22137.pdf
PDF 325 KB Posted
- Attached to
- Wastewater Treatment Improvements
- Solicitation number
- 22137
- Issued by
- Sedgwick County, Kansas
About this file
This is a project description and scope of work document for the City of Hays, Kansas, detailing wastewater treatment facility improvements. The project encompasses construction of one new wetland lagoon cell requiring approximately 15,000 cubic yards of cut material and 9,200 cubic yards of fill material, installation of approximately 1,052 tons of riprap, 470 linear feet of 6-inch Class 200 PVC force main piping, and 930 linear feet of 8-inch SDR 35 PVC transfer piping. The scope also includes miscellaneous intake, transfer, and discharge structures, new fencing, seeding, and miscellaneous appurtenances. The project is designed to improve the capacity and functionality of the city's wastewater treatment operations through the development of additional lagoon capacity and associated infrastructure improvements.
The project documents specify technical requirements for earthwork, materials, and structural components necessary to support the expanded wastewater treatment capacity. Bidders are required to provide comprehensive pricing for all labor, materials, equipment, and services necessary to complete the work in accordance with the specifications and drawings provided. The project includes standard construction requirements for site preparation, material placement, compaction, and final site restoration including seeding and erosion control measures.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .