22 - Atch G - Drawing - PHASE 1 - 100 Percent WAPA-FS.pdf

PDF 2 MB Posted

Attached to
DSW Fire Suppression System Upgrade
Solicitation number
89503121BWA000030
Issued by

About this file

This document outlines requirements for an Invitation for Bid for a fire suppression system upgrade project. The project scope includes removing and replacing all sprinkler heads, installing an intelligent analog addressable fire alarm system, and optionally installing a high-pressure Carbon Dioxide fire suppression system. The acquisition is set aside for small businesses only and will be awarded as a firm-fixed price contract valued between $250,000-$500,000. The place of performance is Phoenix, Arizona and the work must be completed according to specifications outlined in the drawings and documents provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FROM FACP

L202 P

L206 P

L203 P

L205 P

L204 P

1D

1D

1D

1D

1D

1D

1D

1D

S.

3r d

A

VE

. P H

O

EN

IX

, A

R

IZ

O N

A W es te rn A re a

Po w er A dm in is tr at io n

D

IS

PA

TC

H A

N D

O

PE

R A

TI

O

N S

B

LD

G

PH

O

EN

IX

O

M

C

EN

TE

R

NFPA 72 (2013)

10.5.1 SYSTEM DESIGNER.

10.5.1.1 - FIRE ALARM SYSTEM AND EMERGENCY COMMUNICATIONS SYSTEM

PLANS AND SPECIFICATIONS SHALL BE DEVELOPED IN ACCORDANCE WITH

THIS CODE BY PERSONS WHO ARE EXPERIENCED IN THE PROPER DESIGN,

APPLICATION, INSTALLATION, AND TESTING OF THE SYSTEMS.

10.5.2 SYSTEM INSTALLER.

10.5.2.1 - FIRE ALARM SYSTEMS AND EMERGENCY COMMUNICATIONS

SYSTEMS INSTALLATION PERSONNEL SHALL BE QUALIFIED OR SHALL BE

SUPERVISED BY PERSONS WHO ARE QUALIFIED IN THE INSTALLATION,

INSPECTION, AND TESTING OF THE SYSTEMS.

GENERAL NOTES:

1. THIS PROJECT'S FIRE SUPPRESSION SYSTEM SHALL BE INSTALLED IN A

"WORKMAN LIKE MANOR" UTILIZING "GOOD COMMERCIAL PRACTICE".

1. TO ENSURE THE PROPER OPERATION OF THE FIRE SUPPRESSION SYSTEM,

A COMPLETE FUNCTIONAL TEST SHALL BE PERFORMED PRIOR TO THE

FINAL INSPECTION BY THE AUTHORITY HAVING JURISDICTION (A.H.J.).

2. THE INSTALLING CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE

ALL TESTING WITH THE LOCAL A.H.J., GENERAL CONTRACTOR AND ANY

ASSOCIATED CONTRACTORS.

3. UPON COMPLETION OF THE PROJECT, THE INSTALLING CONTRACTOR

SHALL PROVIDE INSPECTION REPORTS, OPERATIONS MANUALS, AND SHOP

DRAWINGS TO THE OWNER REPRESENTATIVE.

4. ALL OF THE FIRE SUPPRESSION SYSTEM PROGRAMMING THAT IS REQUIRED

SHALL BE PERFORMED BY THE INSTALLING CONTRACTOR.

5. ALL OF THE FIRE SUPPRESSION CONTROL PANEL TERMINATIONS SHALL BE

PERFORMED BY THE INSTALLING CONTRACTOR.

6. THE FIRE SUPPRESSION INSTALLATION SHALL BE IN ACCORDANCE WITH

THESE PLANS. CHANGES IN DEVICES, LOCATIONS, AND/OR CIRCUITS MUST

BE APPROVED. IF THE CHANGES ARE SUFFICIENT TO REQUIRE

RE-ENGINEERING A FEE MAY BE CHARGED TO THE CONTRACTOR

REQUESTING THE CHANGES.

7. THE DISCHARGE TIME OF THE FM200 CLEAN AGENT SYSTEM SHALL BE

WITHIN 10 SECONDS OR LESS. THE PROTECTED VOLUME SHALL BE

TOTALLY FLOODED AT A MINIMUM OF 7% CONCENTRATION. THE

PROTECTED VOLUME SHALL MAINTAIN THIS CONCENTRATION FOR A

PERIOD OF 10 MINUTES.

8. THE DISCHARGE TIME OF THE TOTAL FLOOD CO2 SYSTEM SHALL BE WITHIN

1MIN.

9. ALL DOORS WITHIN THE PROTECTED AREA SHALL REQUIRE DOOR

CLOSURES, DOOR SEALS AND DOOR SWEEPS TO PREVENT LEAKAGE AND

MAINTAIN THE PROPER CLEAN AGENT CONCENTRATION LEVEL.

10. A DOOR FAN TEST SHALL BE PERFORMED TO VERIFY THE INTEGRITY OF

THE ROOM. ALL PENETRATIONS, HOLES, CABLE TRAYS, AND TRENCHES

THAT LEAVE THE PROTECTED AREA SHALL BE SEALED.

MOUNTING INSTRUCTIONS:

1. ALL DEVICES SHALL BE INSTALLED UTILIZING THE STANDARDS LOCATED IN

THE "DESIGN STANDARDS" ON THESE DRAWINGS.

2. SMOKE DETECTORS SHALL BE MOUNTED AS FOLLOWS:

2.1. CENTER OF CEILING TILES.

2.2. NO CLOSER THAN THREE (3) FEET FROM AN AIR MOVING REGISTER.

2.3. NO LESS THAN 4" FROM A SIDE WALL.

3. MANUAL RELEASE & ABORT STATIONS SHALL BE MOUNTED AS FOLLOWS:

3.1. 48" TO THE TOP OF THE DEVICE ABOVE THE FINISHED FLOOR.

3.2. WITHIN 5" OF THE EXIT DOOR WHERE POSSIBLE.

4. DISCHARGE HORN/STROBE UNITS SHALL BE MOUNTED AS FOLLOWS:

4.1. SHALL BE MOUNTED SUCH THAT THE ENTIRE LENS IS NOT LESS THAN

80" ABOVE THE FINISHED FLOOR.

4.2. WHEN CEILING HEIGHTS ARE LESS THAN 80", MOUNT THE DEVICE 6"

BELOW THE CEILING.

4.3. ALL CEILING MOUNT DEVICES SHALL BE IN THE CENTER OF THE TILE.

4.4. SET ALL HORN STROBES TO HIGH dBA SETTING.

4.5. SET CANDELA RATING AS NOTED ON PLANS.

5. EXIT DISCHARGE STROBE ONLY UNITS SHALL BE MOUNTED AS FOLLOWS:

5.1. AT EVERY DOOR EXITING THE PROTECTED AREA.

ELECTRICAL INSTALLATION NOTES:

1. THE FIRE SUPPRESSION SYSTEM WIRING SHALL BE INSTALLED UTILIZING

THE STANDARDS LOCATED IN THE "DESIGN STANDARDS" ON THESE

DRAWINGS.

2. REFER TO THE "WIRE CHART" LOCATED ON THESE DRAWINGS FOR

QUANTITY, TYPE & SIZE OF THE WIRE.

3. ALL SIGNAL LINE CIRCUITS (SLC) SHALL BE CLASS "B".

4. ALL INDICATING DEVICE CIRCUITS (IDC) SHALL BE CLASS "B".

5. ALL NOTIFICATION APPLIANCE CIRCUITS (NAC) SHALL BE CLASS "B".

6. THE FIRE SUPPRESSION SYSTEM WIRING SHALL BE INSTALLED IN A

MINIMUM OF 1/2" (EMT) CONDUIT.

7. A LICENSED ELECTRICAL CONTRACTOR SHALL PROVIDE THE

INSTALLATION, LABOR, CONDUIT, AND WIRING FOR ALL 120VAC POWER

CIRCUITS CONNECTED TO THE FIRE ALARM SYSTEM.

WORK BY OTHER TRADES TO BE PROVIDED UNDER THIS SCOPE:

1. ALL 120VAC DEDICATED POWER CIRCUIT, CONDUIT, AND WIRING.

2. SEALING THE ROOM TO MAINTAIN PROPER INTEGRITY OF THE ROOM.

3. THE BUILDING FIRE ALARM SYSTEM CONNECTIONS

SCOPE OF WORK:

1. REMOVE AND INSTALL A NEW FIRE DOOR TO OPERATE (DROP) UPON CO2

DETECTION SYSTEM

2. INSTALL ONE (1) NEW CO2 TOTAL FLOOD FIRE SUPPRESSION SYSTEM TO

PROVIDE INDEPENDENT PROTECTION FOR THE SUBSTATION AREA.

3. THE FIRE SUPPRESSION SYSTEM SHALL SEND AUTOMATIC SIGNALS TO THE

BUILDING FIRE ALARM SYSTEM. REFER TO THE RISER DIAGRAM AND THE

SEQUENCE OF OPERATIONS FOR THE SPECIFIC SIGNALS TO BE

TRANSMITTED.

4. THE FIRE SUPPRESSION SYSTEM SHALL PROVIDE BATTERY BACKUP AS A

SECONDARY POWER SOURCE. REFER TO THE BATTERY CALCULATIONS

LOCATED ON THESE DRAWINGS FOR THE STANDBY TIME AND SIZE OF

BATTERIES REQUIRED.

5. THIS PROJECT'S FIRE SUPPRESSION SYSTEM SHALL BE DESIGNED UTILIZING

THE STANDARDS LOCATED IN THE "DESIGN STANDARDS" SECTION ON THESE

DRAWINGS.

CLEAN AGENT PIPING REQUIREMENTS:

1. REFER TO SYSTEM DRAWINGS AND HYDRAULIC CALCULATIONS FOR THE

LOCATION AND LAYOUT OF THE AGENT DISTRIBUTION PIPING SYSTEM.

EXAMINE THE CONFIGURATION OF THE PIPING SYSTEM TO ENSURE THE

PIPING AND DISCHARGE NOZZLES DO NOT INTERFERE WITH SOLID

STRUCTURE OBJECTS OR EQUIPMENT WITHIN THE HAZARD AREA BEFORE

THE PIPING CONSTRUCTION BEGINS. SHOULD ANY CONFLICTS OCCUR

NOTIFY THE FIRE SUPPRESSION CONTRACTOR TO MAKE THE

APPROPRIATE CHANGES ON THE SYSTEM DRAWINGS AND THE HYDRAULIC

CALCULATIONS BEFORE ANY PIPING CONSTRUCTION BEGINS.

2. PIPING MATERIAL SHALL CONFORM TO THE REQUIREMENTS AS OUTLINED

IN NFPA 2001, SECTION 4-2.1 OF THE CURRENT EDITION. SCHEDULE 40 OR

SCHEDULE 80 PIPE (BLACK OR GALVANIZED) SHALL CONFORM TO ASTM A53

OR A106 SHALL BE THE ONLY ACCEPTABLE PIPE USED IN THE AGENT

DISTRIBUTION PIPING SYSTEM. ORDINARY CAST IRON PIPE, STEEL PIPE

CONFORMING TO ASTM A-120, OR NON-METALLIC PIPE SHALL NOT BE

PERMITTED IN THE AGENT DISTRIBUTION PIPING SYSTEM.

3. PIPE FITTINGS SHALL CONFORM TO THE REQUIREMENTS OUTLINED IN

NFPA 2001, SECTION 4-2.1 OF THE CURRENT EDITION. MALLEABLE IRON

FITTINGS (BLACK OR GALVANIZED) SHALL BE 300 LB (135 KG) CLASS

FITTINGS CONFORMING TO ASTM SPECIFICATION A-197. ORDINARY CAST

IRON FITTING AND 150 LB (68 KG) CLASS FITTINGS SHALL NOT BE

PERMITTED. VICTALIC 77 OR GEM 7000 GROOVED FITTINGS SHALL BE

PERMITTED AS LONG AS THEY ARE UL LISTED FOR THIS APPLICATION.

THREADED, WELDED OR FLANGED FITTINGS SHALL BE PERMITTED AS LONG

AS THEY CONFORM TO THE ABOVE REQUIREMENTS. ALL FITTINGS SHALL

BE THREADED FITTINGS UNLESS OTHERWISE NOTED ON THE SYSTEM

DRAWINGS. HOLE-CUT OR SIMILAR TYPE FITTINGS SHALL NOT BE USED.

4. THE METHOD OF JOINING ALL PIPING SHALL BE IN ACCORDANCE WITH

NFPA 2001. TEFLON TAPE IS RECOMMENDED AND SHALL BE APPLIED ON

THE MALE PIPE THREADS. ALL GROOVED COUPLINGS SHALL BE

LUBRICATED PER MANUFACTURERS SPECIFICATIONS. THREADS ON ALL

PIPE AND FITTINGS SHALL BE TAPERED CONFORMING TO ANSI

SPECIFICATION B-20.1.

5. REDUCTIONS IN PIPE SIZE SHALL BE DIRECTLY AFTER A TEE, UTILIZING A

CONCENTRIC BELL REDUCER, WITH THE TEE BEING THE SAME PIPE SIZE AS

THE INLET LINE TO THE TEE. REDUCTIONS IN PIPE SIZE MAY ALSO BE MADE

USING A CONCENTRIC BELL REDUCER AFTER A UNION, PROVIDED THE

NEXT CHANGE IN DIRECTION (TEE) IS LOCATED A MINIMUM OF 10 PIPE

DIAMETERS DOWNSTREAM OF THE CONCENTRIC BELL REDUCER.

CONCENTRIC BELL REDUCERS OR CONCENTRIC REDUCING COUPLINGS

SHALL BE USED TO MAKE ALL REDUCTIONS IN PIPE SIZE. REDUCING

BUSHINGS, WELD-O-LET, HOLE-CUT FITTINGS AND REDUCING TEE'S SHALL

NOT BE PERMITTED.

6. ALL PIPING SHALL BE INSTALLED IN A PROFESSIONAL MANNER WITH "GOOD

COMMERCIAL PRACTICE". ALL PIPING AND FITTINGS SHALL BE BLOWN

CLEAR , SWABBED WITH A SUITABLE SOLVENT (ACETONE,

TRICHLORETHANE, ECT.) AND ALL PIPE LENGTH SHALL BE REAMED TO

REMOVE ALL BURRS PRIOR TO INSTALLATION. ALL PIPING SHALL BE

RIGIDLY SUPPORTED BY A COMBINATION NETWORK COMPRISED OF PIPE

HANGERS AND RIGID SUPPORT HANGERS. PIPE HANGERS ARE USED

SUPPORT THE "DEAD LOAD" OF THE PIPING SYSTEM AND SHALL BE SPACED

AT INTERVALS NOT TO EXCEED 15 FEET. RIGID PIPE SUPPORTS ARE

REQUIRED TO SUPPORT THE" LIVE LOAD" OF THE PIPING SYSTEM DURING

THE AGENT DISCHARGE AND IS REQUIRED AT EACH DIRECTIONAL CHANGE

FITTING, TEE AND NOZZLE. ALL 180° NOZZLE REQUIRE BACK-BRACING IN

THE OPPOSITE DIRECTION OF THE DISCHARGE PATTERN. EARTHQUAKE

BRACING SHALL BE USED WHERE REQUIRED BY LOCAL CODE. REFER TO

ANSI B31.1 FOR BRACING REQUIREMENTS.

7. CARE SHOULD BE TAKEN WHEN BRACING THE PIPING TO INSURE THE

NOZZLE LOCATIONS ARE WITHIN 1 FOOT OF THE LOCATIONS ON THE

SYSTEM PLANS. CORRECT NOZZLES SHALL BE INSTALLED EXACTLY IN

ACCORDANCE WITH THE SYSTEM PLANS AND DEFLECTOR SET SCREWS

SHALL BE IN PLACE DURING A SYSTEM DISCHARGE OR AGENT

DISTRIBUTION OR THE SYSTEM'S ABILITY TO SUPPRESS A FIRE MAY

ADVERSELY BE AFFECTED. NOZZLES SHALL BE INSTALLED

PERPENDICULAR TO THE CEILING FOR PROPER AGENT DISTRIBUTION. 180°

NOZZLES SHOULD BE ALIGNED PROPERLY WITH RESPECT TO ADJACENT

WALLS (ORIFICE HOLES ORIENTED PARALLEL TO WALL SO NO DIRECT WALL

IMPINGEMENT OF AGENT OCCURS).

8. FINAL INSTALLATION ACCEPTANCE SHALL BE IN ACCORDANCE WITH NFPA

2001 SECTION 7-7 OF THE LATEST EDITION.

9. ALL SYSTEM PIPING SHALL BE INSTALLED IN STRICT ACCORDANCE TO THE

SYSTEM PLANS. IF BUILDING LAYOUT CHANGES AND THE SYSTEM PIPING

CHANGES ARE NECESSARY, THEY MUST BE APPROVED BY THE FIRE

SUPPRESSION CONTRACTOR .

10.INSTALL PIPE, HANGARS AND BRACING IN ACCORDANCE WITH THE MOST

RECENT EDITION OF NFPA 2001, NFPA 13 AND THE FSSA PIPE DESIGN

HANDBOOK.

PROJECT GENERAL INFORMATION

SYSTEM

TYPE

TOTAL FLOOD SUPPRESSION SYSTEM.

DESCRIPTION

KIDDE FIRE SUPPRESSION SYSTEM, UTILIZING A POWER

LIMITED, FULLY SUPERVISED, MANUAL AND AUTOMATIC

INITIATION/DETECTION SYSTEM. THIS SYSTEM SHALL BE

MONITORED BY THE BUILDING FIRE ALARM SYSTEM.

DESIGN STANDARDS

1 MANUFACTURES GUIDELINES

2 NFPA 72 (2013)

3 NFPA 70 (2014)

4 NFPA 2001 (2015)

PROTECTED AREAS SQ.

FT.

SUBSTATION CO2 TOTAL FLOOD 1055

PHOENIX O & M CENTER

615 S. 43rd AVE. PHOENIX, ARIZONAWestern Area Power Administration

DISPATCH AND OPERATIONS BLDG

PROJECT SCOPE

PHASE I SUBSTATION CO2 SYSTEM UPGRADE

PH

AS

E I S

UB

ST

AT

IO

N

CO

2 S

YS

TE

M

UP

GR

AD

E

AUX-1 POWER SUPPLY BATTERY CALCULATION

QTY TYPE PART NUMBER STANDBY TOTAL STANDBY ALARM TOTAL ALARM

1 PWR 76-800030-003 0.0700 Amps 0.0700 Amps 0.0900 Amps 0.0900 Amps

TOTAL 0.0700 Amps TOTAL 0.0900 Amps

SEE VOLTAGE DROP CALCULATIONS FOR DETAILS ON

THE NOTIFICATION APPLIANCE CIRCUITS. PROVIDE 24

HOURS OF BATTERY BACKUP WITH 5MIN (.083 HRS) OF

ALARM.

24 Hrs HOURS 0.083 Hrs

1.68 Ah AMP HOUR 0.01 Ah

1.20 DERATING 1.20

2.02 Ah TOTAL 0.01 Ah

TOTAL REQUIRED 2.025 Ah

SEE EQUIPMENT LIST FOR SIZE

FSCP F1 CONTROL PANEL BATTERY CALCULATION

QTY TYPE PART NUMBER STANDBY TOTAL STANDBY ALARM TOTAL ALARM

1 FSCP 76-800100-001 0.1583 Amps 0.1583 Amps 0.3000 Amps 0.3000 Amps

5 EXR-NAC 76-800013-001 0.0207 Amps 0.1035 Amps 0.1325 Amps 0.6625 Amps

1 PWR 76-800030-003 0.0700 Amps 0.0700 Amps 0.0900 Amps 0.0900 Amps

30 PHOTO DS-PS 0.0002 Amps 0.0045 Amps 0.0002 Amps 0.0066 Amps

29 INPUT 70-407008-001 0.0005 Amps 0.0131 Amps 0.0005 Amps 0.0131 Amps

13 INPUT PAD100-SIM 0.0002 Amps 0.0031 Amps 0.0002 Amps 0.0031 Amps

30 OUTPUT 70-200200-003 0.0005 Amps 0.0150 Amps 0.0005 Amps 0.0150 Amps

9 RELAY PAD100-RM 0.0002 Amps 0.0022 Amps 0.0002 Amps 0.0022 Amps

11 MREL 84-330002-001 0.0005 Amps 0.0050 Amps 0.0005 Amps 0.0050 Amps

5 M SWITCH 76-600000-200 0.0065 Amps 0.0325 Amps 0.0065 Amps 0.0325 Amps

9 WHS HSR-A 0.0000 Amps 0.0000 Amps 0.1020 Amps 0.9180 Amps

13 WST STR-A 0.0000 Amps 0.0000 Amps 0.0850 Amps 1.1050 Amps

8 BELL MBA-6-24 0.0000 Amps 0.0000 Amps 0.0600 Amps 0.4800 Amps

4 REL 85-890181-000 0.0000 Amps 0.0000 Amps 2.0000 Amps 8.0000 Amps

2 REL 85-890181-000 0.0000 Amps 0.0000 Amps 2.0000 Amps 4.0000 Amps

3 SOL BY OTHERS 0.0000 Amps 0.0000 Amps 0.4800 Amps 1.4400 Amps

TOTAL 0.4071 Amps TOTAL 17.0729 Amps

SEE VOLTAGE DROP CALCULATIONS FOR DETAILS ON THE

NOTIFICATION APPLIANCE CIRCUITS. PROVIDE 24 HOURS

OF BATTERY BACKUP WITH 5MIN (.083 HRS) OF ALARM.

24 Hrs HOURS 0.083 Hrs

9.77 Ah AMP HOUR 1.42 Ah

1.20 DERATING 1.20

11.72 Ah TOTAL 1.70 Ah

TOTAL REQUIRED 13.424 Ah

SEE EQUIPMENT LIST FOR SIZE

NOTIFICATION APPLIANCE CIRCUIT SCHEDULE

CIRCUIT TYPE CANDELA PART NUMBER ALARM QTY TOTAL

R1 REL 85-890181-000 2.000 Amps 1 2.000 Amps

R2 REL 85-890181-000 2.000 Amps 1 2.000 Amps

R2 REL 82-878737-001 0.000 Amps 1 0.000 Amps

R3 REL 85-890181-000 2.000 Amps 1 2.000 Amps

R4 REL 85-890181-000 2.000 Amps 1 2.000 Amps

Z1-1 BELL MBA-6-24 0.060 Amps 2 0.120 Amps

Z1-2 WHS HSR-A 0.102 Amps 2 0.204 Amps

Z1-3 WST STR-A 0.085 Amps 5 0.425 Amps

Z2-1 BELL MBA-6-24 0.060 Amps 2 0.120 Amps

Z2-2 WHS HSR-A 0.102 Amps 2 0.204 Amps

Z2-3 WST STR-A 0.085 Amps 3 0.255 Amps

Z3-1 BELL MBA-6-24 0.060 Amps 1 0.060 Amps

Z3-2 WHS HSR-A 0.102 Amps 1 0.102 Amps

Z3-3 WST STR-A 0.085 Amps 1 0.085 Amps

Z4-1 BELL MBA-6-24 0.060 Amps 3 0.180 Amps

Z4-2 WHS HSR-A 0.102 Amps 3 0.306 Amps

Z4-3 WST STR-A 0.085 Amps 3 0.255 Amps

Z5-1 WHS HSR-A 0.102 Amps 1 0.102 Amps

Z5-1 WST STR-A 0.085 Amps 1 0.085 Amps

VOLTAGE DROP CALCULATION

POWER

SUPPLY

CIRCUIT TOTAL AMPS FOOTAGE OHMS PER 1K TOTAL OHMS VOLTAGE DROP

FS1 R1 2.000 Amps 300 Ft. 3.19 0.96 Ohms 1.91 Vdc

FS1 R2 2.000 Amps 100 Ft. 3.19 0.32 Ohms 0.64 Vdc

FS1 R3 2.000 Amps 100 Ft. 3.19 0.32 Ohms 0.64 Vdc

FS1 R4 2.000 Amps 100 Ft. 3.19 0.32 Ohms 0.64 Vdc

FS1 S1 0.480 Amps 300 Ft. 3.19 0.96 Ohms 0.46 Vdc

FS1 S2 0.480 Amps 300 Ft. 3.19 0.96 Ohms 0.46 Vdc

FS1 S3 0.480 Amps 500 Ft. 3.19 1.60 Ohms 0.77 Vdc

FS1 Z1-1 0.120 Amps 250 Ft. 3.19 0.80 Ohms 0.10 Vdc

FS1 Z1-2 0.204 Amps 250 Ft. 3.19 0.80 Ohms 0.16 Vdc

FS1 Z1-3 0.425 Amps 250 Ft. 3.19 0.80 Ohms 0.34 Vdc

FS1 Z2-1 0.120 Amps 250 Ft. 3.19 0.80 Ohms 0.10 Vdc

FS1 Z2-2 0.204 Amps 250 Ft. 3.19 0.80 Ohms 0.16 Vdc

FS1 Z2-3 0.255 Amps 250 Ft. 3.19 0.80 Ohms 0.20 Vdc

FS1 Z3-1 0.060 Amps 250 Ft. 3.19 0.80 Ohms 0.05 Vdc

FS1 Z3-2 0.102 Amps 250 Ft. 3.19 0.80 Ohms 0.08 Vdc

FS1 Z3-3 0.085 Amps 250 Ft. 3.19 0.80 Ohms 0.07 Vdc

FS1 Z4-1 0.180 Amps 250 Ft. 3.19 0.80 Ohms 0.14 Vdc

FS1 Z4-2 0.306 Amps 250 Ft. 3.19 0.80 Ohms 0.24 Vdc

FS1 Z4-3 0.255 Amps 250 Ft. 3.19 0.80 Ohms 0.20 Vdc

FS1 Z5-1 0.187 Amps 250 Ft. 3.19 0.80 Ohms 0.15 Vdc

RELEASE THE GAS INTO THE PROTECTED AREA

SHUT DOWN ALL SMOKE DAMPERS IN THE AREA (AS REQUIRED)

SHUT DOWN ALL AIR HANDLERS IN THE AREA (AS REQUIRED)

SEND TROUBLE SIGNAL TO BUILDING FIRE ALARM/REMOTE MONITORING (IF APPLICABLE)

ILLUMINATE LED ON THE SMOKE DETECTOR

SEND ALARM SIGNAL TO BUILDING FIRE ALARM/REMOTE MONITORING (IF APPLICABLE)

INDICATE THE DEVICE ZONE AT THE CONTROL PANEL

ACTIVATE DISCHARGE STROBE OUTSIDE THE PROTECTED AREA

OUTPUTS AND CONTROLS

HOLD THE AGENT RELEASE UNTIL THE ABORT IS RELEASED

ACTIVATE 30 SEC. TIME DELAY

SOUND LOCAL PIEZO

ACTIVATE PRE-DISCHARGE HORN/STROBES IN THE PROTECTED AREA

2ND SM

OKE DETECTOR ZONE IN ALARM

SINGLE DETECTOR ZONE IN ALARM

EXPIRATION OF THE 30 SEC. TIM

E DELAY

M

ANUAL AGENT RELEASE STATION

LOSS OF PRIM

ARY POW

ER FAULT

OPEN CIRCUIT FAULT

ABORT STATION

BATTERY FAULT

TROUBLE

GROUND FAULT

INPUTS AND ACTIONS

ACTIVATE ALARM BELL IN THE PROTECTED AREA

SEND SUPERVISORY SIGNAL TO BUILDING FIRE ALARM/REMOTE MONITORING (IF APPLICABLE)

CONTROL HEAD DISCONNECTED FROM CYLINDER

DISABLE SW

ITCH IN DISABLE POSITION

DISABLE THE CYLINDER

AGENT DISCHARGE SW

ITCH

CYLINDER LOW

PRESSURE SW

ITCH ACTIVATION

PREACTION SPRINKLER W

ATERFLOW

SW

ITCH

PREACTION SPRINKLER TAM

PER SW

ITCH

PREACTION SPRINKLER LOW

AIR SW

ITCH

LOSS OF AIR PRESSURE

SEQUENCE OF OPERATIONS

VOLTAGE

24VDC

12VDC

24VDC

24VDC

24VDC

24VDC

24VDC

24VDC

24VDC

24VDC

24VDC

COMPATABLE SOLENOIDS CHART

8210G107ASCO

VIKING

ASCO

ASCO

8210G201

13215

8210G207

MANUFACTURER

SKINNER

SKINNER

SKINNER

SKINNER

ASCO

ASCO

ASCO

LV2LBX25

T8210A107 R8210A107 8210A107

PART NUMBER

X5H65100 24 VOLT

X5H65100 12 VOLT

73218BN4UNLVN0C111C2

0.440

0.338

0.700 0.700

CURRENT

0.400 0.700 0.700 0.700

0.800 0.458 0.458

DRAW

24VDCVIKING 11601 0.338

24VDCVIKING 11602 0.338

kFT

5.08

8.45 ohm/kFT

8.08

Coated

ALUMINUM

8.05

13.1 12.8 ohm/

4.89

7.95 ohm/kFT

7.77

Uncoated2

OVERALL

0.002

0.002

0.001

AREA IN.

DC RESISTANCE AT 75°C (167°F)

COPPER

2.05

3.26

2.01

3.19

5.29

3.25

5.17

3.18

5.06

8.21

1.98

3.14

1.93

3.07

4.99

0.006

0.004

0.005

0.003

0.003

QUANTITY

STRANDING

0.015

DIA. IN.

SIZE

kcmil

AWG/

SIZE

AWG/

kcmil

0.030

0.024

0.019

TABLE 8. CONDUCTOR PROPERTIES

0.092

0.073 0.064

0.081

0.051 0.058

0.046 0.040

CONDUCTORS

DIA. IN.

RISER DIAGRAM FS1

Z

M /S

L

Z

M /S

L

Z

M /S

L

Z

M /S

L

Z

M /S

L

OP

L

L

L Z

L

Z

L

C L

Z

L

Z

L

C L

R R2

Z

L

Z

L

C L

Z

L

Z

L

C L

Z

L

Z

L

C L P P

P

L

P

L

Z 1-

Z A

L

P B O

L

H

Z 4-

O

L

O L

Z 4-

Z 4-

L

L

S

P

L

P

L

Z A

L

P B O

L

H

Z 4-

O

L

O L

Z 4-

Z 4-

L

L

O L

Z 4-

L

P

L

H

Z 4-

O

L

B O

L

Z

4-

Z A

L

P

L

P

L

P

L

P

L

Z A

L

P B O

L

H

Z 3-

O

L

Z 3-

L

O L

Z 3-

L

O L

Z 2-

L

H

Z 2-

O

L

P

L

Z A

L

B O

Z 2-

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

Z A

L

B O

L

Z

2-

O L

Z 2-

L

H

Z 2-

O

L

P

L

P

L

P

L

P

L

P

L

Z A

L

O L

Z 2-

L

P

L

P

L

O L

Z 2-

L

Z A

L

P

L

P

L

P

L

P

L

P

L

P

L

H

Z 1-

O

L

P

L

O L

Z 1-

L

Z A

L

B O

L

Z

1-

P

L

P

L

P L

H

Z 1-

O

L

P

L

O L

Z 1-

L

Z A

L

B O

L

Z

1-

P

L

Z

L

Z

L

CL

R

Z

L

Z

L

C L P

R1

Z

L

Z

L

T LAW

Z

L

S

Z

L

Z

L

T LAW

Z

L

S

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

P

L

SLC-L2

BATTERYBATTERY

R E

L

FSCP

DEDICATED

120 VAC

SLC-L1

SLC-L2

24VDC

R R3

R R4

R R5-1

S

S

R E

L

R E

L

R E

L

R E

L

R E

L

R E

L

R E

L

Z

ALARM

TROUBLE

SUPPREVISORY

Z

Z

SLC

FROM

FACP

SLC

FROM

FACP

S1

S2

S3

R R5-2

R E

L

RLY RLY RLY RLY RLY RLY RLY

AIR HANDLER

SHUT DOWN

RLY RLY

E Q

U

IP

M E

N T

P O

W E

R S

H U

T O

F F

D O

O R

R E

L E

A S

E

L

L

L

L

L

L

L

L

L

S.

3r d

A

VE

. P H

O

EN

IX

, A

R

IZ

O N

A W es te rn A re a

Po w er A dm in is tr at io n

D

IS

PA

TC

H A

N D

O

PE

R A

TI

O

N S

B

LD

G

PH

O

EN

IX

O

M

C

EN

TE

R

SLC-L3

O L

Z 5-

L

P

L

H

Z 5-

O

L

O L

Z 1-

L

Z

L

L

IN

E

R H

E A

T

Z

L

Z

L

C C

Z

L

Z

L

T LA W

Z

L

Z

L

V

PHASE II COMPONENTS

PH

AS

E I S

UB

ST

AT

IO

N

CO

2 S

YS

TE

M

UP

GR

AD

E

NOTE: CALCULATIONS INCLUDE PHASE I & II EQUIPMENT, PHASE I SHALL INCLUDE

INSTALLATION OF EQUIPMENT REQUIRED FOR CO2 SYSTEM FUNCTIONALITY ONLY.

THE REMAINDER OF EQUIPMENT WILL BE INSTALLED IN PHASE II

CONFERENCE 1140

CORRIDOR

C O

R R

ID

O

R

UNIT

SUBSTATION

L119 P

H

Z5-1

L302 P

LINEAR HEAT DETECTION

L303O

L Z5-1

L

O

L304 O L Z1-3

LA

S3

S W

T

L132Z

L

Z L134

Z

C R5

R L131Z

C L130Z

1D,1P

1D,1P 1D,1P,1S

1D,1P,1R,1S

1D,1P,2R,1S

1D,1P, 2R,1S

1D,1P,2R,1S

1D,1P,2R,1S

1D, 1P, 1S

L129 Z

R5 R

L1126ZV

1D, 1P, 1S

CORRIDOR

UNIT

SUBSTATION

43'-6"

'-3

CO2 ZONE #5

SITE KEY/ SHEET INDEX

C

A-B

E

D

SYMBOL LEGEND

PREACTION SOLENOIDS

PREACTION LOW AIR SWITCHLA

SPRINKLER TAMPER SWITCHT

SPRINKLER WATERFLOW SWITCHW

ADDRESSABLE MONITOR MODULE (XXX = ADDRESS)XXXZ

CONTROL HEAD MONITOR SWITCHC

MAINTENANCE SWITCHSM

AGENT CONTROL HEAD (AGENT RELEASE)R

AGENT PRE-DISCHARGE HORN/STROBES# S#=CIRCUIT #H

ADDRESSABLE PHOTOELECTRIC SMOKE DETECTOR (XXX = ADDRESS)XXXP

AGENT 180° DISCHARGE NOZZLE

AGENT ABORT STATION (XXX = ADDRESS)XXXA

DESCRIPTIONSYMBOL

FIRE ALARM BELL ONLYB

AGENT DISCHARGE STROBE

S# S#=CIRCUIT #L

ADDRESSABLE CLEAN AGENT RELEASE STATION (XXX = ADDRESS)XXXP

CLEAN AGENT CYLINDER (XXX=LBS OF AGENT)XXX

FIRE SUPPRESSION CONTROL PANELFSCP

NOTE: P=PNEUMATIC

CO2 STOP VALVEV

AGENT 360° DISCHARGE NOZZLE

EXAMPLE:

QTY GAUGE

16 AWG

S

P

COLOR

DESCRIPTION

D

R

TAG #

THHN

TYPE

PRE-ACTION SOLENOID

AUXILIARY 24VDC

CONDUIT

2 14 AWG THHN

2 16 AWG THHN

2 16 AWG THHN

WIRE CHART

BLUEYELLOW

WHITE ORANGE

YELLOW BLUE

2A,1B

TAG-SEE CHART

QUANTITY

SLC DATA

BROWNVIOLETRELEASE CKT

S.

3r d

A

VE

. P H

O

EN

IX

, A

R

IZ

O N

A W es te rn A re a

Po w er A dm in is tr at io n

D

IS

PA

TC

H A

N D

O

PE

R A

TI

O

N S

B

LD

G

PH

O

EN

IX

O

M

C

EN

TE

R

AGENT TOTAL FLOODING CONCENTRATION FACTORS (w/v)

TYPE MANUFACTURER PART NUMBER DESCRIPTION QTY

CYLINDER KIDDE 90-100121-001 125LB AGENT STORAGE CYLINDER W/LLI 2

CYLINDER KIDDE 90-100201-101 200LB AGENT STORAGE CYLINDER W/LLI 3

CYLINDER KIDDE 90-100601-100 600LB AGENT STORAGE CYLINDER W/LLI 1

CYLINDER KIDDE 90-100901-001 900LB AGENT STORAGE CYLINDER W/LLI 3

AHMBT KIDDE WK-699205-050 MALE BRANCH TEE 1/8in NPT (ACTUATION ADAPTER) 4

AHOSE KIDDE WK-264986-000 FLEXIBLE PNEUMATIC ACTUATION HOSE - 30in 7

MCAK KIDDE 82-844895-000 MASTER CYLINDER ADAPTER KIT 3

PHEAD KIDDE 82-878737-000 PRESSURE OPERATED CONTROL HEAD 4

STRAP KIDDE 235317 CYLINDER MOUNTING STRAP 125 & 200LBS 5

STRAP KIDDE 236125 CYLINDER MOUNTING STRAP 900LBS 3

STRAP KIDDE 294651 CYLINDER MOUNTING STRAP 600LBS 1

NOZZLE KIDDE 90-194013-172 180 DEGREE NOZZLE 4

NOZZLE KIDDE 90-194014-177 180 DEGREE NOZZLE 4

NOZZLE KIDDE 90-194015-261 180 DEGREE NOZZLE 1

NOZZLE KIDDE 90-194017-391 180 DEGREE NOZZLE 1

NOZZLE KIDDE 90-194018-422 180 DEGREE NOZZLE 4

NOZZLE KIDDE 90-194023-172 360 DEGREE NOZZLE 4

NOZZLE KIDDE 90-194027-368 360 DEGREE NOZZLE 1

NOZZLE KIDDE 90-194027-377 360 DEGREE NOZZLE 1

NOZZLE KIDDE 90-194028-438 360 DEGREE NOZZLE 4

NOZZLE KIDDE 90-194028-531 360 DEGREE NOZZLE 4

NOZZLE KIDDE 90-194415-239 180 DEGREE NOZZLE 2

SIGN KIDDE 06-231865-739 WARNING HFC227 NAMEPLATE 10

CYLINDER KIDDE 81-870269-002 100LB CO2 STORAGE CYLINDER 8

HOSE KIDDE WK-251821-000 3/4" FLEXIBLE DISCHARGE HOSE 8

DISHEAD KIDDE WK-872450-000 PLAIN-NUT DISCHARGE HEAD 8

CO2SIREN KIDDE 981574 PRESSURE OPERATED SIREN 1

NOZZLE KIDDE 803373 360 DEGREE NOZZLE CO2 S TYPE NOZZLE 8

DISIND KIDDE 81-967082-000 DISCHARGE INDICATOR 1

LOVALVE KIDDE 70985024 1-1/2" LOCKOUT VALVE W/ LIMIT SWITCH 1

ODOR KIDDE 81-897600-000 ODORIZER ASSEMBLY 1

SAFETYO KIDDE 81-803242-000 SAFETY OUTLET 1

STOPV KIDDE 81-870123-000 1-1/2" DIRECTIONAL (STOP) VALVE 1

DELAY30 KIDDE 81-871071-000 CO2 DISCHARGE DELAY (30 SECONDS) 1

SIGN KIDDE 06-231866-851 NAMEPLATE WARNING VACATE 1

SIGN KIDDE 06-231866-852 NAMEPLATE WARNING DO NOT ENTER 1

SIGN KIDDE 06-231866-854 NAMEPLATE WARNING MIGRATION 1

SIGN KIDDE 06-231866-856 NAMEPLATE WARNING ACTUATION 1

SIGN KIDDE WK-310330-000 NAMEPLATE MAIN 1

MECHANICAL FIRE SUPPRESSION EQUIPMENT LIST

TYPE MANUFACTURER PART NUMBER DESCRIPTION QTY

PHASE I

FUTURE PHASE II

DETECTION AND CONTROLS FS1-EQUIPMENT LIST

TYPE MANUFACTURER PART NUMBER DESCRIPTION QTY

FSCP KIDDE 76-800100-001 ARIES NETLINK 3-TIERED CONTROL UNT 1

CARDCAGE KIDDE 76-800010-001 EXPANSION CARD CAGE ASSEMBLY 2

EXR-NAC KIDDE 76-800013-001 R-NAC EXPANSION CARD 5

PWR KIDDE 76-800030-001 AREIES LINK POWER SUPPLY 2

PWR KIDDE 76-800030-001 AREIES LINK POWER SUPPLY 2

PWR KIDDE 76-800030-003 AREIES LINK POWER MANAGEMENT UNIT 1

PWR KIDDE 76-800030-003 AREIES LINK POWER MANAGEMENT UNIT 1

CAB KIDDE 76-600000-514 BATTERY CABINET 2

BATT ENERSYS NP12-18 12 VOLT 18 AMP HOUR STORAGE BATTERY 4

BATT ENERSYS NP7-12 12 VOLT 7 AMP HOUR STORAGE BATTERY 1

BASE KIDDE DS-BS 6" SMOKE DETECTOR BASE 30

PHOTO KIDDE DS-PS PHOTOELECTRIC SMOKE DETECTOR (MODEL: 711U) 30

INPUT KIDDE 70-407008-001 ADDRESSABLE SINGLE INPUT DEVICE 29

INPUT POTTER PAD100-SIM ADDRESSABLE INPUT MONITOR MODULE 13

OUTPUT KIDDE 70-200200-003 ADDRESSABLE ALARM SIGNAL MODULE 30

RELAY POTTER PAD100-RM ADDRESSABLE RELAY DEVICE 9

MREL KIDDE 84-330002-001 ADDRESSABLE DOUBLE ACTION MANUAL PULL STATION 11

M SWITCH KIDDE 76-600000-200 MAINTENANCE SWITCH 5

ABORT KIDDE 84-878752-010 SYSTEM ABORT STATION 10

WHS KIDDE HSR-A SELECTABLE CANDELA WALL MOUNT HORN/STROBE 9

WST KIDDE STR-A SELECTABLE CANDELA WALL MOUNTED STROBE 13

BELL KIDDE MBA-6-24 6" ALARM BELL (MODEL: MBA-6-24) 8

CYLINDER KIDDE 90-100201-101 200LB AGENT STORAGE CYLINDER W/LLI 2

CYLINDER KIDDE 90-100901-001 900LB AGENT STORAGE CYLINDER W/LLI 5

REL KIDDE 85-890181-000 AGENT RELEASE CONTROL KIT ( INCLUDES HEAD & MONITOR) 4

REL KIDDE 82-878737-001 PRESSURE OPERATED CONTROL CONTOL HEAD 3

SMON KIDDE 45-118500-001 SUPERVISORY PRESSURE SWITCH 7

CMON KIDDE 85-100000-100 PRESSURE OPERATED CONTROL HEAD MONITOR 3

REL KIDDE 85-890181-000 CO2 AGENT RELEASE CONTROL KIT ( INCLUDES HEAD & MONITOR) 2

NOTE: INSTALL ONLY EQUIPMENT REQUIRED FOR CO2 SYSTEM FUNCTIONALITY IN PHASE I

THE REMAINDER OF EQUIPMENT WILL BE INSTALLED IN PHASE II

PH

AS

E I S

UB

ST

AT

IO

N

CO

2 S

YS

TE

M

UP

GR

AD

E

ZONE #5 SUBSTATION CO2 SYSTEM ISOMETRIC DIAGRAM (N.T.S.)HYDRAULIC CALULATION

H1-T0280

PNEUMATIC SIREN

ODORIZER

TIME DELAY

LOCK OUT VALVE

PNEUMATIC STOP VALVE

DISCHARGE INDICATOR

H1-T0476

H1-T0568

H1-T0664

H1-T0858

H1-T0754

H1-T0390

H1-T0186

SEE CALC FOR NODE

NUMBERS

NOTE:

ALL PIPE LENGTHS ARE TAKEN

FROM CENTER TO CENTER FIELD

VERIFY ALL PIPE LENGTHS. DO

NOT FABRICATE FROM THESE

DRAWINGS

S.

3r d

A

VE

. P H

O

EN

IX

, A

R

IZ

O N

A W es te rn A re a

Po w er A dm in is tr at io n

D

IS

PA

TC

H A

N D

O

PE

R A

TI

O

N S

B

LD

G

PH

O

EN

IX

O

M

C

EN

TE

R

PH

AS

E I S

UB

ST

AT

IO

N

CO

2 S

YS

TE

M

UP

GR

AD

E

SUBSTATION ROOM VOLUME CALCULATIONS - C02

SECTIO

N

LEN

GTH

WID

TH

SQ.

FEET

HEIG

HT

VOLU

ME

AGENT

FLOOD

FACTO

R

ALTITUDE

CORRECTI

ON

FACTOR

AGEN

T

REQUI

RED

FILL

WEIGH

T

SUBSTA

TION

43.5 24.2

1054.8

14 14768.

0.05 1 738.41

MINIMUM DISCHARGE RATE= MIN AGENT

SUPPLIED / 1 MIN

TOTAL

REQUIRED

738.41

TOTAL SUPPLIED 800.00

8 - 100LBS CYLINDERS

Sheets and Views
PHASE 1 - 100% WAPA-FS-COV
PHASE 1 - 100% WAPA-FS-FS1.0
PHASE 1 - 100% WAPA-FS-FS1.1
PHASE 1 - 100% WAPA-FS-FS1.2
PHASE 1 - 100% WAPA-FS-Spec. Cover

File details come from the government source that posted it. Updated .