20Q0298_Attachment 4_Specifications.pdf
PDF 86 KB Posted
- Solicitation number
- N3904020Q0298
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20Q0298_Attachment 3_Drawings.pdf | ||
| 20Q0298_Attachment 1_RFQ Sheet 230920.pdf | ||
| 20Q0298_Attachment 2_PWS.pdf | ||
| 20Q0298_Combined Synopsis_230920.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQ DOC NO. - __0174V006 ATTACHMENT _________
CONTINUATION SHEET CONTRACT NO. - _______________ PAGE ___ OF ___
NAME OF OFFER OR/CONTRACTOR
DMD ENCLOSURE 1 JO
C. DESCRIPTION/SPECIFICATIONS
C.1 ENCLOSURE: INSULATED MODULAR METAL FRAMED
RELOCATABLE BUILDING.
C.1.1 DOORS AND PENETRATIONS PER ATTACHED DRAWING.
C.1.2 54 FEET X 21 FEET INTERIOR CLEAR SPAN BY 22 FEET – 6
INCHES WALL HEIGHT, PEAKED ROOF.
C.1.3 REMOVAL ROOF SECTION WITH PADEYES.
C.1.3.1 REMOVABLE ROOF SECTION SHALL BE PER ATTACHED
DRAWING AND SPECIFICATION WITH SPS CERTIFIED LIFT PADS.
C.1.4 WIND AND SNOW LOAD REQUIREMENTS.
C.1.5 PRIOR TO FABRICATION, CODE 2310 SHALL REVIEW ALL
DRAWINGS AND SPECIFICATIONS.
C.2 SEE STATEMENT OF WORK FOR MORE DETAILED SPECIFICATIONS
C.2.1 PER PARA 3.6.1 A LOAD TEST IS REQUIRED FOR THE PICK
PLATES (PAD EYES).
C.2.2 PER PARA 3.6.3 MAGNETIC PARTICLE TEST (MT) IS REQUIRED
ON ALL ACCESSIBLE SURFACES OF THE PICK PLATE (PAD EYES)
MATERAIL AND ACCESSIBLE ASSOCIATED WELDS.
ITEM # SUPPLIES/SERVICES QTY U/I
C.3 PNS WILL BE AFFORDED THE OPPORTUNITY TO INSPECT THE
ENCLOSURE AT VENDOR FACILITY PRIOR TO SHIPMENT TO
VALIDATE ACCEPTABLITY.
C.4 DATA REQUIREMENTS PER EXHIBIT A (DD-1423) & ATTACH #1.
C.4.1 PICK PLATE (PAD EYES) LOAD TEST; EXHIBIT A SEQUENCE
A001.
C.4.2 MAGENETIC PARTICAL TEST (MT); EXHIBIT A SEQUENCE A002.
C.4.3 MATERIAL SAFETY DATA SHEETS; EXHIBIT A SEQUENCE A003.
CONTRACT __________________
PRINTED 15 JULY 2020 PAGE _______
EXHIBIT A
(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)
CONTRACT DATA REQUIREMENTS LIST
SYSTEM/ITEM DMD ENCLOSURE CATEGORY ____________
ITEM NO CONTRACTOR
01 SEQ NO A001
02 DATA DESC PICK PLATE (PAD EYES) LOAD TEST
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.4.1
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
15 TOTAL __
16 REMARKS
SEQ. NO. A001
PREPARED BY ________________________________________________ DATE__________________ APPROVED BY ________________________________________________ DATE__________________
DD FORM 1423
PRINTED 15 JULY 2020 PAGE _______
01 SEQ NO A002
02 DATA DESC MAGNETIC PARTICLE TEST (MT)
03 SUBTITLE ALL ACCESSIBLE SURFACES OF THE PICK PLATE (PAD EYES)
MATERAIL AND ACCESSIBLE ASSOCIATED WELDS.
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.4.2
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A002
PRINTED 15 JULY 2020 PAGE _______
01 SEQ NO A003
02 DATA DESC MATERIAL SAFETY DATA SHEETS
03 SUBTITLE ALL PAINT AND INSULATION USED WITHIN OR ON ENCLOSURE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.4.3
06 TECH OFFICE 2310.3
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SEQ. NO. A003
PRINTED 15 JULY 2020 PAGE _______
CONTRACT/SOLICITATION ________________________________________________________________
ITEM ___________________________________________ (DATE FOR ITEM) ___________________
REQUIRED CERTIFICATION
A. CERTIFICATION SHALL BE SUPPLIED WITH EACH SHIPMENT OF MATERIAL.
CERTIFICATION (CERTIFICATE OF COMPLIANCE) SHALL BE SUPPLIED AS OUTLINED IN
PARAGRAPH B. THE VENDOR IS LIABLE FOR CONDUCTING ALL TESTS, ANALYSES,
INSPECTIONS, AND EXAMINATIONS, ETC., AS SPECIFIED BY THE CONTRACT AND
SPECIFICATIONS WHETHER CERTIFICATIONS ARE REQUIRED OR NOT.
CERTIFICATE OF COMPLIANCE (PROVIDE THE FOLLOWING VERBATIM STATEMENT OR
COMPLETE THE OPTIONAL FORM AT THE END OF THIS PART)
"I ATTEST ALL ITEMS FURNISHED ON THIS CONTRACT ARE IN FULL COMPLIANCE WITH
ALL CONTRACT REQUIREMENTS".
B. CERTIFICATION SHALL BE SUPPLIED PER THE FOLLOWING INSTRUCTIONS:
1. THE CERTIFICATION OF COMPLIANCE SHALL CONTAIN THE SIGNATURE AND TITLE OF
THE VENDOR OFFICIAL DESIGNATED RESPONSIBLE FOR QUALITY ASSURANCE.
2. THE MATERIAL IDENTIFICATION (E.G. LOT, BATCH, PART #, ETC.) SHALL BE INCLUDED
ON THE CERTIFICATE OF COMPLIANCE.
PRINTED 15 JULY 2020 PAGE _______
CERTIFICATE OF COMPLIANCE
COMPANY NAME
MATERIL IDENTIFICATION (COMPLETE APPLICABLE ITEMS)
CONTRACT NO. ______________ ORDER NO. ________________ ITEM NO. ____________________ NATIONAL/LOCAL STOCK NO. NSN/LSN ____________________________________________________ MANUFACTURER’S PART NO. _____________________________________________________________ MANUFACTURER’S SERIAL NO. ___________________________________________________________ DRAWING AND PIECE NO. _________________________________________________________________
MANUFACTURER’S LOT/HEAT NOS. AS MARKED ON THE MATERIAL _________________________
ALL INSPECTIONS AND TEST REPORTS REQUIRED BY ATTACHMENT I TO EXHIBIT A (DD FORM
1423) FOR TRACEABILITY TO EACH CONTRACT ITEM MUST ACCOMPANY THIS SIGNED
STATEMENT:
THE INSPECTION AND TEST REPORTS (AS APPLICABLE) PROVIDED REPRESENT THE ACTUAL
ATTRIBUTES OF THE ITEMS FURNISHED ON THIS CONTRACT AND INDICATE FULL
COMPLIANCE WITH ALL CONTRACT REQUIREMENTS. I ATTEST ALL ITEMS FURNISHED ON
THIS CONTRACT ARE IN FULL COMPLIANCE WITH ALL CONTRACT REQUIREMENTS.
SIGNATURE ___________________________________________________ DATE _______________
QUALITY ASSURANCE OFFICIAL
File details come from the government source that posted it. Updated .