This is a set of 100% working design drawings for Heritage Park Phase 1 in Lynchburg, Virginia, prepared by Studio Hill (landscape architecture), Hurt and Proffitt (civil engineering), and LPA (electrical engineering) on behalf of the City of Lynchburg Parks and Recreation Department. Phase 1 construction includes demolition of existing site features, grading and site preparation, stormwater management infrastructure including underground detention and bioretention basins, erosion and sediment control measures, concrete walkways and parking areas, new concrete stairs with handrails, electrical conduit and lighting installations, meadow plantings, and stabilized turf establishment. The project site encompasses approximately 2.60 acres within the existing Heritage Park located at 557 Leesville Road, Lynchburg, Virginia 24502. The design drawings indicate that portions of the overall park improvement plan will be constructed by the City of Lynchburg Parks and Recreation Department while other portions, specifically identified as Phase 1 work, will be procured from general contractors when funding becomes available. The drawings specify that Phase 1 contractors must submit bids as a lump sum for the advertised phase, with careful attention to the bid form requirements distinguishing between work performed by the City and work performed by the contractor.
The design package includes comprehensive specifications for stormwater quality and quantity management, including a Level 1 bioretention basin and underground detention system using StormTech MC-7200 chambers designed to achieve Virginia stormwater compliance across four drainage areas. Contractor responsibilities encompass coordination of demolition sequencing, verification of all underground utilities prior to construction, installation and maintenance of erosion and sediment control devices throughout the project duration, site restoration following construction, and coordination with the City's Environmental Site Inspector for underground detention facility installation and inspection. All work must comply with City of Lynchburg regulations, Virginia Commonwealth standards, and applicable federal and state codes. The contractor is responsible for obtaining all necessary permits and licenses, including a land disturbance permit before any site work commences and a right-of-way permit for work within the right-of-way, with construction in the right-of-way limited to non-peak hours between 8:30 AM and 3:30 PM. The project timeline and funding source have not been specified in the design documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2027-013 LYNCHBURG HERITAGE PARK PHASE 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date:
Revisions:
Review By:
Project No.
Drawn By:
Sheet No.
STUDIO
HILL
Landscape Architecture Architecture
Community Planning Historic Preservation
120 W. Campbell Ave. SW Roanoke, VA 24011 tel: 540-342-5263 fax: 540-345-5625 www.hillstudio.com
Title:
Seal
10 9 8 7 6 5 4 3 2 1
G
F
E
D
C
B
Lynchburg Heritage Park
LYNCHBURG,
VIRGINIA
A 5 4 3 2 110 9 8 7 6
CBA, EWS, KEP
GW
2248.01
06/09/2026
Lic. No. 861
GREGORY W.
WEBSTER
L A
D
S CAPE ARCH
I T
E C
T
C
OM
M
ON
W
EALTH OF VIRG
IN
IA
N
06/09/2026
PER CITY TRC COMMENTS
COVER SHEET
G-000
LYNCHBURG HERITAGE PARK
100% WORKING DRAWINGS
CONSTRUCTION SET
June 09, 2026
PROJECT TEAM:
LANDSCAPE ARCHITECT:
GREG WEBSTER, PLA, LEED AP
HILL STUDIO
120 W CAMPBELL AVE
ROANOKE, VA 24011
(540) 342-5263 gwebster@hillstudio.com
PROJECT DESCRIPTION
OWNER:
HOWARD COVEY
CITY OF LYNCHBURG
301 GROVE STREET
LYNCHBURG, VA 24501
(434) 455-5875 howard.covey@lynchburgva.gov
VICINITY MAP
PROPERTY INFORMATION
PARCEL ID: 24807001
ZONED: R-1 - LOW DENSITY RESIDENTIAL, R-3 - MEDIUM DENSITY RESIDENTIAL
CURRENT USE: PARK / RECREATION (HERITAGE PARK)
OWNER: CITY OF LYNCHBURG
ADDRESS: 557 LEESVILLE RD, LYNCHBURG, VA 24502
CONTACT: HOWARD COVEY - PARKS & REC. DEPT.
PHONE: (434) 455-5875
EMAIL: howard.covey@lynchburgva.gov
PROJECT SITE
1. TOPOGRAPHY IS SHOWN AT 1' INTERVALS. TOPOGRAPHIC SURVEY WORK PERFORMED BY: HURT AND PROFFITT.
2. SEED ALL DISTURBED AREAS EXCEPT WHERE OTHERWISE NOTED.
3. CONTRACTOR TO VERIFY ALL BENCHMARK LOCATIONS AS INDICATED ON PLANS. CONTRACTOR SHALL LOCATE ADDITIONAL PROTECTED, PERMANENT BENCHMARK LOCATIONS AS NECESSARY.
4. CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION AND SEQUENCING OF DEMOLITION AS DESCRIBED BY THESE DOCUMENTS AND SPECIFICATIONS.
5. UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND RECORDS, AND THEREFORE THEIR LOCATION MUST BE CONSIDERED APPROXIMATE ONLY. THERE MAY BE OTHERS, THE EXISTENCE OF WHICH IS PRESENTLY NOT KNOWN. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES AT HIS OWN INITIATIVE AND EXPENSE.
6. CONTRACTOR SHALL BE RESPONSIBLE TO IMMEDIATELY REPAIR ANY ACTIVE UTILITIES DAMAGED DURING CONSTRUCTION AND TO NOTIFY THE OWNERS REPRESENTATIVE AND ANY APPROPRIATE UTILITY COMPANIES OF
THE DAMAGE.
7. ALL MATERIAL GENERATED BY THE DEMOLITION SHALL BE HAULED FROM THE SITE AND DISPOSED OF PER CITY OF LYNCHBURG REGULATIONS.
8. THE CONTRACTOR SHALL COORDINATE FINISHED PAVEMENT GRADES WITH ELEVATIONS AND LOCATIONS OF EXISTING ROADS AND STREETS.
9. OTHER WORK (GRADING, EXCAVATING, CONSTRUCTION) ON THE PROJECT SHALL NOT COMMENCE UNTIL THE APPROPRIATE EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE AS SPECIFIED ON THE PLAN.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND LICENSES REQUIRED BY THE COMMONWEALTH OF VIRGINIA, CITY OF LYNCHBURG, OR ANY OTHER GOVERNING AGENCIES
INVOLVED UNDER THIS CONTRACT.
11. APPROPRIATE FENCING AND/OR BARRICADES SHALL BE USED WHEN DEMOLITION OCCURS NEAR PEDESTRIAN WALKWAYS. ANY SIDEWALK, ENTRANCE, AND/OR STREET CLOSURES TO BE COORDINATED WITH THE CITY
OF LYNCHBURG.
12. LENGTHS OF LINES INDICATED ON THE DRAWINGS FOR UTILITY SYSTEMS ARE APPROXIMATE ONLY. IT SHALL BE THE CONTRACTORS RESPONSIBILITY FOR DETERMINING THE EXACT AMOUNT OF PIPING REQUIRED TO
FURNISH A COMPLETE WORKING SYSTEM IN ACCORDANCE WITH THE INTENT OF THE DRAWINGS.
13. TOP OF INLETS SHOWN ARE APPROXIMATE ONLY, CONTRACTOR SHALL VERIFY EXACT ELEVATIONS REQUIRED TO ASSURE STRUCTURE HEIGHT COMPLIES WITH THE PURPOSE OF THE STRUCTURE AND CONFORMS WITH
ADJACENT FINISHED GRADES.
14. LIMITS OF DISTURBANCE SHALL BE CONTAINED WITHIN THE EXISTING LIMITS INDICATED ON PLANS.
15. CONTRACTOR SHALL NOTIFY A/E OF ANY DISCREPANCIES BETWEEN THE DRAWINGS AND SPECIFICATIONS AND
BETWEEN THE CONTRACT DOCUMENTS AND IN-FIELD EXISTING CONDITIONS.
16. BACKFLOW IS REQUIRED ON ALL EXISTING OR PROPOSED SERVICE CONNECTIONS PRIOR TO STARTING ANY WORK TO DEVELOP THE SITE(S). SERVICE CONNECTIONS SHALL NOT BE UTILIZED FOR DEMOLITION, GRADING, CONSTRUCTION/RENOVATION, AND/OR LANDSCAPING PURPOSES, UNTIL ALL OF THE APPROPRIATE RP'S (OR RPDA'S) FOR BACKFLOW HAVE BEEN INSTALLED. THIS INCLUDES TEMPORARY AS WELL AS PERMANENT
CONNECTIONS.
17. IF DURING DEMOLITION OR CONSTRUCTION, ANY DISCREPANCIES ARE NOTED WITH REGARD TO ANY PUBLIC WATER SERVICES CONNECTION, THE DEPT. OF WATER RESOURCES SHALL BE NOTIFIED. THIS INCLUDES, BUT IS NOT LIMITED TO; CONNECTIONS WHICH NEED TO BE ADDED, ABANDONED, CHANGED, OR RELOCATED.
18. IF ANY BACKFLOW PREVENTION ASSEMBLIES ARE FOUND DURING DEMOLITION OR WHILE OTHER WORK IS BEING PERFORMED FOR THIS PROJECT, THEY SHALL NOT BE REMOVED, RELOCATED, OR REPLACED WITHOUT
ADVANCE AUTHORIZATION FROM THE DEPT. OF WATER RESOURCES.
19. LANDSCAPING AND/OR OTHER SITE FEATURES SHALL NOT BE SUCH THAT THEY IMPACT THE REQUIRED ALLOWANCES FOR ANY RP (OR RPDA) FOR BACKFLOW NOW OR IN THE FUTURE.
20. NO SITE WORK, LOGGING, GRUBBING OR GRADING IS PERMITTED PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT.
21. A RIGHT OF WAY PERMIT WILL BE REQUIRED FOR ANY WORK IN THE RIGHT OF WAY. CONTACT BRAD BUTLER AT 434-455-3931.
22. WORK IN THE RIGHT OF WAY TO BE PERFORMED DURING NONPEAK HOURS OF 8:30AM THROUGH 3:30PM.
23. FOR CONCRETE SCORE PATTERN, REFER TO SHEET L-511.
THESE PLANS ARE AN ALL-ENCOMPASSING SET OF PLANS TO IMPROVE
HERITAGE PARK. PORTIONS OF THE PLANS WILL BE BUILT BY THE PARKS AND
REC DEPARTMENT AND OTHER PORTIONS WILL BE BUILT BY GENERAL
CONTRACTORS, PROCURED WHEN FUNDING IS AVAILABLE. THE
CONTRACTOR BIDDING THIS, AND ENSUING PHASES, SHOULD PAY SPECIFIC
ATTENTION TO THE BID FORM WHEN BIDDING.
CIVIL ENGINEER:
ANDY KLEPAC, PE
HURT AND PROFFITT
2524 LANGHORNE ROAD
LYNCHBURG, VA 24501
(434) 847-7796 bcossman@handp.com
ELECTRICAL ENGINEER:
WINSTON MATTHEWS, PE
LPA
15 E. SALEM AVE, SE, SUITE 101,
ROANOKE, VA 24011
(540) 342 - 1816 wmatthews@lpa-inc.com
HERITAGE PARK HIGH SCHOOL
LEESVILLE RD
PARK INCLUDES: CONCRETE WALKWAYS, PICKLEBALL COURTS, UPDATED LIGHTING,
EXISTING MULTIPURPOSE FIELD, PLAYGROUND, CONCRETE SLAB FOR SKATEPARK, SEAT
WALLS, SITE FURNISHINGS, HERB GARDEN, NEW TREES AND MISC. PLANTINGS.
INSPIRED / RESPONSIVE / TRUSTED
GENERAL
G-000 COVER SHEET
G-001 GENERAL NOTES AND ABBREVIATIONS
V-101 EXISTING CONDITIONS AND DEMOLITION PLAN
V-102 ENLARGED DEMOLITION AREAS
C-101 GRADING PLAN
C-102 GRADING PLAN
C-103 EROSION & SEDIMENT CONTROL PLAN
C-201 EROSION & SEDIMENT CONTROL DETAILS
C-202 STORMWATER DETAILS
C-203 UNDERGROUND DETENTION DETAILS
C-301 DRAINAGE AREA MAPS
L-101 PARK CORE KEY PLAN AND CRITICAL ALIGNMENTS
L-201 ENLARGED PLAN AREA 1
L-202 ENLARGED PLAN AREA 2
L-203 ENLARGED PLAN AREA 3
L-204 ENLARGED PLAN AREA 4
L-205 ENLARGED PLAN AREA 5
L-206 ENLARGED PLAN AREA 6
L-207 ENLARGED PLAN AREA 7
L-208 ENLARGED PLAN AREA 8
L-209 ENLARGED PLANTING PLANS
L-401 SECTIONS
L-402 SECTIONS
L-501 DETAILS PLANTINGS
L-502 DETAILS
L-503 DETAILS
L-504 DETAILS
L-505 DETAILS
L-506 DETAILS
L-507 DETAILS
L-508 SITE FURNISHINGS
L-509 SITE FURNISHINGS
L-510 SITE FURNISHINGS
L-511 SCORING DETAIL
E-001 LEGEND, NOTES AND ABBREVIATIONS SPECIFICATIONS ELECTRICAL
E-101 SITE PLAN POWER/LIGHTING ELECTRCIAL
SHEET INDEX
GENERAL NOTES
To be constructed and installed by the City of Lynchburg
To be constructed and installed by the Contractor as Phase 1
By Others
Legend:
THESE PLANS ARE AN ALL-ENCOMPASSING SET OF PLANS TO IMPROVE HERITAGE
PARK. PORTIONS OF THE PLANS WILL BE BUILT BY THE PARKS AND REC DEPARTMENT
AND OTHER PORTIONS WILL BE BUILT BY GENERAL CONTRACTORS, PROCURED WHEN
FUNDING IS AVAILABLE. THE CONTRACTOR BIDDING THE INDICATED PHASE AS
DIAGRAMED HERE-IN, IS REQUIRED TO ISSUE BID AS A LUMP SUM FOR THE
RESPECTIVE ADVERTISED PHASE.
GENERAL NOTES
AND
ABBREVIATIONS
G-001
GENERAL CROSS REFERENCE NOTES:
1. FOR LIGHTING SEE ELECTRICAL
2. REFER TO CIVIL FOR GRADING AND STORM DRAINAGE, AND E&S.
LEGEND
MONUMENT
IRON PIN FOUND
IRON PIN SET
BENCHMARK
BORE HOLE
ELECTRIC MANHOLE
ELECTRIC JUNCTION BOX
ELECTRIC BOX
ELECTRIC TRANSFORMER
STREET LIGHT
LIGHT POLE
ELECTRIC BOLLARD
WATER MANHOLE
FIRE HYDRANT
WATER METER
WATER VALVE
DRINKING FOUNTAIN
IRRIGATION CONTROL VALVE
YARD HYDRANT
SEWER MANHOLE
CLEAN OUT
DRAINAGE MANHOLE
TRENCH DRAIN
TELEPHONE MANHOLE
TELEPHONE PEDESTAL
CABLE JUNCTION BOX
EXISTING TREES
FIBER OPTIC MANHOLE
FIBER OPTIC JUNCTION BOX
TRAFFIC CONTROL MANHOLE
TRAFFIC JUNCTION BOX
SIGNAL CABINET
TRAFFIC LIGHT POLE
GAS VALVE
GAS METER
CURB AND GUTTER
SIGN
FLAG POLE
10" CONCRETE BASE FOR TEMPORARY FENCE POST
BOLLARD
SEWER LINE W/SIZE
WATER LINE W/SIZE
GAS LINE W/SIZE
UNDERGROUND ELECTRIC LINE
OVERHEAD ELECTRIC LINE
TELEPHONE LINE
CABLE LINE
STORM DRAIN W/SIZE
TRAFFIC CONTROL LINE
FIBER OPTIC LINE
PROPERTY LINE
HANDRAIL
8' HT. TEMPORARY CONSTRUCTION FENCE
GENERAL LANDSCAPE NOTES:
1. GENERAL CONTRACTOR TO FIELD VERIFY ALL EXISTING SITE CONDITIONS AND
DETERMINE THE EXTENT OF WORK PRIOR TO ANY AND ALL CONSTRUCTION.
NOTIFY OWNER OF ANY DISCREPANCIES BETWEEN CONSTRUCTION
DOCUMENTS AND ACTUAL CONDITIONS.
2. COMPLY WITH ALL LOCAL, STATE, AND FEDERAL CODES, LAWS AND
REGULATIONS.
3. CONTRACTOR IS RESPONSIBLE FOR ALL MATERIALS,CONSTRUCTION METHODS
AND CRAFTSMANSHIP. ALL NEW WORK IS TO BE PLUMB, LEVEL, AND SQUARE.
4. VERIFY ALL EXISTING CONDITIONS AND NOTIFY THE LANDSCAPE ARCHITECT OF
ANY DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL CONDITIONS.
5. THE CONTRACTOR IS RESPONSIBLE TO BRING DISCREPANCIES OR CONFLICTS
BETWEEN DRAWINGS AND SPECIFICATIONS TO THE IMMEDIATE ATTENTION
OF THE LANDSCAPE ARCHITECT BEFORE START OF CONSTRUCTION FOR
RESOLUTION. DO NOT ASSUME CORRECTNESS OF ONE DOCUMENT OR THE
OTHER.
6. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WORK WITH OTHER
TRADES AND THE OWNER'S SELF-PERFORMED WORK WHEREVER AND
WHENEVER THEY OVERLAP.
7. COORDINATE CONSTRUCTION ACTIVITIES WITH OWNER'S SCHEDULE. NOISE
RESTRICTIONS SHALL BE COORDINATED WITH THE OWNER.
8. DO NOT SCALE DRAWINGS. UNLESS NOTED OTHERWISE, ALL DIMENSIONS ARE
TO FACE OF NEW FINISH OR FACE OF EXISTING WALL.
9. ALL EXISTING CONDITIONS TO REMAIN SHALL BE PROTECTED DURING
DEMOLITION AND CONSTRUCTION OPERATIONS. PROTECT ADJACENT AREAS
FROM DUST AND DEBRIS. MINIMIZE DAMAGE TO EXISTING LANDSCAPING
AND PAVING. DAMAGED LANDSCAPING AND PAVING MUST BE REPLACED IN
KIND. MAINTAIN A CLEAN, SAFE WORK ENVIRONMENT AT ALL TIMES.
10. PROVIDE PEDESTRIAN PROTECTION AROUND THE CONSTRUCTION AREAS.
11. EXISTING UTILITIES ARE TO REMAIN UNLESS OTHERWISE NOTED.
12. CONTRACTOR IS RESPONSIBLE TO COORDINATE INSPECTION SERVICES
PROVIDED BY INSPECTOR.
13. COORDINATE HOURS OF CONSTRUCTION WITH OWNER.
14. THE SHADE STRUCTURE AND THE PAVILION ARE SHOWN FOR REFERENCE IN
THIS PLAN SET. ARCHITECTURAL AND STRUCTURAL DESIGN DRAWINGS NOT
INCLUDED.
GENERAL LAYOUT NOTES:
1. THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE EXISTING SITE CONDITIONS
PRIOR TO COMMENCING ANY WORK. INSPECT EXISTING SITE CONDITIONS
AFFECTING WORK FOR COMPLIANCE WITH THE CONTRACT DOCUMENTS. PRIOR TO
COMMENCING LANDSCAPE WORK, ADVISE THE PROJECT LANDSCAPE ARCHITECT OF
ANY INCONSISTENCIES WITH SAID CONDITIONS FOR RESOLUTION.
2. COORDINATE LANDSCAPE WORK WITH OTHER CONSTRUCTION TO ENSURE PROPER
SEQUENCING OF WORK, TO MINIMIZE CONFLICTS, AND TO PROTECT IN-PLACE
WORK FROM DAMAGE.
3. CONTRACTOR TO CONDUCT PRE-CONSTRUCTION MEETING TO REVIEW SCOPE OF
WORK WITH OWNER AND LANDSCAPE ARCHITECT.
4. MINIMIZE DISTURBANCE OUTSIDE APPROXIMATE LIMITS OF WORK. DAMAGED
WORK SHALL BE REPLACED OR REPAIRED BY THE CONTRACTOR, TO A LIKE NEW
CONDITION, AT NO ADDITIONAL COST TO THE OWNER.
5. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION AND DEPTH OF
ALL EXISTING UNDERGROUND UTILITIES (PUBLIC AND PRIVATE) PRIOR TO
BEGINNING CONSTRUCTION.
6. EXCAVATION AND OTHER GROUND DISTURBANCE IS NOT ALLOWED WITHIN THE
DRIP-LINE OF EXISTING TREES TO REMAIN UNLESS SPECIFICALLY NOTED.
CONTRACTOR SHALL PROTECT TREES TO REMAIN WITH FENCE.
7. CONTRACTOR SHALL PROVIDE PROTECTION FOR NEWLY INSTALLED WORK AND
FINISHES.
8. THE LIMITS OF WORK DESCRIBED IN THE DRAWINGS ARE APPROXIMATE. WORK
REQUIRED OUTSIDE THESE LIMITS WHICH IS NEEDED TO MEET THE INTENT OF THE
DRAWING IS THE RESPONSIBILITY OF THE CONTRACTOR. ANY MISCELLANEOUS
ITEMS OR MATERIALS NOT SPECIFICALLY NOTED, BUT REQUIRED FOR THE PROPER
EXECUTION, INSTALLATION, OR PERFORMANCE OF THE WORK, SHALL BE PROVIDED
BY THE CONTRACTOR.
9. SEALED EXPANSION JOINTS SHALL BE INSTALLED WHERE NEW CONCRETE PAVING
MEETS EXISTING PAVING, BUILDING WALL, SITE WALLS, COLORED CONCRETE, AND
WHERE NOTED ON PLAN.
10. ALL CONNECTIONS TO EXISTING WORK SHALL BE SMOOTH AND CONTINUOUS, AND
MAINTAIN POSITIVE DRAINAGE. CONTRACTOR TO VERIFY ELEVATIONS WITHIN
PROJECT SCOPE. CONTRACTOR TO ENSURE POSITIVE DRAINAGE AWAY FROM
BUILDING IN ALL DISTURBED AREAS.
11. DIMENSIONS ARE FROM BACK OF CURB (BOC) UNLESS OTHERWISE NOTED.
12. ALL JOINTS ARE TO BE TOOLED.
13. JOINTS IN SIDEWALKS SHALL BE LOCATED AT CRITICAL POINTS AND SPACED EVENLY
BETWEEN THOSE CRITICAL POINTS AS SHOWN ON THE PLAN.
14. ALL CONCRETE IS STANDARD GRAY WITH A MEDIUM BROOM FINISH, UNLESS
OTHERWISE NOTED.
15. CONTRACTOR TO USE DIGITAL FILE FROM A/E TO STAKEOUT LAYOUT IN FIELD.
Date:
Revisions:
Review By:
Project No.
Drawn By:
Sheet No.
STUDIO
HILL
Landscape Architecture Architecture
Community Planning Historic Preservation
120 W. Campbell Ave. SW Roanoke, VA 24011 tel: 540-342-5263 fax: 540-345-5625 www.hillstudio.com
Title:
Seal
10 9 8 7 6 5 4 3 2 1
G
F
E
D
C
B
Lynchburg Heritage Park
LYNCHBURG,
VIRGINIA
A 5 4 3 2 110 9 8 7 6
CBA, EWS, KEP
GW
2248.01
06/09/2026
Lic. No. 861
GREGORY W.
WEBSTER
L A
D
S CAPE ARCH
I T
E C
T
C
OM
M
ON
W
EALTH OF VIRG
IN
IA
N
06/09/2026
PER CITY TRC COMMENTS
LARGE TREES
SMALL/FLOWERING TREES
SHRUBS
HERB MIX
WILDFLOWER MEADOW MIX
TURF GRASS
L-101
G8
L-501
SHEET GRID COORDINATE
SHEET NUMBER WHERE,
SECTION, ELEVATION OR
DETAIL IS DRAWN
SHEET NUMBER WHERE
SECTION, ELEVATION
OR DETAIL IS TAKEN
NEW PARK SIGN
820 81
H
Y D
E
W
W V
S
S
S
S
S
BENCHMARK:
RR SPIKE SET IN
BASE OF P. POLE
ELEV: 868.62'
UGE
UGE
UGE
UGE
UGE UGE UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UG
E
UG
E
U G
E
UGE
UG
E
UG
E
UGE
U G
E U
G E
U G
E
U
IRR
W
W
W W
W W
W W
W W
W
W
W W
W W
W W
W
W
IRR
UU
U
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
(1)
(2)
(1)
(2)
8" T
C
8" T
C
8" TC
8" CI
8" PVC
8" TC
8" TC
18" RCP
INV OUT: 803.5'
INV OUT: 801.3'
18" RCP
12" RCP
INV OUT: 787.4'
18" RCP
18" RCP
12" CMP
18" HDPE
18" HDPE
18" HDPE
U.G. FIELD DRAIN SHOWN APPROXIMATE
18" RCP
18" R C
P
4 5
6 7
13 14
60" CMP
COULD NOT LOCATE SAN.
MANHOLE SHOWN IN THIS
AREA ON CITY G.I.S.
A
C
D
F
INV OUT: 805.1'
12" HDPE
12" HDPE
12" HDPE
42" C
MP
INV OUT: 761.6'
INV IN: 763.8'
INV OUT: 775.4'
INV IN: 776.2'
E
S
INV OUT: 778.5'
" R
C P
CO
" H
DPE
INV IN: 781.3'
INV OUT: 780.9'
B
12" HDPE
INV OUT: 820.8'
INV IN: 821.0'
SS
SS
SS
8" CI
G
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
8" RCP
12" R
CP
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
T
1202.32'
N 74°53'54" E
S 39 °2
5'0 8"
W
.59
387.97'
N 17°58'39" W
239.24'
S 81°52'46" W
699.46'
N 59°16'21" E
338.99'
N 84°07'51" E 146.68'
N 55°12'31" E
304.32'
N 36°41'09" W
657.33'
S 54°46'46" W
274.81'
S 74°21'53" W 100.85'
N 74°27'03" E 98.00'
N 55°39'51" E
113.84'
N 54°06'21" E
122.97'
N 08°29'34" W
76.02'
N 72°48'27" W
195.98'
N
5°
'2 2"
E
.4 8' S 83°25'08" E
542.31' N
°5 2'
" E
0.
PID #24808020
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
INST. #080005984
PID #24808019
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
PID #24808018
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
PID #24808026
C & P TELEPHONE
(ANNEXED FROM
CAMP. COUNTY)
PID #24808035
VERIZON VIRGINIA, INC.
INST. #020007162
PID #24808028
DAVID HONG LE &
PHUONG T. HUYNH
INST. #190007737
DB 922, PG 43 (PLAT)
PID #24808030
STEVEN LEE TUCKER &
VALERIE A. TUCKER
INST. #230000688
PID #24808031
JOHN R. CRAWLEY, III &
DEIDRA C. CRAWLEY
INST. #07000819
DB 707, PG 410 (PLAT)
PID #24808032
APPEL PROPERTIES,
LLC
INST. #170002564
DB 540, PG 486 (PLAT)
PID #24808033
BETTY LOU
JOHNSON PERHAM
INST. #140000003
DB 648, PG 191
10' DRAINAGE
EASEMENT
(DB 513, PG 563)
BROOKEVILL
E V
ILL
AGE
(P B 20
, P G 4-
5 C
AMP. C
O.)
PID
#2
JA
MES E
COLE
MAN, J
R. &
PATR
IC
IA
D
. W
DB 11
, P G 61
PID
#2
LU
KE J.
R
EDDAW
AY &
MIC
HELL
E R . R
EDDAW
AY
IN
ST.
#1
PID
#2
TH
EODORE A
NTH
ONY
YOUNG
IN
ST.
#1
PID
#2
STE
PHEN M
. S
AFR
ITT
& D
ENEEN S
SAFR
ITT
DB 83
6, PG 56
PID
#2
JA
NET D
. W
ARRIC
K &
ADOLP
H T.
B
ROW
N
IN
ST.
#0
PID
#2
ROBERT L
. S
MITH
FA
YE T.
S
MITH
DB 10
, P G 72
PID
#2
EDW
ARD D
ARYL
DUFF
IN
ST.
#1
PID #24703006
FIELDSTONE MANOR, LLC
INST. #060007983
LEESVILLE RD. - S.R.
(60' R/W
PID #24808026
C & P TELEPHONE
(ANNEXED FROM
CAMP. COUNTY)
PID #24808017
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
DEBORAH A. HALL &
PID #24808022
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
PID #24808013
PERIODONTAL LAND
PARTNERS
INST. #070012246
INST. #230006438
DISC GOLF
TEE BOX
V-101
C5
V-102
V-101
A10
V-102
V-101
E5
V-102
GATE
EXISTING TRAIL SEGMENT
TO BE ERADICATED
V-101
A5
V-102
820 81
H
Y D
E
W
W V
S
S
S
S
S
BENCHMARK:
RR SPIKE SET IN
BASE OF P. POLE
ELEV: 868.62'
UGE
U
IRR W
IRR
UU
U
(1)
(2)
(1)
(2)
8" T
C
8" T
C
8" CI
8" PVC
8" TC
8" TC
18" RCP
INV OUT: 803.5'
INV OUT: 801.3'
18" RCP
12" RCP
INV OUT: 787.4'
18" RCP
18" R
CP
12" CMP
18" HDPE
18" HDPE
18" HDPE
U.G. FIELD DRAIN SHOWN APPROXIMATE
18" RCP
18" R C
P
4 5
6 7
13 14
60" CMP
A
C
D
F
INV OUT: 805.1'
12" HDPE
12" HDPE
12" HDPE
42" C
MP
INV OUT: 761.6'
INV IN: 763.8'
INV OUT: 775.4'
INV IN: 776.2'
E
S
INV OUT: 778.5'
" R
C P
CO
" H
DPE
INV IN: 781.3'
INV OUT: 780.9'
B
12" HDPE
INV OUT: 820.8'
INV IN: 821.0'
8" CI
G
8" RCP
12" R
CP
X
T
S 39 °2
5'0 8"
W
S 81°49'42" W
387.97'
N 17°58'39" W
239.24'
S 81°52'46" W
699.46'
N 59°16'21" E
338.99'
N 84°07'51" E 146.68'
N 55°12'31" E
304.32'
N 36°41'09" W
657.33'
S 54°46'46" W
274.81'
S 74°21'53" W 100.85'
339.37' 339.65'
N 74°27'03" E 98.00'
N 55°39'51" E
113.84'
N 54°06'21" E
122.97'
N 08°29'34" W
76.02'
N 72°48'27" W
195.98'
N
5°
'2 2"
E
.4 8' S 83°25'08" E
542.31' N
°5 2'
" E
0.
PID #24808020
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
INST. #080005984
PID #24808019
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
PID #24808018
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
PID #24808026
C & P TELEPHONE
(ANNEXED FROM
CAMP. COUNTY)
PID #24808035
VERIZON VIRGINIA, INC.
INST. #020007162
PID #24808028
DAVID HONG LE &
PHUONG T. HUYNH
INST. #190007737
DB 922, PG 43 (PLAT)
PID #24808030
STEVEN LEE TUCKER &
VALERIE A. TUCKER
INST. #230000688
PID #24808031
JOHN R. CRAWLEY, III &
DEIDRA C. CRAWLEY
INST. #07000819
DB 707, PG 410 (PLAT)
PID #24808032
APPEL PROPERTIES,
LLC
INST. #170002564
DB 540, PG 486 (PLAT)
PID #24808033
BETTY LOU
JOHNSON PERHAM
INST. #140000003
DB 648, PG 191
10' DRAINAGE
EASEMENT
(DB 513, PG 563)
PID
#2
JA
MES
E
COLE
MAN, J
R. &
PATR
IC
IA
D
. W
DB 11
, P G 61
LEESVILLE RD. - S.R.
(60' R/W
PID #24808026
C & P TELEPHONE
(ANNEXED FROM
CAMP. COUNTY)
PID #24808017
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
PID #24808037
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
PID #24808022
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
PID #24808013
PERIODONTAL LAND
PARTNERS
INST. #070012246
DD
CO
Date:
Revisions:
Review By:
Project No.
Drawn By:
Sheet No.
STUDIO
HILL
Landscape Architecture Architecture
Community Planning Historic Preservation
120 W. Campbell Ave. SW Roanoke, VA 24011 tel: 540-342-5263 fax: 540-345-5625 www.hillstudio.com
Title:
Seal
10 9 8 7 6 5 4 3 2 1
G
F
E
D
C
B
Lynchburg Heritage Park
LYNCHBURG,
VIRGINIA
A 5 4 3 2 110 9 8 7 6
CBA, EWS, KEP
GW
2248.01
06/09/2026
Lic. No. 861
GREGORY W.
WEBSTER
L A
D
S CAPE ARCH
I T
E C
T
C
OM
M
ON
W
EALTH OF VIRG
IN
IA
N
06/09/2026
PER CITY TRC COMMENTS
SCALE IN FEET
1"= '-0"
60 30 60 120 180
EXISTING CONDITIONS
AND
DEMOLITION PLAN
V-101
To be constructed and installed by the City of Lynchburg
To be constructed and installed by the Contractor as Phase 1
By Others
S
W
X
W W
W W
W W
W W
W W
W
W
W W
W W
W
W
W
W
W
W
W
IRR
U
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
12" CMP
13 14
F
12" HDPE
INV OUT: 778.5'
" R
C P
CO
X
X
X
X
X
X
J
H
A
C
L
L
M
C
H
Y D
E
W
W V
U G
E
U G
E
UGE
UGE
UGE
UGE
UGE
U G
E U
G E
UG
E
UGE
UGE
UGE
UGE
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
U
W W
W
W W
W W
W W
18" RCP
INV OUT: 803.5'
INV OUT: 801.3'
18" RCP
12" RCP
18" RCP
18" HDPE
18" HDPE
4 5 6 7
E
B
B
L
D
C
F
B
H
B
G
A
B
A
B
H
A
A
C
C
EXISTING SIGNS
TO BE REMOVED
I
EXISTING TRAIL TO BE REMOVED
EXISTING STEPS TO BE REMOVED,
REPLACE WITH NEW STEPS. SEE
SHEET L-204
GATE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
X
X
X
X
X
X
X
X
X
X
338.99'
N 84°07'51" E
B
N
820 81
H
Y D
E
W
W V
S
S
S
S
S
BENCHMARK:
RR SPIKE SET IN
BASE OF P. POLE
ELEV: 868.62'
UGE
U
IRR W
IRR
UU
U
(1)
(2)
(1)
(2)
8" T
C
8" T
C
8" CI
8" PVC
8" TC
8" TC
18" RCP
INV OUT: 803.5'
INV OUT: 801.3'
18" RCP
12" RCP
INV OUT: 787.4'
18" RCP
18" R
CP
12" CMP
18" HDPE
18" HDPE
18" HDPE
U.G. FIELD DRAIN SHOWN APPROXIMATE
18" RCP
18" R C
P
4 5
6 7
13 14
60" CMP
A
C
D
F
INV OUT: 805.1'
12" HDPE
12" HDPE
12" HDPE
42" C
MP
INV OUT: 761.6'
INV IN: 763.8'
INV OUT: 775.4'
INV IN: 776.2'
E
S
INV OUT: 778.5'
" R
C P
CO
" H
DPE
INV IN: 781.3'
INV OUT: 780.9'
B
12" HDPE
INV OUT: 820.8'
INV IN: 821.0'
8" CI
G
8" RCP
12" R
CP
X
T
S 39 °2
5'0 8"
W
S 81°49'42" W
387.97'
N 17°58'39" W
239.24'
S 81°52'46" W
699.46'
N 59°16'21" E
338.99'
N 84°07'51" E 146.68'
N 55°12'31" E
304.32'
N 36°41'09" W
657.33'
S 54°46'46" W
274.81'
S 74°21'53" W 100.85'
339.37' 339.65'
N 74°27'03" E 98.00'
N 55°39'51" E
113.84'
N 54°06'21" E
122.97'
N 08°29'34" W
76.02'
N 72°48'27" W
195.98'
N
5°
'2 2"
E
.4 8' S 83°25'08" E
542.31' N
°5 2'
" E
0.
PID #24808020
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
INST. #080005984
PID #24808019
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
PID #24808018
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
PID #24808026
C & P TELEPHONE
(ANNEXED FROM
CAMP. COUNTY)
PID #24808035
VERIZON VIRGINIA, INC.
INST. #020007162
PID #24808028
DAVID HONG LE &
PHUONG T. HUYNH
INST. #190007737
DB 922, PG 43 (PLAT)
PID #24808030
STEVEN LEE TUCKER &
VALERIE A. TUCKER
INST. #230000688
PID #24808031
JOHN R. CRAWLEY, III &
DEIDRA C. CRAWLEY
INST. #07000819
DB 707, PG 410 (PLAT)
PID #24808032
APPEL PROPERTIES,
LLC
INST. #170002564
DB 540, PG 486 (PLAT)
PID #24808033
BETTY LOU
JOHNSON PERHAM
INST. #140000003
DB 648, PG 191
10' DRAINAGE
EASEMENT
(DB 513, PG 563)
PID
#2
JA
MES
E
COLE
MAN, J
R. &
PATR
IC
IA
D
. W
DB 11
, P G 61
LEESVILLE RD. - S.R.
(60' R/W
PID #24808026
C & P TELEPHONE
(ANNEXED FROM
CAMP. COUNTY)
PID #24808017
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
PID #24808037
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
PID #24808022
DEBORAH A. HALL &
SAMUEL E. HALL
INST. #W210000351
PID #24808013
PERIODONTAL LAND
PARTNERS
INST. #070012246
DD
CO
T B
B
Date:
Revisions:
Review By:
Project No.
Drawn By:
Sheet No.
STUDIO
HILL
Landscape Architecture Architecture
Community Planning Historic Preservation
120 W. Campbell Ave. SW Roanoke, VA 24011 tel: 540-342-5263 fax: 540-345-5625 www.hillstudio.com
Title:
Seal
10 9 8 7 6 5 4 3 2 1
G
F
E
D
C
B
Lynchburg Heritage Park
LYNCHBURG,
VIRGINIA
A 5 4 3 2 110 9 8 7 6
CBA, EWS, KEP
GW
2248.01
06/09/2026
Lic. No. 861
GREGORY W.
WEBSTER
L A
D
S CAPE ARCH
I T
E C
T
C
OM
M
ON
W
EALTH OF VIRG
IN
IA
N
06/09/2026
PER CITY TRC COMMENTS
SCALE IN FEET
1"= '-0"
20 10 20 40 60
ENLARGED
DEMOLITION AREAS
V-102
V-102V-101
E5 ENLARGED DEMOLITION AREA
Scale: 1" = 20'
V-102V-101
A5 ENLARGED DEMOLITION AREA
Scale: 1" = 20'V-102V-101
A10 ENLARGED DEMOLITION AREA
Scale: 1" = 20'
DEMOLITION NOTES
A. EXISTING LIGHT POLE TO BE REMOVED AND TURNED OVER TO OWNER.
BASE TO REMAIN IN PLACE.
B. EXISTING WALK, ASPHALT, AND/OR CURB & GUTTER TO BE REMOVED
C. EXISTING FENCE TO BE REMOVED
D. ADJUST PER CIVIL SHEETS
E. EXISTING POLES TO BE REMOVED
F. HYDRANT AND METER TO REMAIN
G. EXISTING STRUCTURE TO BE REMOVED
H. CURB INLET TO REMAIN
I. EXISTING TREE TO BE REMOVED
J. EXISTING STAIR TO REMAIN
K. EXISTING INLETS AND PIPING TO BE FLUSHED OF DEBRIS AND REMAIN
IN PLACE
L. UTILITY TO REMAIN
M. ERADICATE EXISTING STRIPING
N. REMOVE GATE AND POSTS
V-102V-101
C5 ENLARGED DEMOLITION AREA
Scale: 1" = 20'
To be constructed and installed by the City of Lynchburg
To be constructed and installed by the
H Y D
W
W V
O H
E
U G
E
O H
E O
H E
O H
E O
H E
O H
E
O H
E
O H
E
O H
E
O H
E
U
W
W W
W
18" RCP
INV OUT: 803.5'
INV OUT: 801.3'
18" RCP
12" RCP
18" HDPE
4 5 6
SOURCE
NOT FOUND
3-A/C
1-STORY
BLOCK BLDG.
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
PID #24808035
VERIZON VIRGINIA, INC.
INST. #020007162
MATCHLINE
D D 1A
CO
UNDERGROUND DETENTION
BIORETENTION
820.00 P
822.60 SW
822.40 TC
821.90 P
821.65 SW=P
821.00 P
821.80 TC
821.30 P
822.00
822.00
822.80
823.50
821.80 TC
821.30 P
822.13
820.70 TC
820.20 P
822.15
823.13TC
822.63
822.30 TC
821.80 P
821.85 SW=P
820.10 TC
819.60 P
821.30
821.30
824.0
824.0
821.70
821.50
824.00824.50 824.30
824.18
823.88
824.00
822.00 SW
821.80 SW=P
821.40 SW=P
821.70
821.50
822.80
822.40
826.00
829.50
830.00TW
821.40 821.80
821.00
821.50
823.00
823.50
827.50
827.00
826.30
826.60
824.50
825.00
825.0
823.00
821.30
821.80
822.80 SW
822.50 822.65
INV=810.80
ADJUST TOP TO MATCH
FINISH GRADE AND REPLACE
INLET TOP WITH SOLID COVER
RIVER COBBLES
8'Lx5'Wx1'D
822.40
CONNECT BUILDING
DOWNSPOUTS TO
PROPOSED STORM SYSTEM
WITH 4" SCH. 40 PVC
821.40
821.00 821.50
1B
VDOT CL II RIPRAP
5'W X 25'L
MIN. 3' THICK
±14 CY
M A
TC
H
LI
N
E
TRENCH DRAIN
TOP=822.35
6" N-12 HDPE
INV=815.50
INV=798.00
CONTRACTOR TO VERIFY LINE SIZE AND
PROVIDE CORRESPONDING RPZ IN
HEATED ENCLOSURE ON CONC. PAD.
RPZ: WILKINS 975XL3 (0.25% LEAD FREE)
W
ADJUST TOP OF EXISTING METER
TO MATCH FINISH GRADE
824.10 826.00
826.0
4" DRAINAGE PIPE
(SEE LANDSCAPE PLANS)
4" DRAINAGE PIPE
(SEE LANDSCAPE PLANS)
NOTES
1. YARD INLETS TO BE NYLOPLAST 24"
DRAIN BASINS WITH HEEL-SAFE GRATES.
2. TRENCH DRAIN TO BE ACO FG200 FLOW
DRAIN WITH HEEL-SAFE GRATE AND F660
CATCH BASIN OUTLET (OR APPROVED
EQUAL).
STORM STRUCTURE SCHEDULE
48" MANHOLE
TOP=809.00
INV IN=803.95 (FROM 1B)
INV IN =801.66 (FROM CHAMBERS)
INV OUT=800.00
48" MANHOLE
TOP=809.50
INV IN=804.83 (FROM EX7)
INV OUT=801.66 (TO CHAMBERS)
INV OUT=803.95 (TO 1A)
INV OUT=803.95
YARD INLET
TOP=821.00
INV IN=815.60 (FROM 3)
INV OUT=815.60
YARD INLET
TOP=821.30
INV IN=815.80 (FROM 4)
INV IN=818.00 (FROM 14)
INV OUT=815.80
YARD INLET
TOP=821.30
INV IN=816.35 (FROM 5)
INV IN=817.00 (FROM 12)
INV OUT=816.35
YARD INLET
TOP=821.30
INV IN=816.50 (FROM 6)
INV OUT=816.50
24" BASIN W/ DOMED GRATE
TOP=821.00
INV OUT=817.00
PIPE OUTLET
INV IN=820.00
YARD INLET
TOP=823.00
INV IN=820.40 (FROM 9)
INV OUT=820.40
YARD INLET
TOP=824.00
INV IN=821.00 (FROM 10)
INV IN=821.00 (FROM 13)
INV OUT=821.00
YARD INLET
TOP=825.00
INV OUT=822.50
YARD INLET
TOP=826.00
INV OUT=823.50
YARD INLET
TOP=821.00
INV OUT=818.00
YARD INLET
TOP=824.00
INV OUT=821.50
TRENCH DRAIN AND CATCH BASIN
TOP=822.35
INV OUT=820.50
VDOT STD. DI-3B; L=6'
TOP=820.10
INV OUT=815.70
VDOT STD. DI-3B; L=8'
TOP=821.80
INV=812.0± (MATCH EX.)
1A
1B
PROPOSED PIPE SCHEDULE
1A - 1B
2 - 3
3 - 4
3 - 14
4 - 5
4 - 12
5 - 6
7 - 8
8 - 9
9 - 10
9 - 13
10 - 11
EX2 - 15
EX5 - 2
EX8 - 1A
10 LF OF 18" N-12 HDPE @ 0.00%
24 LF OF 15" N-12 HDPE @ 0.85%
66 LF OF 15" N-12 HDPE @ 0.83%
56 LF OF 8" SCH. 40 PVC @ 4.45%
17 LF OF 15" N-12 HDPE @ 0.91%
54 LF OF 12" N-12 HDPE @ 1.85%
55 LF OF 15" N-12 HDPE @ 0.92%
38 LF OF 15" N-12 HDPE @ 1.06%
65 LF OF 15" N-12 HDPE @ 0.92%
104 LF OF 15" N-12 HDPE @ 1.44%
56 LF OF 12" N-12 HDPE @ 0.89%
49 LF OF 12" N-12 HDPE @ 2.03%
61 LF OF 15" N-12 HDPE @ 7.98%
14 LF OF 15" N-12 HDPE @ 0.70%
70 LF OF 18" N-12 HDPE @ 2.84%
1" = 20'
20 10 20 40
GRAPHIC SCALE IN FEET
N O
R
TH
Date:
Revisions:
Review By:
Project No.
Drawn By:
Sheet No.
STUDIO
HILL
Landscape Architecture Architecture
Community Planning Historic Preservation
120 W. Campbell Ave. SW Roanoke, VA 24011 tel: 540-342-5263 fax: 540-345-5625 www.hillstudio.com
Title:
Seal
10 9 8 7 6 5 4 3 2 1
G
F
E
D
C
B
Lynchburg Heritage Park
LYNCHBURG,
VIRGINIA
A 5 4 3 2 110 9 8 7 6
ASK
ASK
20241346
3/13/2026
ANDREW S. KLEPAC
Lic. No. 048440
3/13/2026
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
2524 LANGHORNE ROAD
LYNCHBURG VA 24501
HANDP.COM WEBSITE
434.847.7796 MAIN
434.847.0047 FAX
INSPIRED / RESPONSIVE / TRUSTED
PER CITY TRC COMMENTS
C-101
GRADING PLAN
CONTOUR825
PROPOSED LEGEND
STORM SEWER
STORM SEWER INLET
1 STORM STRUCTURE LABEL
CLEANOUTCO
To be constructed and installed by the City of Lynchburg
To be constructed and installed by the
U
W W
W W
W W
W
W
W W
W
IRR
U
U
INV OUT: 787.4'
18" RCP
12" CMP
12" HDPE
CO
MATCHLINE
D D
1A
UNDERGROUND DETENTION
822.50 822.65
823.20823.35
822.58
806.15
803.85
803.60
805.50
1B
VDOT CL II RIPRAP
5'W X 22'L
MIN. 3' THICK
±12 CY MIN.
M A
TC
H
LI
N
E
6" N-12 HDPE
INV=798.00
CONTRACTOR TO VERIFY LINE SIZE AND
PROVIDE CORRESPONDING RPZ IN
HEATED ENCLOSURE ON CONC. PAD.
RPZ: WILKINS 975XL3 (0.25% LEAD FREE)
1" = 20'
20 10 20 40
GRAPHIC SCALE IN FEET
N O
R
TH
Date:
Revisions:
Review By:
Project No.
Drawn By:
Sheet No.
STUDIO
HILL
Landscape Architecture Architecture
Community Planning Historic Preservation
120 W. Campbell Ave. SW Roanoke, VA 24011 tel: 540-342-5263 fax: 540-345-5625 www.hillstudio.com
Title:
Seal
10 9 8 7 6 5 4 3 2 1
G
F
E
D
C
B
Lynchburg Heritage Park
LYNCHBURG,
VIRGINIA
A 5 4 3 2 110 9 8 7 6
ASK
ASK
20241346
3/13/2026
ANDREW S. KLEPAC
Lic. No. 048440
3/13/2026
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
2524 LANGHORNE ROAD
LYNCHBURG VA 24501
HANDP.COM WEBSITE
434.847.7796 MAIN
434.847.0047 FAX
INSPIRED / RESPONSIVE / TRUSTED
PER CITY TRC COMMENTS
C-102
GRADING PLAN
CONTOUR825
PROPOSED LEGEND
STORM SEWER
STORM SEWER INLET
1 STORM STRUCTURE LABEL
CLEANOUTCO
To be constructed and installed by the City of Lynchburg
To be constructed and installed by the
835 80
5 820 81
X
X
H Y D
E
W
W V
S
S
O H
E
O H
E
OH E
OH E
OH E
OH E
OH E
UG E
UG E UG E
UG E
UG E UG E
UG E
UG
E
U G
E
UG E
UG E
U G
E
OH E
O H
E
O H
E
O H
E
X X
X
X X
X
X
X
X
O H
E
G
ATE
GATE
G
ATE
OLD GOALPOST
U
GOALPOST
IRR
W
W W W
W W
W W
W
W
W
IRR
UU
U
SS
SS
SS
SS
SS
SS
SS
(1)
8" PVC
8" TC
18" RCP
INV OUT: 803.5'
INV OUT: 801.3'
18" RCP
12" RCP
18" RCP
12" CMP
18" HDPE 18" HDPE
18" HDPE
U.G. FIELD DRAIN SHOWN APPROXIMATE
18" RCP
18" R C
P
DISC GOLF
TEE BOX
4 5 6
13 14
D
F
INV OUT: 805.1' 12" HDPE
12" HDPE
12" HDPE
E
SOURCE
NOT FOUND
3-A/C
1-STORY
BLOCK BLDG.
" R
C P
CO
12" HDPE
INV OUT: 820.8'
INV IN: 821.0'
GOALPOST
GOALPOST
G R
AVEL PATH
OLD GOALPOST
G
AT
E X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
PID #24808026
C & P TELEPHONE
(ANNEXED FROM CAMP. COUNTY)
PID #24808035
VERIZON VIRGINIA, INC.
INST. #020007162
ZONE 'AE'
ZONE 'X'
ZONE 'AE'ZONE 'X'
LOD
LOD
LODLOD
LOD
LOD LOD LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD LOD
LOD
LOD LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LOD
LO
D
LOD
LOD
LO
D
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LODLODLOD
LOD
LOD
X
X
X
X X
X
XX
X
XX
X
X X
X
X X
X X
X
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LODLO
D
LO
D
LOD LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
X
X X
X X
SF
SF
SF
SF
SF
SF
IP
IPIP
IP
IP
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
CE
IP IP IP
835 80
5 820 81
H Y D
W
W V
S
S
O H
E
O H
E
OH E
OH E
OH E
OH E
OH E
UG E
UG E UG E
UG E
UG E UG E
UG E
UG
E
U G
E
O H
E
O H
E
O H
E
G
ATE
U
IRR
W
W W W
W W
W W
W
W
W
IRR
U
U
SS
SS
SS
SS
SS
SS
SS
(1)
8" PVC
8" TC
18" RCP
INV OUT: 803.5'
INV OUT: 801.3'
18" RCP
12" RCP
12" CMP
18" HDPE
U.G. FIELD DRAIN SHOWN APPROXIMATE
18" RCP
18" R C
P
4 5 6
D
F
INV OUT: 805.1' 12" HDPE
12" HDPE
12" HDPE
SOURCE
NOT FOUND
3-A/C
1-STORY
BLOCK BLDG.
" R
C P
CO
12" HDPE
INV OUT: 820.8'
INV IN: 821.0'
G
AT
E X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
PID #24808026
C & P TELEPHONE
(ANNEXED FROM CAMP. COUNTY)
PID #24808035
VERIZON VIRGINIA, INC.
INST. #020007162
ZONE 'AE'
ZONE 'X'
ZONE 'AE'ZONE 'X'
LOD
LOD
LODLOD
LOD
LOD LOD LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD LOD
LOD
LOD LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LOD
LO
D
LOD
LOD
LO
D
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LODLODLOD
LOD
LOD
X
X
X
X X
X
XX
X
XX
X
X X
X
X X
X X
X
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LO
D
LODLO
D
LO
D
LOD LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
X
X X
X X
D D
SF
SF
SF
SF
SF
SF
IP
IP
IP
IP
IP
IP
IP IP
IP
IP
IPIP
IP
X
IP
SF
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
PS
MU
PS
MU
PS
MU
IP
IP
1" = 50'
50 25 50 100
GRAPHIC SCALE IN FEET
N O
R
TH
Date:
Revisions:
Review By:
Project No.
Drawn By:
Sheet No.
STUDIO
HILL
Landscape Architecture Architecture
Community Planning Historic Preservation
120 W. Campbell Ave. SW Roanoke, VA 24011 tel: 540-342-5263 fax: 540-345-5625 www.hillstudio.com
Title:
Seal
10 9 8 7 6 5 4 3 2 1
G
F
E
D
C
B
Lynchburg Heritage Park
LYNCHBURG,
VIRGINIA
A 5 4 3 2 110 9 8 7 6
ASK
ASK
20241346
3/13/2026
ANDREW S. KLEPAC
Lic. No. 048440
3/13/2026
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
2524 LANGHORNE ROAD
LYNCHBURG VA 24501
HANDP.COM WEBSITE
434.847.7796 MAIN
434.847.0047 FAX
INSPIRED / RESPONSIVE / TRUSTED
PER CITY TRC COMMENTS
C-103
EROSION &
SEDIMENT
CONTROL PLAN
PHASE 1 EROSION & SEDIMENT CONTROL PLAN PHASE 2 EROSION & SEDIMENT CONTROL PLAN
VIRGINIA CONSTRUCTION BEST
MANAGEMENT PRACTICES (BMPs)
SF SILT FENCE
C-PCM-04
CE CONSTRUCTION ENTRANCE
C-SCM-03
PS PERMANENT SEEDING
C-SSM-10
MU MULCHING
C-SSM-11
IP INLET PROTECTION
C-SCM-04
To be constructed and installed by the City of Lynchburg
To be constructed and installed by the
Review By:
Project No.
Drawn By:
Sheet No.
STUDIO
HILL
Landscape Architecture Architecture
Community Planning Historic Preservation
120 W. Campbell Ave. SW Roanoke, VA 24011 tel: 540-342-5263 fax: 540-345-5625 www.hillstudio.com
Title:
Seal
10 9 8 7 6 5 4 3 2 1
G
F
E
D
C
B
Lynchburg Heritage Park
LYNCHBURG,
VIRGINIA
A 5 4 3 2 110 9 8 7 6
ASK
ASK
20241346
3/13/2026
ANDREW S. KLEPAC
Lic. No. 048440
3/13/2026
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
2524 LANGHORNE ROAD
LYNCHBURG VA 24501
HANDP.COM WEBSITE
434.847.7796 MAIN
434.847.0047 FAX
INSPIRED / RESPONSIVE / TRUSTED
PER CITY TRC COMMENTS
C-201
EROSION &
SEDIMENT
CONTROL
DETAILS
EROSION AND SEDIMENT CONTROL DEVICES:
PERIMETER EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY. AS CONSTRUCTION PROCEEDS, ALL ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED AS SOON AS POSSIBLE. EROSION AND SEDIMENT CONTROL DEVICES AS SHOWN ON THE PLAN ARE A MINIMUM AND THE PROJECT CONDITION MAY DICTATE ADDITIONAL CONTROL. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE PER THE LATEST EDITION OF THE VIRGINIA STORMWATER MANAGEMENT
HANDBOOK.
EROSION AND SEDIMENT CONTROL MAINTENANCE:
THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL EROSION CONTROL DEVICES FOR THE DURATION OF THE PROJECT. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE CHECKED WEEKLY AND WITHIN 24 HOURS OF ANY RUNOFF-PRODUCING RAINFALL TO INSURE THAT ALL DEVICES ARE IN PLACE AND FUNCTIONING AS REQUIRED. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE MAINTAINED PER THE LATEST EDITION OF THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK. IN GENERAL, IF THE SILT BUILT UP BEHIND A BARRIER BECOMES AS DEEP AS 9 INCHES, THE SILT IS TO BE REMOVED AND THE BARRIER REPAIRED OR REPLACED.
AFTER COMPLETION OF THE PROJECT, AND PERMANENT SEEDING HAS BEEN ESTABLISHED, EROSION CONTROL DEVICES AND ANY SILT BUILT UP SHALL BE REMOVED. DISTURBED AREAS DUE TO THIS CLEANUP OPERATION
SHALL BE REPAIRED, RESEEDED AND REMULCHED.
EROSION AND SEDIMENT CONTROL NARRATIVE
PROJECT DESCRIPTION
THIS PROJECT CONSISTS OF IMPROVEMENTS AT HERITAGE PARK IN LYNCHBURG, VIRGINIA. A TOTAL OF 2.60 ACRES WILL BE
DISTURBED AS A RESULT OF CONSTRUCTION.
EXISTING SITE CONDITIONS
THE SITE IS PREDOMINANTLY A GRASSED AREA, WITH SIDEWALKS AND DRIVES. RUNOFF DRAINS FROM WEST TO EAST.
ADJACENT PROPERTY
THE PROJECT IS WITHIN HERITAGE PARK, AND IS ADJACENT TO WOODED AREAS TO THE SOUTH AND EAST, A VERIZON
BUILDING TO THE WEST, AND THE HERITAGE HIGH SCHOOL CAMPUS TO THE NORTH.
CRITICAL AREAS
NO CRITICAL AREAS HAVE BEEN IDENTIFIED FOR THIS DEVELOPMENT.
OFFSITE AREAS
CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT A SITE PLAN IS SUBMITTED FOR APPROVAL, FOR ANY BORROW AREAS OFF SITE, OR AN AMENDED PLAN IS FILED FOR ANY WASTE AREAS ON SITE BEYOND THOSE NOTED ON THE PLANS.
SOILS
THE MOST RECENT SOIL SURVEY MAP FOR THE PROJECT SITE INDICATES THAT THE SITE CONSISTS OF CECIL FINE SANDY
LOAM (K=0.20, HYD. GROUP B); AND WILKES LOAM (K=0.37, HYD. GROUP C)
STORMWATER
QUALITY
THE PROJECT'S REMOVAL REQUIREMENT WILL BE PROVIDED BY A PROPOSED LEVEL 1 BIORETENTION BASIN, A
MANUFACTURED TREATMENT DEVICE, AND DESIGNATING CONSERVED OPEN SPACE.
QUANTITY
DRAINAGE AREA #1: THIS DRAINAGE AREA DISCHARGES TO AN EXISTING (MANMADE) STORM SEWER SYSTEM IN THE EXISTING PARKING LOT. THE DRAINAGE AREA TO THIS SYSTEM WILL BE REDUCED TO ALLOW FOR COMPLIANCE WITH THE ENERGY BALANCE CRITERIA FOR CHANNEL PROTECTION, AND THE 10-YEAR FLOW WILL BE REDUCED BELOW PRE-DEVELOPMENT VALUES. THIS PIPE SYSTEM IS ADEQUATE FOR CONVEYING THE POST-DEVELOPED FLOW FROM THE
PROJECT. THIS PIPE DISCHARGES INTO A 100-YEAR FLOODPLAIN.
DRAINAGE AREA #2: THIS DRAINAGE AREA DISCHARGES TO AN EXISTING (MANMADE) STORM SEWER SYSTEM IN THE EXISTING PARKING LOT. STORMWATER QUANTITY CONTROL FOR THIS DRAINAGE AREA WILL BE PROVIDED BY A BIORETENTION BASIN AND AN UNDERGROUND DETENTION SYSTEM. THESE MEASURES WILL ALLOW FOR COMPLIANCE WITH THE ENERGY BALANCE CRITERIA FOR CHANNEL PROTECTION. THIS PIPE SYSTEM IS ADEQUATE FOR CONVEYING THE POST-DEVELOPED FLOW FROM THE PROJECT. THE RECEIVING CHANNEL BELOW THE PIPE WAS ANALYZED TO THE 100-YEAR
FLOODPLAIN, AND WAS FOUND TO BE ADEQUATE.
DRAINAGE AREA #3: THIS DRAINAGE AREA DISCHARGES TO AN EXISTING (MANMADE) STORM SEWER SYSTEM IN THE EXISTING PARKING LOT. THE DRAINAGE AREA TO THIS SYSTEM WILL BE REDUCED TO ALLOW FOR COMPLIANCE WITH THE ENERGY BALANCE CRITERIA FOR CHANNEL PROTECTION, AND THE 10-YEAR FLOW WILL BE REDUCED BELOW PRE-DEVELOPMENT VALUES. THIS PIPE SYSTEM IS ADEQUATE FOR CONVEYING THE POST-DEVELOPED FLOW FROM THE PROJECT. THE RECEIVING CHANNEL BELOW THE PIPE WAS ANALYZED TO THE 100-YEAR FLOODPLAIN, AND WAS FOUND TO
BE ADEQUATE.
