23Q0097_Itemized Pricing_04102023.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- N5523623Q0097
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23Q0097_SF18 Solicitation_04182023.pdf | ||
| USS Abraham Lincoln Pipe lagging Package No. 2, SWT 077-001.docx | DOCX document | |
| 23Q0097_ATTACHMENT2_RFC.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 ItEMIZED PRICING SHEET
| CONTRACT: | PIPE LAGGING SERVICES |
| CONTRACTOR: | |
| PURCHASE ORDER: | |
| SHIP: | USS Abraham LINCOLN (CVN-72) |
| LOCATION: | NAVY REGION SOUTHWEST |
| ITEM NO CLIN | DESCRIPTION | QTY | UNIT OF ISSUE | UNIT PRICE | EXTENDED AMOUNT |
| 0001 | COMMERCIAL INDUSTRIAL SERVICES (CIS) PIPE LAGGING SERVICES CONTRACT FOR THE REMOVAL OF EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS AND/OR INSTALLATION OF NEW AND/OR EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS ONBOARD THE USS ABRAHAM LINCOLN (CVN-72). | 1 | LOT | $0.00 | |
| MOLD REMEDIATION: |
Provide labor services, equipment and materials for the accomplishment of the Mold Remediation requirements for insulation and lagging and/or covers on machinery, pipe unions, pipe hangers, entire chiller body, chiller framework, chiller FWD and AFT end caps, valve bodies and all NPS pipe sizes in accordance with the statement of work and references C.1.1.(a) through C.1.1.(aa).
EA05-7256 (7-180-0-E) NR.3 A/C PLANT
Mold Remediation for different A/C Piping syatems and all NPS pipe sizes
| TEMPERATURE OF 125 DEGREES AND LOWER | 420 | SF | |
| EA05-7257 (7-180-0-E) NR.4 A/C PLANT |
Mold Remediation for different A/C Piping systems and all NPS pipe sizes.
| TEMPERATURE OF 125 DEGREES AND LOWER | 420 | SF | |
| REMOVAL AND DISPOSAL REQUIREMENTS: |
The Contractor shall provide labor services, equipment, laboratory testing, and materials for the removal and disposal of all existing piping insulation, lagging and/or reusable covers for the locations and system identified in the Purchase Order. Removal and disposal requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).
EA05-7257 (7-180-0-E) NR.4 A/C PLANT
Pipe size: Three and one-half (3 1/2) inch NPS and smaller
| TEMPERATURE OF 125 DEGREES AND LOWER | 25 | LF | |
| EA05-7256 (7-180-0-E) NR.3 A/C PLANT |
Pipe size: Four (4) inch NPS to nine (9) inch NPS
| TEMPERATURE OF 125 DEGREES AND LOWER | 85 | LF | |
| EA05-7257 (7-180-0-E) NR.4 A/C PLANT |
Pipe size: Four (4) inch NPS to nine (9) inch NPS
| TEMPERATURE OF 125 DEGREES AND LOWER | 55 | LF | |
| EA05-7256 (7-180-0-E) NR.3 A/C PLANT |
Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS
| TEMPERATURE OF 125 DEGREES AND LOWER | 12 | LF | |
| EA05-7257 (7-180-0-E) NR.4 A/C PLANT |
Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS
| TEMPERATURE OF 125 DEGREES AND LOWER | 12 | LF | |
| EA05-7256 (7-180-0-E) NR.3 A/C PLANT |
Pipe unions, pipe hangers, entire chiller body, chiller sturctural framework, chiller Fwd and Aft end caps, valve bodies, etc.
| TEMPERATURE OF 125 DEGREES AND LOWER | 420 | SF | |
| EA05-7257 (7-180-0-E) NR.4 A/C PLANT |
Pipe unions, pipe hangers, entire chiller body, chiller sturctural framework, chiller Fwd and Aft end caps, valve bodies, etc.
| TEMPERATURE OF 125 DEGREES AND LOWER | 420 | SF | |
| INSTALLATION REQUIREMENTS: |
The Contractor shall provide labor services, equipment, laboratory testing, and materials for the installation of new pipe lagging, insulation, lagging pads, and/or reusable covers for the locations and system identified in the Purchase Order. The Contractor shall accomplish the cleaning and painting requirements for new piping insulation, lagging, and/or re-usable covers to match surrounding areas. The Installation and painting requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).
EA05-7257 (7-180-0-E) NR.4 A/C PLANT
Pipe size: Three and one-half (3 1/2) inch NPS and smaller
| TEMPERATURE OF 125 DEGREES AND LOWER | 25 | LF | |
| EA05-7256 (7-180-0-E) NR.3 A/C PLANT |
Pipe size: Four (4) inch NPS to nine (9) inch NPS
| TEMPERATURE OF 125 DEGREES AND LOWER | 85 | LF | |
| EA05-7257 (7-180-0-E) NR.4 A/C PLANT |
Pipe size: Four (4) inch NPS to nine (9) inch NPS
| TEMPERATURE OF 125 DEGREES AND LOWER | 55 | LF | |
| EA05-7256 (7-180-0-E) NR.3 A/C PLANT |
Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS
| TEMPERATURE OF 125 DEGREES AND LOWER | 12 | LF | |
| EA05-7257 (7-180-0-E) NR.4 A/C PLANT |
Pipe size: Ten (10) inch NPS to twenty-four (24) inch NPS
| TEMPERATURE OF 125 DEGREES AND LOWER | 12 | LF | |
| EA05-7256 (7-180-0-E) NR.3 A/C PLANT |
Pipe unions, pipe hangers, entire chiller body, chiller sturctural framework, chiller Fwd and Aft end caps, valve bodies, etc.
| TEMPERATURE OF 125 DEGREES AND LOWER | 420 | SF | |
| EA05-7257 (7-180-0-E) NR.4 A/C PLANT |
Pipe unions, pipe hangers, entire chiller body, chiller sturctural framework, chiller Fwd and Aft end caps, valve bodies, etc.
TEMPERATURE OF 125 DEGREES AND LOWER 420 SF
BRUNO LARA NAVARRO SBS 21 MARCH 2023 TOTAL AMOUNT $0.00
| NEW MILESTONE EVENT | DATE |
| PURCHASE ORDER START DATE | 9-May-2023 |
| PURCHASE ORDER END DATE | 26-May-2023 |
| NOTES: |
| 1. The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, services, crane services, gas free services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract in accordance with the requirements of the contract, the references of the Statement Of Work (SOW), and the Itemized Pricing listed in the scope of work. |
| 2. The Contractor shall perform the requirements of this contract in accordance with the Statement Of Work (SOW), references C.1.1 (a) through C.1.1.(aa), and the requirements of the Itemized Pricing listed in the scope of work. |
| 3. Independent Government Estimate (IGE) of the Unit Price was based on comparable work requirements (Delivery Orders) executed under contract number N55236-2-19-D-0001 |