This is a project manual and solicitation document for a public works elevator modernization project issued by the Washington State Department of Enterprise Services (DES) on behalf of Clark College. The project, numbered 2026-235 G (1-1), involves modernizing two existing passenger elevators—one in Anna Pechanec Hall (APH) and one in Cannell Library—at Clark College in Vancouver, Washington. The APH elevator modernization includes mechanical upgrades that were completed in 2025, while the Cannell Library work encompasses electrical upgrades and wet pipe sprinkler system upgrades. Two optional additive alternates are available: Alternate Bid No. 1 for replacement cab finishes at the Cannell Library elevator and Alternate Bid No. 2 for replacement cab finishes at the APH elevator. Bids are due by 1:00 PM on Thursday, August 20, 2026, through the DES Public Procurement Portal, with a virtual public bid opening via Microsoft Teams at approximately 1:30 PM the same day. A mandatory pre-bid walk-through is scheduled for 11:00 AM on Tuesday, August 4, 2026, at the Clark College Facilities Services Building. The contract duration specifies 205 calendar days for substantial completion and an additional 30 calendar days for final completion from the Notice to Proceed.
The estimated bid cost range is $320,000 to $430,000, with a 5% bid guarantee required for bids exceeding $35,000. Liquidated damages are assessed at $200 per calendar day for delays beyond the contract time. A minimum 15% apprenticeship utilization requirement applies to this project, with apprentices' participation tracked through the Washington Department of Labor & Industries' Prevailing Wage Intents and Affidavit system. Voluntary diversity business goals have been established at 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veteran-owned business participation. Contractors must meet mandatory responsibility criteria, including valid Washington contractor licensing, current business registration, prevailing wage training requirements, and compliance with wage theft prevention standards. Subcontractor listings for HVAC, plumbing, electrical, structural steel, and rebar installation are required at or shortly after bid submission. Washington State Sales Tax is excluded from bid prices but will be included in progress payments. The successful contractor must register with the DES Public Works Diversity Tracking & Management System (B2Gnow) to report monthly payment details to subcontractors and suppliers throughout the contract term.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLC - APH and Library
Elevator Modernizations
Project No. 2026-235 G (1-1)
PROJECT MANUAL
June 17, 2026
Contracting Agency:
Department of Enterprise Services
Facility Professional Servcies
Client Agency:
Clark College
CLC – APH and Library Elevator Modernizations Clark College
Project No. 2026-235 G (1-1)
Project Manual June 17, 2026
Contracting Agency:
State of Washington, Department of Enterprise Services
Facility Professional Services
Owner:
State of Washington, Department of Enterprise Services
Facility Professional Services 1500 Jefferson Street SE P.O. Box 41476 Olympia, WA 98504-1476 564-233-5874 Contact: Doug Craig, Project Manager
Client Agency:
Clark College
1933 Fort Vancouver Way Vancouver, WA 98663
360-992-2606 Contact: Richard Nevis, Architect, Facilities Services
Architect:
Starling Whitehead & Lux Architects PS
901 Fifth Avenue, Suite 3100 Seattle, WA 98164
206-682-8300 Contact: Ross Whitehead AIA
APPROVED FOR BID:
Rich Nevis II 7.15.26
Richard Nevis, Architect – Facilities Services, Clark College DATE
Doug Craig 07/13/26
Doug Craig, Project Manager, DES Facility Professional Services DATE
Nancy Deakins, Assistant Program Manager, DES Facility Professional Services DATE
7/20/2026
CLC – APH and Library Elevator Modernizations 00 0107 Clark College SEALS PAGE Project No. 2026-235 G (1-1) Page 1 of 1
June 17, 2026 00 0107-1
SECTION 00 0107 - SEALS PAGE
The undersigned hereby certifies that the Divisions 1 through 14 Technical Specifications in this Project Manual were prepared by me or under my direct supervision, and that I am duly registered under the laws of the State of Washington and hereby affix my "Professional Seal."
Ross M. Whitehead, AIA Starling Whitehead & Lux Architects
The undersigned hereby certifies that the Division 21 Technical Specifications in this Project Manual were prepared by me or under my direct supervision, and that I am duly registered under the laws of the State of Washington and hereby affix my "Professional Seal."
Kenton Aikens, PE, FPE, CFPS Interface Engineering
The undersigned hereby certifies that the Division 26 Technical Specifications in this Project Manual were prepared by me or under my direct supervision, and that I am duly registered under the laws of the State of Washington and hereby affix my "Professional Seal."
Cody Bargholz, PE, LEED AP, LC Interface Engineering
END OF DOCUMENT
CLC – APH and Library Elevator Modernizations 00 0110 Clark College TABLE OF CONTENTS Project No. 2026-235 G (1-1) Page 1 of 2
June 17, 2026 00 0110 - 1
00 00 01 - TABLE OF CONTENTS
Division 00 – Procurement and Contracting Requirements No. Title Pages
00 0107 Seals Page 00 0110 Table of Contents 00 0115 List of Drawing Sheets 00 0200 Instructions to Bidders for Washington State Facility Construction and Small Works
1. Advertisement for Bids
2. Bidding Terms and Conditions
3. Division 00 Supplemental Bidder Responsibility
i. Supplemental Bidder Responsibility Form 1 – Contractor Experience Detail
ii. Supplemental Bidder Responsibility Form 2 – Resume of Key Personnel for Proposed Project
iii. Supplemental Bidder Responsibility Form 5 – Reference Evaluation Questionnaire
iv. Supplemental Bidder Responsibility Form 6 – Evaluation Score Sheet
4. Plan Centers
5. Pre-Bid Walk-Through Agenda Template 00 5000 Contracting Forms and Supplements
1. Certificate of Insurance Form
2. Instructions for Submittal of Contractor Invoice for Payment
3. A-19 Invoice Voucher Form
4. Change Order Proposal (COP) Form
5. Field Authorization (FA) Form
6. Substantial Completion Checklist Form
7. Certificate of Substantial Completion Form
8. Final Acceptance Checklist Form
00 7200 General Conditions for Washington State Facility Construction and Small Works 00 7343 Prevailing Wage Rates
Division 01 - General Requirements No. Title Pages 01 1000 Summary 01 2000 Price and Payment Procedures 01 2050 Contract Modification Procedures Request for Equitable Adjustment in Contract Time 02 2300 Alternates 01 2500 Substitution Procedures Substitution Request Form 01 3000 Administrative Requirements Request for Information Form Preconstruction Checklist Template Construction Progress Meeting Agenda Template Construction Closeout Meeting Agenda Template 01 3216 Construction Progress Schedule
CLC – APH and Library Elevator Modernizations 00 0110 Clark College TABLE OF CONTENTS Project No. 2026-235 G (1-1) Page 2 of 2
June 17, 2026 00 0110 - 2
01 4000 Quality Requirements Notice of Nonconformance Form 01 4216 Definitions 01 5000 Temporary Facilities and Controls 01 6000 Product Requirements 01 7000 Execution Requirements 01 7419 Construction Waste Management and Disposal 01 7800 Closeout Submittals and Procedures
Division 07 – Thermal and Moisture Protection No. Title Pages
07 8400 Firestopping
Division 14 – Conveying Equipment No. Title Pages 14 2423 Hydraulic Passenger Elevators: Library 14 2423 Hydraulic Passenger Elevators: Anna Pechanec Hall
Division 21 – Fire Suppression No. Title Pages 21 0000 Fire Suppression Basic Requirements 21 0500 Common Work Results for Fire Suppression 21 1300 Fire Suppression Sprinkler Systems
Division 26 – Electrical No. Title Pages 26 0000 Electrical Basic Requirements 26 0509 Equipment Wiring 26 0519 Low-Voltage Electrical Power Conductors and Cables 26 0526 Grounding and Bonding for Electrical Systems 26 0529 Hangers and Supports for Electrical Systems and Equipment 26 0533 Raceways 26 0534 Boxes 26 0553 Identification for Electrical Systems 26 0573 Electrical Distribution System Studies 26 2726 Wiring Devices 26 2800 Overcurrent Protective Devices 26 2816 Enclosed Switches and Circuit Breakers 26 5100 Lighting
END OF SECTION
CLC – APH and Library Elevator Modernizations 00 0115 Clark College LIST OF DRAWING SHEETS Project No. 2026-235 G (1-1) 1 of 1
June 17, 2026 00 0115 - 1
SECTION 00 0115 - LIST OF DRAWING SHEETS
Sheet No. Contents
TITLE SHEETS
T1.00 Title Sheet T2.00 Site Staging & Access Plan
CANNELL LIBRARY
R3.10 Existing Condition Photos – Cannell Library
A2.10 Demolition Floor Plans – Cannell Library A3.10 Construction Floor Plans – Cannell Library A5.10 Sections and Details – Cannell Library
E1.10 Symbol List and General Notes – Electrical – Cannell Library E3.10 Power Plan – Cannell Library E6.10 Electrical One Line Diagram – Cannell Library E6.11 Panel Schedules – Cannell Library E7.10 Electrical Details – Cannell Library
ANNA PECHANEC HALL
R3.20 Existing Condition Photos – Pechanec Hall
A2.20 Demolition Floor Plans – Pechanec Hall A3.20 Construction Floor Plans – Pechanec Hall A5.20 Sections and Details – Pechanec Hall
E1.20 Symbol List and General Notes – Electrical – Pechanec Hall E3.20 Power Plan – Pechanec Hall E4.20 Enlarged Electrical Plan – Pechanec Hall E6.20 Electrical One Line Diagram – Pechanec Hall E6.21 Panel Schedules – Pechanec Hall E7.20 Electrical Details – Pechanec Hall
END OF SECTION
INSTRUCTIONS TO BIDDERS Effective July 1, 2026
Facility Professional Services Post Office Box 41476 Olympia, Washington 98504-1476
(360) 902-7272
Instructions to Bidders Effective: July 1, 2026
For Washington State Facility Construction and Small Works
Approved by: _____________________ Kimberly Sockle, Assistant Director
INSTRUCTIONS TO BIDDERS
FOR WASHINGTON STATE FACILITY CONSTRUCTION AND SMALL WORKS
PART 0 – GENERAL CONDITIONS
0.00 EXPLANATION TO PROSPECTIVE BIDDERS
A. In accordance with RCW 39.04.380 effective March 30, 2012, the State of Washington is enforcing a Reciprocal Preference for Resident Contractors. Any public works bid received from a nonresident contractor from a state that provides an in-state percentage bidding preference, a comparable percentage disadvantage must be applied to the bid of that nonresident contractor.
A nonresident contractor from a state that provides a percentage bid preference means a contractor that:
1. Is from a state that provides a percentage bid preference to its resident contractors bidding on public works contracts.
2. At the time of bidding on a public works project, does not have a physical office located in
Washington.
The state of residence for a nonresident contractor is the state in which the contractor was incorporated or, if not a corporation, the state where the contractor's business entity was formed.
All nonresident contractors will be evaluated for out-of-state Bidder preference. If the state of the nonresident contractor provides an in-state contractor preference, a comparable percentage disadvantage will be applied to their bid prior to contract award.
This section does not apply to public works procured pursuant to RCW 39.04.155, 39.04.280, or any other procurement exempt from competitive bidding.
B. Any prospective Bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must submit a request in writing to the Architect/Engineer (A/E) eight (8) business days before the bid due date or by logging into the DES Public Procurement Portal (https://deswa.bonfirehub.com) and submitting a vendor discussion. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective Bidder concerning a solicitation will be furnished promptly to all other prospective Bidders by addendum to the solicitation if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective Bidders.
C. In accordance with the legislative findings and policies set forth in RCW 39.19 the State of Washington encourages participation in all of its contracts by MWBE firms certified by the Office of Minority and Women’s Business Enterprises (OMWBE). Participation may be either on a direct basis in response to this invitation or as a subcontractor to a Bidder. However, unless required by federal statutes, regulations, grants, or contract terms referenced in the contract documents, no preference will be included in the evaluation of bids, no minimum level of MWBE participation shall be required as a condition for receiving an award, and bids will not be rejected or considered non-responsive on that basis. Any affirmative action requirements set forth in federal regulations or statutes included or referenced in the contract documents will apply.
D. In accordance with the legislative findings and policies set forth in RCW 43.60A.200, the State of Washington encourages 3% (three percent) participation in all of its contracts by Veteran-owned businesses (defined in RCW 43.60A.010) and located at:
https://dva.wa.gov/veterans-service-members-and-their-families/veteran-owned-businesses.
E. In order to report payment detail, the Contractor must create an account in the DES Public Works Diversity Tracking & Management System powered by B2GNow or verify if an account has already been created on behalf of the Contractor: https://des.diversitycompliance.com. The DES Public Works Diversity Tracking & Management System is designed to streamline and automate compliance reporting requirements, empowering vendors to maintain accurate contact information and submit contract payment details online.
1. For account login or account creation details, go to the DES Public Works Diversity Tracking
& Management System home page by clicking on the URL listed above and clicking on Information for Vendors.
2. Every month for the duration of the contract, and while the contract is active in the DES Public
Works Diversity Tracking & Management System, submit and accurately maintain the following payment information through the DES Public Works Diversity Tracking & Management System:
(a) Payments received by the prime contractor from the Agency.
(b) Payments paid to each first-tier subcontractor.
(c) Payments paid to each first-tier supplier.
3. The Contractor must also ensure the following information is reported in the DES Public Works
Diversity Tracking & Management System by first tier subcontractors and suppliers for the duration of the contract:
(a) Confirmation of payments from the prime contractor to the subcontractor.
(b) Payment reporting to each supplier.
E. In accordance with RCW 39.04.320, for all public works estimated to cost one million dollars or more, the State of Washington requires no less than 15% of the labor hours be performed by apprentices, unless otherwise stated in the bid advertisement or on the Submittal Questionnaire/Bidding Terms and Conditions. A contractor or subcontractor may not be required to exceed the 15% requirement. On applicable projects, the Bidder shall establish in the DES Public Procurement Portal and the Submittal Questionnaire/Bidding Terms and Conditions a minimum required percentage of apprentice labor hours compared to the total labor hours. The project’s apprenticeship utilization rate is calculated using the approved affidavits from the L&I portal.
Apprenticeship Requirements are not required for Small Works Projects estimated under $350K.
1. Incentives - The Contractor who meets or exceeds this utilization requirement on eligible contracts, will be awarded a monetary incentive described in the Apprentice Utilization Requirements of section 10.12 of the General Conditions.
2. Penalties - The Contractor who fails to meet the utilization requirement and fails to demonstrate a Good Faith Effort, as outlined below, is subject to penalties described in the Apprentice Utilization Requirements section in section 10.12 of the General Conditions.
Contractor will receive an invoice payable to the Owner within 30 days. The contractor will have 30 days to pay the penalty invoice at the time of receipt before the penalty is considered outstanding. Contractors with outstanding apprenticeship penalties may be considered non-responsive.
3. Cost Value - The expected cost value associated with meeting the goal is included in the
Base Bid as described in section 10.12 of the General Conditions.
4. Utilization Plan - The Contractor shall submit an Apprentice Utilization Plan (Plan) using the Supplemental Bidder Responsibility Criteria Form 4 demonstrating how they intend to achieve the Apprenticeship Utilization Requirements. The Plan shall have enough information to track the Contractor’s progress in meeting the utilization requirement. The Contractor shall submit the Plan on the Apprentice Utilization Plan template (on the DES Public Works Forms website).
(a) The Plan shall be submitted to the Project Manager when requested for the Supplemental
Bidder Responsibility Criteria. A Plan that fails to meet the minimum requirements in RCW 39.04.350 may result in the contractor being determined as not responsible.
(b) The Plan shall be uploaded to the Department of Labor & Industries’ (L&I) Prevailing Wage Intents and Affidavit (PWIA) system on L&I’s website within 10 business days of Notice to Proceed of the contract and prior to submitting the first invoice.
(c) It is expected that the Contractor will actively seek out opportunities to meet the
Apprentice Utilization Requirement during construction even if the Plan indicates a shortfall in meeting the requirement.
(d) The Contractor shall provide an updated Plan during the course of construction when there are significant changes to the Plan which may affect their ability to meet the requirement.
(e) If the Plan indicates that the Contractor will not attain the Apprentice Utilization Requirement, then Contractor must submit “Good Faith Effort” (GFE) documentation with their Plan to L&I’s PWIA system.
5 Additional Resource Information
(a) For questions regarding how to complete the Apprentice Utilization Plan template or Good Faith Effort documentation, please contact the Project Manager listed in the Bid Advertisement.
(b) Step-by-step instructions on how to access and navigate the L&I’s PWIA system, including uploading required documents can be found on the L&I website.
(c) Additional information about apprentice utilization on Public Works Project can be found on the L&I website.
0.01 PREPARATION OF BIDS
A. Bidders must be registered as a vendor through the DES Public Procurement Portal (https://deswa.bonfirehub.com). Bid submissions must be submitted through the DES Public Procurement Portal (https://deswa.bonfirehub.com). The individual who has signed/submitted the Bid through the E Portal shall be the authorized designee responsible for bid submissions.
B. All bidders for Small Works Projects must be currently registered on the MRSC Small Works Roster (vendor list) found http://mrscrosters.org/.
C. Bidders are required to submit bid prices for one or more items on various bases through the DES Public Procurement Portal on the BidTable, including: (1) lump sum base bid; (2) lump sum bid alternate prices; (3) unit prices; or (4) any combination of items 1 through 3 above.
D. If the solicitation includes alternate bid items, failure to bid on the alternates may disqualify the bid. If bidding on all items is not required, Bidders should indicate “no bid” on the DES Public Procurement Portal BidTable for any item on which no price is submitted.
E. Substitute bid forms will not be considered unless this solicitation authorizes their submission.
0.02 BID GUARANTEE
A. When the sum of the base bid plus all additive bid alternates is $35,000.00 or less, bid security is not required.
When the sum of the base bid plus all additive alternates is greater than $35,000.00, a bid guarantee in the amount of 5% of the base bid amount is required. Failure of the Bidder to provide bid guarantee when required shall render the bid non-responsive.
B. Acceptable forms of bid guarantee are A bid bond or postal money order, or certified check or cashier’s check made payable to the Washington State Treasurer. At the time of bid, the bidder must upload an electronic copy of the acceptable bid guarantee to the DES Public Procurement Portal (https://deswa.bonfirehub.com).
If any of the 3 lowest responsive bidders has indicated a cashier’s check as their form of bid security, they will be contacted by DES with instructions on how to submit the original/valid cashier’s check within 48 hours of being notified. The Owner will return bid guarantees (certified check or cashier’s check) to unsuccessful Bidders as soon as practicable, but not sooner than the execution of a contract with the successful Bidder. The successful Bidder’s bid guarantee will be returned to the successful Bidder with its official notice to proceed with the work of the contract.
C. The Bidder will allow 60 days from bid opening date for acceptance of its bid by the Owner.
The Bidder will return to the Owner a signed contract, insurance certificate and bond or bond waiver within 15 days after receipt of the contract. If the apparent successful Bidder fails to sign all contractual documents or provide the bond and insurance as required or return the documents within 15 days after receipt of the contract, the Owner may terminate the award of the contract.
D. In the event a Bidder discovers an error in its bid following the bid opening, the Bidder may request to withdraw its bid under the following conditions:
1. The Bidder must submit written notification of the withdrawal to the Owner within 24 hours following the bid opening.
2. The Bidder provides written documentation of the claimed error to the satisfaction of the
Owner within 72 hours following the bid opening.
3. The Owner will approve or disapprove the request for withdrawal of the bid in writing. If the
Bidder’s request for withdrawal of its bid is approved, the Bidder will be released from further obligation to the Owner without penalty. If it is disapproved, the Owner may retain the Bidder’s bid guarantee.
0.03 ADDITIVE OR DEDUCTIVE BID ITEMS
The low Bidder, for purposes of award, shall be the responsive Bidder offering the low aggregate amount for the base bid item, plus additive or deductive bid alternates selected by the Owner, and within funds available for the project.
The Bidder agrees to hold all bid alternate prices for sixty (60) days from date of bid opening.
0.04 ACKNOWLEDGEMENT OF ADDENDA
Bidders shall acknowledge receipt of all addenda to this solicitation by identifying the addenda numbers on the DES Public Procurement Portal Submittal Questionnaire. Failure to do so shall result in the bid being declared non-responsive.
0.05 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK
The Bidder acknowledges that it has taken steps necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to; (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and road; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site; (4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during the work.
The Bidder also acknowledges that it has satisfied itself as to character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including exploratory work done by the Owner, as well as from the drawings and specifications made a part of this contract. Any failure of the Bidder to take the actions described and acknowledged in this paragraph will not relieve the Bidder from responsibility for estimating properly the difficulty and cost of successfully performing the work.
0.06 BID AMOUNTS
A. The bid prices shown for each item on the DES Public Procurement Portal BidTable shall include all labor, material, equipment, overhead and compensation to complete all of the work for that item.
B. The actual cost of building permit (only) and the public utility hookup fees will be a direct reimbursement to the Contractor or paid directly to the permitting agency by the Owner. Fees for these permits should not be included by the Bidder in the bid amount.
C. The Bidder agrees to hold the base bid prices for sixty (60) days from date of bid opening.
0.07 TAXES
The bid amounts shall not include Washington State Sales Tax (WSST). All other taxes imposed by law shall be included in the bid amount. The Owner will include WSST in progress payments. The Contractor shall pay the WSST to the Department of Revenue and shall furnish proof of payment to the Owner if requested.
[NOTE: Contractor must bond for contract amount plus the WSST.]
0.08 SUBMISSION OF BIDS
A. Bids must be submitted on or before the time as specified in the Advertisement for Bids.
B. The Bid shall be submitted electronically through the DES Public Procurement Portal as specified in the Advertisement for Bids.
C. Prior to the bid opening, the Owner’s representative will designate the official bid clock. Any part of the Bid Form, or in the rare situation of a bid modification, not received prior to the specified times, per the designated bid clock, will not be considered and the bid will be returned to the Bidder unopened.
D. A bid may be withdrawn electronically by a Bidder’s authorized representative before the bid submittal date and time specified in the Advertisement for Bids.
E. People with disabilities who wish to request special accommodation, (e.g., sign language interpreters, braille, etc.) need to contact the Owner ten (10) business days prior to the scheduled bid opening.
F. In the event the DES Public Procurement Portal is unavailable to all users at the bid submittal deadline, DES will contact the Bidders within 24 hours, and DES will extend the bid submittal time.
G. Neither DES nor DES Public Procurement Portal can guarantee the availability of Internet connectivity or related telecommunication and hosting services and will not be liable or responsible if the Bidder and its representative(s) or designee(s) cannot connect to the DES Public Procurement Portal.
H. The Bidder must comply with the Euna Procurement Portal’s Terms of Service
(https://gobonfire.com/terms-service/) when submitting the Bid through the DES Public Procurement Portal.
0.09 SUBCONTRACTOR LISTING
Pursuant to RCW 39.30.060, when the consultant’s estimated cost of the project, including the base bid and additive alternates, is $1 million or more, bidders shall comply with the following requirements
Subcontractor Listing Requirements are not required for Small Works Projects estimated under $350K.
A. Form A: (HVAC, Plumbing and Electrical) must be submitted at TIME OF BID to the DES Public
Procurement Portal https://deswa.bonfirehub.com with bid submission; late submission will render the bid non-responsive.
1. Failure of the Bidder to submit the NAMES and LICENSE NUMBERS of such subcontractors, or to name itself to perform such work, shall render the bid nonresponsive. (Failure to submit this form will render the bid nonresponsive)
B. Form B: (Structural Steel Installation and Rebar Installation) must be submitted no later than forty-eight (48) hours after bid deadline via email to FPSsubcontractorlist@des.wa.gov.
(Or may be submitted with the bid submittal through the Procurement Portal https://deswa.bonfirehub.com.)
1. Failure of the Bidder to submit the NAMES of such subcontractors, or to name itself to perform such work, shall render the bid nonresponsive. (Failure to submit this form will render the bid nonresponsive)
C. The Bidder can name itself for the performance of the work. Bidders who name themselves to perform the work are expected to perform the work and the Department of Enterprise Services reserves the right to reject substitution of the bidder with a subcontractor unless the bidder demonstrates a change in circumstances from the time of bid submission that is outside of the control of the bidder.
1. For any listed category not included in the project, the bidder may mark 'Not Applicable' or
'N/A' or leave that category blank, provided the form is signed.
D. Substitution of a listed subcontractor (at any tier) before or after the award of the prime contract is prohibited except for the following reasons:
1. Refusal of the listed subcontractor to sign a contract with the prime contractor,
2. Bankruptcy or insolvency of the listed subcontractor,
3. Inability of the listed subcontractor to perform the requirements of the proposed contract or the project,
4. Inability of the listed subcontractor to obtain the necessary license, bonding, insurance, or other statutory requirements to perform the work detailed in the contract,
5. Refusal or inability to provide a letter of bondability from a surety company, or
6. The listed subcontractor is barred from participating in the project as a result of a court order.
E. The Bidder shall not list more than one Subcontractor for each category of work identified
UNLESS Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor will be used for which alternate.
F. Failure of the Bidder to submit Form A with the NAMES and LICENSE NUMBERS of such Subcontractors and Form B with the NAMES of such Subcontractors or to name itself to perform such work within the specified times, shall render the Bidder's bid nonresponsive and, therefore, will be eliminated (withdrawn) from the DES Public Procurement Portal.
G. The Subcontractor List Form A and Form B are intended to discourage bid shopping.
0.10 BID RESULTS
After the Bid Opening, Bidders may obtain bid results from the office of DES Facility Professional Services (FPS) or by logging into the DES Public Procurement Portal (https://deswa.bonfirehub.com) and viewing public notices. Bid results may also be obtained from the A/E.
0.11 BID PROTESTS
A. Bidders may submit a bid protest to easmail@des.wa.gov within 2 business days of the Bid Opening, or within 2 business days after DES provided electronic copies of bid submissions received to those Bidders that timely requesting copies of bids received, if later. To be considered timely for purposes of this Section 0.11, a request for electronic copies of bid submissions received must be made within 2 business days after the bid opening.
1. DES will not acknowledge or accept any bid protest received more than 2 business days after the time set out in (A) above.
2. DES will not accept bid protests from non-bidders.
B. DES will review any bid protest received and shall maintain sole discretion on the merits of and resolution of any bid protest.
C. DES will provide written notice to protesting bidders of an intent to enter upon a Public Works
Contract with anyone other than the protesting bidder as follows:
1. Not less than 2 business days following the Bid Opening, if no bidders request electronic copies of bid submissions received, or
2. Not less than 2 business days following the date on which DES provided electronic copies of the bid submissions received to those bidders requesting electronic copies of bids received.
0.12 LOW RESPONSIBLE BIDDER
A. Mandatory Responsibility Criteria: Before awarding a public works contract, a Bidder must meet the following mandatory responsibility criteria under RCW 39.04.350 (1) & (2) to be considered a responsible Bidder and qualified to be awarded a public works project. The individual who has signed/submitted the Bid through the DES Public Procurement Portal shall be the authorized designee responsible for bid submissions. The Bidder must:
1. At the time of bid submittal, have a certificate of registration in compliance with RCW 18.27, a plumbing contractor license in compliance with RCW 18.106, an elevator contractor license in compliance with RCW 70.87, or an electrical contractor license in compliance with RCW
19.28 as required under the provisions of those chapters.
2. Have a current state unified business identifier number.
3. If applicable, have industrial insurance coverage for the Bidder's employees working in Washington as required in RCW 51; an employment security department number as required in RCW 50; and a state excise tax registration number as required in RCW 82.
4. Not be disqualified from bidding on any public works contract under RCW 39.06.010, or
39.12.065(3).
5. If bidding on a public works project subject to the apprenticeship utilization requirements in
RCW 39.04.320, not have been found out of compliance by the Washington State Apprenticeship and Training Council for working apprentices out of ratio, without appropriate supervision, or outside their approved work processes as outlined in their standards of apprenticeship under RCW 49.04 for the one-year period immediately preceding the date of the bid solicitation.
6. Public Works and Prevailing Wage Training/Exemption. Bidders shall have received training on the requirements related to public works and prevailing wage under this chapter and chapter 39.12 RCW. The bidder must designate a person or persons to be trained on these requirements. The training must be provided by the department of labor and industries or by a training provider whose curriculum is approved by the department. The department, in consultation with the prevailing wage advisory committee, must determine the length of the training. Bidders that have completed three or more public works projects and have had a valid business license in Washington for three or more years are exempt from this subsection. The department of labor and industries must keep records of entities that have satisfied the training requirement or are exempt and make the records available on its website. Responsible parties may rely on the records made available by the department regarding satisfaction of the training requirement or exemption.
https://lni.wa.gov/licensing-permits/public-works-projects/contractors-employers/contractor-training
7. Within the three-year period immediately preceding the date of the bid solicitation, not have been determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgement entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of RCW 49.46, 49.48, or 49.52. A bidder shall submit a signed Contractor Certification form with the bid or within two (2) business days of request by Owner regarding this wage theft prevention responsible bidder criteria.
B. Supplemental Responsibility Criteria: In addition to the mandatory Bidder responsibility, the
Owner may adopt relevant supplemental criteria for determining Bidder responsibility applicable to a particular project which the Bidder must meet (RCW 39.04.350 (3)).
1. If applicable, the Owner shall consider an overall accounting of the attached supplemental criteria for determining Bidder responsibility “DIVISION 00 SUPPLEMENTAL
RESPONSIBILITY CRITERIA”.
2. At least eight (8) business days prior to the bid submittal deadline, a potential Bidder may request that the Owner modify the supplemental responsibility criteria. The Owner will evaluate the information submitted by the potential Bidder and respond before the bid submittal deadline through the DES Public Procurement Portal. If the evaluation results in a change of criteria, the Owner will issue an addendum to the bidding documents identifying the new criteria. The addendum will be posted as a public notice in the DES Public Procurement Portal.
3. Upon Owner’s request, the apparent low Bidder must supply the requested responsibility information within two (2) business days of request by Owner. Withholding information or failure to submit all the information requested within the time provided may render the bid non-responsive.
4. If the Owner determines that the apparent low Bidder is not responsible, the Owner will notify the Bidder of its preliminary determination in writing.
5. Within three (3) business days after receipt of the preliminary determination, the Bidder may withdraw its bid or request a hearing in writing to easmail@des.wa.gov, where the Bidder may appeal the preliminary determination and present additional information to the Owner.
6. The Owner will schedule a hearing within five (5) business days of receipt of the Bidder’s request. The hearing members will include the FPS Assistant Director or designee, Program Manager or designee, and Project Manager.
7. The Owner will issue a Final Determination after reviewing information presented at the hearing.
8. If the Owner determines a Bidder to be not responsible, the Owner will provide, in writing, the reasons for the determination. If the final determination affirms that the Bidder is not responsible, the Owner will not execute a contract with any other Bidder until two (2) business days after the Bidder determined to be not responsible has received the final determination.
9. The Owner’s Final Determination is specific to this project and will have no effect on other or future projects.
0.13 CONTRACT AWARD
A. The Owner will evaluate bids responsiveness and responsibility in the DES Public Procurement Portal (https://deswa.bonfirehub.com).
1. A bid will be considered responsive if it meets the following requirements:
(a) It is received at the proper submittal time, date, and location online through the DES
Public Procurement Portal.
(b) It meets the required requested information through the DES Public Procurement Portal.
(c) It is submitted by a licensed/registered contractor within the state of Washington at the time of bid opening and is not banned from bidding by the Department of Labor and Industries.
(d) It is accompanied by a bid guarantee, if required.
2. A bid will be considered responsible if it meets the following requirements:
(a) It meets the mandatory responsibility criteria established in RCW 39.04.350 and an overall accounting of the supplemental responsibility criteria established for the project.
(b) The bidder completes, signs, and submits the “Contractor Certification Wage Theft Prevention – Responsible Bidder Criteria” form with their bid submission or within two (2) business days of request by the Owner.
B. The Owner reserves the right to accept or reject any or all bids and to waive informalities.
C. The Owner may negotiate bid price adjustments with the low responsive Bidder, including changes in the contract documents, to bring the bid within the available funding per RCW 39.04.015.
D. The apparent low Bidder, for purpose of award, shall be the responsive and responsible Bidder offering the low aggregate amount for the base bid plus selected additive or deductive bid alternates and meeting all other bid submittal requirements.
E. Reciprocal Preference for Resident Contractors. For a public works bid received from a nonresident contractor from a state that provides an in-state percentage bidding preference, a Comparable Percentage Disadvantage (CPD) will be applied to the bid of that nonresident contractor. The CPD is the in-state contractor percent advantage provided by the contractor’s home state.
For the purpose of determining the successful Bidder, multiply the Nonresident Contractor bid amount by the CPD. The “bid amount” shall be the total of the base bid and all accepted alternate bid items. The CPD shall be added to the Nonresident Contractor bid amount which equates to the Nonresident Disadvantage Total. The Nonresident Disadvantage Total shall be compared to the Washington contractor bid amounts. The Bidder with the lowest total shall be the successful Bidder. See example below:
EXAMPLE:
Alaska Nonresident Contractor Bid Amount $100,000 Multiplied by the Alaska CPD x 0.05 Alaska CPD Total $ 5,000
Alaska Nonresident Contractor Bid Amount $100,000 Alaska CPD Total $ 5,000 Nonresident Disadvantage Total $105,000*
*Note – If the Nonresident Disadvantage Total is lower than all other Washington contractor bid amounts, the Alaska Nonresident Contractor is the successful Bidder and will be awarded a contract for the bid amount of $100,000.
If the Nonresident Disadvantage Total is higher than a Washington contractor bid amount, the successful Washington Bidder will be awarded a contract for the bid amount.
F. The Contract will only become effective when signed by the Owner. Prior to the Owner’s signature, any and all costs incurred shall be the sole responsibility of the Bidder.
0.14 DOCUMENTS (ATTACHED)
A. Advertisement for Bids B. Bidding Terms and Conditions C. Subcontractor Listing Form B D. Supplemental Bidder Responsibility Criteria (if applicable) E. Certificate of Insurance form F. Special Conditions (if applicable)
Note: AIA Payment Bond and Performance Bond current forms (A312) are required, when applicable. These forms will not be provided by the Owner.
ADVERTISEMENT FOR BIDS
Sealed bids will be accepted for the following project:
PROJECT NO.: 2026-235 G (1-1)
TITLE: CLC - APH and Library Elev Modernizations
AGENCY: FPS for Clark College
PROJECT MANAGER: Doug Craig
ESTIMATED BID COST RANGE: $320,000.00 to $430,000.00
SUBMITTAL
TIME/DATE/LOCATION:
No later than 1:00 PM, Thursday, August 20, 2026.
Submit Online at DES Public Procurement Portal:
https://deswa.bonfirehub.com.
(See additional information below)
Bids should be submitted no later than 1:00 PM for the Virtual Public Bid Opening on Microsoft Teams which will be held at approximately 1:30 PM on Thursday, August 20, 2026
Join on your computer, mobile app or room device Click here to join the meeting Meeting ID: 232 943 171 100 Passcode: WPJKXj
Download Teams | Join on the web Or call in (audio only) +1 564-999-2000,,994059963# United States, Olympia
(833) 322-1218,,994059963# United States (Toll-free)
Phone Conference ID: 994 059 963# Find a local number | Reset PIN (See additional information below)
ADVERTISEMENT Page 2 of 3 Effective May 1, 2026
ISSUED BY: Department of Enterprise Services
PRE-BID WALK-THROUGH:
11:00 A.M. on Tuesday, August 4, 2026 Meet at Facilities Services Building on the east side of the Clark College main campus, 1933 Fort Vancouver Way, Vancouver, WA 98663. See site map on Drawing T2.00. Park in the Brown Lot in any space not marked F/S.
For specific directions for an on-site pre-bid meeting or site visit, please contact the Consultant listed below.
All Public Works Bid Openings will be conducted via live stream on Microsoft Teams. A link to the live stream for bid opening can be found above. We will strive to begin bid opening live streams within thirty minutes of the bid closing and appreciate your patience as we deploy this new process.
If you have questions, please contact the Project Manager, Doug Craig at doug.craig@des.wa.gov or 564-233-5874
This link provides support with the Euna Procurement Vendor processes and help:
https://customer.eunasolutions.com/public/s/. Visit site for help and details.
DES Public Procurement Portal is the official platform for accessing plans, specifications and detailed submissions for DES Public Works Projects. These documents can be obtained through the DES Public Procurement Portal https://deswa.bonfirehub.com. Contractors may also obtain plans and specifications from the Plan Centers listed below, or from Starling Whitehead & Lux Architects, 901 Fifth Avenue, Suite 3100, Seattle, WA 98164, 206-812-0459, hallstrom@swlarchitects.com upon deposit of $200.00. Please make checks payable to Starling Whitehead & Lux Architects. Plans must be returned in good condition within seven (7) days following bid date to obtain a refund of deposit. After seven days no refunds will be made.
List of plan centers: Abadan Reprographics & Imaging, Spokane, WA; ARC Document Solutions, Seattle, WA; ARC Document Solutions, Tacoma, WA; Associated Builders & Contractors, Spokane, WA; Associated General Contractors, Boise, ID; Builder’s Exchange of Washington, Everett, WA; Daily Journal of Commerce Plan Center, Portland, OR; Daily Journal of Commerce, Seattle, WA; Hermiston Plan Center, Hermiston, OR; Contractor Plan Center, Milwaukie, OR;
Ridgeline Graphics (Wenatchee Plan Center), Wenatchee, WA; Spokane Regional Plan Center, Spokane, WA; Tri-City Construction Council, Kennewick, WA; Walla Walla Valley Plan Center, Walla Walla, WA; Weekly Construction Reporter, Bellingham, WA; Yakima Plan Center, Yakima, WA.
Please direct questions regarding this project through the DES Public Procurement Portal https://deswa.bonfirehub.com. Or to the office of the Consultant, Starling Whitehead & Lux Architects, Attn: Jonas Hallstrom, 206-812-0459, hallstrom@swlarchitects.com.
ADVERTISEMENT Page 3 of 3 Effective May 1, 2026
Bid Results will be available on the DES Public Procurement Portal: https://deswa.bonfirehub.com following the bid opening.
The State of Washington prevailing wage rates are applicable for this public works project located in Clarke County. Bidders are responsible to verify and use the most recent prevailing wage rates.
The “Effective Date” for this project is the bid submittal time and date above. The applicable prevailing wage rates may be found on the Department of Labor & Industries website located at https://secure.lni.wa.gov/wagelookup/.
Supplemental Bidder Responsibility will be evaluated for this project. In determining Bidder responsibility, the Owner shall consider an overall accounting of the criteria set forth in “DIVISION 00 SUPPLEMENTAL RESPONSIBILITY CRITERIA”. Please direct questions regarding this subject to the office of the Consultant.
The successful Bidder is required to register and create an account in the DES Diversity Compliance program (B2Gnow) at https://des.diversitycompliance.com. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.