DRAINAGE AREA #4: THIS DRAINAGE AREA DISCHARGES AS SHEET FLOW. THE RECEIVING AREA BELOW THE SIDEWALK WAS ANALYZED TO SHOW THAT THE FLOW DEPTH IS NO MORE THAN 0.10' FOR STORMS UP TO AND INCLUDING THE 10-YEAR EVENT. THE SHEET FLOW VELOCITIES ARE NON-EROSIVE. THUS, THE SHEET FLOW WILL NOT CAUSE OR CONTRIBUTE TO
EROSION, SEDIMENTATION, OR FLOODING OF DOWN GRADIENT PROPERTIES OR RESOURCES.
THE 12-DIGIT HUC FOR THIS PROJECT IS 020802030304 (JM10).
THE VIRGINIA RUNOFF REDUCTION METHOD RE-DEVELOPMENT SPREADSHEET WAS USED FOR QUALITY CALCULATIONS, AND THE NRCS (TR-55 AND TR-20) METHOD WAS USED FOR QUANTITY CALCULATIONS.
EROSION AND SEDIMENT CONTROL
CONSTRUCTION ENTRANCE (CE) - WHERE THE ENTRANCE IS PROPOSED IN PAVED AREAS CONTRACTOR SHALL REMOVE ALL MUD, DIRT, AND DEBRIS PRIOR TO ENTERING THE PUBLIC RIGHT OF WAY. CONTRACTOR SHALL INSTALL ADDITIONAL STONE STABILIZATION AS NECESSARY TO PREVENT TRACKING ONTO THE EXISTING ROADWAY WITHIN THE LIMITS OF
CONSTRUCTION.
SILT FENCE (SF) - A TEMPORARY SEDIMENT BARRIER CONSTRUCTED OF POSTS PLACED ACROSS OR AT THE TOE OF A SLOPE OR IN A MINOR DRAINAGE WAY TO INTERCEPT AND DETAIN SEDIMENT AND DECREASE FLOW VELOCITIES FROM
DRAINAGE AREAS OF LIMITED SIZE.
INLET PROTECTION (IP) - STORM DRAIN INLET PROTECTION SHALL BE PLACED AT THE INLET OF ALL CURB AND DROP INLETS
TO FILTER SEDIMENT-LADEN RUNOFF.
PERMANENT SEEDING (PS) - ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER BY PLANTING SEED ON ROUGH-GRADED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A YEAR OR MORE OR WHERE PERMANENT, LONG-LIVED
VEGETATIVE COVER IS NEEDED ON FINE-GRADED AREAS.
MULCHING (MU) - APPLICATION OF PLANT RESIDUES OR OTHER SUITABLE MATERIALS TO DISTURBED SURFACES TO PREVENT EROSION AND REDUCE OVERLAND FLOW VELOCITIES. FOSTERS PLANT GROWTH BY INCREASING AVAILABLE
MOISTURE AND PROVIDING INSULATION AGAINST EXTREME HEAT OR COLD.
VEGETATIVE MEASURES
TEMPORARY SEEDING/PERMANENT STABILIZATION: SEEDING MEASURES SHALL BE TAKEN ON DISTURBED SOIL AT CUT/FILL SLOPES, SIDES OF SEDIMENT BASINS, DITCH LINES, OR AREAS OUTSIDE OF ON-GOING CONSTRUCTION PRACTICES WITHIN SEVEN (7) DAYS OF COMPLETED GRADING. ALL AREAS DISTURBED BY CONSTRUCTION WILL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING FINAL GRADING. UNLESS OTHERWISE INDICATED, ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE LATEST EDITION OF THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK.
MANAGEMENT STRATEGIES
- EROSION AND SEDIMENT CONTROL SHOULD BE DISCUSSED BETWEEN THE GRADING CONTRACTOR AND THE OWNER
PRIOR TO ANY EXCAVATION SO THAT LIMITS OF CONSTRUCTION AND EROSION CONTROL METHODS ARE CLEARLY
UNDERSTOOD BY BOTH PARTIES.
- CONSTRUCTION WILL BE SEQUENCED SO THAT GRADING OPERATIONS CAN BEGIN AND END AS QUICKLY AS POSSIBLE.
- THERE IS TO BE NO TRACKING OF MUD OR DIRT BY CONSTRUCTION EQUIPMENT ONTO ANY PAVED DRIVES OR ROADS.
- SEDIMENT TRAPPING MEASURES WILL BE INSTALLED AS A FIRST STEP IN GRADING AND WILL BE SEEDED AND MULCHED
IMMEDIATELY FOLLOWING INSTALLATION.
- SEEDING OR OTHER STABILIZATION WILL FOLLOW IMMEDIATELY AFTER GRADING.
- AREAS WHICH ARE NOT TO BE DISTURBED WILL BE CLEARLY MARKED BY FLAGS, SIGNS, ETC.
- AFTER ACHIEVING ADEQUATE STABILIZATION, THE TEMPORARY E&S CONTROLS WILL BE CLEANED UP AND REMOVED.
PERMANENT STABILIZATION
ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING FINISH GRADING. MULCH (STRAW OR FIBER) WILL BE USED ON RELATIVELY FLAT AREAS. IN ALL SEEDING OPERATIONS, SEED, FERTILIZER AND LIME WILL BE APPLIED PRIOR TO MULCHING.
SUGGESTED CONSTRUCTION SEQUENCE
1. INSTALL CONSTRUCTION ENTRANCE(S).
2. INSTALL PERIMETER CONTROLS AND ALL APPURTENANCES AS SHOWN ON PLANS.
3. CLEAR AND GRUB SITE; STRIP AND STOCKPILE TOPSOIL.
4. BEGIN SITE BULK GRADING.
5. INSTALL STORM SEWER; INSTALL INLET PROTECTION AS EACH STORMWATER STRUCTURE IS PLACED.
6. CONSTRUCT SITE AND LANDSCAPE IMPROVEMENTS.
7. COMPLETE FINAL SITE GRADING.
8. INSTALL PERMANENT SEEDING AND MULCH ON ALL DISTURBED AREAS.
9. BIORETENTION SHALL BE INSTALLED UPON STABILIZATION OF ALL UPSTREAM DRAINAGE AREAS.
10. CONTRACTOR TO RESTORE ALL AREAS BACK TO EITHER PROPOSED GRADES OR EXISTING CONDITIONS AFTER
COMPLETION OF THE PROJECT. ALL DISTURBED AREAS, HAUL ROADS, CONSTRUCTION ROADS, LAY DOWN AREAS, ETC.
SHALL BE RESTORED.
GENERAL EROSION AND SEDIMENT CONTROL NOTES
ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA STORMWATER MANAGEMENT HANDBOOK AND VIRGINIA REGULATIONS EROSION AND STORMWATER MANAGEMENT REGULATIONS.
ES-2: THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION.
ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING.
ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.
ES-5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT
LIMITED TO, OFF SITE BORROW AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE
OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY.
ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO
PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY.
ES-7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING
ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.
ES-8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE.
ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING
RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES
SHALL BE MADE IMMEDIATELY.
To be constructed and installed by the City of Lynchburg
To be constructed and installed by the
OUTFALL REPAIR PROFILE
CHANNEL BELOW EXISTING STRUCTURE #8
N.T.S.
MIN. 3' THICK CL II RIPRAP
PER VDOT STD. EC-1
GEOTEXTILE FABRIC
EXISTING PIPE AND HEADWALL
FILTER FABRIC AND CL II RIPRAP TO
EXTEND TO EXISTING GRADE, UNLESS
ROOTS ARE ENCOUNTERED. IF ROOTS
ARE PRESENT, FILL MATERIAL TO BE AS
DIRECTED BY THE OWNER.
EXISTING GRADE
Date:
Revisions:
Review By:
Project No.
Drawn By:
Sheet No.
STUDIO
HILL
Landscape Architecture Architecture
Community Planning Historic Preservation
120 W. Campbell Ave. SW Roanoke, VA 24011 tel: 540-342-5263 fax: 540-345-5625 www.hillstudio.com
Title:
Seal
10 9 8 7 6 5 4 3 2 1
G
F
E
D
C
B
Lynchburg Heritage Park
LYNCHBURG,
VIRGINIA
A 5 4 3 2 110 9 8 7 6
ASK
ASK
20241346
3/13/2026
ANDREW S. KLEPAC
Lic. No. 048440
3/13/2026
ENGINEERING • SURVEYING • LAND DEVELOPMENT • ENVIRONMENTAL
GEOTECHNICAL • CONSTRUCTION TESTING & INSPECTION • CULTURAL RESOURCES
2524 LANGHORNE ROAD
LYNCHBURG VA 24501
HANDP.COM WEBSITE
434.847.7796 MAIN
434.847.0047 FAX
INSPIRED / RESPONSIVE / TRUSTED
PER CITY TRC COMMENTS
C-202
STORMWATER
DETAILS
24"
3"
9"
PER PLAN
3:13:1
BIORETENTION DETAIL (P-FIL-05)
N.T.S.
Vr=0.40
Vr=0.40
3" MULCH
Vr=0.25
FILTER MEDIA
85% SILICA-BASED SAND
10% SOIL FINES (SANDY LOAM OR LOAMY SAND)
5% LEAF COMPOST (FULLY COMPOSTED, NOT
PARTIALLY ROTTED LEAVES)
CONTRACTOR SHALL PROVIDE SOURCE OF
BIO-RETENTION MEDIA MIX.
PEA GRAVEL
CLEAN WASHED
#57 STONE
6" PERFORATED SCH. 40 PVC
UNDERDRAIN @ MIN. 0.5% SLOPE.
PERFORATIONS TO BE BY
MANUFACTURER; 3 8" Ø AT 6" O.C.
INSTALL 4' WIDE FILTER FABRIC STRIP OVER
UNDERDRAIN AND ON SIDES OF
BIORETENTION. FILTER FABRIC TO BE
NON-WOVEN W/MIN. FLOW RATE OF 150
GPM/SF (GEOTEX 351 OR APPROVED EQUAL)
KEY-IN FILTER
FABRIC (TYP)
MIN. ELEV=821.80
24" NYLOPLAST BASIN
WITH DOMED GRATE
TOP=821.00
INV OUT=817.00
ELEV=820.00
SLOPES TO BE SOD OR OTHER
LAND COVER AS SPECIFIED ON
THE LANDSCAPE DRAWINGS
STORMWATER BMP NOTES
1. UG DETENTION BASIS-OF-DESIGN PRODUCT: STORMTECH MC-7200 CHAMBERS OR APPROVED EQUAL.
THIS BMP IS LISTED AS "STORMTECH ISOLATOR ROW PLUS" ON THE DEQ BMP CLEARINGHOUSE.
2. UNDERGROUND STORAGE SYSTEM SHALL HAVE A MINIMUM H-20 LOAD RATING.
3. BIORETENTION TO BE INSTALLED UPON STABILIZATION OF ALL UPSTREAM DRAINAGE AREAS.
4. BIORETENTION INSTALLATION, MAINTENANCE, AND INSPECTION SHALL CONFORM TO VIRGINIA DEQ
STORMWATER DESIGN SPECIFICATION P-FIL-05.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE PROPOSED BMP FACILITIES ONCE
ALL CONNECTIONS HAVE BEEN COMPLETED, AND SHALL CERTIFY THAT THE BMP HAS BEEN
MAINTAINED PER MANUFACTURER'S MAINTENANCE GUIDELINES (OR RELEVANT INDUSTRY
STANDARDS) PRIOR TO TRANSFER TO THE OWNER.
6. THE CONTRACTOR SHALL PROVIDE "AS-BUILT" DRAWINGS OF ALL STORMWATER MANAGEMENT
FACILITIES. CONTRACTOR SHALL CONTACT ENGINEER TO COORDINATE INSPECTION OF
UNDERGROUND STORMWATER MANAGEMENT COMPONENTS PRIOR TO BACKFILLING. THE "AS-BUILT"
DRAWINGS SHALL SHOW THE ACTUAL FINISHED GROUND CONTOURS, OUTLET STRUCTURE
DIMENSIONS AND ELEVATIONS, ETC. AS THEY EXIST AT THE COMPLETION OF THE PROJECT. BEFORE
THE E&SC AND SWM BOND CAN BE RELEASED, THE CITY OF LYNCHBURG WILL REQUIRE THAT:
A. LYNCHBURG'S ENVIRONMENTAL SITE INSPECTOR MUST BE CONSULTED PRIOR TO INSTALLING THE
UNDERGROUND DETENTION (UGD) FACILITY; AND
B. AS-BUILT SURVEYS MUST BE CONDUCTED AS THE UGD IS BEING INSTALLED; AND
C. THE UGD BE CAMERED/CCTV-ED, AND THAT PICTURES/VIDEOS BE SUBMITTED TO THE CITY FOR
REVIEW; AND
D. A LETTER FROM THE BMP MANUFACTURER OR PROJECT ENGINEER NEEDS TO BE
SUBMITTED, CERTIFYING THAT: THE BMP HAS BEEN INSTALLED CORRECTLY, THE BMP HAS BEEN
ACTIVATED / IS ONLINE, AND THAT THE BMP IS FUNCTIONING AS DESIGNED.
GRADING NOTES
1. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE PER THE STANDARDS AND
SPECIFICATIONS OF THE MOST RECENT VERSION OF THE VIRGINIA STORMWATER MANAGEMENT
CONTROL HANDBOOK (VSMH).
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EROSION CONTROL DEVICES FOR THE DURATION OF THE PROJECT. ALL EROSION CONTROL DEVICES SHALL BE CHECKED DAILY TO ENSURE THAT ALL ARE PROPERLY IN PLACE AND FUNCTIONING AS PLANNED. ALL EROSION CONTROL DEVICES WILL BE REPAIRED (CLEANED) AS NECESSARY, AND AFTER EACH RAINFALL PRODUCING
RUNOFF AS A MINIMUM.
3. ALL DISTURBED AREAS TO RECEIVE TEMPORARY SEEDING, PERMANENT SEEDING AND MULCH. ALL SLOPES STEEPER THAN 3:1 MUST RECEIVE BLANKET AND MATTING IN ADDITION TO SEEDING AND
MULCHING PRACTICES.
4. ALL FILL SHALL BE COMPACTED TO MINIMUM 95% STANDARD PROCTOR. FILL UNDER BUILDING SHALL BE COMPACTED TO 98% STANDARD PROCTOR. ALL FILL SHALL BE PLACED IN 8" LOOSE LIFTS.
5. CONTRACTOR IS TO FURNISH THE NAME OF THEIR VIRGINIA CERTIFIED RESPONSIBLE LAND
DISTURBER TO THE CITY OF LYNCHBURG PRIOR TO ANY LAND DISTURBANCE.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL ADDITIONAL E&S MEASURES OR
MAINTENANCE REQUESTS OR REROUTING, OR RELOCATING, E&S MEASURES AS DEEMED
NECESSARY BY THE CITY OF LYNCHBURG.
7. ALL FILL AREAS TO BE STRIPPED OF UNSUITABLE MATERIAL BEFORE PLACING AND COMPACTING FILL
MATERIAL.
8. CONTRACTOR SHALL BACKFILL TO THE EDGE OF PAVEMENT AND COMPACT. CONTRACTOR SHALL
SEED, FERTILIZE AND MULCH IMMEDIATELY UPON COMPLETION OF GRADING OPERATIONS.
9. CONTRACTOR SHALL CONTACT ENGINEER IF ADDITIONAL CONSTRUCTION ENTRANCE MEASURES ARE NEEDED TO PREVENT THE TRACKING OF MUD, DIRT, OR DEBRIS ONTO ANY PAVED SURFACES
INSIDE OR OUTSIDE OF THE PROPOSED CONSTRUCTION LIMITS.
10. A SOIL TEST IS REQUIRED, PRIOR TO FINAL SITE STABILIZATION, TO DETERMINE FERTILIZER
APPLICATION RATES FOR THE ESTABLISHMENT OF GRASS ON THE SITE.
11. ALL TEMPORARY MEASURES MUST BE REMOVED WITHIN 30 DAYS OF PERMANENT STABILIZATION OF
THE SITE.
12. CONTRACTOR RESPONSIBLE FOR OBTAINING AN APPROVED E&S PLAN FOR ALL OFFSITE WASTE OR
BORROW AREAS IF NEEDED.
13. THE CITY OF LYNCHBURG HAS THE AUTHORITY TO ADD OR DELETE E&S CONTROLS ON AN
AS-NEEDED BASIS.
14. NO E&S CONTROLS CAN BE REMOVED WITHOUT APPROVAL FROM THE CITY OF LYNCHBURG.
15. ALL STORM PIPE IS TO BE INSTALLED PER MANUFACTURERS INSTRUCTIONS AND VDOT STD. PB-1.
16. ALL STORM SEWER STRUCTURES TO HAVE INVERT SHAPING PER VDOT STD. IS-1.
17. PROVIDE MIN. 6" TOPSOIL IN AREAS TO RECEIVE SEEDING.
MS-1: HAS TEMPORARY STABILIZATION BEEN ADDRESSED FOR ANY PERIOD LONGER THAN 14 DAYS AND PERMANENT STABILIZATION BEEN ADDRESSED FOR ANY PERIOD LONGER THAN ONE YEAR IN THE
NARRATIVE?
MS-2: HAS STABILIZATION OF SOIL STOCKPILES, BORROW AREAS, AND DISPOSAL AREAS BEEN
ADDRESSED IN THE NARRATIVE AND ON THE PLAN?
MS-3: HAS THE ESTABLISHMENT AND MAINTENANCE OF PERMANENT VEGETATIVE STABILIZATION BEEN
ADDRESSED?
MS-4: DOES THE PLAN SPECIFICALLY STATE THAT SEDIMENT-TRAPPING FACILITIES SHALL BE
CONSTRUCTED AS A FIRST STEP IN LAND-DISTURBING ACTIVITIES?
MS-5: DOES THE PLAN SPECIFICALLY STATE THAT STABILIZATION OF EARTHEN STRUCTURES IS
REQUIRED IMMEDIATELY AFTER INSTALLATION? IS THIS NOTED FOR EACH MEASURE ON THE
PLAN?
MS-6: ARE SEDIMENT TRAPS AND SEDIMENT BASINS SPECIFIED WHERE NEEDED AND DESIGNED TO THE
STANDARD AND SPECIFICATION?
MS-7: HAVE THE DESIGN AND TEMPORARY/PERMANENT STABILIZATION OF CUT AND FILL SLOPES BEEN
ADEQUATELY ADDRESSED? IS SURFACE ROUGHENING PROVIDED FOR SLOPES STEEPER THAN
3:1?
MS-8: HAVE ADEQUATE TEMPORARY OR PERMANENT CONVEYANCES (PAVED FLUMES, CHANNELS,
SLOPE DRAINS) BEEN PROVIDED FOR CONCENTRATED STORMWATER RUNOFF ON CUT AND FILL
SLOPES?
MS-9: HAS WATER SEEPING FROM A SLOPE FACE BEEN ADDRESSED (E.G., SUBSURFACE DRAINS)?
MS-10: IS ADEQUATE INLET PROTECTION PROVIDED FOR ALL OPERATIONAL STORM DRAIN AND CULVERT
INLETS?
MS-11: ARE ADEQUATE OUTLET PROTECTION AND/OR CHANNEL LININGS PROVIDED FOR ALL
STORMWATER CONVEYANCE CHANNELS AND RECEIVING CHANNELS? IS THERE A SCHEDULE
INDICATING:
1. DIMENSIONS OF THE OUTLET PROTECTION? LINING? SIZE OF RIPRAP?
2. CROSS SECTION AND SLOPE OF THE CHANNELS? TYPE OF LINING? SIZE OF RIPRAP, IF
USED?
MS-12: ARE IN-STREAM PROTECTION MEASURES REQUIRED SO THAT CHANNEL IMPACTS ARE MINIMIZED?
MS-13: ARE TEMPORARY STREAM CROSSINGS OF NON-ERODIBLE MATERIAL REQUIRED WHERE
APPLICABLE?
MS-14: ARE ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR
CROSSING LIVE WATERCOURSES BEING FOLLOWED?
MS-15: HAS IMMEDIATE RE-STABILIZATION OF AREAS SUBJECT TO IN-STREAM CONSTRUCTION (BED AND
BANKS) BEEN ADEQUATELY ADDRESSED?
MS-16: HAVE DISTURBANCES FROM UNDERGROUND UTILITY LINE INSTALLATIONS BEEN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .