20Q0298_Attachment 3_Drawings.pdf

PDF 35 KB Posted

Attached to
Pre-engineered, Self-framing, Relocatable Metal Building
Solicitation number
N3904020Q0298
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AA

SECTION A-A

11 1/2"

3'-0"

3'-6 1/2"

12'-0"

1'-6"

9'-5 1/2" 3'-0"

41'-6 1/2"

21'-0" INTERIOR CLEAR SPAN

54'-0" INTERIOR CLEAR SPAN

11 1/2"

17'-1/2"

3'-0"

B

B

SECTION B-B

THERE IS TO BE A 14' CLEAR

SPAN FLOOR TO ROOF

BETWEEN ANY SUPPORT

BRACES

15'-0"

20'-0" 20'-0"

18'-0"

O 10" SLEEVE

O 6" PENETRATION

O 10" SLEEVE

8'-0"

O 6" PENETRATION

22'-4 1/2" Exterior Dimension

22'-6"

9'-0"

O 8" SLEEVE

55'-4 1/2" EXTERIOR DIMENSION

9'-0"

O 8" SLEEVE

22'-6"O 6" PENETRATION

8'-0"

3'X7'

PERSONNEL DOOR

(OPENS OUT TYP.)

3'X7'

PERSONNEL DOOR

(OPENS OUT TYP.)

3'X7'

PERSONNEL DOOR

(OPENS OUT TYP.)

18' REMOVEABLE ROOF PANEL

WITH LIFTING LUGS

12'X16' ROLL UP

DOOR WITH MANUAL

CHAIN OPERATOR

6" PENETRATIONS ARE TO BE FRAMED

OPENINGS ALL OTHER PENETRATIONS SHALL

BE SLEEVES

FINAL PIER SIDE ENCLOSURE 2
FINAL PIER SIDE ENCLOSURE 3
FINAL PIER SIDE ENCLOSURE

File details come from the government source that posted it. Updated .