Bidders may contact the Office of Minority and Women's Business Enterprise (OMWBE) at http://OMWBE.wa.gov/ to obtain information on certified firms. Bidders may also utilize Washington Small Businesses registered in B2Gnow at DES diversity compliance program B2Gnow and Veteran-owned Businesses at https://www.dva.wa.gov/veterans-their-families/veteran-owned-businesses/vob-search.
The State reserves the right to accept or reject any or all bids and to waive informalities.
STATE OF WASHINGTON
DEPARTMENT OF ENTERPRISE SERVICES
FACILITY PROFESSIONAL SERVICES
2026235Gadvtwr1
Project Name: CLC – APH and Library Elevator Modernizations Project No.: 2026-235 G (1-1)
Contractor Name:
BIDDING TERMS AND CONDITIONS Page 1 of 3 Effective May 1,2026
STATE OF WASHINGTON DEPARTMENT OF ENTERPRISE SERVICES
FACILITY PROFESSIONAL SERVICES
https://deswa.bonfirehub.com/
B I D D I N G T E R M S A N D C O N D I T I O N S
BID SUBMISSIONS
Bids submitted in compliance with the contract documents.
1) BASE BID AND ALTERNATES (including Trench Excavation Safety Provisions) will be submitted by the Bidder through the DES Public Procurement Portal
• Do not include Washington State Sales Tax
If the bid amount contains any work which requires trenching exceeding a depth of four feet, all costs for trench safety shall be included in the Base Bid for adequate trench safety systems in compliance with Chapter 39.04 RCW. 49.17 RCW and WAC 296-155-650. Bidder must include a lump sum dollar amount (even if the value is $0.00) to be responsive.
2) BID ALTERNATES DESCRIPTION (if applicable)
• A/E Must specify whether additive or deductive
• Do not include Washington State Sales Tax
(1) Cab Finishes at Cannell Library Elevator (additive)
(2) Cab Finishes at Anna Pechanec Hall Elevator (additive)
(3) N/A
(4) N/A
(5) N/A
The Owner reserves the right to accept or reject any or all bid prices within sixty (60) days of the bid date.
In compliance with the contract documents, the below bidding terms and conditions apply:
BIDDING TERMS AND CONDITIONS Page 2 of 3 Effective May 1,2026
TIME FOR COMPLETION
Contract Time – The undersigned hereby agrees to Substantially Complete all the work under the Base Bid (and accepted Alternates) within 205 calendar days after the date of Notice to Proceed.
Final Completion – All the Work shall be fully and finally completed in accordance with the contract documents within 30 calendar days after the date of Substantial Completion.
FEDERAL AND STATE REQUIREMENTS
The undersigned agrees to perform the requirements set out and incorporated by reference in attached “DIVISION 00 SPECIAL CONDITIONS” section in the specifications, if applicable.
LIQUIDATED DAMAGES
The undersigned agrees to pay the Owner as liquidated damages the sum of $200.00 for each consecutive calendar day that is in default after the Contract Time. Liquidated damages shall be deducted from the contract invoice after taxes and retainage.
BIDDING TERMS AND CONDITIONS Page 3 of 3 Effective May 1,2026
WAGE THEFT PREVENTION – RESPONSIBLE BIDDER CRITERIA
WASHINGTON STATE PUBLIC WORKS CONTRACTS
Return this signed “Contractor Certification” with your signed Bid Form or within two
(2) business days of request by Owner.
Prior to awarding a public works contract, the Washington State Department of Enterprise Services is required to determine that a bidder meets the responsibility criteria to be considered a ‘responsible bidder’ and is qualified to be awarded a public works project. See RCW 39.04.350(1)(g) & (2). Pursuant to legislative enactment in 2017, the responsibility criteria include a contractor certification that the contractor has not willfully violated Washington’s wage laws. See Chap. 258, 2017 Laws (enacting SSB 5301).
Project No.: 2026-235 G (1-1)
Project Name: CLC – APH and Library Elevator Modernization
Procurement Solicitation Date: Tuesday, July 28, 2026
I hereby certify, on behalf of the firm identified below, as follows (check one):
NO WAGE VIOLATIONS. This firm has NOT been determined by a final and binding citation and notice of assessment issued by the Washington Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of RCW chapters 49.46, 49.48, or 49.52 within three (3) years prior to the date of the above-referenced procurement solicitation date.
VIOLATIONS OF WAGE LAWS. This firm has been determined by a final and binding citation and notice of assessment issued by the Washington Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, a provision of RCW chapters 49.46, 49.48, or 49.52 within three (3) years prior to the date of the above-referenced procurement solicitation date.
I hereby certify, under penalty of perjury under the laws of the State of Washington, that the certifications herein are true and correct and that I am authorized to make these certifications on behalf of the firm listed herein.
Firm Name:_________________________________________________________________
Name of Contractor/Bidder – Print full legal entity name of firm
By:____________________________ Signature of authorized person
Title:___________________________ Title of person signing certificate
Date:___________________________
Print Name of person making certifications for firm
Place:___________________________________
Print city and state where signed
125 Supplemental Bidder Responsibility Criteria without Inclusion Plan and Apprenticeship_Dec 21, 2022
Division 00 Supplemental Bidder
Responsibility Criteria (Without Inclusion Plan and Apprenticeship Requirements)
Low Responsible Bidder
It is the intent of the Owner to award a contract to the lowest responsive and responsible Bidder.
In determining the Bidder’s responsibility, the Owner shall consider an overall accounting of the items listed below. Potential Bidders may request the Owner modify the Bidder responsibility criteria. The request must be in writing and submitted at least 7 days prior to the bid opening.
The apparent low bidder shall submit the required information within two (2) business days of receiving request from Owner. This request may be made in the form of a telephone call or email message. The required information shall be provided on the referenced forms bound herein. Electronic copies may be made available upon request.
This is the start of the file's text. The full file is on GovTribe.