20Q0298_Attachment 4_Specifications.pdf

PDF 86 KB Posted

Attached to
Pre-engineered, Self-framing, Relocatable Metal Building
Solicitation number
N3904020Q0298
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQ DOC NO. - __0174V006 ATTACHMENT _________

CONTINUATION SHEET CONTRACT NO. - _______________ PAGE ___ OF ___

NAME OF OFFER OR/CONTRACTOR

DMD ENCLOSURE 1 JO

C. DESCRIPTION/SPECIFICATIONS

C.1 ENCLOSURE: INSULATED MODULAR METAL FRAMED

RELOCATABLE BUILDING.

C.1.1 DOORS AND PENETRATIONS PER ATTACHED DRAWING.

C.1.2 54 FEET X 21 FEET INTERIOR CLEAR SPAN BY 22 FEET – 6

INCHES WALL HEIGHT, PEAKED ROOF.

C.1.3 REMOVAL ROOF SECTION WITH PADEYES.

C.1.3.1 REMOVABLE ROOF SECTION SHALL BE PER ATTACHED

DRAWING AND SPECIFICATION WITH SPS CERTIFIED LIFT PADS.

C.1.4 WIND AND SNOW LOAD REQUIREMENTS.

C.1.5 PRIOR TO FABRICATION, CODE 2310 SHALL REVIEW ALL

DRAWINGS AND SPECIFICATIONS.

C.2 SEE STATEMENT OF WORK FOR MORE DETAILED SPECIFICATIONS

C.2.1 PER PARA 3.6.1 A LOAD TEST IS REQUIRED FOR THE PICK

PLATES (PAD EYES).

C.2.2 PER PARA 3.6.3 MAGNETIC PARTICLE TEST (MT) IS REQUIRED

ON ALL ACCESSIBLE SURFACES OF THE PICK PLATE (PAD EYES)

MATERAIL AND ACCESSIBLE ASSOCIATED WELDS.

ITEM # SUPPLIES/SERVICES QTY U/I

C.3 PNS WILL BE AFFORDED THE OPPORTUNITY TO INSPECT THE

ENCLOSURE AT VENDOR FACILITY PRIOR TO SHIPMENT TO

VALIDATE ACCEPTABLITY.

C.4 DATA REQUIREMENTS PER EXHIBIT A (DD-1423) & ATTACH #1.

C.4.1 PICK PLATE (PAD EYES) LOAD TEST; EXHIBIT A SEQUENCE

A001.

C.4.2 MAGENETIC PARTICAL TEST (MT); EXHIBIT A SEQUENCE A002.

C.4.3 MATERIAL SAFETY DATA SHEETS; EXHIBIT A SEQUENCE A003.

CONTRACT __________________

PRINTED 15 JULY 2020 PAGE _______

EXHIBIT A

(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)

CONTRACT DATA REQUIREMENTS LIST

SYSTEM/ITEM DMD ENCLOSURE CATEGORY ____________

ITEM NO CONTRACTOR

01 SEQ NO A001

02 DATA DESC PICK PLATE (PAD EYES) LOAD TEST

03 SUBTITLE

04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A

05 CONTRACT REF PARA. C.4.1

06 TECH OFFICE 2310.3

07 DD 250 REQ DD

08 APP CODE

09 IAC INPUT

10 FREQUENCY O-TIME

11 AS OF DATE

12 DATE 1ST SUBM WITH MATERIAL

13 DATE SUB SUBM

14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)

15 TOTAL __

16 REMARKS

SEQ. NO. A001

PREPARED BY ________________________________________________ DATE__________________ APPROVED BY ________________________________________________ DATE__________________

DD FORM 1423

PRINTED 15 JULY 2020 PAGE _______

01 SEQ NO A002

02 DATA DESC MAGNETIC PARTICLE TEST (MT)

03 SUBTITLE ALL ACCESSIBLE SURFACES OF THE PICK PLATE (PAD EYES)

MATERAIL AND ACCESSIBLE ASSOCIATED WELDS.

04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A

05 CONTRACT REF PARA. C.4.2

06 TECH OFFICE 2310.3

07 DD 250 REQ DD

08 APP CODE

09 IAC INPUT

10 FREQUENCY O-TIME

11 AS OF DATE

12 DATE 1ST SUBM WITH MATERIAL

13 DATE SUB SUBM

14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)

SEQ. NO. A002

PRINTED 15 JULY 2020 PAGE _______

01 SEQ NO A003

02 DATA DESC MATERIAL SAFETY DATA SHEETS

03 SUBTITLE ALL PAINT AND INSULATION USED WITHIN OR ON ENCLOSURE

04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A

05 CONTRACT REF PARA. C.4.3

06 TECH OFFICE 2310.3

07 DD 250 REQ DD

08 APP CODE

09 IAC INPUT

10 FREQUENCY O-TIME

11 AS OF DATE

12 DATE 1ST SUBM WITH MATERIAL

13 DATE SUB SUBM

14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)

SEQ. NO. A003

PRINTED 15 JULY 2020 PAGE _______

CONTRACT/SOLICITATION ________________________________________________________________

ITEM ___________________________________________ (DATE FOR ITEM) ___________________

REQUIRED CERTIFICATION

A. CERTIFICATION SHALL BE SUPPLIED WITH EACH SHIPMENT OF MATERIAL.

CERTIFICATION (CERTIFICATE OF COMPLIANCE) SHALL BE SUPPLIED AS OUTLINED IN

PARAGRAPH B. THE VENDOR IS LIABLE FOR CONDUCTING ALL TESTS, ANALYSES,

INSPECTIONS, AND EXAMINATIONS, ETC., AS SPECIFIED BY THE CONTRACT AND

SPECIFICATIONS WHETHER CERTIFICATIONS ARE REQUIRED OR NOT.

CERTIFICATE OF COMPLIANCE (PROVIDE THE FOLLOWING VERBATIM STATEMENT OR

COMPLETE THE OPTIONAL FORM AT THE END OF THIS PART)

"I ATTEST ALL ITEMS FURNISHED ON THIS CONTRACT ARE IN FULL COMPLIANCE WITH

ALL CONTRACT REQUIREMENTS".

B. CERTIFICATION SHALL BE SUPPLIED PER THE FOLLOWING INSTRUCTIONS:

1. THE CERTIFICATION OF COMPLIANCE SHALL CONTAIN THE SIGNATURE AND TITLE OF

THE VENDOR OFFICIAL DESIGNATED RESPONSIBLE FOR QUALITY ASSURANCE.

2. THE MATERIAL IDENTIFICATION (E.G. LOT, BATCH, PART #, ETC.) SHALL BE INCLUDED

ON THE CERTIFICATE OF COMPLIANCE.

PRINTED 15 JULY 2020 PAGE _______

CERTIFICATE OF COMPLIANCE

COMPANY NAME

MATERIL IDENTIFICATION (COMPLETE APPLICABLE ITEMS)

CONTRACT NO. ______________ ORDER NO. ________________ ITEM NO. ____________________ NATIONAL/LOCAL STOCK NO. NSN/LSN ____________________________________________________ MANUFACTURER’S PART NO. _____________________________________________________________ MANUFACTURER’S SERIAL NO. ___________________________________________________________ DRAWING AND PIECE NO. _________________________________________________________________

MANUFACTURER’S LOT/HEAT NOS. AS MARKED ON THE MATERIAL _________________________

ALL INSPECTIONS AND TEST REPORTS REQUIRED BY ATTACHMENT I TO EXHIBIT A (DD FORM

1423) FOR TRACEABILITY TO EACH CONTRACT ITEM MUST ACCOMPANY THIS SIGNED

STATEMENT:

THE INSPECTION AND TEST REPORTS (AS APPLICABLE) PROVIDED REPRESENT THE ACTUAL

ATTRIBUTES OF THE ITEMS FURNISHED ON THIS CONTRACT AND INDICATE FULL

COMPLIANCE WITH ALL CONTRACT REQUIREMENTS. I ATTEST ALL ITEMS FURNISHED ON

THIS CONTRACT ARE IN FULL COMPLIANCE WITH ALL CONTRACT REQUIREMENTS.

SIGNATURE ___________________________________________________ DATE _______________

QUALITY ASSURANCE OFFICIAL

File details come from the government source that posted it. Updated .