CDRL IPMR YR85_95_PM.pdf
PDF 139 KB Posted
- Solicitation number
- N6264926RA054
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
PREVIOUS EDITION MAY BE USED.
DD FORM 1423, FEB 2024
Page of
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoDM 5010.12 for detailed instructions.)
DD FORM 1423, FEB 2024
Page of
CONTRACT DATA REQUIREMENTS LIST
C. CATEGORY:
14. DISTRIBUTION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES Draft Final Reg Repro
16. REMARKS
14. DISTRIBUTION
15.TOTAL
Image of arrow pointing towards totals
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Name of preparer of CDRL.
Item H. Date CDRL was prepared and signature of preparer of CDRL.
Item I. Name of CDRL approval authority.
Item J. Date CDRL was approved and signature of CDRL approval authority.
Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.
Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.
Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.
9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List" Hide Attachment Bar
| CurrentPage: |
| PageCount: |
| Select Classification from drop-down list.: 1 |
| DI: |
| Click on this button to attach a file(s).: |
| A. CONTRACT LINE ITEM NUMBER: 0001 |
| exhibit: A |
| C. CATEGORY: Select for "TDP.": 1 |
| C. CATEGORY: Select for "TM.": 0 |
| C. CATEGORY: Select for "OTHER.": 0 |
| C. CATEGORY: Enter specification for "Other.": |
| System: |
| ContractNum: |
| Contractor: |
| 1. DATA ITEM NUMBER: A001 |
| titleDataItem: INTEGRATED PROGRAM MANAGEMENT REPORT (IPMR) |
| subtitle: |
| 4. AUTHORITY (Data Acquisition Document Number): DI-MGMT-81861A |
| contractRef: FY27 NAVSEA Standard Items |
| reqOffice: SRF-JRMC, CODE 1209 |
| 7. DD 250 REQUIREMENT: LT |
| 8. APPROVAL CODE : N/A |
| 9. DISTRIBUTION STATEMENT REQUIRED: (SEE BLK16) |
| freq: ASREQ |
| asOfDate: N/A |
| dateFirstSub: SEE BLK16 |
| dateSubseqSub: ASREQ |
| 16. REMARKS: BLOCK 4: |
Contractor shall provide in writing, in English, utilizing Microsoft Office Suite, a schedule of work to be performed, In Accordance With (IAW) FY27 NAVSEA Standard Item, 009-111.
BLOCK 9: Distribution authorization is annotated on all supporting documents in requirement package and shall be followed IAW annotated guidance. All unmarked references shall be handled with distribution statement "D" authorization.
BLOCK 10: At a minimum, a revised schedule and analysis is required to communicate changes of five (5) working days or greater to: TGI start/end date, POP date, or potential impact of milestone.
BLOCK 12:
1. The first submission of IPMR is due within five (5) working days upon award of delivery order. The first narrative submission of the Integrated Master Schedule (IMS) shall outline the baseline start and completion dates of all major production work, inspection, testing, etc. within the period of performance.
BLOCK 13: Subsequent IPMR shall include updated IMS incorporating all of the Contractor work from 60 days prior to Start Availability (SA) date and every 30 days until SA+90 days.
