $

4 Aerobic Wastewater Treatment Unit 3 LS $ $

5 Liquid Chlorine Disinfection System 3 EA $ $

6 Spray Heads with Pressure Lines 6 EA $ $

7 Electrical Connection 3 EA $ $

8 Septic Tank 1,000 gallons 2 EA $ $

9 Solid Sewer Pipe 137 LF $ $

10 Chambers 950 LF $ $

11 Two-way Clean Out 2 EA $ $

12 Septic Tank Abandonment 3 EA $ $

Construction Subtotal $ Name Salem Num. OK 10-S16

ITEM DESCRIPTION QTY UNIT

UNIT

COST

TOTAL

COST

1 Rock Removal 10 CY $ $

2 Imported Backfill 10 CY $ $

3 3-Year Service Contract 6 LS $ $

4 Aerobic Wastewater Treatment Unit 6 LS $ $

5 Liquid Chlorine Disinfection System 6 EA $ $

6 Spray Heads with Pressure Lines 12 EA $ $

7 Electrical Connection 6 EA $ $

8 Septic Tank Abandonment 3 EA $ $

9 Manhole Abandonment 3 EA $ $

10 ODEQ Permit 6 EA $ $

Construction Subtotal $

Construction Total $

Company Name

Prepared By

Date