23Q0097_Itemized Pricing_04102023.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
USS ABRAHAM LINCOLN (CVN-72) CIS PIPE LAGGING (PACKAGE NO. 2)
Solicitation number
N5523623Q0097
Issued by

View the file

Other files

File Type Posted
23Q0097_SF18 Solicitation_04182023.pdf PDF
USS Abraham Lincoln Pipe lagging Package No. 2, SWT 077-001.docx DOCX document
23Q0097_ATTACHMENT2_RFC.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 ItEMIZED PRICING SHEET

CONTRACT:PIPE LAGGING SERVICES
CONTRACTOR:
PURCHASE ORDER:
SHIP:USS Abraham LINCOLN (CVN-72)
LOCATION:NAVY REGION SOUTHWEST
ITEM NO CLINDESCRIPTIONQTYUNIT OF ISSUEUNIT PRICEEXTENDED AMOUNT
0001COMMERCIAL INDUSTRIAL SERVICES (CIS) PIPE LAGGING SERVICES CONTRACT FOR THE REMOVAL OF EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS AND/OR INSTALLATION OF NEW AND/OR EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS ONBOARD THE USS ABRAHAM LINCOLN (CVN-72).1LOT$0.00
MOLD REMEDIATION:

Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements for insulation and lagging and/or covers on machinery, pipe unions, pipe hangers, entire chiller body, chiller framework, chiller FWD and AFT end caps, valve bodies and all NPS pipe sizes in accordance with the statement of work and references C.1.1.(a) through C.1.1.(aa).

EA05-7256 (7-180-0-E) NR.3 A/C PLANT

Mold Remediation for different A/C Piping syatems and all NPS pipe sizes

TEMPERATURE OF 125 DEGREES AND LOWER420SF
EA05-7257 (7-180-0-E) NR.4 A/C PLANT

Mold Remediation for different A/C Piping systems and all NPS pipe sizes.

TEMPERATURE OF 125 DEGREES AND LOWER420SF
REMOVAL AND DISPOSAL REQUIREMENTS:

The Contractor shall provide labor services, equipment, laboratory testing, and materials for the removal and disposal of all existing piping insulation, lagging and/or reusable covers for the locations and system identified in the Purchase Order. Removal and disposal requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).

EA05-7257 (7-180-0-E) NR.4 A/C PLANT

Pipe size: Three and one-half (3 1/2) inch NPS and smaller

TEMPERATURE OF 125 DEGREES AND LOWER25LF
EA05-7256 (7-180-0-E) NR.3 A/C PLANT

Pipe size: Four (4) inch NPS to nine (9) inch NPS

TEMPERATURE OF 125 DEGREES AND LOWER85LF
EA05-7257 (7-180-0-E) NR.4 A/C PLANT

Pipe size: Four (4) inch NPS to nine (9) inch NPS

TEMPERATURE OF 125 DEGREES AND LOWER55LF
EA05-7256 (7-180-0-E) NR.3 A/C PLANT

Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS

TEMPERATURE OF 125 DEGREES AND LOWER12LF
EA05-7257 (7-180-0-E) NR.4 A/C PLANT

Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS

TEMPERATURE OF 125 DEGREES AND LOWER12LF
EA05-7256 (7-180-0-E) NR.3 A/C PLANT

Pipe unions, pipe hangers, entire chiller body, chiller sturctural framework, chiller Fwd and Aft end caps, valve bodies, etc.

TEMPERATURE OF 125 DEGREES AND LOWER420SF
EA05-7257 (7-180-0-E) NR.4 A/C PLANT

Pipe unions, pipe hangers, entire chiller body, chiller sturctural framework, chiller Fwd and Aft end caps, valve bodies, etc.

TEMPERATURE OF 125 DEGREES AND LOWER420SF
INSTALLATION REQUIREMENTS:

The Contractor shall provide labor services, equipment, laboratory testing, and materials for the installation of new pipe lagging, insulation, lagging pads, and/or reusable covers for the locations and system identified in the Purchase Order. The Contractor shall accomplish the cleaning and painting requirements for new piping insulation, lagging, and/or re-usable covers to match surrounding areas. The Installation and painting requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).

EA05-7257 (7-180-0-E) NR.4 A/C PLANT

Pipe size: Three and one-half (3 1/2) inch NPS and smaller

TEMPERATURE OF 125 DEGREES AND LOWER25LF
EA05-7256 (7-180-0-E) NR.3 A/C PLANT

Pipe size: Four (4) inch NPS to nine (9) inch NPS

TEMPERATURE OF 125 DEGREES AND LOWER85LF
EA05-7257 (7-180-0-E) NR.4 A/C PLANT

Pipe size: Four (4) inch NPS to nine (9) inch NPS

TEMPERATURE OF 125 DEGREES AND LOWER55LF
EA05-7256 (7-180-0-E) NR.3 A/C PLANT

Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS

TEMPERATURE OF 125 DEGREES AND LOWER12LF
EA05-7257 (7-180-0-E) NR.4 A/C PLANT

Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS

TEMPERATURE OF 125 DEGREES AND LOWER12LF
EA05-7256 (7-180-0-E) NR.3 A/C PLANT

Pipe unions, pipe hangers, entire chiller body, chiller sturctural framework, chiller Fwd and Aft end caps, valve bodies, etc.

TEMPERATURE OF 125 DEGREES AND LOWER420SF
EA05-7257 (7-180-0-E) NR.4 A/C PLANT

Pipe unions, pipe hangers, entire chiller body, chiller sturctural framework, chiller Fwd and Aft end caps, valve bodies, etc.

TEMPERATURE OF 125 DEGREES AND LOWER 420 SF

BRUNO LARA NAVARRO SBS 21 MARCH 2023 TOTAL AMOUNT $0.00

NEW MILESTONE EVENTDATE
PURCHASE ORDER START DATE9-May-2023
PURCHASE ORDER END DATE26-May-2023
NOTES:
1. The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, services, crane services, gas free services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract in accordance with the requirements of the contract, the references of the Statement Of Work (SOW), and the Itemized Pricing listed in the scope of work.
2. The Contractor shall perform the requirements of this contract in accordance with the Statement Of Work (SOW), references C.1.1 (a) through C.1.1.(aa), and the requirements of the Itemized Pricing listed in the scope of work.
3. Independent Government Estimate (IGE) of the Unit Price was based on comparable work requirements (Delivery Orders) executed under contract number N55236-2-19-D-0001