24_FAC_005_MHS_Construction_Drawings.pdf
PDF 9 MB Posted
- Attached to
- MONROE HIGH SCHOOL HVAC UPGRADES
- Solicitation number
- PE-64710-NONST-2024-000000004
- Issued by
- Dekalb County, Georgia
About this file
This document appears to be construction drawings for HVAC upgrades to Monroe High School in Albany, Georgia, which is being managed by the Georgia Department of Education (GA DOE ID# 0117).
The key details include the overall project scope of HVAC upgrades, including the removal and replacement of various mechanical equipment such as exhaust fans, ductless heat pumps, water source heat pumps, and ceiling heaters throughout the school. The project also involves the demolition and installation of new ductwork, piping, and associated equipment. The drawings provide a comprehensive overview of the mechanical system upgrades, including equipment schedules, new work plans, demolition plans, and detailed mechanical system diagrams and drawings. The project is scheduled for completion by September 22, 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24_FAC_005_Addendum No_ 1_10202023_MHS.pdf | ||
| Phase 2 HVAC Upgrades _ Bid Tab.pdf | ||
| 24_FAC_005_MHS_Bid Set_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D A
D E
BLECKLEY LAURENS
CHATHAM
EFFINGHAM
IRWIN
BERRIEN
LOWNDESGRADY
SE
MI
NO
LE
DECATUR
EARLY
MILLER
BAKER
THOMAS
BROOKS
COLQUITT
MITCHELL
COOK
TIFT
SCHLEY
TERRELL
DOUGHERTY
WEBSTER
RANDOLPH
QUITMAN
CLAY
CALHOUN
CHATTAHOOCHEE
STEWART
MARION
WILCOX
CRISP
WORTH
LEE
TURNER
DOOLY
MACON
SUMTER
HOUSTON
PULASKI
McINTOSH
PIERCE
CHARLTON
LA
NIE
R
CLINCH
ECHOLS
ATKINSON
WARE
CAMDEN
BRANTLEY
GLYNN
TOOMBS
APPLING
COFFEE
BEN HILL
TELFAIR
DAVIS
JEFF
WHEELER
DODGE
TREUTLEN
M
ON
TG
OM
ER
Y
LONG
WAYNE
LIBERTY
BULLOCH
EVANS
CANDLER
TATTNALL
BRYAN
DAWSON FRANKLIN
CLARKE
OCONEE
PUTNAM
BALDWIN
TWIGGS
HENRY
FA
YE
TT
E
PIKE
UPSON
SPALDING
M
ER
IW
ET
HER
HARRIS
MUSCOGEE
TALBOT
COWETA
HEARD
TROUP
PEACH
CRAWFORD
TAYLOR
BIBB
MONROE
LAMAR
BUTTS
JASPER
JONES
CHEROKEE
FULTON
PAULDING
HARALSON
CARROLL
DOUGLAS
BARTOWFLOYD
POLK
COBB
NEWTON
DEKALB
CL
AY
TO
N
ROCKD
AL
E
WALTON
MORGAN
GWINNETT
FORSYTH
JACKSON
HALL BANKS
BARROW
M cD
U F
FI
E
JEFFERSON
EMANUEL
WASHINGTON
WILKINSON
JOHNSON
HANCOCK
WARREN
GLASCOCK
JENKINS
SCREVEN
RICHMOND
BURKE
COLUMBIA
OGLETHORPE
WILKES
TALIAFERROGREENE
LINCOLN
ELBERT
HART
MADISON
RABUN
STEPHENS
FANNIN
PICKENS
GILMER
WHITF
IELD
GORDON
C H
AT
TO
O G
A
WALKER M
U
R R
AY
CATOOSA
UNION
LUMPKIN
WHITE
HABERSHAM
TOWNS
BACON
DOUGHERTY
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID#: 0117
T100
TITLE SHEET
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
T100 TITLE SHEET
C100 SITE PLAN
A100 ARCHITECTURAL CEILING PLAN - OVERALL
MD100 MECHANICAL DEMOLITION PLAN - OVERALL
MD101 MECHANICAL DEMOLITION PLAN - AREA A
MD102 MECHANICAL DEMOLITION PLAN - AREA B
MD103 MECHANICAL DEMOLITION PLAN - AREA C
MD104 MECHANICAL DEMOLITION PLAN - AREA D
MD401 MECHANICAL ROOM LARGE SCALE DEMOLITION PLAN
MD402 MECHANICAL DEMOLITION ISOMETRIC VIEWS
M100 MECHANICAL NEW WORK PLAN - OVERALL
M101 MECHANICAL NEW WORK PLAN - AREA A
M102 MECHANICAL NEW WORK PLAN - AREA B
M103 MECHANICAL NEW WORK PLAN - AREA C
M104 MECHANICAL NEW WORK PLAN - AREA D
M401 MECHANICAL ROOM LARGE SCALE NEW WORK PLANS
M402 MECHANICAL ISOMETRIC VIEWS
M403 MECHANICAL DIAGRAMS
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M503 MECHANICAL DETAILS
M504 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
M602 MECHANICAL SCHEDULES, LEGEND & GENERAL NOTES
ED101 ELECTRICAL DEMOLITION PLAN - OVERALL
E100 ELECTRICAL OVERALL PLAN
E101 ELECTRICAL NEW WORK PLAN - OVERALL
E801 ELECTRICAL SCHEDULES AND LEGEND
INDEX OF DRAWINGS GEORGIA/COUNTY MAP PROJECT LOCATION
MONROE HIGH SCHOOL - HVAC
UPGRADES
900 LIPPITT DR, ALBANY, GA 31701
GA DOE ID#: 0117
No. Description Date
PARKING LOT
PAVED
D
R
IV
E
PAVED DRIVE
PARKING LOT
ALBANY AREA
VOCATIONAL HIGH
SCHOOL
GREEN HOUSE
GARDEN
NO WORK IN THIS AREA
E X
IS
T
IN
G
S
ID
E W
A L K
GENERAL NOTE: EXISTING DOMESTIC WATER LINES, SANITARY SEWER LINES,
MANHOLES, ETC. SIZES AND LOCATIONS SHOWN ARE BASED ON ORIGINAL DESIGN
DOCUMENTS AND MAY DIFFER FROM INSTALLED CONDITIONS. CONTRACTOR FIELD
VERIFY EXISTING CONDITIONS AS REQUIRED.
GENERAL NOTE: LOCATIONS OF MODULAR CLASSROOM TRAILER IS APPROXIMATE.
CONTRACTOR SHALL CAREFULLY COORDINATE PLACEMENT OF CLASSROOMS TO
AVOID CONFLICT AND MAINTAIN REQUIRED CLEARANCES.
98' - 0"
TEMPORARY MODULAR
CLASSROOM
6 CLASSROOM MODULE
EXISTING
PORTABLE
CLASSROOM
CONTRACTOR SHALL COORDINATE WITH
OWNER FOR TEMPORARY CONNECTION
TO EXISTING 1½" DOMESTIC COLD WATER
PIPING AT THIS APPROXIMATE LOCATION.
CONTRACTOR SHALL COORDINATE
LOCATION OF MODULAR CLASSROOM
WATER CONNECTION AND ADJUST
TEMPORARY WATER LINE ROUTING AS
REQUIRED.
PAVED DRIVE
CONTRACTOR SHALL COORDINATE WITH
OWNER FOR TEMPORARY CONNECTION
TO EXISTING 4" SANITARY SEWER LINE AT
THIS APPROXIMATE LOCATION.
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID#: 0117
C100
SITE PLAN
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
1" = 30'-0"
SITE PLAN
NO WORK IN THIS AREA
CEILING HATCH LEGEND
DEMO EXISTING CEILING TILE & GRID AS REQUIRED TO
REMOVE EXISTING EQUIPMENT AND INSTALL NEW
EQUIPMENT. REPLACE WITH NEW CEILING TILE AND GRID.
NEW TILE SHALL BE STANDARD ACT TO MATCH EXISTING.
(NO HATCH) EXISTING CEILING TILE & GRID TO REMAIN.
GENERAL NOTE: REMOVAL OF CEILING REQUIRED FOR REMOVAL OF
EXISTING EXHAUST FANS LOCATED ABOVE CEILINGS IN RESTROOMS IS NOT
SHOWN. SEE MECHANICAL DRAWINGS FOR LOCATIONS OF ITEMS LOCATED
ABOVE CEILINGS THAT MAY REQUIRE REMOVAL OF CEILING TILES.
GENERAL NOTE: REMOVAL OF CEILINGS REQUIRED FOR INSTALLATION OF
NEW DUCTLESS FAN COIL UNITS IS NOT SHOWN. SEE MECHANICAL
DRAWINGS FOR LOCATIONS OF NEW DFCUS. TEMPORARILY REMOVE
CEILING TILE & GRID AS REQUIRED TO INSTALL NEW DFCUS, REFRIGERANT
PIPING, CONDENSATE PIPING, SUPPORTS, ETC. AND REINSTALL CEILING.
REPLACE ANY TILE/GRID DAMAGED DURING DEMOLITION/INSTALLATION OF
NEW DFCUS. PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID#: 0117
A100
ARCHITECTURAL CEILING
PLAN - OVERALL
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
MD101
MD102
MD103
MD104
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
AB
C
D
GA DOE ID#: 0117
MD100
MECHANICAL DEMOLITION
PLAN - OVERALL
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
1/16" = 1'-0"
MECHANICAL DEMOLITION PLAN - OVERALL
PRE-ENGINEERING CR
A101
DESIGN LAB.
A102
STORAGE
A103 COMPUTER NWK
A104
LEARNING CENTER
A108
OFFICE
A107
DRAFTING LAB
A105
MECH
A111
STORAGE
A110
WOMEN'S
A112
MEN'S
A113
STORAGE
A116
OFFICE
A117
JANITOR
A114
ELECTRONICS LAB
A115
VOCATIONAL SCIENCE
A118
OFFICE
A119 STOR./PREP
A120
STORAGE
A124
OFFICE
A123
DCT CR.
A122
OFFICE
A126
CLASSROOM
A127
AUTO LAB
A125
AUTO
A128
TOOLS
A130
TOILET
A131
AUTO SHOP
A129
WOOD WORKING
A145
SMALL ENGINES
A144
AQUACULTURE
A143
AGRI-SCI. LAB
A136
CLASSROOM
A138
OFFICE
A137
OFFICE
A149
ELECTRICAL
A150
CLASSROOM
A151
CONSTRUCTION LAB
A148
ELECT./HVAC LAB
A158
CLASSROOM
A161
OFFICE
A159
TOILET
A160
METALS LAB.
A164
OFFICE
A167
CLASSROOM
A165
TOILET
A166
MECH.
A172
MD401
MD402
MD402
MD402
3 MD402
MD402
MD402
LRLS LS LR LS LR
SEE LARGE
SCALE PLAN
1111 11
11 11
11 11
12 13
D(TYP)
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
AB
C
D
GA DOE ID#: 0117
MD101
MECHANICAL DEMOLITION
PLAN - AREA A
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
NOTES: (THIS SHEET ONLY)
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN - AREA A
1 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOF MOUNTED EXHAUST FAN.
2 . REMOVE EXISTING ROOF MOUNTED DUCTLESS HEAT PUMP AND
ASSOCIATED PIPING. EXISTING EQUIPMENT SUPPORT PLATFORM
TO REMAIN. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
DUCTLESS OUTDOOR UNIT.
3 . REMOVE EXISTING CEILING HEATER. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW CEILING HEATER.
4 . REMOVE EXISTING VERTICAL WATER SOURCE HEAT PUMP AND
ASSOCIATED HOSE KIT. SEE NEW WORK DRAWINGS FOR
INSTALLATION OF NEW WSHP IN THE SAME LOCATION.
5 . REMOVE EXISTING WALL MOUNTED DUCTLESS FAN COIL UNIT AND
ASSOCIATED REFRIGERANT PIPING. REMOVE CONDENSATE
PIPING AS REQUIRED TO ALLOW FOR INSTALLATION OF NEW WALL
MOUNTED DFCU IN THE SAME LOCATION. SEE NEW WORK PLANS.
6 . GENERAL: EXISTING DUCT AND PIPING SIZES (IF SHOWN) AND
LOCATIONS, ARE BASED ON ORIGINAL DESIGN DOCUMENTS AND
MAY NOT REFLECT ACTUAL INSTALLED CONDITIONS.
CONTRACTOR SHALL FIELD VERIY EXISTING DUCT AND PIPING
SIZES AND LOCATIONS AS REQUIRED.
No. Description Date
7 . EXISTING EXHAUST FAN TO REMAIN.
8 . EXISTING UNIT HEATER TO REMAIN.
9 . REMOVE EXISTING WALL HEATER. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW WALL HEATER.
10 . REMOVE EXISTING GRILLE/DIFFUSER AND ASSOCIATED NEW FLEX
DUCT (IF APPLICABLE). FIELD VERIFY EXISTING SIZES AND
LOCATIONS. (TYPICAL ALL GRILLES/DIFFUSERS) SEE NEW WORK
PLAN FOR INSTALLATION OF NEW GRILLE/DIFFUSER IN SAME
LOCATION.
11 . REMOVE EXISTING SIDEWALL GRILLE. FIELD VERIFY EXISTING
SIZES AND LOCATIONS. (TYPICAL ALL GRILLES) SEE NEW WORK
PLAN FOR INSTALLATION OF NEW GRILLE IN SAME LOCATION.
12 . EXISTING DUCT MOUNTED SUPPLY GRILLES TO REMAIN. CLEAN
GRILLES TO REMOVE ALL DUST, DIRT, ETC. (TYPICAL)
13 . EXISTING ROOF MOUNTED MAKE-UP HEATER, DUCTWORK, ETC.
TO REMAIN.
14 . REMOVE EXISTING DUCT MOUNTED ELECTRIC HEATER,
ASSOCIATED WIRING, CONTROLS, ETC. FROM THIS APPROXIMATE
LOCATION. PROVIDE NEW DUCT SIZED TO MATCH EXISTING DUCT
WHERE HEATER WAS REMOVED. SEAL DUCT AIR TIGHT AND
INSULATE IN ACCORDANCE WITH SPECIFICATION. FIELD VERIFY
EXACT LOCATION.
15 . REMOVE EXISTING ROOF MOUNTED ENERGY RECOVERY UNIT AND
ASSOCIATED CONDENSATE PIPING. EXISTING ROOF CURB TO
REMAIN. SEE NEW WORK PLAN FOR INSTALLATION OF NEW ERU IN
THE SAME LOCATION.
VISOTOR WAIT
B105
RECEPTION
B104
STUD. WAIT
B103
WORK ROOM
B119
TOIL.
B106
BOOK KEEPER
B107
PARENT COORD.
B108
B121
TOIL.
B117
CLINIC
B116
CONFERENCE
B109
PRINCIPAL
B112
TOIL.
B114
TOIL.
B115
INFORMATION
TECHNOLOGY LAB.
A173
OFFICE
A176
STORAGE
A175
RVI
B129
STOR.
B130
TOIL.
B131
WORK ROOM
B128
PASSAGE
B132
OFFICE
B127
STUD. WAIT
B126
SRO
B125
SUPERVISOR
B135
WAITING
B137
CONFERENCE
B134
STOR.
B133
MECHANICAL RM.
B147
ELECTRICAL RM.
B148
VAULT
B143
COUNS
B142
COUNS.
B141
CAREER CENTER
B139
COUNS.
B146
MEDIA PRODUCTION
C107
TEST STOR.
B144
RECORDS
B145
COMPUTER NWK
C108
Room
C109
MD102
LS
LR
LS
LR
LS
LR
D
D
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
AB
C
D
GA DOE ID#: 0117
MD102
MECHANICAL DEMOLITION
PLAN - AREA B
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
NOTES: (THIS SHEET ONLY)
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN - AREA B
1 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOF MOUNTED EXHAUST FAN.
2 . REMOVE EXISTING DUCTLESS HEAT PUMP MOUNTED ATOP
EXISTING CONCRETE EQUIPMENT PAD, AND ASSOCIATED
PIPING.SEE NEW WORK PLAN FOR INSTALLATION OF NEW
DUCTLESS OUTDOOR UNIT.
3 . REMOVE EXISTING WALL MOUNTED DUCTLESS FAN COIL UNIT AND
ASSOCIATED REFRIGERANT PIPING. REMOVE CONDENSATE
PIPING AS REQUIRED TO ALLOW FOR INSTALLATION OF NEW WALL
MOUNTED DFCU IN THE SAME LOCATION. SEE NEW WORK PLANS.
4 . REMOVE EXISTING VERTICAL WATER SOURCE HEAT PUMP AND
ASSOCIATED HOSE KIT. SEE NEW WORK DRAWINGS FOR
INSTALLATION OF NEW WSHP IN THE SAME LOCATION.
5 . REMOVE EXISTING ELECTRIC UNIT HEATER. SEE NEW WORK PLAN
FOR INSTALLATION OF NEW UNIT HEATER.
6 . REMOVE EXISTING ROOFTOP WATER SOURCE HEAT PUMP AND
ASSOCIATED CONDENSATE PIPE. EXISTING ROOF CURB TO
REMAIN. REMOVE EXISTING BIPOLAR IONIZATION UNIT AND STORE
FOR REUSE IN NEW ROOFTOP WSHP. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOFTOP WSHP.
7 . GENERAL: EXISTING DUCT AND PIPING SIZES (IF SHOWN) AND
LOCATIONS, ARE BASED ON ORIGINAL DESIGN DOCUMENTS AND
MAY NOT REFLECT ACTUAL INSTALLED CONDITIONS.
CONTRACTOR SHALL FIELD VERIY EXISTING DUCT AND PIPING
SIZES AND LOCATIONS AS REQUIRED.
8 . REMOVE EXISTING GRILLE/DIFFUSER AND ASSOCIATED NEW FLEX
DUCT (IF APPLICABLE). FIELD VERIFY EXISTING SIZES AND
LOCATIONS. (TYPICAL ALL GRILLES/DIFFUSERS) SEE NEW WORK
PLAN FOR INSTALLATION OF NEW GRILLE/DIFFUSER IN SAME
LOCATION.
9 . REMOVE EXISTING VERTICAL WATER SOURCE HEAT PUMP,
RETURN AIR PLENUM, HOSE KIT, AND CONDENSATE PIPING.
REMOVE EXISTING BIPOLAR IONIZATION UNIT AND STORE FOR
REUSE IN NEW VRF VERTICAL FAN COIL UNIT. CAP EXISTING LOOP
PIPING AS HIGH AS POSSIBLE. MAINTAIN EXISTING ERU SUPPLY
DUCT TO RETURN AIR DUCT.
10 . REMOVE EXISTING VERTICAL WATER SOURCE HEAT PUMP,
ASSOCIATED DUCTWORK, RETURN AIR PLENUM, HOSE KIT, AND
CONDENSATE PIPING. REMOVE EXISTING BIPOLAR IONIZATION
UNIT AND TURN OVER TO OWNER. CAP EXISTING LOOP PIPING AS
HIGH AS POSSIBLE. CAP EXISTING ERU SUPPLY DUCT AND SEAL
AIR TIGHT.
11 . REMOVE EXISTING BRANCH DUCTS UP TO TRUNK DUCT. SEAL
OPENING IN TRUNK DUCT WHERE BRANCH DUCT WAS REMOVED
AND SEAL AIR TIGHT. INSULATED IN ACCORDANCE WITH
SPECIFICATION. DUCT LAYOUT IS BASED ON ORIGINAL DESIGN
DOCUMENTS AND MAY NOT REPRESENT ACTUAL INSTALLATED
CONDITIONS. FIELD VERIFY EXACT LOCATION OF EXISTING
DUCTWORK.
12 . COMPLETELY REMOVE EXISTING TRUNK DUCT, BRANCH DUCTS,
ASSOCIATED SUPPORTS, INSULATION, FLEX DUCT, AND
DIFFUSERS AS SHOWN. DUCT LAYOUT IS BASED ON ORIGINAL
DESIGN DOCUMENTS AND MAY NOT REPRESENT ACTUAL
INSTALLATED CONDITIONS. FIELD VERIFY EXACT LOCATION OF
EXISTING DUCTWORK.
13 . REMOVE EXISTING DUCTWORK UP TO THIS APPROXIMATE
LOCATION. SEE NEW WORK PLAN FOR CONNECTION OF NEW
SUPPLY/RETURN DUCT AT THIS LOCATION. DUCT LAYOUT IS
BASED ON ORIGINAL DESIGN DOCUMENTS AND MAY NOT
REPRESENT ACTUAL INSTALLATED CONDITIONS. FIELD VERIFY
EXACT LOCATION OF EXISTING DUCTWORK.
14 . REMOVE EXISTING CONDENSATE DRAIN PIPING.
15 . REMOVE EXISTING LOOP SUPPLY/RETURN PIPING UP TO AND
INCLUDING EXISTING HOSE KIT AND SHUT OFF VALVE.
16 . REMOVE EXISTING SUPPLY/RETURN DUCTWORK AS REQUIRED TO
REMOVE EXISTING WSHP.
17 . REMOVE EXISTING LOOP PIPING UP TO THIS APPROXIMATE
LOCATION TO ALLOW FOR REROUTING PIPING TO AVOID CONFLITS
WITH NEW WHSP ACCESS PANELS. SEE NEW WORK PLAN.
1/4" = 1'-0"MD102
2 B147 LARGE SCALE DEMO PLAN No. Description Date
COMPUTERS
C106
WORK ROOM
C105
TOILET
C104
OFFICE
C103
OFFICE
C102
CIRCULATION
C113
MEDIA CENTER
C100
STORAGE
C110
CONFERENCE
C111
LS LR
LS LR
D
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
AB
C
D
GA DOE ID#: 0117
MD103
MECHANICAL DEMOLITION
PLAN - AREA C
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
NOTES: (THIS SHEET ONLY)
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN - AREA C
1 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOF MOUNTED EXHAUST FAN.
2 . REMOVE EXISTING CEILING HEATER. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW CEILING HEATER.
3 . REMOVE EXISTING ROOFTOP WATER SOURCE HEAT PUMP AND
ASSOCIATED CONDENSATE PIPING. EXISTING ROOF CURB TO
REMAIN. REMOVE EXISTING BIPOLAR IONIZATION UNIT AND STORE
FOR REUSE IN NEW ROOFTOP WSHP. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOFTOP WSHP.
4 . GENERAL: EXISTING DUCT AND PIPING SIZES (IF SHOWN) AND
LOCATIONS, ARE BASED ON ORIGINAL DESIGN DOCUMENTS AND
MAY NOT REFLECT ACTUAL INSTALLED CONDITIONS.
CONTRACTOR SHALL FIELD VERIY EXISTING DUCT AND PIPING
SIZES AND LOCATIONS AS REQUIRED.
5 . REMOVE EXISTING GRILLE/DIFFUSER AND ASSOCIATED NEW FLEX
DUCT (IF APPLICABLE). FIELD VERIFY EXISTING SIZES AND
LOCATIONS. (TYPICAL ALL GRILLES/DIFFUSERS) SEE NEW WORK
PLAN FOR INSTALLATION OF NEW GRILLE/DIFFUSER IN SAME
LOCATION.
5 11
LS LR
LS
LR
KITCHEN
D105
COOLER
D119
DRY STORAGE
D121
FREEZER
D120
OFFICE
D118
LOADING
D116
ELECTRICAL RM.
D110
MECHANICAL RM.
D109
Room
C129
TOILET
D114
DISHWASHING
D107
D
D
D
D
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
AB
C
D
GA DOE ID#: 0117
MD104
MECHANICAL DEMOLITION
PLAN - AREA D
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
NOTES: (THIS SHEET ONLY)
1/8" = 1'-0"
MECHANICAL DEMOLITION PLAN - AREA D
1 . REMOVE EXISTING ROOF MOUNTED CENTRIFUGAL EXHAUST FAN.
EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOF MOUNTED EXHAUST FAN.
2 . REMOVE EXISTING ROOF DUCTLESS HEAT PUMP MOUNTED AND
ASSOCIATED PIPING. EXISTING EQUIPMENT SUPPORT PLATFORM
TO REMAIN. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
DUCTLESS OUTDOOR UNIT.
3 . REMOVE EXISTING WALL MOUNTED DUCTLESS FAN COIL UNIT AND
ASSOCIATED REFRIGERANT PIPING. REMOVE CONDENSATE
PIPING AS REQUIRED TO ALLOW FOR INSTALLATION OF NEW WALL
MOUNTED DFCU IN THE SAME LOCATION. SEE NEW WORK PLANS.
4 . REMOVE EXISTING DOOR AIR CURTAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW DOOR AIR CURTAIN.
5 . REMOVE EXISTING ROOFTOP WATER SOURCE HEAT PUMP AND
ASSOCIATED CONDENSATE PIPING. EXISTING ROOF CURB TO
REMAIN. REMOVE EXISTING BIPOLAR IONIZATION UNIT AND STORE
FOR REUSE IN NEW ROOFTOP WSHP. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW ROOFTOP WSHP.
6 . REMOVE EXISTING CENTRIFUGAL UPBLAST KITCHEN EXHAUST
FAN. EXISTING ROOF CURB TO REMAIN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW FAN.
7 . REMOVE EXISTING KITCHEN MAKE UP AIR UNIT. EXISTING ROOF
CURB TO REMAIN. SEE NEW WORK PLAN FOR INSTALLATION OF
NEW KMUAU.
8 . GENERAL: EXISTING DUCT AND PIPING SIZES (IF SHOWN) AND
LOCATIONS, ARE BASED ON ORIGINAL DESIGN DOCUMENTS AND
MAY NOT REFLECT ACTUAL INSTALLED CONDITIONS.
CONTRACTOR SHALL FIELD VERIY EXISTING DUCT AND PIPING
SIZES AND LOCATIONS AS REQUIRED.
9 . REMOVE EXISTING WALL HEATER. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW WALL HEATER.
10 . REMOVE EXISTING PACKAGED TERMINAL HEAT PUMP. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW PTHP.
11 . REMOVE EXISTING VERTICAL WATER SOURCE HEAT PUMP AND
ASSOCIATED HOSE KIT. REMOVE EXISTING BIPOLAR IONIZATION
KIT AND STORE FOR REUSE IN NEW WSHP. REMOVE EXISTING
SUPPLY/RETURN DUCTWORK AS REQUIRED TO REMOVE EXISTING
WSHP. REMOVE EXISTING LOOP SUPPLY/RETURN PIPING UP TO
AND INCLUDING EXISTING HOSE KIT AND SHUT OFF VALVE. SEE
NEW WORK DRAWINGS FOR INSTALLATION OF NEW WSHP IN THE
SAME LOCATION.
12 . REMOVE EXISTING GRILLE/DIFFUSER AND ASSOCIATED NEW FLEX
DUCT (IF APPLICABLE). FIELD VERIFY EXISTING SIZES AND
LOCATIONS. (TYPICAL ALL GRILLES/DIFFUSERS) SEE NEW WORK
PLAN FOR INSTALLATION OF NEW GRILLE/DIFFUSER IN SAME
LOCATION.
13 . EXISTING DUCT MOUNTED SUPPLY GRILLES TO REMAIN. CLEAN
GRILLES TO REMOVE ALL DUST, DIRT, ETC. (TYPICAL)
14 . EXISTING DISHWASHER EXHAUST FAN TO REMAIN.
B-1
PRV
P R
V
G
G
HX-1
FLOW FLOW
FLOW FLOW
C F
C F
C F
P-2 P-1
AAV
D
1 ¼"
P-3P-4
FLOW
4" H
R
EXISTING EXTERIOR WALL
OUTSIDE
C S
C S
C S
C R
C S
C
SF
L O
W
F L O
W 8
L S
F L O
W 8
L S
F L O
W
F L O
W
F L O
W
F L O
W
F L O
W
F L O
W
F L O
W
L R
L R
L S
F L O
W
L S
F L O
W
8" LS
FLOW
8" LS
FLOW
FLOW
8" LR
C S
F L O
W
C R
F L O
W
8" CR
FLOW
F
LO
W
P-5
4" HS
FLOW
4" HS
FLOW
4" HR
L S
F L O
W
L R
F L O
W
4 4 4
11 11
LOOP AND COOLING WATER DEMOLITION PIPING SCHEMATIC
CF
CF
CF
CF
PBPB
GG
8" C S
8" C R
G G
G G
G
G
11 (BELOW)
11(BELOW)
C S
C R
C S
8" CS
8" LS
L S
L R
L R
L R
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID#: 0117
MD401
MECHANICAL ROOM LARGE
SCALE DEMOLITION PLAN
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
NOTES: (THIS SHEET ONLY)
1 . EXISTING BOILER EMERGENCY STOP BUTTON
2 . REMOVE EXISTING COOLING TOWER VFD/DISCONNECT. SEE
ELECTRICAL.
3 . REMOVE EXISTING ELECTRIC UNIT HEATER AT THIS APROXIMATE
LOCATION. SEE NEW WORK PLAN FOR INSTALLATION OF NEW
ELECTRIC UNIT HEATER.
4 . REMOVE EXISTING PUMP, ASSOCIATED VALVES, GAUGES, ETC. AS
SHOWN. SEE NEW WORK PLAN FOR INSTALLATION OF NEW PUMP
IN SAME LOCATION.
5 . REMOVE EXISTING HEAT EXCHANGER, ASSOCIATED VALVES,
GAUGES, ETC. AS SHOWN. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW HEAT EXCHANGER IN SAME LOCATION.
6 . REMOVE EXISTING WSHP, CONDENSATE PIPING, AND FLEXIBLE
HOSE KIT. REMOVE EXISTING DUCTWORK AS REQUIRED TO
REMOVE EXISTING WSHP AND INSTALL NEW WSHP IN SAME
LOCATION. SEE NEW WORK PLAN.
7 . REMOVE EXISTING VERTICAL INLINE HOT WATER PUMP AND
ASSOCIATED SUPPORTS. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW PUMP.
8 . REMOVE EXISTING BOILER, FLUE, CONDENSATE PIPING, PRV
PIPING, ASSOCIATED VALVES, GAUGES ETC. AS SHOWN. SEE NEW
WORK PLAN FOR INSTALLATION OF NEW CONDENSING BOILER.
9 . EXISTING EXPANSION TANK TO REMAIN.
10 . REMOVE EXISTING AIR SEPARATOR, AUTOMATIC AIR VENT, BLOW
DOWN VALVE, SUPPORTS, ETC. SEE NEW WORK PLAN FOR
INSTALLATION OF NEW AIR SEPARATOR IN SAME LOCATION.
11 . REMOVE EXISTING PIPING AS REQUIRED FOR INSTALLATION OF
NEW HEAT EXCHANGER. SEE MECHANICAL ROOM ISOMETRIC
VIEW AND NEW WORK PLAN.
12 . EXISTING UNDERGROUND PIPING TO REMAIN FOR RE-USE.
13 . DISCONNECT EXISTING COOLING TOWER SUPPLY AND RETURN
PIPING.
14 . REMOVE EXISTING COOLING TOWER. EXISTING PIERS TO REMAIN
FOR RE-USE.
15 . REMOVE EXISTING MAKE-UP WATER PIPING AS REQUIRED FOR
REMOVAL OF COOLING TOWER. PIPING TO BE RE-CONNECTED,
SEE NEW WORK PLAN.
16 . REMOVE EXISTING OVERFLOW PIPING TO STUB-UP. STUB-UP TO
REMAIN FOR RE-USE.
17 . REMOVE EXISTING CHEMICAL FEED PIPING UP TO AND INCLUDING
EXISTING BALL VALVE. SEE NEW WORK PLAN FOR INSTALLATION
OF NEW CHEMICAL FEED PIPING.
18 . REMOVE EXISTING PUMP DISCONNECT. SEE ELECTRICAL.
19 . REMOVE EXISTING EXPANSION PIPING AS REQUIRED FOR
RE-PIPING OF NEW HEAT EXCHANGER. SEE NEW WORK PLAN.
20 . REMOVE EXISTING HOT WATER PIPING UP TO AND INCLUDING
EXISTING VALVES IN VERTICAL DROP. SEE NEW WORK PLAN FOR
CONNECTION OF NEW HOT WATER PIPING.
21 . CONTRACTOR SHALL DISCONECT GAS PIPING FROM BOILER UP TO
EXISTING SHUT OFF VALVE TO ALLOW FOR ITS REMOVAL. SEE
NEW WORK PLAN FOR CONNECTION OF EXISTING PIPING TO NEW
BOILER.
22 . REMOVE EXISTING ONE SHOW CHEMICAL FEEDER AND
ASSOCIATED PIPING UP TO BALL VALVES AT CONNECTION TO
LOOP PIPING. SEE NEW WORK PLAN FOR NEW ONE SHOT
CHEMICAL FEEDER.
No. Description Date
1/4" = 1'-0"MD101
1 MECHANICAL ROOM DEMOLITION LARGE SCALE PLAN
D
D
L R
L S
LR
LS
D D
LR
LS
LR
LS
D D
D
L R
L S
L R
L S
DD
L R
L S L
SL
R
D
LS
LR
LR
LS 2
LS
LR
D D
D
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID#: 0117
MD402
MECHANICAL DEMOLITION
ISOMETRIC VIEWS
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
1/4" = 1'-0"MD101
1 A164 MEZZANINE PLAN - DEMOLITION
1/4" = 1'-0"MD101
2 A158 MEZZANINE PLAN - DEMOLITION
1/4" = 1'-0"MD101
3 A148 MEZZANINE PLAN - DEMOLITION
1/4" = 1'-0"MD101
4 A136 MEZANINE PLAN - DEMOLITION
1/4" = 1'-0"MD101
5 A129 MEZZANINE PLAN - DEMOLITION
5.1 A129 MEZZANINE DEMOLITION PLAN
1.1 A164 MEZZANINE DEMOLITION PLAN
1/4" = 1'-0"MD101
6 A111 MECHANICAL ROOM PLAN - DEMOLITION
2.1 A158 MEZZANINE DEMOLITION PLAN
4.1 A136 MEZZANINE DEMOLITION PLAN
3.1 A148 MEZZANINE DEMOLITION PLAN
6.1 A111.1 MECH RM DEMOLITION EAST WALL
6.2 A111.1 MECH RM DEMOLITION WEST WALL
NOTES: (THIS SHEET ONLY)
1 . REMOVE EXISTING VERTICAL WATER SOURCE HEAT PUMP.
REMOVE EXISTING BIPOLAR IONIZATION UNIT AND STORE FOR
REUSE IN NEW WSHP. SEE NEW WORK DRAWINGS FOR
INSTALLATION OF NEW WSHP.
2 . REMOVE EXISTING SUPPLY/RETURN DUCTWORK AS REQUIRED TO
REMOVE EXISTING WSHP.
3 . REMOVE EXISTING LOOP SUPPLY/RETURN PIPING UP TO AND
INCLUDING EXISTING HOSE KIT AND SHUT OFF VALVE.
4 . REMOVE EXISTING CONDENSATE DRAIN PIPING.
M101
M102
M103
M104
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID#: 0117
M100
MECHANICAL NEW WORK
PLAN - OVERALL
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
1/16" = 1'-0"
MECHANICAL NEW WORK PLAN - OVERALL
F-A1
F-A2
F-A3
F-A4
F-A5
F-A9
F-A28
CH-A1
CH-A2
CH-A3
M401
WSHP-A5
WSHP-A16
WSHP-A2
WSHP-A15
WSHP-A3
WSHP-A4
WSHP-A14
WSHP-A18
WSHP-A11
M402
M402
M402
M402
M402
DFCU-A4
DOU-A4
WSHP-A6
WSHP-A1
WSHP-A7
WSHP-A9
WSHP-A10
DOU-A2
DFCU-A2
DFCU-A1DFCU-A3.1
DFCU-A3.2
IU-1.9
DCT CR.
A122
VOCATIONAL SCIENCE
A118
OFFICE
A123
STORAGE
A124
STOR./PREP
A120
OFFICE
A119
ELECTRONICS LAB
A115
OFFICE
A117
STORAGE
A116
MEN'S
A113
WOMEN'S
A112
MECH
A111
DRAFTING LAB
A105
COMPUTER NWK
A104
STORAGE
A103
DESIGN LAB.
A102
PRE-ENGINEERING CR
A101
CLASSROOM
A165
TOILET
A166
OFFICE
A167
MECH.
A172
METALS LAB.
A164
CLASSROOM
A161
ELECT./HVAC LAB
A158
CLASSROOM
A151
ELECTRICAL
A150
OFFICE
A149
CONSTRUCTION LAB
A148
AQUACULTURE
A143
CLASSROOM
A138
AGRI-SCI. LAB
A136
OFFICE
A137
SMALL ENGINES
A144
WOOD WORKING
A145
OFFICE
A126
AUTO LAB
A125
AUTO SHOP
A129
TOOLS
A130
TOILET
A131
JANITOR
A114
STORAGE
A110
LEARNING CENTER
A108
OFFICE
A107
CLASSROOM
A127
AUTO
A128
TOILET
A160
OFFICE
A159
DOU-A1
DOU-A3
A4
A4
D1
A4
A4
A3
D1
A2
D1
A4
A4
A4
D1
A4
A4
C2
C2
C2
C2
C2
E1
C2
C2
C2
E1
C2
E1
C2
C2
E1
C2
C2
C2
C1
C2
C2
C2
C2
C2
C2
C2
E1
C2
C2 C2
E1
C2
C2
C2
E1
E1
A3
EWH-A1
M402
C2 A2
C2A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A2
D2
D3
A4
450 C1
A2
C2
A2
150A2
A2
C2
665 665
665665
570570
570 570
A4
A4
C2
A2
C2
A4
A4
C2
A4
C2
C2
A2
C2
C2
A3
A3
A3
A3
A3
A3
A3
A3
A3
340 A3
A3
340 A3
A3
A3
A3
A3
A3
C2
C2
C2
C2
C2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
A2
175 D1
D1
A4
A4
A4
C2
A4
A4
A4
C2
75 C2
77 7
7 7
D
R 10
D
DR
R
17RR
D
D
D
R13
C1
15 R
R
WSHP-A12
ERU-1
D D
TTTT
TT TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT TT
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
AB
C
D
GA DOE ID#: 0117
M101
MECHANICAL NEW WORK
PLAN - AREA A
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
NOTES: (THIS SHEET ONLY)
1 . NEW CENTRIFUGAL EXHAUST FAN MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW FAN CONNECTION TO EXISTING DUCT.
2 . NEW OUTDOOR HEAT PUMP/CONDENSING UNIT MOUNTED ATOP
EXISTING EQUIPMENT SUPPORT PLATFORM ON ROOF.
3 . NEW CEILING HEATER MOUNTED IN SAME LOCATION AS HEATER
REMOVED DURING DEMOLITION.
4 . NEW VERTICAL WATER SOURCE HEAT PUMP. PROVIDE NEW HOSE
KIT FOR CONNECTING NEW WSHP TO EXISTING LOOP PIPING.
PROVIDE TRANSITIONS AS REQUIRED FROM NEW HOSE KIT TO
EXISTING PIPING SIZE. FIELD VERIFY WHICH PIPE IS
SUPPLY/RETURN PRIOR TO CONNECTING NEW HOSE KIT. FIELD
VERIFY EXISTING RETURN CONNECTION AND PIPING CONNECTION
LOCATIONS. SEE WSHP HOSE KIT AND PIPING DETAIL.
5 . NEW WALL MOUNTED DUCTLESS FAN COIL UNIT MOUNTED IN
SAME LOCATION AS DFCU REMOVED DURING DEMOLITION. FIELD
VERIFY EXACT LOCATION. SEE WALL MOUNTED DUCTLESS
INDOOR UNIT DETAIL. CONNECT NEW CONDENSATE PIPE TO
EXISTING PIPE, FIELD VERIFY EXACT LOCATION.
6 . GENERAL: EXISTING DUCT AND PIPING SIZES (IF SHOWN) AND
LOCATIONS, ARE BASED ON ORIGINAL DESIGN DOCUMENTS AND
MAY NOT REFLECT ACTUAL INSTALLED CONDITIONS.
CONTRACTOR SHALL FIELD VERIY EXISTING DUCT AND PIPING
SIZES AND LOCATIONS AS REQUIRED.
1/8" = 1'-0"
MECHANICAL NEW WORK PLAN - AREA A
No. Description Date
12 . DFCU DRAIN PIPING ROUTED TO SPILL ON ROOF. ONCE TUBING
PENETRATES PIPE BOX IT SHALL BE CONCEALED IN PVC PIPING
THAT IS ELBOWED DOWN TO 4" ABOVE ROOF LEVEL AND
SECURED TO PIPE BOX. CONCEALING VINYL TUBING SHALL
PROTECT IT FROM UV DAMAGE. DO NOT EXPOSE TUBING TO
OUTDOORS.
13 . NEW DUCTLESS OUTDOOR UNIT MOUNTED ATOP NEW EQUIPMENT
SUPPORT PLATFORM. SEE EQUIPMENT SUPPORT PLATFORM
DETAIL.
14 . NEW PIPE BOX ON ROOF. SEE PIPE BOX DETAIL.
15 . CONDENSATE DRAIN PIPING ROUTED TO EXISTING CONDENSATE
DRAIN BOX. FIELD VERIFY EXACT LOCATION.
16 . PROVIDE RECTORSEAL FORTRESS LINE HIDE KIT OR EQUAL TO
CONCEAL ALL REFRIGERANT AND CONDENSATE PIPING EXPOSED
BELOW CEILING.
17 . NEW CEILING CASSETTE SUSPENDED FROM DROP RODS (MIN 3/8")
CONNECTED TO STRUCTURE WITH SUPPLEMENTAL 2"X2"X1/4"
ANGLE IRON. SEE VRF / MINI SPLIT CEILING CASSETTE UNIT DETAIL
AND COMPACT CEILING CASSETTE IN CEILING GRID DETAIL. DFCU
PLACEMENT IS BASED ON ORIGINAL DESIGN DRAWINGS. FIELD
VERIFY EXISTING DUCT CONDITIONS AND RELOCATE THE DFCU TO
AVOID CONFLICTS.
7 . PROVIDE NEW SIDEWALL GRILLE. FIELD VERIFY EXISTING SIZES
AND LOCATIONS. (TYPICAL ALL GRILLES) PROVIDE SIZE TO MATCH
EXISTING GRILLE.
8 . PROVIDE NEW GRILLE/DIFFUSER. PROVIDE NEW FLEX DUCT (IF
APPLICABLE) OF NECK SIZE SCHEDULED. PROVIDE
TRANSITIONS/OFFSETS AS REQUIRED TO CONNECT NEW
GRILLE/DIFFUSER TO EXISTING DUCTWORK. (TYPICAL ALL
GRILLES/DIFFUSERS UNLESS SPECIFICALLY NOTED OTHERWISE)
9 . PROVIDE FULL SIZE, SLOPED, INSULATED PVC VINYL TUBE FOR
DRAIN PIPING FROM UNIT DRAIN PORT AND TRANSITION TO RIGID
DRAIN PIPE AS DETAILED IN VRF CONDENSATE DRAIN
CONNECTION DETAIL. PROVIDE FITTINGS AS REQUIRED TO
CONNECT DRAIN PIPE.
10 . NEW VRF CEILING CASSETTE SUSPENDED FROM DROP RODS (MIN
3/8") CONNECTED TO STRUCTURE WITH SUPPLEMENTAL 2"X2"X1/4"
ANGLE IRON. SEE VRF / MINI SPLIT CEILING CASSETTE UNIT DETAIL
AND COMPACT CEILING CASSETTE IN CEILING GRID DETAIL. DFCU
PLACEMENT IS BASED ON ORIGINAL DESIGN DRAWINGS. FIELD
VERIFY EXISTING DUCT CONDITIONS AND RELOCATE THE DFCU TO
AVOID CONFLICTS.
11 . CONDENSATE PIPING DROPS DOWN WALL TO EXISTING MOP SINK
AT THIS APPROXIMATE LOCATION. BRACKET DRAIN PIPING TO
WALL.
18 . NEW ERU MOUNTED ATOP EXISTING ROOF CURB. PROVIDE
ADAPTER CURB/ROOFED-IN CURB EXTENSION AS REQUIRED TO
MOUNT ERU ATOP EXISTING CURB AND MAKE DUCT
CONNECTIONS. MODIFY/EXTEND EXISTING DUCTWORK AS
REQUIRED TO MAKE CONNECTION. FIELD VERIFY EXISTING
CONDITIONS.
19 . NEW WALL HEATER MOUNTED IN SAME LOCATION AS HEATER
REMOVED DURING DEMOLITION.
20 . ROUTE SLOPED (1/4" PER FOOT), TRAPPED, PVC CONDENSATE
DRAIN PIPING FROM ROOFTOP EQUIPMENT TO ROOF DRAIN AS
SHOWN. PROVIDE PIPE SUPPORTS ON MAXIMUM 6' CENTERS. SEE
CONENSATE DRAIN TRAP DETAIL AND CONDENSATE PIPE
SUPPORT ON ROOF DETAIL.
21 . CONDENSATE PIPE SUPORT ON ROOF. SEE CONDENSATE PIPE
SUPOORT ON ROOF DETAIL. (TYPICAL)
22 . WALL MOUNTED DDC TEMPERATURE SENSOR TO ALLOW FOR
MONITORING OF SPACE TEMPERATURE BY DDC SYSTEM.
WSHP-AD2
HRU-1
IU-1.5
IU-1.1
IU-1.2
IU-1.3
IU-1.6
IU-1.4
F-AD1
F-AD2
F-AD3
F-AD4
EUH-MC1
DOU-AD1
DOU-MC1
DFCU-MC1
DFCU-AD1
WSHP-MC3
7 7
WSHP-AD4
WSHP-MC2
WSHP-A8
WSHP-MC1
IU-1.7
MDC-1
M102
IU-1.8
WSHP-C2
WSHP-C1
PARENT COORD.
B108 CONFERENCE
B109
PRINCIPAL
B112
TOIL.
B114
TOIL.
B115
CLINIC
B116
TOIL.
B117
B121
WORK ROOM
B119
STUD. WAIT
B103
RECEPTION
B104
VISOTOR WAIT
B105
TOIL.
B106
BOOK KEEPER
B107
WORK ROOM
B128
OFFICE
B127
STUD. WAIT
B126
SRO
B125
SUPERVISOR
B135
WAITING
B137
ATTENDANCE
B138
CONFERENCE
B134
STOR.
B133
VAULT
B143
COUNS
B142
COUNS.
B141
COUNS.
B146
RECORDS
B145
TEST STOR.
B144
TOIL.
B131
STOR.
B130
RECEPTION
B140
CAREER CENTER
B139
PASSAGE
B132
INFORMATION
TECHNOLOGY LAB.
A173
OFFICE
A176
STORAGE
A175
MEDIA PRODUCTION
C107
COMPUTER NWK
C108
ELECTRICAL RM.
B148
MECHANICAL RM.
B147
RVI
B129
Room
C109
A3
A3
A3
A1
A1
A1
B1
B1
TT TT TTTT
TT TTFCU-1.5TT
FCU-1.7
C2
A4
150 A4
C2
C2
C2
C2
A2
295 A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
C2
C2
C2
C2
C2
C2
A3
A3
A4
A4
A4
A2
A2
A2
C2
C2
250A2
C2
310A2
A2
A2
A2
A4
A2
A2
C2
A2
C2
C2
A2
A2
C2
C2
A2
C2
A2
C2
A2
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
A5
C2
(TYP OF 4)
(TYP OF 4)
C2
C2
(TYP OF 4)
(TYP OF 4)
C2
F1
F1
F1
F1
F1
F1
A4
A4
A4
A4
A4
A3
C2
A2
C1
C1
C1
C1
C1
D
1 1/2" D 1 1/2" D
D
R
R
D
RR
D
R
D R
DR
D R
D
R
D
R
6"ø 6"ø
8"ø
6"ø 6"ø
6"ø
D
R(TYP)
D
R
GENERAL: PROVIDE PIPE SLEEVES AT ALL PIPING WALL
PENETRATIONS. SEE PIPE SLEEVE DETAIL(S).
R
R
R R
R R
D
R
D
D
D
R
R
TT
TT
TT
TT
TT
TT
TT
TT
TT
TT
MECHANICAL RM.
B147
EUH-MC1
WSHP-MC1
WSHP-A8WSHP-AD2
WSHP-AD4
WSHP-MC2
WSHP-MC34
4 4
2 1/2" LR
2 1/2" LS
26DD
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
AB
C
D
GA DOE ID#: 0117
M102
MECHANICAL NEW WORK
PLAN - AREA B
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
NOTES: (THIS SHEET ONLY)
1/8" = 1'-0"
MECHANICAL NEW WORK PLAN - AREA B
1 . NEW CENTRIFUGAL EXHAUST FAN MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW FAN CONNECTION TO EXISTING DUCT.
2 . NEW OUTDOOR HEAT PUMP/CONDENSING UNIT MOUNTED ATOP
EXISTING EQUIPMENT SUPPORT PLATFORM ON ROOF.
3 . NEW WALL MOUNTED DUCTLESS FAN COIL UNIT MOUNTED IN
SAME LOCATION AS DFCU REMOVED DURING DEMOLITION.
CONNECT NEW CONDENSATE PIPE TO EXISTING PIPE. FIELD
VERIFY EXACT LOCATION.
4 . NEW VERTICAL WATER SOURCE HEAT PUMP. PROVIDE NEW HOSE
KIT FOR CONNECTING NEW WSHP TO EXISTING LOOP PIPING.
PROVIDE TRANSITIONS AS REQUIRED FROM NEW HOSE KIT TO
EXISTING PIPING SIZE. FIELD VERIFY WHICH PIPE IS
SUPPLY/RETURN PRIOR TO CONNECTING NEW HOSE KIT. FIELD
VERIFY EXISTING RETURN CONNECTION AND PIPING CONNECTION
LOCATIONS. SEE WSHP HOSE KIT AND PIPING DETAIL.
5 . NEW VRF HEAT RECOVERY UNIT MOUNTED ATOP NEW CONCRETE
EQUIPMENT PAD. SEE CONCRETE EQUIPMENT PAD DETAIL.
6 . NEW ELECTRIC UNIT HEATER MOUNTED IN SAME LOCATION AS
HEAT REMOVED DURING DEMOLTION. FIELD VERIFY EXACT
LOCATION.
7 . NEW VRF CEILING CASSETTE SUSPENDED FROM DROP RODS (MIN
3/8") CONNECTED TO STRUCTURE WITH SUPPLEMENTAL 2"X2"X1/4"
ANGLE IRON. SEE VRF / MINI SPLIT CEILING CASSETTE UNIT DETAIL
AND COMPACT CEILING CASSETTE IN CEILING GRID DETAIL.
8 . NEW ROOFTOP WSHP MOUNTED ATOP EXISTING ROOF CURB.
PROVIDE ADAPTER CURB AS REQUIRED TO TRANSITION FRON
NEW UNIT CONNECTION TO EXISTING DUCT LAYOUT. REINSTALL
BIPOLAR IONIZATION UNIT REMOVED DURING DEMOLITION.
9 . GENERAL: EXISTING DUCT AND PIPING SIZES (IF SHOWN) AND
LOCATIONS, ARE BASED ON ORIGINAL DESIGN DOCUMENTS AND
MAY NOT REFLECT ACTUAL INSTALLED CONDITIONS.
CONTRACTOR SHALL FIELD VERIY EXISTING DUCT AND PIPING
SIZES AND LOCATIONS AS REQUIRED.
10 . CAP EXISTING OUTSIDE AIR DUCT AND SEAL AIR TIGHT.
11 . PROVIDE NEW GRILLE/DIFFUSER. PROVIDE NEW FLEX DUCT (IF
APPLICABLE) OF NECK SIZE SCHEDULED. PROVIDE
TRANSITIONS/OFFSETS AS REQUIRED TO CONNECT NEW
GRILLE/DIFFUSER TO EXISTING DUCTWORK. (TYPICAL ALL
GRILLES/DIFFUSERS UNLESS SPECIFICALLY NOTED OTHERWISE)
12 . VRF CENTRAL CONTROLLER MOUNTED ON WALL AT 4'-6" A.F.F.
PROVIDE BACNET INTERFACE TO ALLOW VRF SYSTEM TO
COMMUNICATE WITH DDC SYSTEM.
13 . EXISTING ERU SUPPLY DUCT CONNECTS TO EXISTING RETURN
DUCT AT THIS APPROXIMATE LOCATION. REBALANCE ERU SUPPLY
AIR FOR 100 CFM.
14 . CONDENSATE PIPING ELBOWS DOWN INTO EXISTING FLOOR
DRAIN AT THIS APPROXIMATE LOCATION. FIELD VERIFY EXACT
LOCATION.
15 . VRF DISTRIBUTION CONTROLLER SUSPENDED FROM DROP RODS
(MIN 3/8"). PROVIDE DRAIN PAN BELOW DISTRIBUTION
CONTROLLER WITH AUDIBLE ALARM AND DOWNTURNED PIPE
WITH VALVE. SEE VRF DRAIN PAN DETAIL AND VRF HEAT
RECOVERY DISTRIBUTION CONTROLLER DETAIL.
16 . 1 ½" CONDENSATE DRAIN PIPE ROUTED TO EXISTING FLOOR
DRAIN AT THIS APPROXIMATE LOCATION. BRACKET DRAIN PIPING
TO WALL.
17 . PROVIDE FULL SIZE, SLOPED, INSULATED PVC VINYL TUBE FOR
DRAIN PIPING FROM UNIT DRAIN PORT AND TRANSITION TO RIGID
DRAIN PIPE AS DETAILED INVRF CONDENSATE DRAIN
CONNECTION DETAIL. PROVIDE FITTINGS AS REQUIRED TO
CONNECT DRAIN PIPE.
18 . VRF REFRIGERANT PIPING RISES UP EXTERIOR WALL,
PENETRATES EXTERIOR WALL ABOVE CEILING LEVEL AND IS
ROUTED TO MDC AS SHOWN. PROVIDE PIPE SLEEVE AT ALL WALL
PENETRATIONS.
19 . PROVIDE 1½" ELBOW UP AND MINIMUM 8"TALL VERTICAL OPEN
STAND PIPE AT THIS APPROXIMATE LOCATION.
20 . REBALANCE EXISTING ERU SUPPLY DUCT FOR 80 CFM OF
OUTSIDE AIR. FIELD VERIFY LOCATION OF EXISTING DAMPER.
21 . REBALANCE EXISTING ERU SUPPLY DUCT FOR 300 CFM OF
OUTSIDE AIR. FIELD VERIFY LOCATION OF EXISTING DAMPER.
22 . APPROXIMATELY 32" X 32" EXISTING RETURN DUCT DROPS, FOR
CONNECTION TO WSHP COMMON RETURN PLENUM. PROVIDE
TRANSITIONS AND OFFSETS AS REQUIRED TO CONNECT TO WSHP
CONNECTION SIZE COMMON RETURN PLENUM. MODIFY EXISTING
DUCT AS REQUIRED TO MAKE CONNECTION.
23 . APPROXIMATELY 60" X 30" EXISTING SUPPLY DUCT DROPS, FOR
CONNECTION TO NEW WSHP SUPPLY DUCT CONNECTION.
PROVIDE TRANSITIONS AND OFFSETS AS REQUIRED TO CONNECT
TO WSHP. MODIFY EXISTING DUCT AS REQUIRED TO MAKE
CONNECTION.
24 . RELOCATE EXISTING LOOP PIPING TO MAINTAIN ACCESS TO WSHP
ACCESS PANELS. DO NOT ROUTE PIPING IN FRONT OF ACCESS
PANELS.
25 . MAINTAIN MINIMUM 3' CLEARANCE FRON WSHP TO WALL TO
ALLOW ACCESS TO WSHP ACCESS PANEL.
26 . PROVIDE NEW INSULATED, TRAPPED, SLOPED COPPER
CONDENSATE DRAIN PIPING ROUTED FROM WSHP TO ELBOW
DOWN INTO FLOOR DRAIN AS SHOWN.
27 . PROVIDE NEW HOSE KIT TO CONNECT NEW WSHP TO EXISTING
LOOP PIPING. SEE WSHP HOSE KIT AND PIPING DETAIL. PROVIDE
TRANSITIONS AS REQUIRED FROM NEW HOSE KIT SIZE TO
EXISTING PIPING SIZE. EXTEND/MODIFY EXISTING LOOP PIPING AS
REQUIRED TO INSTALL NEW HOSE KIT.
28 . ROUTE SLOPED (1/4" PER FOOT), TRAPPED, PVC CONDENSATE
DRAIN PIPING FROM ROOFTOP EQUIPMENT TO ROOF DRAIN AS
SHOWN. PROVIDE PIPE SUPPORTS ON MAXIMUM 6' CENTERS. SEE
CONENSATE DRAIN TRAP DETAIL AND CONDENSATE PIPE
SUPPORT ON ROOF DETAIL.
29 . CONDENSATE PIPE SUPORT ON ROOF. SEE CONDENSATE PIPE
SUPOORT ON ROOF DETAIL. (TYPICAL)
30 . WALL MOUNTED DDC TEMPERATURE SENSOR TO ALLOW FOR
MONITORING OF SPACE TEMPERATURE BY DDC SYSTEM.
1/4" = 1'-0"M102
2 B147 LARGE SCALE NEW WORK PLAN
F-MC1
CH-B1
CH-B2
WSHP-C4
WORK ROOM
C105
TOILET
C104
OFFICE
C103
OFFICE
C102
COMPUTERS
C106
CONFERENCE
C111
STORAGE
C110
MEDIA CENTER
C100
CIRCULATION
C113
C2
A2
A2
A2
A2
A4
A4
A4
A4
A4
C2
C2
(TYP OF 2)
(TYP OF 2)
(TYP OF 2)
C2
C2
(TYP OF 2)
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A3
A3
A3
A4
A2
A2
A3
C2
C2
C2
C2
A2
A2
A4
A2
C2
C2
C2
C2
A4
D
TT
TT
TT
TT
TT
TT
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
AB
C
D
GA DOE ID#: 0117
M103
MECHANICAL NEW WORK
PLAN - AREA C
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
NOTES: (THIS SHEET ONLY)
1/8" = 1'-0"
MECHANICAL NEW WORK PLAN - AREA C
1 . NEW CENTRIFUGAL EXHAUST FAN MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW FAN CONNECTION TO EXISTING DUCT.
2 . NEW CEILING HEATER MOUNTED IN SAME LOCATION AS HEATER
REMOVED DURING DEMOLITION.
3 . NEW ROOFTOP WSHP MOUNTED ATOP EXISTING ROOF CURB.
PROVIDE ADAPTER CURB AS REQUIRED TO TRANSITION FRON
NEW UNIT CONNECTION TO EXISTING DUCT LAYOUT. REINSTALL
BIPOLAR IONIZATION UNIT REMOVED DURING DEMOLITION.
4 . GENERAL: EXISTING DUCT AND PIPING SIZES (IF SHOWN) AND
LOCATIONS, ARE BASED ON ORIGINAL DESIGN DOCUMENTS AND
MAY NOT REFLECT ACTUAL INSTALLED CONDITIONS.
CONTRACTOR SHALL FIELD VERIY EXISTING DUCT AND PIPING
SIZES AND LOCATIONS AS REQUIRED.
5 . PROVIDE NEW GRILLE/DIFFUSER. PROVIDE NEW FLEX DUCT (IF
APPLICABLE) OF NECK SIZE SCHEDULED. PROVIDE
TRANSITIONS/OFFSETS AS REQUIRED TO CONNECT NEW
GRILLE/DIFFUSER TO EXISTING DUCTWORK. (TYPICAL ALL
GRILLES/DIFFUSERS UNLESS SPECIFICALLY NOTED OTHERWISE)
6 . ROUTE SLOPED (1/4" PER FOOT), TRAPPED, PVC CONDENSATE
DRAIN PIPING FROM ROOFTOP EQUIPMENT TO ROOF DRAIN AS
SHOWN. PROVIDE PIPE SUPPORTS ON MAXIMUM 6' CENTERS. SEE
CONENSATE DRAIN TRAP DETAIL AND CONDENSATE PIPE
SUPPORT ON ROOF DETAIL.
7 . CONDENSATE PIPE SUPORT ON ROOF. SEE CONDENSATE PIPE
SUPOORT ON ROOF DETAIL. (TYPICAL)
DAC-1
F-K3
DOU-K2
DFCU-K2
DOU-K1
DFCU-K1
WSHP-B2
KEF-1
KSF-1
WSHP-K1
WSHP-B1
WSHP-C5
WSHP-K2
KITCHEN
D105
DISH RETURN
D106
TOILET
D114
SERVING LINES
D104
DISHWASHING
D107
COOLER
D119
DRY STORAGE
D121
FREEZER
D120
OFFICE
D118
CAN WASH
D115
LAUNDRY
D112
LOCKERS
D113
ELECTRICAL RM.
D110
MECHANICAL RM.
D109
Room
C129
LOADING
D116
EWH-K1
A4
A4
A4
A4
A4
A4
A4
A4
A4
C2
C2
(TYP OF 4)
(TYP OF 4)
C2
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
A4
C2
(TYP OF 4)
A4
C2
(TYP OF 4)
PTHP-1
C1
A3
A3
C1
C1
F-K8
EWH-K2
D
R
R
TT
TT
D
D
D
D
D
D
TT
TT
TT
TT
TT
TT
TT
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
AB
C
D
GA DOE ID#: 0117
M104
MECHANICAL NEW WORK
PLAN - AREA D
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
NOTES: (THIS SHEET ONLY)
1/8" = 1'-0"
MECHANICAL NEW WORK PLAN - AREA D
1 . NEW CENTRIFUGAL EXHAUST FAN MOUNTED ATOP EXISTING
ROOF CURB. PROVIDE ADAPTER CURB AS REQUIRED TO
TRANSITION FROM NEW FAN CONNECTION TO EXISTING DUCT.
2 . NEW OUTDOOR HEAT PUMP/CONDENSING UNIT MOUNTED ATOP
EXISTING EQUIPMENT SUPPORT PLATFORM ON ROOF.
3 . NEW WALL MOUNTED DUCTLESS FAN COIL UNIT MOUNTED IN
SAME LOCATION AS DFCU REMOVED DURING DEMOLITION. FIELD
VERIFY EXACT LOCATION.
4 . NEW DOOR AIR CURTAIN MOUNTED IN SAME LOCATION AS DOOR
AIR CURTAIN REMOVED DURING DEMOLITION.
5 . NEW ROOFTOP WSHP MOUNTED ATOP EXISTING ROOF CURB.
PROVIDE ADAPTER CURB AS REQUIRED TO TRANSITION FRON
NEW UNIT CONNECTION TO EXISTING DUCT LAYOUT. REINSTALL
BIPOLAR IONIZATION UNIT REMOVED DURING DEMOLITION.
6 . NEW CENTRIFUGAL KITCHEN EXHAUST FAN MOUNTED IN SAME
LOCATION AS FAN REMOVED DURING DEMOLITION. PROVIDE
ADAPTER CURB AS REQUIRED TO TRANSITION FROM NEW FAN
CONNECTION TO EXISTING DUCT.
7 . NEW KITCHEN MAKE-UP AIR UNIT MOUNTED IN SAME LOCATION OF
KMUAU REMOVED DURING DEMOLITION. PROVIDE ADAPTER CURB
AS REQUIRED TO TRANSITION FROM NEW FAN CONNECTION TO
EXISTING DUCT.
8 . GENERAL: EXISTING DUCT AND PIPING SIZES (IF SHOWN) AND
LOCATIONS, ARE BASED ON ORIGINAL DESIGN DOCUMENTS AND
MAY NOT REFLECT ACTUAL INSTALLED CONDITIONS.
CONTRACTOR SHALL FIELD VERIY EXISTING DUCT AND PIPING
SIZES AND LOCATIONS AS REQUIRED.
9 . PROVIDE NEW GRILLE/DIFFUSER. PROVIDE NEW FLEX DUCT (IF
APPLICABLE) OF NECK SIZE SCHEDULED. PROVIDE
TRANSITIONS/OFFSETS AS REQUIRED TO CONNECT NEW
GRILLE/DIFFUSER TO EXISTING DUCTWORK. (TYPICAL ALL
GRILLES/DIFFUSERS UNLESS SPECIFICALLY NOTED OTHERWISE)
10 . NEW WALL HEATER MOUNTED IN SAME LOCATION AS HEATER
REMOVED DURING DEMOLITION.
11 . NEW PACKAGED TERMINAL HEAT PUMP IN SAME LOCATION AS
PTHP REMOVED DURING DEMOLITION.
12 . COOLER/FREEZER DDC TEMPERATURE SENSOR. MOUNTED NEAR
CENTER OF FREEZER IN LOCATION THAT ACCURATELY MEASURES
COOLER/FREEZER TEMPERATURE.
13 . NEW WALL MOUNTED DUCTLESS FAN COIL UNIT MOUNTED IN
SAME LOCATION AS DFCU REMOVED DURING DEMOLITION. FIELD
VERIFY EXACT LOCATION.
14 . PROVIDE NEW INSULATED, TRAPPED, SLOPED COPPER
CONDENSATE DRAIN PIPING ROUTED FROM WSHP TO ELBOW
DOWN INTO FLOOR DRAIN AS SHOWN.
15 . ROUTE SLOPED (1/4" PER FOOT), TRAPPED, PVC CONDENSATE
DRAIN PIPING FROM ROOFTOP EQUIPMENT TO ROOF DRAIN AS
SHOWN. PROVIDE PIPE SUPPORTS ON MAXIMUM 6' CENTERS. SEE
CONENSATE DRAIN TRAP DETAIL AND CONDENSATE PIPE
SUPPORT ON ROOF DETAIL.
16 . CONDENSATE PIPE SUPORT ON ROOF. SEE CONDENSATE PIPE
SUPOORT ON ROOF DETAIL. (TYPICAL)
17 . PROVIDE NEW DDC THERMOSTAT FOR CONTROL OF PTHP.
THERMOSTAT MOUNTED ON WALL WITH B.E. AT 4'-6" A.F.F.
PROVIDE SURFACE MOUNTED RACEWAY AS REQUIRED TO
CONCEAL ALL CONTROL WIRING BELOW CEILING ROUTED FROM
PTHP TO THERMOSTAT. COORDINATE NEW THERMOSTAT WITH
EXISTING LIGHT SWITCHES, WALL BOARDS, ETC.
EUH-A2
WSHP-A17
AS-1
P-1
P-2
P-3
P-4
B-1
P-5
PBPB
CT-1
G
L S
L R
G
VFD-P-2
VFD-P-1
C R
C S
D
G
H R
H S
D
COCO
G
G
C S
C S
C R
8" CS
L S
L R
L S
B-1
PRV
P R
V
G
G
HX-1
FLOW FLOW
FLOW FLOW
C F
C F
C F
P-2 P-1
AAV
D
1 ¼"
P-3P-4
FLOW
4" H
REXISTING EXTERIOR WALL
OUTSIDE
C S
C S
C S
C R
C S
C
SF
L O
W
F L O
W 8
L S
F L O
W
L S
F L O
W
F L O
W
F L O
W
F L O
W
F L O
W
F L O
W
F L O
W
L R
L R
L S
F L O
W
L S
F L O
W
8" LS
FLOW
8" LS
FLOW
FLOW
8" LR
C S
F L O
W
C R
F L O
W
8" CR
FLOW
F
LO
W
4" HS
FLOW
4" HS
FLOW
4" HR
L S
F L O
W
L R
F L O
W
4 4 4
11 11
LOOP AND COOLING WATER NEW WORK PIPING SCHEMATIC
1415 161616
CF
CF
CF
CF
1818 18 18
T
T
FSFS
FS
28 29
EXP
P-5
T
T
38 38 38 38
T T
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID#: 0117
M401
MECHANICAL ROOM LARGE
SCALE NEW WORK PLANS
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
1/4" = 1'-0"M101
1 MECHANICAL ROOM NEW WORK LARGE SCALE PLAN
NOTES: (THIS SHEET ONLY)
No. Description Date
1 . BOILER EMERGENCY SHUT DOWN PUSH BUTTON FOR SHUT DOWN
OF BOILER B-1. SWITCH SHALL BE RED MUSHROOM HEAD TYPE
PUSH OFF AND RESET BY PUSHING AGAIN. DESIGNED FOR FULL
120V SNGLE PHASE POWER LOAD OF BOILER. (SQ-D # 9001 KR5R05
K8S MODULE & #FF9001 KA4 CONTACT BLOCK). PROVIDE BAKELITE
LABEL ENGRAVED AS FOLLOWS: "BOILER EMERGENCY SHUT
DOWN".
2 . NEW COOLING TOWER VFD MOUNTED IN SAME LOCATION AS VFD
REMOVED DURING DEMOLITION.
3 . NEW ELECTRIC UNIT HEATER MOUNTED IN SAME LOCATION AS
UNIT HEATER REMOVED DURING DEMOLITION.
4 . NEW BASE MOUNTED END SUCTION PUMP MOUNTED IN SAME
LOCATION AS PUMP REMOVED DURING DEMOLITION. SEE BASE
MOUNTED END SUCTION PUMP DETAIL.
5 . NEW HEAT EXCHANGER MOUNTED IN SAME LOCATION AS HEAT
EXCHANGER REMOVED DURING DEMOLITION. MODIFY EXISTING
PIPING AS REQUIRED TO CONNECT EXISTING PIPING TO NEW
HEAT EXCHANGER.
6 . NEW VERTICAL WATER SOURCE HEAT PUMP MOUNTED ATOP
EXISTING CONCRETE EQUPMENT PAD IN SAME LOCATION AS
WSHP REMOVED DURING DEMOLITION. PROVIDE DUCT
OFFSETS/TRANSITIONS AS REQUIRED TO CONNECT NEW WSHP TO
EXISTING DUCTWORK. PROVIDE NEW HOSE KIT TO CONNECT NEW
WSHP TO EXISTING LOOP PIPING. SEE WSHP HOSE KIT AND PIING
DETAIL. PROVIDE TRANSITIONS AS REQUIRED FROM NEW HOSE
KIT SIZE TO EXISTING PIPING SIZE. EXTEND/MODIFY EXISTING
LOOP PIPING AS REQUIRED TO INSTALL NEW HOSE KIT.
7 . NEW VERTICAL INLINE PUMP.
8 . DOUBLE WALL AL-294C FLUE RISES FROM BOILER TO FLUE CAP ON
ROOF. SEE CAP AT EXISTING CURB AND FLUE THRU ROOF DETAIL.
OFFSET FLUE AS REQUIRED TO ROUTE THE NEW FLUE IN THE
SAME LOCATION AS THE FLUE REMOVED DURING DEMOLITION.
10 . NEW TANGENTIAL AIR SEPARATOR WITH 8" CONNECTION AND
DRAIN IN SAME LOCATION AS AIR SEPARATOR REMOVED DURING
DEMOLITION. SEE AIR SEPARATOR DETAIL.
11 . MODIFY EXISTING PIPING AS REQUIRED TO INSTALL AND
CONNECT NEW HEAT EXCHANGER.
12 . NEW LOOP WATER PUMP VFDS MOUNTED IN WALL. COORDINATE
LOCATION WITH EXISTING CONDUIT, PIPING, ETC. RELOCATE
EXISTING CONDUIT/PIPING AS REQUIRED TO MOUNT VFD ON
WALL.
13 . NEW DDC CONTROL PANEL MOUNTED ON 3/4 PLYWOOD
BACKBOARD. COORDINATE LOCATION WITH EXISTING PIPING,
CONDUIT, ETC.
14 . BALL VALVE AND DRAIN PIPE FOR DRAINING BOILER.
15 . ROUTE CONDENSATE DRAIN LINE FROM BOILER VENT SYSTEM
AND FROM BOILER DRAIN THRU SCHEDULE 40 PVC PIPING AND
THEN THRU CONDENSATE ACID NEUTRALIZER KIT (PROVIDED BY
BOILER MANUFACTURER) PRIOR TO DISCHARGING INTO FLOOR
DRAIN. FIELD VERIFY EXISTING FLOOR DRAIN LOCATION. DO NOT
DICHARGE DIRECTLY INTO FLOOR DRAIN.
16 . EXISTING CONCRETE EQUIPMENT PAD. (TYP)
17 . PROVIDE NEW 1" CHEMICAL FEED PIPING TO CONNECT TO
EXISTING PIPING.
18 . SUCTION DIFFUSER WITH SUPPORT FOOT, STRAINER, AND
MAGNET WITH 8" SYSTEM CONNECTION AND PUMP CONNECTION
AS REQUIRED. PROVIDE TEMPORARY FINE MESH STRAINER
DURING START-UP.
19 . HIGH CAPACITY AUTOMATIC AIR VENT WITH MINIMUM 10 SCFM
CAPACITY AT 15 PSIG. TACO MODEL NO. 409. PIPE TO FLOOR
DRAIN.
20 . PRIMARY FLOW SWITCH TO VERIFY FLOW
21 . BACK-UP FLOW SWITCH WIRED IN PARALLEL WITH PRIMARY FLOW
SENSOR
22 . FIELD MOUNTED FLOW SWITCH FURNISHED BY BOILER
MANUFACTURER AND INSTALLED BY CONTRACTOR TO PROVIDE
FLOW THROUGH BOILER.
23 . BACK-UP FLOW SWITCH WIRED IN PARALLEL WITH PRIMARY FLOW
SENSOR
24 . 3" SCHEDULE 40 PVC OVERFLOW DRAIN CONNECTS TO 3" DRAIN
PIPING. COMMON 3" DRAIN PIPE CONTINUES EXISTING DRAIN
PIPING.
25 . ELECTRONIC WATER LEVEL CONTROL SENSOR CONTROLLER.
PROVIDE HEAT TAPE FOR FREEZE PROTECTION OF CONTROLLER.
26 . PROVIDE SIDE DRAIN CONNECTION WITH 3" BUTTERFLY VALVE
AND ROUTE TO OVERFLOW PIPE.
27 . POWER CONNECTION BOX AND FIXED SET POINT AMBIENT
SENSING THERMOSTAT FOR ELECTRIC HEAT TAPE CONTROL AND
TERMINATION. (ONE DEDICATED HEAT TAPE CIRCUIT FOR CS & CR
PIPING)
28 . BOILER SHUTOFF VALVE AND Y-STRAINER SHALL BE IN VERTICAL
PIPE RISE AS CLOSE TO FLOOR AS POSSIBLE.
29 . INLINE LINE-SIZE Y-STRAINER WITH BALL VALVE, HOSE
CONNECTION, AND CAP.
30 . PROVIDE TEMPORARY FINE MESH STRAINER IN Y-STRAINER.
REPLACE WITH STANDARD MESH AFTER CLEANING AND START-UP
OF PIPING SYSTEM.
31 . PROVIDE REGULATOR CAPABLE OF REGULATING 3500 CFH OF
NATURALL GAS FROM 2 PSIG TO 14 IN W.C.
32 . PROVIDE NEW LINE SIZE GAS PIPING ROUTED FROM EXISTING
SHUT OFF VALVE TO NEW BOILER AS SHOWN. PROVIDE OFFSETS
AND TRANSITIONS AS REQUIRED TO MAKE CONNECTION.
33 . NEW ONE SHOT CHEMICAL FEEDER. SEE ONE SHOT CHEMICAL
FEED SYSTEM DETAIL.
34 . BOILER TEMPERATURE CONTROL SENSOR PROVIDED BY BOILER
MANUFACTURER TO CONTROL BOILER. TEMPERATURE SENSOR
FURNISHED BY BOILER MANUFACTURER FOR MOUNTING IN LOOP
SUPPLY PIPING FOR CONNECTION TO BOILER'S
MICROPROCESSOR CONTROLLER.
35 . HOW WATER RETURN TEMPERATURE SENSOR.
36 . PROVIDE 24" (MIN) BETWEEN CENTERLINE OF HOT RETURN AND
HOT SUPPLY FROM LOOP MAIN TO MAINTAIN
PRIMARY/SECONDARY FLOW AND TO PREVENT RECIRCULATING
HOT SUPPLY INTO HOT RETURN.
37 . CARBON MONOXIDE SENSOR FOR SHUTOFF OF BOILER B-1.
MOUNT ON PLYWOOD BACKBOARD.
38 . LINE SIZE TRIPLE DUTY VALVE.
39 . NEW COOLING WATER RETURN TEMPERATURE SENSOR.
40 . NEW COOLING WATER SUPPLY TEMPERATURE SENSOR.
WSHP-A11
WSHP-A12
WSHP-A16
WSHP-A2
"x
WSHP-A10
WSHP-A9
WSHP-A7
WSHP-A1
WSHP-A6
WSHP-A13
1 1/2" LR
1 1/2" LS
1 1/2" LR
1 1/2" LS
1 1/4" LR
1 1/4" LS
1 1/4" LR
1 1/4" LS
1 1/4" LR
1 1/4" LS
DD
2" LS
2" LR
WSHP-A3
WSHP-A15
WSHP-A5
WSHP-A18
WSHP-A14
WSHP-A4 5
2 4
WSHP-A12
WSHP-A11
24"ø
22"ø
1WSHP-A18
WSHP-A51
"ø
/4
L
R 2" LR
1 1/4" LS
2" LS
DD
D
F-A2
WSHP-A14
WSHP-A4
27"ø
4F-A3
D
L R
L S
D
D
L R
L S
WSHP-A15
WSHP-A3
2" LR
2" LS
D D
1 1/4" LR
1 1/4" LS
4D
WSHP-A16
WSHP-A2
1 1/4" LR
1 1/4" LS
2" LR
2" LS
D
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID#: 0117
M402
MECHANICAL ISOMETRIC
VIEWS
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
5.1 A129 MEZZANINE NEW WORK
1.1 A164 MEZZANINE NEW WORK
1/4" = 1'-0"M101
6 A111 MECHANICAL ROOM PLAN - NEW WORK
2.1 A158 MEZZANINE NEW WORK
4.1 A136 MEZZANINE NEW WORK
3.1 A148 MEZZANINE NEW WORK
6.1 A111.1 MECH RM NEW WORK EAST WALL
6.2 A111.1 MECH RM NEW WORK WEST WALL
NOTES: (THIS SHEET ONLY)
1/4" = 1'-0"M101
1 A129 MEZZANINE PLAN - NEW WORK
1/4" = 1'-0"M101
2 A136 MEZANINE PLAN - NEW WORK
1/4" = 1'-0"M101
3 A148 MEZZANINE PLAN - NEW WORK
1/4" = 1'-0"M101
4 A158 MEZZANINE PLAN - NEW WORK
1/4" = 1'-0"M101
5 A164 MEZZANINE PLAN - NEW WORK
No. Description Date
1 . NEW VERTICAL WATER SOURCE HEAT PUMP MOUNTED IN SAME
LOCATION AS WSHP REMOVED DURING DEMOLITION. REINSTALL
BIPOLAR IONIZATION UNIT REMOVED DURING DEMOLITION.
2 . PROVIDE DUCT OFFSETS/TRANSITIONS AS REQUIRED TO
CONNECT NEW WSHP TO EXISTING DUCTWORK. FIELD VERIFY
EXISTING DUCT SIZES. DUCTWORK EXPOSED TO VIEW SHALL BE
PAINT GRIP TYPE AND PAINTED TO MATCH EXISTING DUCTWORK.
3 . PROVIDE NEW HOSE KIT TO CONNECT NEW WSHP TO EXISTING
LOOP PIPING. SEE WSHP HOSE KIT AND PIPING DETAIL. PROVIDE
TRANSITIONS AS REQUIRED FROM NEW HOSE KIT SIZE TO
EXISTING PIPING SIZE. EXTEND/MODIFY EXISTING LOOP PIPING AS
REQUIRED TO INSTALL NEW HOSE KIT.
4 . PROVIDE NEW INSULATED, TRAPPED, SLOPED COPPER
CONDENSATE DRAIN PIPING ROUTED FROM WSHP TO ELBOW
DOWN INTO FLOOR DRAIN AS SHOWN.
5 . WSHP FREE RETURN. PROVIDE FILTER RACK FOR HOLDING 2"
FILTERS.
GENERAL NOTES:
1. EQUIPMENT MODEL NUMBERS INDICATED ARE FOR BASIS-OF-DESIGN
MANUFACTURER, CARRIER, UNLESS NOTED OTHERWISE.
2. REFRIGERANT PIPING SIZES INDICATED ARE APPROXIMATE AND SHALL BE
VERIFIED / COORDINATED WITH EQUIPMENT SUPPLIER BASED ON REQUIRED
LENGTHS, SYSTEM LAYOUT / INSTALLATION, SYSTEM CAPACITY, ETC. AND OTHER
FACTORS AS REQUIRED BY MANUFACTURER.
PROJECT NUMBER:
DATE:
DRAWN BY:
CHECKED BY:
TITLE:
SUBJECT TO GENERAL
COPYRIGHT LAWS ©
REVISIONS
GA DOE ID#: 0117
M403
MECHANICAL DIAGRAMS
M O
N R
O E
H
IG
H S
C H
O O
L
H V
A C
U P
G R
A D
E S
WBF
JA3
L
IP
P
IT
T D
R
A L
B A
N Y
G
A
2023127
09/22/2023
No. Description Date
NOT TO SCALE
VRF SYSTEM 1 PIPING DIAGRAM
INSTALL CONDENSATE CONNECTION AT FCU'S ACCORDING TO MANUFACTURER'S
INSTALLATION INSTRUCTIONS, WHICH VARIES BETWEEN MANUFACTURERS.
INSULATION AS SPECIFIED.
CONTINUE OVER FITTINGS.
1-½" COPPER
CONDENSATE MAIN PIPE
D O
N O
T E
X C
E E
D M
A N
U F
A C
T U
R E
R 'S
M
A X
IM
U
M L
IF
T
C A
P A
B
IL
IT
Y
STAINLESS STEEL
WORM GEAR CLAMP.
DRAIN SOCKET, PROVIDED
WITH VRF EQUIPMENT
INSULATED FLEXIBLE DRAIN
CONNECTOR PROVIDED WITH
VRF EQUIPMENT.
REDUCER SUPPLIED BY
VRF MANUFACTURER.
3/4" SHORT SECTION OF PVC
PROVIDE 3/4" SOLVENT-WELD PVC X MIP ADAPTER.
3/4" COPPER X FIP ADAPTER
VRF FAN COIL UNIT.
THREADED DROP ROD
SECURELY ANCHORED TO
STRUCTURE. (TYP OF 4) SEE
UPPER SUPPORT DETAIL.
SOFT ACR COPPER TUBE LINES
TO INDOOR UNIT. ALL LINES
SHALL BE FULLY INSULATED.
CONTROL / ELECTRICAL PANEL.
MAINTAIN MANUFACTURER'S
CLEARANCE AND ACCESS
REQUIREMENTS.
WHERE SCHEDULED, PROVIDE FACTORY
CONDENSATE PUMP. FULL SIZE
CONDENSATE DRAIN LINE RISES TO
MAXIMUM LIFT AND ROUTED TO DRAIN AS
SHOWN ON DRAWINGS.
WHERE SCHEDULED, FILTER BOX
ACCESSORY WITH 2" ANGLE
PLEATED MEDIA.
FOR UNITS WITHOUT A CONDENSATE
PUMP, PROVIDE FULL SIZE, TRAPPED
CONDENSATE DRAIN LINE TO DISCHARGE
AS SHOWN ON DRAWINGS.
FLEXIBLE DUCT CONNECTION.
(TYPICAL SUPPLY AND RETURN)
DUCTED VRF INDOOR UNIT
SUPPLY DUCT. SEE
PLANS FOR LOCATION.
RETURN DUCT. SEE
PLANS FOR LOCATION.
THREADED DROP ROD
SECURELY ANCHORED TO
STRUCTURE. (TYP OF 4) SEE
UPPER SUPPORT DETAIL.
REFRIGERANT LINES ROUTED
TO SUB CONTROLLER WHERE
SCHEDULED AND SHOWN ON
DRAWINGS.
FULL PORT 410A, 700 PSIG
RATED ISOLATION BALL
VALVES AT EACH PORT.
SOFT ACR COPPER
REFRIGERANT LINES ROUTED
TO EACH INDOOR UNIT.
HARD DRAWN ACR COPPER
REFRIGERANT LINES FROM
OUTDOOR UNIT.
CONTROL/ELECTRICAL PANEL. MAINTAIN
MANUFACTURER'S CLEARANCE AND
ACCESS REQUIREMENTS.
FULL SIZE, INSULATED CONDENSATE
DRAIN LINE ROUTED TO LOCATION
SHOWN ON DRAWINGS.
INDOOR UNIT LIQUID AND GAS
PORTS (TYPICAL)
PROVIDE EQUIPMENT TAG FOR
CORRESPONDING INDOOR UNIT ABOVE
CONNECTED PORTS (TYPICAL FOR ALL PORTS)
MOUNT UNIT AT HEIGHT SHOWN ON DRAWINGS . DO
NOT BLOCK SUPPLY OR RETURN OPENINGS. PROVIDE
CLEARANCE FOR PROPER AIRFLOW AS REQUIRED BY
MANUFACTURER.
ROUTE CONDENSATE PIPING OUT BACK OF UNIT
OR SIDE, AS SHOWN ON FLOOR PLAN. WHERE
SHOWN CONNECTING TO CONDENSATE PUMP,
SEE WALL MOUNTED INDOOR UNIT CONDENSATE
PUMP DETAIL. SEE SCHEDULE FOR CONDENSATE
PUMP REQUIREMENTS.
W
ALL
INSULATE REFRIGERANT LINES
INDEPENDENTLY WITH 3/4"
ARMAFLEX INSULATION.
5" MIN. BOTH SIDES TO OBSTRUCTION/WALL.
UNLESS NOTED OTHERWISE, PROVIDE LINE HIDE
DUCTING AND FITTINGS FROM FCU TO CEILING TO
CONCEAL REFRIGERANT PIPING ( AND CONDENSATE
DISCHARGE TUBING WHERE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .