UW Tower Elevator Modernization - Bid Specifications Summary
This is a bid specification document issued by the University of Washington Facilities, Project Delivery Group for the modernization of elevator systems at UW Tower in Seattle, Washington. The project involves full modernization of nine electric traction passenger elevators, including one 23-stop gearless overhead traction elevator, five 20-stop gearless overhead traction elevators serving the high-rise tower, and three 5-stop geared overhead traction elevators serving other buildings in the UW Tower complex. Associated electrical and mechanical improvements are required to bring power, lighting, and machine room temperature control to current code standards. Additional work includes new pit ladders for four elevators, temporary hoistway openings for equipment installation, and miscellaneous cutting, patching, and painting. The pre-bid site meeting is scheduled for July 14, 2026, at 7:30 a.m. at UW Tower, 4333 Brooklyn Avenue NE, Seattle, Washington 98105. Sealed bids are due by 3:00 p.m. on July 28, 2026, with public bid opening via Zoom at 3:15 p.m. Part II of the bid form, containing subcontractor information for structural steel and rebar installation, must be submitted within 48 hours of the bid deadline. The architect's estimate is $7,385,000, and the contract award will be to the lowest responsive and responsible bidder.
Bidders must provide a bid guarantee of at least five percent of the base bid in the form of a surety bond, cashier's check, certified check, or cash. All bids must include prevailing wage calculations and comply with Washington State labor and registration requirements, including current contractor registration, UBI number, workers' compensation coverage, and employment security numbers. Mandatory apprentice utilization of at least 15 percent of total labor hours is required, with monetary incentives for exceeding and penalties for not meeting this goal. The University of Washington has established an aspirational goal of 20 percent Business Equity Enterprise (BEE) utilization, inclusive of 15 percent minority and women-owned business participation. Bidders must register with Workday Strategic Sourcing to download documents and submit bids. Prior to contract execution, the successful bidder must submit payment and performance bonds for 100 percent of the contract award amount plus sales tax, evidence of required insurance with minimum coverage limits of $1,000,000 general liability per occurrence and $2,000,000 aggregate, and a company safety program. The contract requires compliance with prevailing wage rates, nondiscrimination requirements, and reporting of subcontractor payments through the Access Equity system on a monthly basis.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT DELIVERY GROUP
UW TOWER ELEVATOR
MODERNIZATION
PROJECT NUMBER: 208453
PROJECT MANUAL
May 15, 2026
Template Last Revised July 25, 2025 Section 00 01 03
UW Tower Elevator Modernization
Project No. 208453 May 15, 2026
UNIVERSITY OF WASHINGTON
Project Delivery Group
VERTICAL TRANSPORTATION
The Greenbusch Group, Inc.
MECHANICAL ENGINEERING
The Greenbusch Group, Inc.
ARCHITECTURAL DESIGN
ScharrerAD
ELECTRICAL ENGINEERING
TFWB
STRUCTURAL ENGINEERING
PCS Structural
UW Project Number 208453 The Greenbusch Group, Inc.
May 15, 2026
Section 00 01 10
TABLE OF CONTENTS
Template Last Revised July 25, 2025
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00 ADVERTISEMENT FOR BIDS
00 21 00 INSTRUCTIONS FOR BIDDERS
00 41 00 BID FORM
00 72 00 UW GENERAL CONDITIONS FOR WASHINGTON STATE FACILITY
CONSTRUCTION
00 73 00 SUPPLEMENTAL CONDITIONS TO THE GENERAL CONDITIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 11 01 SUMMARY OF WORK – REGULATED MATERIALS
01 25 00 SUBSTITUTION PROCEDURES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 29 76 PROGRESS PAYMENT PROCEDURES
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 31 19 PROJECT MEETINGS
01 32 16 CONSTRUCTION PROGRESS SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 00 ELECTRONIC COMMUNICATIONS
01 35 23 OWNER SAFETY REQUIREMENTS
01 42 00 REFERENCES
01 45 00 CONTRACTOR QUALITY CONTROL
01 45 23 TESTING AND INSPECTION SERVICES
01 50 00 TEMPORARY FACILITIES AND CONTROLS.
01 58 00 PROJECT IDENTIFICATION
01 71 23 FIELD ENGINEERING
01 73 29 CUTTING AND PATCHING
01 74 00 CONSTRUCTION WASTE MANAGEMENT
01 75 00 TEST ENGINEER SERVICES
01 77 00 CLOSEOUT PROCEDURES
01 78 36 WARRANTIES
01 91 00 GENERAL COMMISSIONING REQUIREMENTS
APPENDIX A - DIVISION 00 AND 01 FORMS
APPENDIX B - PREVAILING WAGE RATES INFORMATION
APPENDIX C - REGULATED MATERIALS SURVEY – NOT INCLUDED FOR THIS PHASE
The Greenbusch Group, Inc.
May 15, 2026
Section 00 01 10
DIVISION 02 – EXISTING CONDITIONS
02 41 19 REMOVAL AND ALTERATIONS
02 80 00 FACILITY REMEDIATION
02 82 00 ASBESTOS REMOVAL
02 83 00 LEAD CONTROL ACTIVITIES
02 86 00 PCB-CONTAINING BULK MATERIALS
02 90 00 MERCURY-CONTAINING FLUORESCENT LIGHT REMOVAL PROCEDURES
DIVISION 05 – METALS
05 50 00 METAL FABRICATIONS
05 51 50 LADDERS
05 70 00 DECORATIVE METAL
DIVISION 06 – WOODS, PLASTICS & COMPOSITES
06 42 19 PLASTIC LAMINATE WALL PANELS
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 84 13 PENETRATION FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 07 – OPENINGS
08 11 00 STEEL DOORS AND FRAMES
08 70 00 HARDWARE
DIVISION 09 – FINISHES
09 05 11 CONCRETE FLOOR PREPARATION
09 68 13 TILE CARPETING
09 90 00 PAINTING AND COATING
DIVISION 10 – SPECIALTIES
10 44 00 FIRE PROTECTION SPECIALTIES
DIVISION 14 – VERTICAL TRANSPORTATION
14 21 00 ELECTRIC TRACTION ELEVATORS
DIVISION 22 – PLUMBING
22 21 00 PLUMBING PUMPS
DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING
23 05 00 COMMON WORK RESULTS FOR HVAC
The Greenbusch Group, Inc.
May 15, 2026
Section 00 01 10
23 23 00 REFRIGERANT PIPING
23 81 26 SPLIT-SYSTEM HEAT PUMPS
DIVISION 26 – ELECTRICAL
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19 WIRE, CABLE, TERMINATIONS
26 05 26 GROUNDING
26 05 29 HANGERS, SUPPORTS, AND FASTENERS
26 05 33 RACEWAY AND BOXES
26 05 48 VIBRATION AND SEISMIC CONTROL FOR ELECTRICAL
26 05 53 IDENTIFICATION FOR ELECTRICAL
26 24 16 PANELBOARDS
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
DIVISION 28 – FIRE ALARM
28 31 00 FIRE DETECTION AND ALARM SYSTEMS
END OF SECTION
208453 The Greenbusch Group, Inc.
05/15/2026
Section 00 11 00
ADVERTISEMENT FOR BIDS
University of Washington UW Tower Elevator Modernization Bid Due Date:: July 28, 2026 A/E’s estimate: $7,385,000
NOTICE TO CONTRACTORS:
Bid Submittal: Sealed bids are requested by the University of Washington Facilities, Project Delivery Group. Please visit https://university-of-washington.public-portal.us.workdayspend.com/ to view this opportunity. Firms must register on Workday Strategic Sourcing, the UW Facilities electronic bidding system, to download and respond to this advertisement for bids.
Part I of the Bid Form will be received up to 3:00 p.m. on July 28, 2026 Bids will then be publicly opened and read aloud via Zoom only (current version required) https://washington.zoom.us/j/99030498329 at 3:15pm. Part II of the Bid Form will be received within 48 hours of the published bid submittal time as amended by addenda. Bid results will be published to the UW Facilities website including any revisions due to the subcontractor listing. Bids received after the date and hour specified, as amended by addenda, will not receive consideration.
Project Description: The project includes the following work: Full modernization of nine (9) electric traction passenger elevators including one (1) 23-stop gearless overhead traction elevator and five (5) 20-stop gearless overhead traction elevators serving a high-rise tower, as well as three (3) 5-stop geared overhead traction elevators serving the other buildings in the UW Tower complex. The project also includes associated Electrical and Mechanical improvements to bring power, lighting, and machine room temperature control up to current code requirements. It is anticipated that temporary openings in the hoistway wall and ceiling for Elevator 3 will be required in order to move the new elevator equipment into the machine rooms. The scope also includes new pit ladders for Elevators 3, 7, 8, and 9, as well as miscellaneous cutting, patching, and painting related to the scope of work described above. Refer to Phasing Plans regarding anticipated building access routes and phasing of construction.
Questions: Questions about this project should be directed to:
A/E Name: The Greenbusch Group, Inc.
Contact Person: Richard Frederick Phone Number: 206-644-1364
Pre-Bid Site Meeting: The Project site is available for inspection by prospective bidders at a pre-bid site meeting and walk-through at 7:30am on July 14, 2026 at UW Tower 4333 Brooklyn Ave NE, Seattle, WA 98105.
Bid Documents: Bid documents may be viewed without registration. Bidders are required to register with Workday Strategic Sourcing in order to download plans, specifications, and addenda for this Project, and to submit their bid. To register, go to https://go.scoutrfp.com.
Bid Guarantee: A surety company bid bond on a form acceptable to Owner, a cashier's check or a certified check payable to the order of University of Washington, or cash, shall accompany each bid in an amount not less than five percent (5%) of the Base Bid. No bidder may withdraw its bid after the bid due date and time, unless the award of the contract is delayed for a period exceeding 60 days.
https://urldefense.com/v3/__https:/university-of-washington.public-portal.us.workdayspend.com/__;!!K-Hz7m0Vt54!nh6jHpgB_Meu9adIAkycoOYRSdUKJhoHo3hu1-u7ElXHoGatWffhw4FThsGTX91jO67Tto_UQ1mJII0$ https://washington.zoom.us/j/99030498329 https://go.scoutrfp.com/rfps/public/278462
The Greenbusch Group, Inc.
05/15/2026
Section 00 11 00
Subcontractor Payment Reporting Requirements: The awarded Contractor is obligated to complete the vendor registration in Access Equity. Access Equity is a secure online vendor management system (B2Gnow). Confidential information (Tax ID, etc.) will not be published. Prime Contractors that have previously registered with B2Gnow for any public entity must verify the system has updated information.
Contractors can access the system at https://omwbe.diversitycompliance.com/ or through a direct link on the Office of Minority and Women’s Business Enterprises (OMWBE) website at:
https://omwbe.wa.gov/. Every month the Prime Contractor is required to report payments made to all Subcontractors and Subconsultants through the Access Equity system. This monthly reporting information includes total payment in dollars made to the Subcontractor and Subconsultant, payment dates, and any additional information required to verify payment to Subcontractors and Subconsultants. The Prime Contractor will enter this payment information into the Access Equity system, and the Subcontractors and Subconsultants will verify this payment information in the system. Online training is available through the Access Equity/B2Gnow system. This requirement applies to both Prime Contractors, Subcontractors, and Subconsultants.
Apprentice Utilization: Mandatory apprentice utilization of at least 15% of the total labor hours worked on the contract is required. Apprentices must be registered as apprentices with the State Apprenticeship and Training Council. Bidders may contact the Department of Labor & Industries, Apprenticeship Program at 360-902-5320 to obtain information on apprenticeship programs. The Contract includes monetary incentives for meeting the goals, and monetary penalties for not meeting the goals. The costs associated with meeting these requirements are included in the bid amount. Prior to issuance of the Notice to Proceed, the Contractor will be required to submit to the Owner an Apprenticeship Utilization Plan.
Business Equity: The University of Washington is committed to providing optimal opportunity for participation in contracting by Business Equity Enterprises (BEE). The University of Washington defines a Business Equity Enterprise (BEE) as “any entity licensed to do business in the State of Washington, including a corporation, partnership, sole proprietorship, or other legal entity that meets any of the following:”
Certified Business Enterprise (CBE): Any business enterprise certified with the Washington State Office of Minority and Women’s Business Enterprises.
Lesbian/Gay/Bisexual/Transgender Business Enterprise (LGBTBE): More than 50% owned and controlled by at least one person who is a member of the LGBT community.
Minority Business Enterprise (MBE): More than 50% owned and controlled by at least one person who is a member of one or more of the following minority groups:
• Asian Pacific American
• Black American
• Hispanic American
• Native American
• Subcontinent Asian American
Minority Women’s Business Enterprise (MWBE): More than 50% owned and controlled by at least one woman who is a member of one or more of the above minority groups.
Small Business Enterprise (SBE): A business entity that:
• Can attest that it is owned and operated independently from all other businesses and
• Conforms to the U.S. Small Business Administration Size Standards of the North American
Industry Classification System (NAICS) Codes in which it is to be engaged at the UW; or
• Is certified with the OMWBE.
https://omwbe.diversitycompliance.com/ https://omwbe.wa.gov/
The Greenbusch Group, Inc.
05/15/2026
Section 00 11 00
Veteran’s Business Enterprise (VBE): Certified with the Washington State Department of Veteran’s Affairs (DVA).
Women’s Business Enterprise (WBE): More than 50% owned and controlled by one or more women.
The University of Washington has determined that an overall aspirational goal of 20% Business Equity Enterprise (BEE) utilization, inclusive of 15% minority and women-owned business utilization, is practicable and attainable on this construction project; that goal is negotiable based upon the specialized nature of the work and the relative availability of BEE to perform the specific work scopes identified in this project. The University of Washington welcomes the participation of all BEE, irrespective of gross revenues, including those that are self-designated and those that are state (OMWBE) certified.
Participation may be on a direct basis in response to this invitation to bid, or as a subcontractor or supplier.
Safety Plans: Prior to the issuance of the Notice to Proceed, the Contractor will be required to submit to the Owner a copy of its company safety program. See Modifications to the General Conditions, Part 5 for details.
The Owner reserves the right to reject any or all bids and to waive as an informality any irregularities in the bids received.
Date(s) of Publication: June 26, 2026 smarriot Highlight smarriot Typewritten Text June 29, 2026
The Greenbusch Group, Inc.
May 15, 2026
Section 00 21 00
INSTRUCTIONS FOR BIDDERS
1. CONTRACTOR'S REGISTRATION
All bidders at the time of bid submittal must be registered by the Washington State Department of Labor and Industries in accordance with 18.27 RCW, 18.106 RCW, 19.28 RCW, and 70.87 RCW.
2. SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK
A. Bidder acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the Work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the Work or its cost.
B. The Project site is available for inspection for prospective bidders at a pre-bid site meeting and walk-through, as indicated in the Advertisement for Bids, and existing conditions should be examined. This will be the only opportunity for bidders to visit the project site.
C. Bidder acknowledges that it has satisfied itself as to the character, quality and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by Owner, as well as from the drawings and specifications made a part of these Contract Documents.
D. Bidder acknowledges that adjoining areas will be conducting normal operations during the work.
Bidder should anticipate pedestrian and traffic congestion, limited parking, and the requirement that the work be coordinated with ongoing operations.
E. Bidder acknowledges that its bid is based upon a schedule and assumptions which incorporate these conditions.
F. Owner assumes no responsibility for any conclusions or interpretations made by bidder based on the information made available by Owner. Should a bidder find discrepancies or omissions in the drawings or specifications, or should bidder be in doubt as to their meaning, bidder shall at once notify the Owner. If appropriate, Owner will send written instructions to all bidders by addenda.
Questions received less than 5days before the bid due date and time may not be answered. All addenda issued shall be incorporated into these Contract Documents.
3. PREPARATION OF BIDS
Bidder shall comply with the following instructions in preparing its bid.
A. The name, address, and Contractor's license number of bidder shall be typed or printed on the bid in the space provided. The name must match the name on the bid guarantee.
Bids must be (1) submitted on the forms furnished by Owner or on copies of those forms, and (2) signed by the bidder.
B. Bidders shall submit bids in the format provided in the Bid Form. Only the amounts and information asked for in the Bid Form furnished will be considered as the bid. All blank spaces must be filled in.
C. Bidder shall bid upon all alternates indicated in the Bid Form. When bidding on alternates for which there is no charge, bidder shall write the words "No Charge" in the space provided on the Bid Form. If a bidder fails to bid an alternate, or notes "no bid," it will be construed as meaning that there will be no change in the Contract Sum and that the alternate is included in the Contract Sum. Alternate bids will not be considered unless requested in the Bid Form.
The Greenbusch Group, Inc.
May 15, 2026
Section 00 21 00
D. Bidder shall provide the names of the licensed subcontractors and proof of license with whom the bidder, if awarded the contract, will subcontract for the performance of the work of: HVAC (heating, ventilation and air conditioning), plumbing as described in chapter 18.106 RCW, and electrical as described in chapter 19.28 RCW, or to name itself for the work if it is licensed to perform the work for which it has named itself. Errors identified by the Owner in the proof of license information must be corrected by the bidder within 48 hours of bid submission. The Bidder shall not list more than one subcontractor for each category of work identified, unless subcontractors vary with bid alternates, in which case the bidder must indicate which subcontractor will be used for which alternate. Failure of the bidder to submit as part of the bid the names of such subcontractors or to name itself to perform such work or the naming of two or more subcontractors to perform the same work shall render the bidder’s bid nonresponsive and, therefore, void. The requirement of this section to name the bidders’ proposed heating, ventilation and air conditioning, plumbing and electrical subcontractors applies only to subcontractors who will contract directly with the Bidder.
E. Bidder shall submit with within 48 hours of the published bid submittal time, as amended by addenda, Part II of its Bid Form, the names of the subcontractors with whom the bidder, if awarded the contract, will subcontract for performance of the work of structural steel installation and rebar installation. Failure of the bidder to submit Part II of the Bid Form within the required timeline shall render the bidder’s bid nonresponsive, and therefore, void. Part II of the Bid Form shall be emailed to PDGbids@uw.edu.
F. The cost of trench safety systems for trench excavation that exceeds a depth of four feet must be identified as a lump sum amount on the Bid Form as well as included in the Base Bid amount.
The costs of trench safety systems shall not be considered as incidental to any other contract item, and any attempt to include the trench safety systems as an incidental cost is prohibited.
Identification of this amount is an acknowledgment that the bidder has considered proper safety provisions in the estimate but does not relieve the bidder of responsibility for full compliance with all laws and statutes regardless of their actual cost. If this project will involve trench excavation in excess of a depth of four feet, bidder must include a lump sum dollar amount. “N/A” and ‘zero” are not responsive.
G. Bidders shall acknowledge all addenda by identifying the addendum number(s) in the space provided on the Bid Form. Notwithstanding any automatic notification methods utilized by Bidder, Bidder is responsible for checking Owner’s Workday Strategic Sourcing website for any addenda issued up to and until the bid due date and time specified in Section 00 11 00.
H. Bidder shall include in the bid all allowances provided in the Bid Form. Owner will pay the difference if the actual cost exceeds the allowance.
4. TAXES
The bid shall include all taxes imposed by law except Washington State Sales Tax. Sales tax shall not be included in the bid price, except that the retail sales tax upon sales and rentals to prime contractors and subcontractors of tools, equipment, and material primarily for use by the Contractor rather than for resale as a component part of the finished structure, shall be included in the bid price. A proportionate amount of State sales tax will be added to each progress payment, collected from Owner, and paid to the State by Contractor.
5. BID GUARANTEE
Bidder shall furnish a bid guarantee in the form of a firm commitment, such as bid bond, postal money order, cash or cashier's check payable to Owner, in the amount of at least 5% of the base bid. Owner reserves the right to hold the bid guarantees of all bidders until the successful bidder has entered into the contract and furnished the required bonds and insurance certificates, or for a period of 60 days, whichever is the shorter time.
The Greenbusch Group, Inc.
May 15, 2026
Section 00 21 00
6. FILING FEES
Applicable state laws concerning prevailing wages, hours, workers' compensation and other conditions of employment are called to the attention of bidders for their compliance. Bidder shall include in the bid any filing fees required to comply with applicable labor laws.
7. SPECIFIED PRODUCTS
Bids must be based upon use of items named in the specifications, or approved equals or substitutions.
In certain cases, specific items have been named because of operational or maintenance considerations; approval of equals or substitutions should not be assumed.
Requests for approval of equals or substitutions must be made in writing and received by the A/E at least 5 days prior to the date of bid due date and time . Said request must include complete descriptions, technical data, and performance records. Any approval of the proposed equal or substitution will be made by addendum issued to all bidders. See Section 01 25 00, Substitution Procedures, for instructions.
8. SUBMISSION AND WITHDRAWAL OF BIDS
A. Bids and bid modifications shall be submitted in Workday Strategic Sourcing or as specified in the Advertisement for Bids.
B. Part II of the Bid Form may be modified by emailing a revised Part II if received prior to the deadline for submittal of Part II.
C. Receipt of bids and bid modifications by telegraph, facsimile, telephone, or orally will not be considered, with the exception of Part II of the Bid Form, which must be submitted by email to PDGbids@uw.edu when required.
D. A bidder may withdraw its bid through Workday Strategic Sourcing website before the bid due date and time..
9. LATE SUBMISSIONS
A. Any bid, bid modification or request to withdraw a bid which is received after the deadlines set forth herein will not be considered.
B. The only acceptable evidence to establish the time of receipt is when the submission is received and logged by Workday Strategic Sourcing or other documentary evidence of receipt maintained by Owner.
10. BID EVALUATION
Bids which are incomplete, or which are conditioned in any way, or which contain erasures, alterations, or items not called for in the Bid Form, or which are not in conformity with the law or with these Instructions, shall be rejected as nonresponsive if the irregularity is material and may be rejected as nonresponsive if the irregularity is not material. Failure to submit Part II of the Bid Form within the allotted times as described in the Advertisement for Bid, Section 00 11 00, shall render the entire bid nonresponsive.
After the public bid reading, bids will be checked for correctness of bid item price extensions and the total bid price. A discrepancy between the bid item price and the extended amount of any bid item shall be resolved by accepting the bid unit price as correct. The summation of extensions, corrected where necessary, will be used for the purposes of determining the low bidder.
mailto:PDGbids@uw.edu
The Greenbusch Group, Inc.
May 15, 2026
Section 00 21 00
The Bid Form identifies line items for unit bid amounts for time and material pricing (Column A). Each line item includes a column (Column B) with estimated quantities to be used for bid evaluation. The final column (Column C) is the cost extension resulting from multiplying the Bidder’s unit bid amounts (Column A) by the estimated quantity (Column B). The bidder shall complete Columns A and C and total all amounts in Column C to obtain the total base bid amount. All extensions, and the total base bid amount, will be verified and corrected, if required, by the Owner before award.
If the bid includes a supplemental schedule of unit prices for labor and materials, or other items for the purpose of establishing a cost basis for unforeseen contract changes, Owner reserves the right to reject, without impairing the balance of the bid, any or all such predetermined unit prices.
Owner reserves the right to reject any or all bids and to waive any informalities or nonmaterial irregularities in the bids received.
The determination of the low responsive bid shall be made by Owner based upon any combination of the base bid and alternates which, in Owner's sole discretion, is in Owner's best interest considering price, schedule and other factors. The numbering of the alternates in the Bid Form bears no relationship to the order in which the alternates may be selected by Owner.
In accordance with RCW 39.04.380, for a public works bid received from a nonresident contractor from a state that provides an in-state percentage bidding preference, a Comparable Percentage Disadvantage (CPD) will be applied to the bid of that nonresident contractor. The CPD is the percent advantage provided by the nonresident contractor’s home state. For the purpose of determining the successful bidder, Owner will multiply the nonresident contractor bid amount by the CPD. The “bid amount” shall be the total of the base bid and all accepted alternate bid items. The CPD shall be added to the nonresident contractor bid amount to establish the Nonresident Disadvantage Total. The Nonresident Disadvantage Total shall be compared to the Washington state contractor bid amounts.
See example below:
Alaska Nonresident Contractor Bid Amount $100,000 Multiplied by the Alaska CPD x 0.05
Alaska CPD Total $ 5,000
Alaska Nonresident Contractor Bid Amount $100,000 Alaska CPD Total + $5,000
Nonresident Disadvantage Total $105,000
If the Nonresident Disadvantage Total is lower than all other Washington contractor bid amounts, the Alaska nonresident contractor is the low bidder and will be awarded a contract for the bid amount of $100,000, provided that they are determined to be a responsive and responsible bidder.
If the Nonresident Disadvantage Total is higher than a Washington contractor bid amount, the Washington bidder will be awarded a contract for the bid amount, provided that they are determined to be a responsive and responsible bidder.
11. LOW RESPONSIBLE BIDDER
A. It is the intent of Owner to award a contract to the low responsible bidder. Before award, the bidder must meet the following bidder responsibility criteria to be considered a responsible bidder. The bidder may be required by the Owner to submit documentation demonstrating compliance with the criteria. The bidder must:
1. Have a current certificate of registration in compliance with chapter 18.27 RCW, 18.106 RCW, 70.87 RCW or 19.28 RCW which must have been in effect at the time of bid submittal.
The Greenbusch Group, Inc.
May 15, 2026
Section 00 21 00
2. Have a current Washington Unified Business Identifier (UBI) number.
3. If applicable:
a. Have Industrial Insurance (workers’ compensation) coverage for the bidder’s employees working in Washington, as required in Title 51 RCW;
b. Have a Washington Employment Security Department number, as required in Title 50
RCW;
c. Have a Washington Department of Revenue state excise tax registration number, as required in Title 82 RCW.
4. Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3).
5. If applicable, provide evidence of the required contractor training from Washington State Department of Labor & Industry. Chapter 39.04.350 and 39.06.020 RCW.
6. Within the three-year period immediately preceding the date of the bid solicitation, not have been determined by a final and binding citation and notice of assessment issued by the Washington Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of Chapter 49.46, 49.48, or 49.52 RCW.
7. Not have been found out of compliance by the Washington state apprenticeship and training council for working apprentices out of ratio, without appropriate supervision, or outside their approved work processes as outlined in their standards of apprenticeship under chapter
49.04 RCW for the one-year period immediately preceding the first date of advertising for this project.
12. CONTRACT AWARD AND EXECUTION
The formal acceptance by the Owner of the lowest responsive bid of a responsible bidder will be in the form of a notice of award of public works contract issued by the Owner to the bidder. Within 7 calendar days of the notice of award date, bidder shall submit an executed Contract (see Appendix A); certificate of insurance and endorsements as required in the Contract Documents; and Payment and Performance Bonds using AIA Document A312, most current edition, or other form acceptable to Owner, in Contract Award Amount plus Washington State Sales Tax. If the successful bidder, after award of the Contract, fails to execute all Contract Documents or provide insurance documentation and bonds as required within the time specified, Owner may revoke award of the Contract and the bid guarantee may be retained by Owner.
The Greenbusch Group, Inc.
May 15, 2026
Section 00 41 00
BID FORM
Template Last Revised February 1, 2023 Initials of Bidder's Representative
TO: Board of Regents University of Washington Seattle, Washington 98195
The undersigned Bidder submits the following bid:
BASE BID:
Pursuant to and in compliance with the Contract Documents, including the Advertisement for Bids and Instructions for Bidders, the Bidder hereby certifies that it has carefully examined the Contract Documents entitled:
UW Tower Elevator Modernization
Prepared by The Greenbusch Group, Inc.
and the conditions affecting the Work, and being familiar with the site; and having made the necessary examinations, proposes to furnish all labor, materials, equipment, and services necessary to complete the Work in strict accordance with the Contract Documents for the above-named project for the following sum, which is hereby designated as the Base Bid:
Base Bid
SUBCONTRACT LISTING REQUIREMENT (Per new law effective July 27, 2025):
HVAC, PLUMBING, ELECTRICAL: List here the names of the licensed subcontractors and proof of license with whom the Bidder, if awarded the contract, will subcontract for performance of the work of HVAC, plumbing (as described in chapter 18.106 RCW) and electrical (as described in chapter 19.28 RCW), or to name itself for the work if it is licensed to perform the work for which it has named itself. Errors identified by the Owner in the proof of license information must be corrected by the bidder within 48 hours of submission. Substitution of any listed subcontractor may only be according to the procedure and parameters set forth in RCW 39.30.060.
Bidder shall not list more than one subcontractor for each trade identified unless subcontractors vary with bid alternates, in which case the Bidder must indicate which subcontractor will be used for which alternate.
Failure of the Bidder to list the NAMES AND LICENSE NUMBERS of such subcontractors shall render the bid nonresponsive, and therefore, void.
The Greenbusch Group, Inc.
May 15, 2026
Section 00 41 00
Trade You must check one box for each trade. If subcontracting, you must name the subcontractor(s) you will use and the category of work.
Heating, Ventilation & Air Conditioning (HVAC)
BASE BID
Name of Sub:
License No.
Category of Work:
Bidder will self-perform this work. Bidder License No._________
N/A (Owner determined this project does not include this work)
Heating, Ventilation & Air Conditioning (HVAC)
BID ALTERNATE NO. 1
Name of Sub:
License No.
Category of Work:
Bidder will self-perform this work. Bidder License No._________
N/A (Owner determined this project does not include this work)
Heating, Ventilation & Air Conditioning (HVAC)
BID ALTERNATE NO. 2
Name of Sub:
License No.
Category of Work:
Bidder will self-perform this work. Bidder License No._________
N/A (Owner determined this project does not include this work)
Plumbing
BASE BID
Name of Sub:
License No.
Category of Work:
Bidder will self-perform this work. Bidder License No._________
N/A (Owner determined this project does not include this work)
Plumbing
BID ALTERNATE NO. 1
Name of Sub:
License No.
Category of Work:
Bidder will self-perform this work. Bidder License No._________
N/A (Owner determined this project does not include this work)
Plumbing
BID ALTERNATE NO. 2
Name of Sub:
License No.
Category of Work:
Bidder will self-perform this work. Bidder License No._________
N/A (Owner determined this project does not include this work)
The Greenbusch Group, Inc.
May 15, 2026
Section 00 41 00
Electrical
BASE BID
Name of Sub:
License No.
Category of Work:
Bidder will self-perform this work. Bidder License No._________
N/A (Owner determined this project does not include this work)
Electrical
BID ALTERNATE NO. 1
Name of Sub:
License No.
Category of Work:
Bidder will self-perform this work. Bidder License No._________
N/A (Owner determined this project does not include this work)
Electrical
BID ALTERNATE NO. 2
Name of Sub:
License No.
Category of Work:
Structural Steel Installation and Rebar Installation: RCW 39.30.060.1.b, requires the bidder to submit within forty-eight hours of the published bid submittal time, as amended by addenda, the names of the subcontractors with whom the Bidder will subcontract for the performance of the work of structural steel installation and rebar installation.
Please indicate whether the bidder intends to submit Part II of the Bid Form, names of subcontractors for the structural steel installation and rebar installation along with Part I of the Bid Form, or will submit Part II of the Bid Form within forty-eight hours.
Bidder has submitted Part II with Bid
Bidder will submit Part II within 48 hours of the bid submittal deadline
Failure of the Bidder to list the NAMES AND LICENSE NUMBERS of such subcontractors shall render the bid nonresponsive, and therefore, void.
SALES TAX:
None of the sums stated in the foregoing include Washington State Sales Tax, except as designated in Article 4 of the Instructions for Bidders.
The Greenbusch Group, Inc.
May 15, 2026
Section 00 41 00
TIME OF COMPLETION AND LIQUIDATED DAMAGES:
The undersigned Bidder agrees, if awarded the Contract, to complete the Work of the Contract within the number of calendar days specified in Supplemental Conditions, Section 00 73 00, and also agrees to the amounts specified for Liquidated Damages. It is further agreed that the time for completion of the Work described herein is a reasonable time considering the average climatic range and usual industrial conditions prevailing in the locality.
TRENCH EXCAVATION SAFETY PROVISIONS:
If the Contract Documents contain any work which requires trenching exceeding a depth of four feet, all costs for adequate trench safety systems shall be identified as a separate bid item in compliance with Chapter 39.04 RCW and WAC 296-155-650. The purpose of this provision is to ensure that the Bidder agrees to comply with all the relevant trench safety requirements of Chapter 49.17 RCW. This bid amount shall be considered as part of the Base Bid set forth above. Bidder must include a lump sum dollar amount in blank below (even if the value is $0.00) to be responsive.
Trench Excavation Safety Provisions Only: N/A
CONTRACT AND BONDS:
If the Owner awards a contract based on this bid within sixty (60) days of the bid submittal deadline, the Bidder agrees to execute a contract for the above work, for compensation computed from the above stated sums, on the University of Washington Public Works Contract form, and to furnish Payment and Performance Bonds and acceptable evidence of insurance as required by the Contract Documents.
BID GUARANTEE:
Pursuant to paragraph 5 of the Instruction to Bidders, Section 00 21 00, Bidder hereby certifies that it has furnished a bid guarantee for no less than 5% of the base bid, and that such guarantee accompanies this Bid Form.
The successful bidder shall submit an executed Contract, Payment and Performance Bonds, and acceptable evidence of insurance within seven (7) calendar days after receipt of award notice and Public Works Contract form from the Owner. If the successful bidder, upon award of a contract by the Owner, fails to execute the Public Works Contract or submit the Payment and Performance Bonds and acceptable evidence of insurance as required within the time specified, Owner may revoke the award.
Should the successful bidder fail to enter into a contract with Owner, the bid guarantee may be retained by Owner as liquidated damages, not as a penalty.
If a contract is not awarded within sixty (60) days after the bid submittal deadline, or if the bidder delivers a signed Public Works Contract, Payment and Performance Bonds, and acceptable evidence of insurance, then the certified or cashier’s check or cash submitted as the bid guarantee shall be returned to the bidder, or the Bid Bond shall become void.
The Greenbusch Group, Inc.
May 15, 2026
Section 00 41 00
DECLARATION:
Bidder acknowledges that they are in compliance with all of the responsible bidder requirements under RCW 39.04.350, including: having a certificate of registration under RCW 18.27 prior to bidding; a UBI number; industrial insurance coverage if required under Title 51 RCW; an employment security number under Title 50; and a state excise tax registration number under Title 82 and have received training on requirements related to public works and prevailing wage by Labor and Industries or approved training provider under RCW 39.04.350, and chapter 39.12 or are exempted by Labor and Industries. https://secure.lni.wa.gov/verify. Bidder affirms they are not disqualified from bidding on any public works contract under RCW 39.06 or RCW 39.12.065(3) or on the System for Award Management, (sam.gov). Bidder will provide proof of these requirements if requested.
Bidder agrees to adhere to the non-discrimination requirements during the bidding and performance of the Work as required by Section 5.06 of the General Conditions.
Bidder’s Business Name:
Type of Business:
Sole Proprietorship Partnership Corporation (State of Incorporation:___) Other
Physical Business Address (Must not be a P.O. Box):
Owner: State: Zip Code:
Business Telephone Number: Business Fax Number: Business E-mail Address:
State of Washington numbers for the following:
Contractor Registration No.: UBI No.: Employment Security Dept. No.:
Receipt is hereby acknowledged of Addenda No(s).: _____ _____ _____ _____ _____ _____
The Greenbusch Group, Inc.
May 15, 2026
Section 00 41 00
OFFICIAL AUTHORIZED TO SIGN FOR BIDDER:
"I certify (or declare) under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct":
Signature: Date:
Print Name and Title Location or Place Executed: (Owner, State)
The Greenbusch Group, Inc.
May 15, 2026
Section 00 41 00
BID FORM PART II:
• PART II: (To be submitted by email to PDGbids@uw.edu within forty- eight hours of the bid submittal date and time indicated in Section 00 11 00)or as amended in addenda.
Bidder’s Business Name:_________________________________________________________
A. Structural Steel Installation, and Rebar Installation subcontractors
List here the names of the subcontractors with whom the Bidder, if awarded the contract, will subcontract for performance of the work of structural steel installation, rebar installation, or to name itself for the work if it is licensed to perform the work for which it has named itself. Substitution of any listed subcontractor may only be according to the procedure and parameters set forth in RCW 39.30.060.
Trade You must check one box for each trade. If subcontracting, you must name the subcontractor(s) you will use and the category of work.
Structural Steel Installation
Name of Sub:
License No.
Category of Work:
Bidder will self-perform this work. Bidder License No. __________
N/A (Owner determined this project does not include this work)
Structural Steel Installation
BID ALTERNATE NO. 1
Name of Sub:
License #
Category of Work:
Bidder will self-perform this work. Bidder License No. __________
N/A (Owner determined this project does not include this work)
Structural Steel Installation
BID ALTERNATE NO. 2
Name of Sub:
License No.
Category of Work:
Bidder will self-perform this work. Bidder License No.___________ mailto:PDGbids@uw.edu
The Greenbusch Group, Inc.
May 15, 2026
Section 00 41 00
Rebar Installation 1
Base Bid
Name of Sub:
License No.
Category of Work:
Bidder will self-perform this work. Bidder License No._________
N/A (Owner determined this project does not include this work)
Rebar Installation
BID ALTERNATE NO. 1
Name of Sub:
License No.
Category of Work:
Bidder will self-perform this work. Bidder License No._________
N/A (Owner determined this project does not include this work)
Rebar Installation
BID ALTERNATE NO. 2
Name of Sub:
License No.
Category of Work:
Section 00 72 00
UW GENERAL CONDITIONS
FOR WASHINGTON STATE FACILITY CONSTRUCTION
July 2025
Section Description Page
PART 1 – GENERAL PROVISIONS
1.01 Definitions…………………………………………………………………………………
1.02 Order of Precedence……………………………………………………………………….. 5
1.03 Execution and Intent……………………………………………………………………….. 5
PART 2 – INSURANCE AND BONDS
2.01 Contractor’s Liability Insurance…………………………………………………………
2.02 Coverage Limits…………………………………………………………………………….. 8
2.03 Insurance Coverage Certificates………………………………………………………….. 8
2.04 Payment and Performance Bonds………………………………………………………… 9
2.05 Alternative Surety…………………………………………………………………………… 9
2.06 Builder’s Risk………………………………………………………………………………… 9
PART 3 – TIME AND SCHEDULE
3.01 Progress and Completion………………………………………………………………….. 9
3.02 Construction Schedule……………………………………………………………………… 10
3.03 Owner’s Right to Suspend the Work for Convenience………………………………….. 10
3.04 Owner’s Right to Stop the Work for Cause……………………………………………
3.05 Delay…………………………………………………………………………………………. 11
3.06 Notice to Owner of Labor Disputes……………………………………………………….. 12
3.07 Damages for Failure to Achieve Timely Completion……………………………………. 12
PART 4 – SPECIFICATIONS, DRAWINGS, AND OTHER DOCUMENTS
4.01 Discrepancies and Contract Document Review…………………………………………. 13
4.02 Project Record………………………………………………………………………………. 13
4.03 Shop Drawings………………………………………………………………………………. 14
4.04 Organization of Specifications……………………………………………………………... 15
4.05 Ownership and Use of Drawings, Specifications & other Documents………………
PART 5 – PERFORMANCE
5.01 Contractor Control and Supervision………………………………………………………. 15
5.02 Permits, Fees and Notices…………………………………………………………………. 16
5.03 Patents and Royalties………………………………………………………………………. 17
5.04 Prevailing Wages……………………………………………………………………………. 17
5.05 Hours of Labor………………………………………………………………………………. 18
5.06 Nondiscrimination…………………………………………………………………………… 18
5.07 Safety Precautions………………………………………………………………………….. 19
5.08 Operations, Material Handling, and Storage Areas……………………………………… 21
5.09 Prior Notice of Excavation………………………………………………………………….. 21
5.10 Unforeseen Physical Conditions…………………………………………………………... 22
5.11 Protection of Existing Structures, Equipment, Vegetation, Utilities, & Improvements. 22
5.12 Layout of Work………………………………………………………………………………. 22
5.13 Material and Equipment…………………………………………………………………….. 22
5.14 Availability and Use of Utility Services……………………………………………………. 23
5.15 Tests and Inspections………………………………………………………………………. 23
5.16 Correction of Nonconforming Work……………………………………………………….. 24
5.17 Clean Up……………………………………………………………………………………… 25
5.18 Access to Work……………………………………………………………………………… 25
5.19 Other Contracts……………………………………………………………………………… 25
5.20 Subcontractors and Suppliers……………………………………………………………… 25
5.21 Warranty of Construction…………………………………………………………………… 27
UW GENERAL CONDITIONS
FOR WASHINGTON STATE FACILITY CONSTRUCTION
PART 5 – PERFORMANCE (continued)
5.22 Indemnification………………………………………………………………………………. 27
PART 6 – PAYMENTS AND COMPLETION
6.01 Contract Sum………………………………………………………………………………… 28
6.02 Schedule of Values…………………………………………………………………………. 28
6.03 Application for Payment…………………………………………………………………….. 28
6.04 Progress Payments…………………………………………………………………………. 29
6.05 Payments Withheld…………………………………………………………………………. 29
6.06 Retainage and Bond Claim Rights………………………………………………………… 30
6.07 Substantial Completion……………………………………………………………………... 30
6.08 Prior Occupancy…………………………………………………………………………….. 30
6.09 Final Completion, Acceptance, and Payment……………………………………………. 30
PART 7 – CHANGES
7.01 Change in the Work………………………………………………………………………… 31
7.02 Change in the Contract Sum………………………………………………………………. 32
7.03 Change in the Contract Time………………………………………………………………. 39
PART 8 – CLAIMS AND DISPUTE RESOLUTION
8.01 Claims Procedure…………………………………………………………………………… 41
8.02 Litigation……………………………………………………………………………………. 42
8.03 Claims Audits………………………………………………………………………………… 42
PART 9 – TERMINATION OF THE WORK
9.01 Termination by Owner for Cause………………………………………………………….. 44
9.02 Termination by Owner for Convenience………………………………………………….. 45
PART 10 – MISCELLANEOUS PROVISIONS
10.01 Governing Law………………………………………………………………………………. 46
10.02 Successors and Assigns…………………………………………………………………… 46
10.03 Business Equity Requirements……………………………………………………………. 46
10.04 Meaning of Words…………………………………………………………………………… 48
10.05 Rights and Remedies……………………………………………………………………….. 48
10.06 Contractor Registration……………………………………………………………………... 48
10.07 Time Computations…………………………………………………………………………. 48
10.08 Records Retention…………………………………………………………………………... 48
10.09 Third-Party Agreements……………………………………………………………………. 48
10.10 Antitrust Assignments………………………………………………………………………. 48
10.11 Headings and Captions…………………………………………………………………….. 49
GENERAL CONDITIONS
FOR WASHINGTON STATE FACILITY CONSTRUCTION
PART 1 – GENERAL PROVISIONS
1.01 DEFINITIONS
A. “Application for Payment” means a written request submitted by Contractor to A/E for payment of Work completed in accordance with the Contract Documents and approved Schedule of Values, supported by such substantiating data as Owner or A/E may require.
B. “Architect,” “Engineer,” or “A/E” means a person or entity lawfully entitled to practice architecture or engineering, representing Owner within the limits of its delegated authority.
C. Diverse Businesses:
Certified Business Enterprise (CBE): Any business enterprise certified with the Washington State Office of Minority and Women’s Business Enterprises (OMWBE), Northwest Mountain Minority Supplier
Diversity Council (NWMMSDC), or Women's Business Enterprise Council (WBEC).
Lesbian/Gay/Bisexual/Transgender Business Enterprise (LGBTBE): More than 50% owned and controlled by at least one person who is a member of the LGBT community.
Minority Business Enterprise (MBE): More than 50% owned and controlled by at least one person who is a member of one or more of the following minority groups:
• Asian Pacific American
• Black American
• Hispanic American
• Native American
• Subcontinent Asian American
Minority Women’s Business Enterprise (MWBE): More than 50% owned and controlled by at least one woman who is a member of one or more of the above minority groups.
Small Business Enterprise (SBE): A business entity that:
• Can attest that it is owned and operated independently from all other businesses and
• Conforms to the U.S. Small Business Administration Size Standards of the North American Industry
Classification System (NAICS) Codes in which it is to be engaged at the UW; or
• Is certified with the OMWBE.
Veteran’s Business Enterprise (VBE): Certified with the Washington State Department of Veteran’s
Affairs (DVA)
Women’s Business Enterprise (WBE): More than 50% owned and controlled by one or more women.
D. “Change Order” means a written instrument signed by Owner and Contractor stating their agreement upon all of the following: (1) a change in the Work; (2) the amount of the adjustment in the Contract Sum, if any, and (3) the extent of the adjustment in the Contract Time, if any.
GENERAL CONDITIONS
E. “Claim” means Contractor’s exclusive remedy for resolving disputes with Owner regarding the terms of a Change Order or a request for equitable adjustment, as more fully set forth in Part 8.
F. “Contract Award Amount” is the sum of the Base Bid and any accepted Alternates.
G. “Contract Documents” means the Advertisement for Bids, Instructions for Bidders, completed Bid Form, General Conditions, Modifications to the General Conditions, Supplemental Conditions, Public Works Contract, other Special Forms, Drawings and Specifications, and all addenda and modifications thereof.
H. “Contract Sum” is the total amount payable by Owner to Contractor, for performance of the Work in accordance with the Contract Documents, including all taxes imposed by law and properly chargeable to the Work, except Washington State sales tax.
I. “Contract Time” is the number of calendar days allotted in the Contract Documents for achieving
Substantial Completion of the Work.
J. “Contractor” means the person or entity who has agreed with Owner to perform the Work in accordance with the Contract Documents.
K. “Day(s): Unless otherwise specified, day(s) shall mean calendar day(s).”
L. “Drawings” are the graphic and pictorial portions of the Contract Documents showing the design, location, and dimensions of the Work, and may include plans, elevations, sections, details, schedules, and diagrams.
M. “Final Acceptance” means the written acceptance issued to Contractor by Owner after Contractor has completed the requirements of the Contract Documents, as more fully set forth in Section
6.09 B.
N. “Final Completion” means that the Work is fully and finally complete in accordance with the Contract
Documents, as more fully set forth in Section 6.09 A.
O. “Force Majeure” means those acts entitling Contractor to request an equitable adjustment in the Contract
Time, as more fully set forth in paragraph 3.05A.
P. “Notice” means a written notice which has been delivered in person to the individual or a member of the firm or entity or to an officer of the corporation for which it was intended or, if delivered or sent by registered or certified mail, to the last business address known to the party giving notice.
Q. “Notice to Proceed” means a notice from Owner to Contractor that defines the date on which the Contract Time begins to run.
R. “Owner” means the state agency, institution, or its authorized representative with the authority to enter into, administer, and/or terminate the Work in accordance with the Contract Documents and make related determinations and findings.
S. “Person” means a corporation, partnership, business association of any kind, trust, company, or individual.
T. “Prior Occupancy” means Owner’s use of all or parts of the Project before Substantial Completion, as more fully set forth in Section 6.08 A.
U. “Progress Schedule” means a schedule of the Work, in a form satisfactory to Owner, as further set forth in
Section 3.02.
V. “Project” means the total construction of which the Work performed in accordance with the Contract
GENERAL CONDITIONS
Documents may be the whole or a part and which may include construction by Owner or by separate contractors.
W. “Project Record” means the separate set of Drawings and Specifications as further set forth in…