225DO005_WO_01_Quantitites_-_Bridge_Maintenace_Services.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- On-Call Bridge Maintenance Services (15% SBE) State and local contract opportunity
- Solicitation number
- IFB 225DO005
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a work order quantities spreadsheet for bridge maintenance services from RTD (Regional Transportation District) in Colorado, specifically Work Order #1 under contract 225DO005 dated July 25, 2025. The document details maintenance activities across four West Corridor Light Rail Transit bridges: LRT-COLFAX, LRT-6TH-INDIANA, LRT-WADSWORTH, and LRT-CML, with an additional vegetation removal task. Services include routine preventive maintenance such as clearing and cleaning expansion joints, removing debris buildup, cleaning abutment drains, sealing cracks wider than 1/8 inch, power washing and sealing bridge decks, as well as repair maintenance activities like concrete patching, tightening anchor bolts, and extending drain downspouts. The work encompasses significant quantities including 44,040 square feet of deck sealing at LRT-6TH-INDIANA, 26,950 square feet at LRT-CML, 25,389 square feet at LRT-WADSWORTH, and 13,380 square feet at LRT-COLFAX, along with various linear feet measurements for joint cleaning and crack sealing.
The spreadsheet shows unit costs and totals as $0, indicating this is a quantities-only document used for bidding purposes rather than a final pricing document. Each bridge location includes traffic control, permitting, and mobilization as lump sum items, suggesting contractors must account for these logistical requirements. The work order aligns with RTD's broader bridge maintenance contract that covers all RTD-owned bridges, adjacent structures, and culverts on both a cyclic and as-needed basis, encompassing activities from routine cleaning and sealing to structural repairs and component replacements. The contract includes a 15% Small Business Enterprise (SBE) set-aside requirement, indicating RTD's commitment to supporting small business participation in this maintenance program.
View the file
Other files for this state and local contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ICE_procur. WO
| 225DO005 - Bridge Maintenance Services | ||||||||
| 7/25/25 | ||||||||
| Work Order #1 | ||||||||
| Number | Str. | |||||||
| Group | Str. | |||||||
| Number | Maint. Activity Code | Maint. | ||||||
| Description | Quantities | Unit | Unit Cost | Total | ||||
| 1 | West Corridor | LRT-COLFAX | RM-06 | Extend drain downspout to base of slope along Abutment 1 | 1 | Lump Sum | $0 | |
| West Corridor | LRT-COLFAX | PM-07 | Clear and clean expansion joints | 40 | LF | $0 | ||
| West Corridor | LRT-COLFAX | PM-07 | Remove debris buildup at and between plinths, and along deck edges | 13,380 | SF | $0 | ||
| West Corridor | LRT-COLFAX | PM-02 | Remove debris and clean abutment drains | 40 | LF | $0 | ||
| West Corridor | LRT-COLFAX | PM-05 | Seal cracks wider than 1/8" | 1,000 | LF | $0 | ||
| West Corridor | LRT-COLFAX | PM-07 | Power wash deck | 13,380 | SF | $0 | ||
| West Corridor | LRT-COLFAX | PM-05 | Seal deck, includeng deck preparation | 13,380 | SF | $0 | ||
| West Corridor | LRT-COLFAX | Traffic control/Permit/Mobilization | 1 | LS | $0 | |||
| 2 | West Corridor | LRT-6TH-INDIANA | RM-02 | Removed loose concrete and re-patch area in Span 2 | 800 | SF | $0 | |
| West Corridor | LRT-6TH-INDIANA | RM-03 | Tighten loose anchor bolt nuts at Piers 7 and 8. | 1 | Lump Sum | $0 | ||
| West Corridor | LRT-6TH-INDIANA | PM-07 | Clear and clean expansion joints | 60 | LF | $0 | ||
| West Corridor | LRT-6TH-INDIANA | PM-02 | Remove debris and clean abutment drains | 40 | LF | $0 | ||
| West Corridor | LRT-6TH-INDIANA | PM-07 | Remove debris buildup along steel angles and between plinths | 30,640 | SF | $0 | ||
| West Corridor | LRT-6TH-INDIANA | PM-06 | Seal cracks wider than 1/8" | 2,000 | LF | $0 | ||
| West Corridor | LRT-6TH-INDIANA | PM-07 | Power wash deck | 30,640 | SF | $0 | ||
| West Corridor | LRT-6TH-INDIANA | PM-05 | Seal deck, includeng deck preparation | 30,640 | SF | $0 | ||
| West Corridor | LRT-6TH-INDIANA | Traffic control/Permit/Mobilization | 1 | LS | $0 | |||
| 3 | West Corridor | LRT-WADSWORTH | PM-02 | Remove debris from abutment drains and replace missing grates | 126 | LF | $0 | |
| West Corridor | LRT-WADSWORTH | PM-07 | Clean bird netting from debris | 1 | Lump Sum | $0 | ||
| West Corridor | LRT-WADSWORTH | PM-07 | Clear and clean expansion joints | 126 | LF | $0 | ||
| West Corridor | LRT-WADSWORTH | PM-07 | Power wash deck | 25,389 | SF | $0 | ||
| West Corridor | LRT-WADSWORTH | PM-05 | Seal deck, includeng deck preparation | 25,389 | SF | $0 | ||
| West Corridor | LRT-WADSWORTH | Traffic control/Permit/Mobilization | 1 | LS | $0 | |||
| 4 | West Corridor | LRT-CML | RM-10 | Extend Pier 2 drain downspout | 1 | Lump Sum | $0 | |
| West Corridor | LRT-CML | PM-07 | Clear and clean expansion joints | 140 | LF | $0 | ||
| West Corridor | LRT-CML | PM-07 | Remove debris buildup at and between plinths, and along deck edges | 26,950 | SF | $0 | ||
| West Corridor | LRT-CML | PM-02 | Remove debris and clean abutment drains | 70 | LF | $0 | ||
| West Corridor | LRT-CML | PM-05 | Seal cracks wider than 1/8" | 1,000 | LF | $0 | ||
| West Corridor | LRT-CML | PM-07 | Power wash deck | 26,950 | SF | $0 | ||
| West Corridor | LRT-CML | PM-05 | Seal deck | 26,950 | SF | $0 | ||
| West Corridor | LRT-CML | Traffic control/Permit/Mobilization | 1 | LS | $0 | |||
| SUBTOTAL: | $0 | |||||||
| 5 | West Corridor | LRT-CML | PM-08 | Remove trees/vegetation under/against structure at Colfax, Indiana, 6th Ave (Union) bridges | 1 | LS | $0 | |
| TOTAL: | $0 |