BLOCK 14
1. The schedule of work to be performed shall be submitted electronically.
2. Code 1209 Points of Contacts (POC) are:
AARON ROSE, SRF BUSINESS ASSOCIATE (TOKYU SHACK)
aaron.j.rose4.civ@us.navy.mil
MARK WILSON, SRF CLASS TEAM LEAD (TOKYU SHACK)
mark.j.wilson56.civ@us.navy.mil
16. REMARKS: JOB ORDER INFO
ICN/KO:38HWC55101A01CU TITLE: F/O – REPLACE STAPLE ON BROW AND PRESERVE PLATFORM
ICN/KO:38HWC51204A02CU TITLE: F/O - CLEAN AND INSPECT COOLING COIL AND DRAIN
ICN/KO:38HVC51202A01CU TITLE: F/O - ACCOMPLISH PLANNED MAINTENANCE OF 1S, 2S AND SHORE POWER SWITCHBOARD ICN/KO:38HVC51203A01CU TITLE: F/O - ACCOMPLISH PLANED MAINTENANCE OF ELECTRIC HEATERS ICN/KO:38HWC32402A01CU TITLE: F/O - ACCOMPLISH PLANED MAINTENANCE OF 1J SHORELINE CONNECTION BOX ICN/KO:38HVC51204A01CU TITLE: F/O - INSPECT AND CLEAN MARLO FAN COIL UNITICN/KO:38HWC51402A02CU TITLE: F/O – ACCOMPLISH PLANNED MAINTENANCE OF MANUALLY OPERATED CHILLED WATER VALVE ICN/KO:38HWC55301A01CU TITLE: F/O – ACCOMPLISH PLANNED MAINTENANCE OF MANUALLY OPERATED FRESH WATER VALVE ICN/KO:38HWC51203A01CU TITLE: F/O - CLEAN AND INSPECT VENTILATION FAN HOUSING AND IMPELLER ICN/KO:38HVC55801A01CU TITLE: F/O - ACCOMPLISH PLANNED MAINTENANCE OF NITROGEN REGULATOR ICN/KO:38HWC55805A01CU TITLE: F/O - ACCOMPLISH PLANNED MAINTENANCE OF MANUALLY OPERATED STEAM VALVE ICN/KO:38HWC55801A02CU TITLE: F/O - ACCOMPLISH PLANNED MAINTENANCE OF STEAM Y-STRAINER
ICN/KO:38HVC51201A01CU TITLE: F/O - CLEAN AND INSPECT A/C & VENT SYSTEM DUCTS
ICN/KO:38HVC32104A01CU TITLE: *F/O - ACCOMPLISH PLANNED MAINTENANCE OF POWER PANEL
ICN/KO:38HWC52101A01CU TITLE: F/O - CLEAN AND INSPECT A/C & VENT SYSTEM DUCT
ICN/KO:38HWC55803A01CU TITLE: F/O - CLEAN AND INSPECT A/C & VENT SYSTEM DUCT
ICN/KO:38HWC66502A01CU TITLE: F/O - INSPECT AND CLEAN HOUSING AND IMPELLER OF VENTILATION FAN ICN/KO:38HVC43603A01CU TITLE: F/O - ACCOMPLISH PLANED MAINTENANCE OF DIGITAL AIRFLOW MONITORING SYSTEM ICN/KO:38HVC32401A01CU TITLE: *F/O - ACCOMPLISH PLANNED MAINTENANCE OF CONTROLLER OF CHT PUMP AND CHW PUMP ICN/KO:38HWC32103A01CU TITLE: *F/O - ACCOMPLISH PLANNED MAINTENANCE OF POWER PANEL ICN/KO:38HWC43602A01CU TITLE: F/O - ACCOMPLISH PLANED MAINTENANCE OF FLOODING ALARM SWITCH
| Click to add continuation field for Remarks: |
| 14. DISTRIBUTION - a. ADDRESSEE, new line: SRF-JRMC (BLK16) |
| 15.TOTAL - Total draft copies is automatically calculated.: |
| 15.TOTAL - Total final regular copies is automatically calculated.: 1 |
| 15.TOTAL - Total final reproducible copies is automatically calculated.: |
| priceGrp: |
| estTotalPrice: |
| remarks: |
| preparedBy: Aaron Rose |
| J. SIGNATURE: H. SIGNED ON 20260508 |
| J. SIGNATURE: J. SIGNED ON 20260518 |
| J. SIGNATURE: |
| approvedBy: Aaron Rose |
| Click to add additional data items.: |
| Click to delete additional data items.: |
File details come from the government source that posted it. Updated .