05 May 2022
Attachment B
Drawings
89503222BWA000055
PROJECT DRAWINGS
YELLOWTAIL SWITCHYARD
BREAKER 1662 and 1862 REPLACEMENT
STATE
SECTION C
DESCRIPTION/SPECIFICATIONS
Spec. No. 1041
MONTANA
YELLOWTAIL SWITCHYARD
BREAKER 1662 AND 1862 REPLACEMENT
PROJECT DRAWINGS
A. GENERAL:
CONSTRUCTION DRAWINGS: Construction drawings are the specification drawings and any additional drawings required for use in construction. The construction drawings will be issued after contract award and may include amendment changes and other details, which make the drawings suitable to use for construction purposes.
PROJECT DRAWINGS: Project drawings included herein are reduced reproductions and are not to scale. Some project drawings show details of fabrication and other information not a part of the work. Disregard information and details, which are not applicable.
STANDARD DRAWINGS: Where details shown on standard drawings included herein differ from construction or project drawings or text, the details of construction or project drawings or text shall govern. A complete set of standard drawings are available at https://www.wapa.gov/DoingBusiness/SellingToWestern/Pages/what-western-buys.aspx.
INFORMATIONAL DRAWINGS: Some project drawings have the words “FOR INFORMATION ONLY” appearing above the title block. These drawings show some information, which may be required for bidding purposes. These drawings do not show items to be furnished or work to be performed.
EXISTING INSTALLATION DRAWINGS: Some project drawings have the words “EXISTING INSTALLATION” appearing above the title block. These drawings show the existing installations prior to modifications and may show some new work to be performed.
REFERENCE DRAWINGS: Reference drawings referred to on project drawings and not included herein, are not necessary for bidding purposes.
CONTRACTOR'S RESPONSIBILITY: Check all drawings and advise WAPA of any errors or omissions.
B. LIST OF DRAWINGS:
LOCATION MAP:
1. YT 0015 Rev. C – Location and Vicinity Map
ELECTRICAL:
2. YT 0001 Rev. P EI – Switching Diagram (Existing Installation)
3. YT 0001 Rev. Q – Switching Diagram
4. YT 1000 Rev. I FIO – Arrangement Plan (For Information Only)
5. YT 1011 Rev. I EI – 115kV Bus Structure Plan (Existing Installation)
6. YT 1011 Rev. J – 115kV Bus Structure Plan
7. YT 1100 Rev. E – Equipment and Material Index
8. YT 1118 Rev. H EI – 115kV Bus Structure Sections B-B, C-C, and H-H (Existing Installation)
9. YT 1118 Rev. I – 115kV Bus Structure Sections B-B, C-C, and H-H
10. YT 1119 Rev. H EI – 115kV Bus Structure Sections D-D, E-E, and J-J (Existing Installation)
11. YT 1119 Rev. I – 115kV Bus Structure Sections D-D, E-E, and J-J
12. YT 1511 Rev. F EI – 115kV Bus Structure Grounding Plan (Existing Installation)
13. YT 1511 Rev. G – 115kV Bus Structure Grounding Plan
14. YT 1600 Rev. E FIO – 120/240V Station Service Wiring Diagram (For Information Only)
15. YT 1601 Rev. C FIO – Sta Service DWB, LW2B, LW2C Wiring Diagram (For Information Only)
16. YT 1711 Rev. J EI – 115kV Bus Structure Buried Cable and Conduit Plan (Existing Installation)
17. YT 1711 Rev. K – 115kV Bus Structure Buried Cable and Conduit Plan
CIVIL & SITE DRAWINGS:
18. YT 2000 Rev. D FIO – Grading Plan (For Information Only)
FOUNDATION AND STRUCTURAL DRAWING INDEX:
19. YT 2056-2 Rev. D – Foundation/Structural Data and Drawing Index (SH 2 of 2)
CONCRETE:
20. YT 2001 Rev. G EI – Foundations General Plan (Existing Installation)
21. YT 2001 Rev. H – Foundations General Plan
22. YT 2003 Rev. E EI – Foundation Plan 115kV Area (Existing Installation)
23. YT 2003 Rev. F – Foundation Plan 115kV Area
24. YT 2004 Rev. C EI – Foundations Outline and Reinforcement (Existing Installation)
25. YT 2303 Rev. A – Foundations Outline and Reinforcement
STEEL:
26. YT 2550 Rev. D – Anchor Bolts
27. YT 2062 FIO – Equipment Cabinet Platforms (For Information Only)
28. YT 2925 FIO – Equipment Cabinet Platforms (for Information Only)
GEOLOGY:
29. YT 8000 Rev. A – Surface Geology and Location of Exploration
30. YT 8001 Rev. A – Logs of Exploration
SUITABLE FOR CONSTRUCTION AS OF:
Apr 27, 2022- 6:31am
Apr 27, 2022- 6:30am
Apr 27, 2022- 6:30am
SU
IT
AB
LE
F O
R S
O
LI
C
IT
AT
IO
N A
S O
F:
A pr
5, 4-
0:
am
Apr 27, 2022- 6:31am
Apr 27, 2022- 6:32am
Apr 27, 2022- 6:32am
Apr 27, 2022- 6:33am
Apr 27, 2022- 6:33am
Apr 27, 2022- 6:34am
Apr 27, 2022- 6:34am
Apr 27, 2022- 6:35am
Apr 27, 2022- 6:35am
Apr 27, 2022- 6:36am
Apr 27, 2022- 6:36am
Apr 27, 2022- 6:37am
May 05, 2022- 9:25am
May 05, 2022- 9:27am
AB
LE
F O
R S
O
LI
C
IT
AT
IO
N A
S O
F:
M ar
6, 4-
0:
Apr 27, 2022- 6:38am
Apr 27, 2022- 6:41am
Apr 27, 2022- 6:39am
Apr 27, 2022- 6:39am
AB
LE
F O
R S
O
LI
C
IT
AT
IO
N A
S O
F:
M ar
6, 4-
0:
Apr 27, 2022- 6:40am
AB
LE
F O
R S
O
LI
C
IT
AT
IO
N A
S O
F:
M ar
6, 4-
0:
Apr 27, 2022- 6:40am
Apr 27, 2022- 6:42am
CIVIL ENGINEERING MANAGER
Apr 27, 2022- 6:42am
Apr 27, 2022- 6:43am
| Cover Page |
| Project Drawings |
| yt_0015c |
| yt_0001p_ei |
| yt_0001q |
| yt_1000i_fio |
| yt_1011i_ei |
| yt_1011j |
| yt_1100e |
| yt_1118h_ei |
| yt_1118i |
| yt_1119h_ei |
| yt_1119i |
| yt_1511f_ei |
| yt_1511g |
| yt_1600e_fio |
| yt_1601c_fio |
| yt_1711j_ei |
| yt_1711k |
| yt_2000d_fio |
| yt_2056_2d |
| yt_2001g_ei |
| yt_2001h |
| yt_2003e_ei |
| yt_2003f |
| yt_2004c_ei |
| yt_2303a |
| yt_2550d |
| yt_2062_fio |
| yt_2925_fio |
| yt_8000a |
| yt_8001a |
File details come from the government source that posted it. Updated .