2027-081_Equipment-Operator_Form.pdf

PDF 130 KB Posted

Attached to
DNR RFB Park Rapids-Baudette HWT Mowing
Solicitation number
2000018503
Issued by
Minnesota

About this file

This is a Required Equipment and Operator Experience Form for Solicitation #2027-081 issued by the Minnesota Department of Natural Resources for mowing and maintenance work on Hunter Walking Trails in the Park Rapids and Baudette Wildlife areas across Becker, Beltrami, Clearwater, Hubbard, and Wadena Counties. The project encompasses approximately 128.4 miles of trail mowing, brush clearing, and deadfall removal. Contractors must submit responses electronically through the Swift Portal, with all bidders required to review attachments and comply with all solicitation requirements. A site visit with Project Supervisor Justin Pitt is available by contacting 218-308-2337. The State reserves the right to award items separately, by grouping, or by total amount, and will make awards to the lowest responsible vendor meeting specifications and all terms and conditions.

Bidders must provide a rubber-tracked skid steer with a minimum 80 gross engine horsepower rating, ground pressure not exceeding 5.0 psi, and a minimum hydraulic pump flow of 25.0 gpm equipped with a rotary cutting head capable of mowing grass, brush, and trees up to 4 inches in diameter at breast height. Chainsaws may be required for larger deadfalls. All personnel operating specified equipment must have a minimum of 100 hours of experience with the equipment type and attachments. Unit prices must include all labor, materials, tools, transportation, equipment, applicable taxes, and all costs necessary for project completion. Contractors must complete the equipment and operator experience form with specific details regarding equipment year, make, model, horsepower rating, track width, hydraulic pump flow, and cutting head specifications, along with operator names and hours of experience. False statements on the form constitute grounds for contract forfeiture and legal penalties.

View the file

Other files

File Type Posted
DNR_RFB_Park_Rapids-Baudette_HWT_Mowing.pdf PDF
2027-081_Prime_Response_Form.pdf PDF
2027-081_Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUIRED EQUIPMENT AND OPERATOR EXPERIENCE FORM

Park Rapids-Baudette HWT Mowing Becker, Beltrami, Clearwater, Hubbard and Wadena Counties / Near Bemidji and Park Rapids

Solicitation # 2027-081

VERSION: ORIGINAL

Refer to Specifications & Terms for full equipment required and operator experience specifications for this project.

List ALL equipment items you will provide for this project.

CONTRACTOR NAME: ________________________________________________

Equipment Specifications:

A rubber-tracked skid steer (80 min. gross engine horse power rating) equipped with a rotary cutting head capable of mowing/cutting grass, brush or small trees up to 4 inch diameter at breast height. The ground pressure of equipment may not exceed 5.0 psi. Equipment will have a minimum hydraulic pump flow of 25.0 gpm. Chainsaws may be required for deadfalls or trees exceeding the cutting capacity of the equipment’s cutting head.

Bidder must provide the following on equipment that will be used (Tracked skid steer with rotary cutting head):

Year__________________, Make_____________________________, Model________________________, Horsepower Rating _____________________, Track Width________________________________________

Hydraulic pump flow (gpm) ___________, Make & Model of Cutting Head ____________________________

Required Operator Experience:

Personnel working on this project must have a minimum of 100 hours operating the specified type of equipment and attachments to be used.

Operator #1 Name: _____________ _______________________________________

Hours of Experience: _______________

Operator #2 Name: ____________________________________________________

Hours of Experience: _______________

Any changes or additions to this listed equipment may be made if they meet all required equipment specifications and an updated form is supplied to the Contract Officer and Project Supervisor.

I understand that falsification, in any way, of the facts or conditions I have represented herein constitutes a false statement for which penalties under the law apply and which will be just cause for forfeit of contract. (Any change requires an updated form.)

Signature of Contractor Title Date

File details come from the government source that posted it. Updated .