Bid_schedule_updated_12-14-16.pdf
PDF 48 KB Posted
- Attached to
- Aerobic Wastewater Systems Project Federal contract opportunity
- Solicitation number
- 246-17-Q-0004
About this file
Bid schedule update.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_12-21-16.pdf | ||
| Bid_schedule_updated_12-21-16.pdf | ||
| Creeknationaerobics_Questions.pdf | ||
| Salem_Soil_Test.pdf | ||
| Hanna_Soil_Test.pdf | ||
| Misty_valley_soil_test.pdf | ||
| Creek_Aerobic_Systems_Spec.pdf | ||
| Bid_schedule.pdf | ||
| SF24-16.pdf | ||
| Creek_Aerobic_Systems_Spec.docx | DOCX document | |
| General_Decision_Number_OK160033_10-07-2016__OK33.pdf | ||
| SOW.pdf | ||
| ok10-s14-16_Drawings.pdf | ||
| Aerobic_Project_OEH_Okmulgee_SF18_R1.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Name Hanna Num. OK 10-S14 OEH Okmulgee Service Area Tribe Muscogee (Creek) Nation BY D. Tompkins
ITEM DESCRIPTION QTY UNIT
UNIT
COST
TOTAL
COST
1 Rock Removal 10 CY $ $
2 Imported Backfill 10 TONS $ $
3 Service Contract I 3-Year 6 LS $ $
4 Service Contract II 2-Year 1 LS $ $
5 Aerobic Wastewater Treatment Unit 7 LS $ $
6 Liquid Chlorine Disinfection System 7 EA $ $
7 Spray Heads with Pressure Lines 14 EA $ $
8 Electrical Connection 7 EA $ $
9 Septic Tank Abandonment 4 EA $ $
10 Manhole Abandonment 3 EA $ $
11 ODEQ Permit 7 EA $ $
Subtotal $
Name Misty Valley Num. OK 10-S15
ITEM DESCRIPTION QTY UNIT
UNIT
COST
TOTAL
COST
1 Rock Removal 10 CY $ $
2 Imported Backfill 10 TONS $ $
3 3-Year Service Contract 3 LS $ $
4 Aerobic Wastewater Treatment Unit 3 LS $ $
5 Liquid Chlorine Disinfection System 3 EA $ $
6 Spray Heads with Pressure Lines 6 EA $ $
7 Electrical Connection 3 EA $ $
8 Septic Tank 1,000 gallons 2 EA $ $
9 Solid Sewer Pipe 137 LF $ $
10 Chambers 950 LF $ $
11 Two-way Clean Out 2 EA $ $
12 Septic Tank Abandonment 3 EA $ $
Construction Subtotal $ Name Salem Num. OK 10-S16
ITEM DESCRIPTION QTY UNIT
UNIT
COST
TOTAL
COST
1 Rock Removal 10 CY $ $
2 Imported Backfill 10 CY $ $
3 3-Year Service Contract 6 LS $ $
4 Aerobic Wastewater Treatment Unit 6 LS $ $
5 Liquid Chlorine Disinfection System 6 EA $ $
6 Spray Heads with Pressure Lines 12 EA $ $
7 Electrical Connection 6 EA $ $
8 Septic Tank Abandonment 3 EA $ $
9 Manhole Abandonment 3 EA $ $
10 ODEQ Permit 6 EA $ $
Construction Subtotal $
Construction Total $
Company Name
Prepared By
Date