225DO005_WO_01_Quantitites_-_Bridge_Maintenace_Services.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- On-Call Bridge Maintenance Services (15% SBE) State and local contract opportunity
- Solicitation number
- IFB 225DO005
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a Work Order Quantities document for the Regional Transportation District (RTD) in Denver, Colorado, detailing bridge maintenance services under contract 225DO005. The document specifies Work Order #1 scope for four West Corridor Light Rail Transit bridges: LRT-COLFAX, LRT-6TH-INDIANA, LRT-WADSWORTH, and LRT-CML. Maintenance activities include expansion joint cleaning (ranging from 40 to 140 linear feet across bridges), power washing (ranging from 13,380 to 30,640 square feet), deck sealing with preparation (matching power wash quantities), debris removal from drains (40 to 126 linear feet), and crack sealing for fissures wider than 1/8 inch (1,000 to 2,000 linear feet). Additional work includes concrete patching at LRT-6TH-INDIANA (800 square feet), tightening anchor bolt nuts, drain downspout extensions, bird netting cleaning, and vegetation removal. Each work order location includes traffic control, permits, and mobilization costs listed as lump sum items. The overall contract is structured as a three-year term with two optional one-year renewal extensions, with RTD anticipating final contractor selection by September 18, 2025, and bids due September 11, 2025.
All line items in Work Order #1 are listed at zero unit costs, indicating this document serves as a quantities template rather than a priced bid. The work will be performed on a fixed-price basis with payments made according to completed quantities multiplied by contracted unit prices. The solicitation includes a mandatory 15% Small Business Enterprise (SBE) set-aside requirement, and bidders must provide bid security equal to 5% of their bid amount and demonstrate good faith efforts to meet SBE participation goals to be considered responsive. Contractors must demonstrate a five-year track record in bridge maintenance, comply with Federal Railroad Administration and Federal Transit Administration regulations, complete RTD's On Track Safety Training, and obtain necessary Right-of-Way Access Permits and Building and Grounds Access Permits. Work must be capable of execution during nights, weekends, and off-peak hours to minimize disruptions to light rail and commuter rail operations, which involve overhead catenary systems operating at 750 volts DC and 25,000 volts AC respectively.
View the file
Other files for this state and local contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ICE_procur. WO
| 225DO005 - Bridge Maintenance Services | ||||||||
| 7/25/25 | ||||||||
| Work Order #1 | ||||||||
| Number | Str. | |||||||
| Group | Str. | |||||||
| Number | Maint. Activity Code | Maint. | ||||||
| Description | Quantities | Unit | Unit Cost | Total | ||||
| 1 | West Corridor | LRT-COLFAX | RM-06 | Extend drain downspout to base of slope along Abutment 1 | 1 | Lump Sum | $0 | |
| West Corridor | LRT-COLFAX | PM-07 | Clear and clean expansion joints | 40 | LF | $0 | ||
| West Corridor | LRT-COLFAX | PM-07 | Remove debris buildup at and between plinths, and along deck edges | 13,380 | SF | $0 | ||
| West Corridor | LRT-COLFAX | PM-02 | Remove debris and clean abutment drains | 40 | LF | $0 | ||
| West Corridor | LRT-COLFAX | PM-05 | Seal cracks wider than 1/8" | 1,000 | LF | $0 | ||
| West Corridor | LRT-COLFAX | PM-07 | Power wash deck | 13,380 | SF | $0 | ||
| West Corridor | LRT-COLFAX | PM-05 | Seal deck, includeng deck preparation | 13,380 | SF | $0 | ||
| West Corridor | LRT-COLFAX | Traffic control/Permit/Mobilization | 1 | LS | $0 | |||
| 2 | West Corridor | LRT-6TH-INDIANA | RM-02 | Removed loose concrete and re-patch area in Span 2 | 800 | SF | $0 | |
| West Corridor | LRT-6TH-INDIANA | RM-03 | Tighten loose anchor bolt nuts at Piers 7 and 8. | 1 | Lump Sum | $0 | ||
| West Corridor | LRT-6TH-INDIANA | PM-07 | Clear and clean expansion joints | 60 | LF | $0 | ||
| West Corridor | LRT-6TH-INDIANA | PM-02 | Remove debris and clean abutment drains | 40 | LF | $0 | ||
| West Corridor | LRT-6TH-INDIANA | PM-07 | Remove debris buildup along steel angles and between plinths | 30,640 | SF | $0 | ||
| West Corridor | LRT-6TH-INDIANA | PM-06 | Seal cracks wider than 1/8" | 2,000 | LF | $0 | ||
| West Corridor | LRT-6TH-INDIANA | PM-07 | Power wash deck | 30,640 | SF | $0 | ||
| West Corridor | LRT-6TH-INDIANA | PM-05 | Seal deck, includeng deck preparation | 30,640 | SF | $0 | ||
| West Corridor | LRT-6TH-INDIANA | Traffic control/Permit/Mobilization | 1 | LS | $0 | |||
| 3 | West Corridor | LRT-WADSWORTH | PM-02 | Remove debris from abutment drains and replace missing grates | 126 | LF | $0 | |
| West Corridor | LRT-WADSWORTH | PM-07 | Clean bird netting from debris | 1 | Lump Sum | $0 | ||
| West Corridor | LRT-WADSWORTH | PM-07 | Clear and clean expansion joints | 126 | LF | $0 | ||
| West Corridor | LRT-WADSWORTH | PM-07 | Power wash deck | 25,389 | SF | $0 | ||
| West Corridor | LRT-WADSWORTH | PM-05 | Seal deck, includeng deck preparation | 25,389 | SF | $0 | ||
| West Corridor | LRT-WADSWORTH | Traffic control/Permit/Mobilization | 1 | LS | $0 | |||
| 4 | West Corridor | LRT-CML | RM-10 | Extend Pier 2 drain downspout | 1 | Lump Sum | $0 | |
| West Corridor | LRT-CML | PM-07 | Clear and clean expansion joints | 140 | LF | $0 | ||
| West Corridor | LRT-CML | PM-07 | Remove debris buildup at and between plinths, and along deck edges | 26,950 | SF | $0 | ||
| West Corridor | LRT-CML | PM-02 | Remove debris and clean abutment drains | 70 | LF | $0 | ||
| West Corridor | LRT-CML | PM-05 | Seal cracks wider than 1/8" | 1,000 | LF | $0 | ||
| West Corridor | LRT-CML | PM-07 | Power wash deck | 26,950 | SF | $0 | ||
| West Corridor | LRT-CML | PM-05 | Seal deck | 26,950 | SF | $0 | ||
| West Corridor | LRT-CML | Traffic control/Permit/Mobilization | 1 | LS | $0 | |||
| SUBTOTAL: | $0 | |||||||
| 5 | West Corridor | LRT-CML | PM-08 | Remove trees/vegetation under/against structure at Colfax, Indiana, 6th Ave (Union) bridges | 1 | LS | $0 | |
| TOTAL: | $0 |
Sheet1
File details come from the government source that posted it. Updated .