2026057 Pay Item Worksheet.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Pavement Marking Continuing Services
- Solicitation number
- IFB 360 2026057 2
- Issued by
- Palm Beach County, Florida
About this file
This is a Pay Item Worksheet for Palm Beach County Project #2026057, a pavement marking continuing services construction contract. The project encompasses six distinct lots of pavement marking and related services, including thermoplastic pavement marking lines in various colors and widths (white, yellow, and green), raised reflective pavement markers in amber, white, red, and bi-directional configurations, paint traffic lines in multiple colors and widths, pavement marking removal services, preformed cold plastic markings, and miscellaneous items such as thermoplastic rumble strips, contrast tape, flexible delineators, and foil back tape. The worksheet details extensive quantities across numerous line items, ranging from individual units (EA) to linear feet (LF), nautical miles (NM), gallons per mile (GM), square yards (SY), and square feet (SF). The contract appears to be a continuing services arrangement requiring bidders to provide unit pricing for each pay item across all six lots.
All costs for maintenance of traffic and mobilization are to be considered incidental to and included within the unit prices for each pay item. The worksheet emphasizes that linear foot units represent net lengths and that preliminary layout of striping locations shall be included in the unit prices. Notably, the spreadsheet contains formulas for calculating total amounts based on unit prices, with a disclaimer that the county does not guarantee the accuracy of these formulas and that actual items and quantities in the plans shall govern. Installation costs are required for all items unless otherwise specified, and specific material requirements apply based on surface type, such as epoxy for concrete installations and thermoplastic or bituminous for asphalt installations of reflective pavement markers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Form.pdf | ||
| 2026057 Spec.pdf | ||
| Qualifications and Experience Package Form.docx | DOCX document | |
| OSBD Schedules and Instructions.pdf | ||
| RFI Form.docx | DOCX document | |
| Alternate Format Availability.pdf | ||
| Qualifications and Experience Package Form.pdf | ||
| 2026057 Pre bid meeting sign in sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2026057 Proposal Form
| BID PROPOSAL | ||||||
| PAVEMENT MARKING CONTINUING SERVICES CONSTRUCTION | ||||||
| CONTRACT | ||||||
| PBC PROJECT #2026057 | ||||||
| # | FDOT ITEM NUMBER | ITEM DESCRIPTION | QTY | UNITS | UNIT PRICE | AMOUNT |
| LOT 1 - Thermoplastic | ||||||
| Thermoplastic Pavement Marking Lines - Colors & Widths as Indicated | ||||||
| 1 | 711-11-101 | White, 6" | 360 | NM | $ - 0 | |
| 2 | 711-11-201 | Yellow, 6" | 240 | NM | $ - 0 | |
| 3 | 711-11-102 | White, 8" | 24 | NM | $ - 0 | |
| 4 | 711-11-202 | Yellow, 8" | 24,000 | LF | $ - 0 | |
| 5 | 711-11-103 | White, 12" | 19,200 | LF | $ - 0 | |
| 6 | 711-11-104 | White, 18" | 14,400 | LF | $ - 0 | |
| 7 | 711-11-204 | Yellow, 18" | 19,200 | LF | $ - 0 | |
| 8 | 711-11-105 | White, 24" | 24,000 | LF | $ - 0 | |
| 9 | 711-11-141 | White, 6" (2 x 4 Skip) | 120 | GM | $ - 0 | |
| 10 | 711-11-241 | Yellow, 6" (2 x 4 Skip) | 24 | GM | $ - 0 | |
| 11 | 711-11-141 | White, 6" (6 x 10 Skip) | 24 | GM | $ - 0 | |
| 12 | 711-11-241 | Yellow, 6" (6 x 10 Skip) | 26 | GM | $ - 0 | |
| 13 | 711-11-131 | White, 6" (10 x 30 Skip) | 14 | GM | $ - 0 | |
| 14 | 711-11-231 | Yellow, 6" (10 x 30 Skip) | 14 | GM | $ - 0 | |
| 15 | 920-711-2 | Green, Bike Lane Marking, Pre-formed | 1,600 | SY | $ - 0 | |
| Arrows & Messages; as Indicated; White Only | ||||||
| 16 | 711-11-17 | Turn Arrow | 24,000 | EA | $ - 0 | |
| 17 | 711-11-17 | Straight Arrow | 7,200 | EA | $ - 0 | |
| 18 | 711-11-17 | Straight/Turn Arrows; Combination | 4,800 | EA | $ - 0 | |
| 19 | 711-11 | Yield Triangles | 450 | EA | $ - 0 | |
| 20 | 711-11-16 | MERGE Message | 3,600 | EA | $ - 0 | |
| 21 | 711-11-16 | RXR Message | 2,280 | EA | $ - 0 | |
| 22 | 711-11-16 | SCHOOL Message | 4,800 | EA | $ - 0 | |
| 23 | 711-11-16 | ONLY Message | 2,880 | EA | $ - 0 | |
| 24 | 711-11-16 | U-TURN Message | 1,200 | EA | $ - 0 | |
| 25 | 711-11-16 | HANDICAP Message | 600 | EA | $ - 0 | |
| 26 | 711-11-16 | YIELD Message | 150 | EA | $ - 0 | |
| 27 | 711-11 | Bike Lane Symbol with Arrow | 3,600 | EA | $ - 0 | |
| 28 | 711-11-16 | DO NOT BLOCK Message | 250 | EA | $ - 0 | |
| 29 | 711-11-16 | BUS Message | 200 | EA | $ - 0 | |
| 30 | 711-11-16 | SOUTH Message | 500 | EA | $ - 0 | |
| 31 | 711-11-16 | NORTH Message | 500 | EA | $ - 0 | |
| 32 | 711-11-16 | STOP Message | 350 | EA | $ - 0 | |
| 33 | 711-11-16 | RAMP Message | 1,400 | EA | $ - 0 | |
| SUBTOTAL (LOT 1) | $ - 0 | |||||
| LOT 2 - Raised Reflective Pavement Markers (see footnotes for application) - Colors & Types as Indicated | ||||||
| 34 | 706-1-3 | Amber; Bi-Directional | 72,000 | EA | $ - 0 | |
| 35 | 706-1-3 | White & Red; Bi-Directional | 48,000 | EA | $ - 0 | |
| 36 | 706-1-3 | Amber & Red; Bi-Directional | 52,000 | EA | $ - 0 | |
| SUBTOTAL (LOT 2) | $ - 0 | |||||
| LOT 3 - Paint | ||||||
| Traffic Paint Lines - Colors, Types, and Widths as Indicated | ||||||
| 37 | 710-90 | White, 4" | 1,440 | LF | $ - 0 | |
| 38 | 710-90 | Yellow, 4" | 1,440 | LF | $ - 0 | |
| 39 | 710-90 | White, 6" | 144 | NM | $ - 0 | |
| 40 | 710-90 | Blue, 6" | 2,880 | LF | $ - 0 | |
| 41 | 710-90 | Black, 6" | 72,000 | LF | $ - 0 | |
| 42 | 710-90 | Yellow, 6" | 72 | NM | $ - 0 | |
| 43 | 710-90 | White, 8" | 1,440 | LF | $ - 0 | |
| 44 | 710-90 | Yellow, 8" | 23,040 | LF | $ - 0 | |
| 45 | 710-90 | White, 12" | 13,920 | LF | $ - 0 | |
| 46 | 710-90 | White, 18" | 6,624 | LF | $ - 0 | |
| 47 | 710-90 | Yellow, 18" | 3,600 | LF | $ - 0 | |
| 48 | 710-90 | White, 24" | 12,960 | LF | $ - 0 | |
| 49 | 710-90 | White, 6" (2 x 4 Skip) | 5 | GM | $ - 0 | |
| 50 | 710-90 | Yellow, 6" (2 x 4 Skip) | 0.25 | GM | $ - 0 | |
| 51 | 710-90 | White, 6" (6 x 10 Skip) | 3.60 | GM | $ - 0 | |
| 52 | 710-90 | Yellow, 6" (6 x 10 Skip) | 0.25 | GM | $ - 0 | |
| 53 | 710-90 | White, 6" (10 x 30 Skip) | 48 | GM | $ - 0 | |
| 54 | 710-90 | Yellow, 6" (10 x 30 Skip) | 48 | GM | $ - 0 | |
| 55 | 710-90 | Reflective Paint - Island Nose - Yellow | 24 | SY | $ - 0 | |
| Arrows & Messages: White | ||||||
| 56 | 710-90 | Turn Arrow | 1,056 | EA | $ - 0 | |
| 57 | 710-90 | Straight/Combination Arrow | 528 | EA | $ - 0 | |
| 58 | 710-90 | Message (ONLY; SCHOOL; MERGE; YIELD & Straight Arrow) | 750 | EA | $ - 0 | |
| SUBTOTAL (LOT 3) | $ - 0 | |||||
| LOT 4 - Pavement Marking Removal | ||||||
| 59 | N/A | Traffic Paint | 2,880 | SF | $ - 0 | |
| 60 | 711-17 | Thermoplastic | 24,000 | SF | $ - 0 | |
| 61 | N/A | Cold Plastic (Preformed) | 14,400 | LF | $ - 0 | |
| 62 | 713-17 | Construction Tape | 96,000 | LF | $ - 0 | |
| 63 | N/A | Pavement Markers | 21,888 | EA | $ - 0 | |
| SUBTOTAL (LOT 4) | $ - 0 | |||||
| LOT 5 - Preformed Cold Plastic | ||||||
| 64 | N/A | White or Yellow, 6" | 5,760 | LF | $ - 0 | |
| 65 | N/A | White, 8" | 1,440 | LF | $ - 0 | |
| 66 | N/A | White or Yellow, 12" | 288 | LF | $ - 0 | |
| 67 | N/A | White or Yellow, 18" | 288 | LF | $ - 0 | |
| 68 | N/A | White, 24" | 288 | LF | $ - 0 | |
| 69 | N/A | Message, White (ONLY; SCHOOL; MERGE; U-TURN; YIELD; Bike Lane Symbol w/Arrow) | 150 | EA | $ - 0 | |
| 70 | N/A | Turn Arrow, White | 132 | EA | $ - 0 | |
| SUBTOTAL (LOT 5) | $ - 0 | |||||
| LOT 6 - Miscellaneous | ||||||
| 71 | 701-1 | Thermoplastic Rumble Strips (Index 518) | 950 | EA | $ - 0 | |
| 72 | N/A | 9" Contrast Tape | 6,500 | LF | $ - 0 | |
| 73 | 705-11 | Flexible Delineators (All Types) | 10,500 | EA | $ - 0 | |
| 74 | N/A | Foil Back Tape | 25,680 | LF | $ - 0 | |
| SUBTOTAL (LOT 6) | $ - 0 | |||||
| TOTAL BID | $ - 0 |
| THE COUNTY DOES NOT GUARANTEE THE ACCURACY OF THE FORMULAS AND EXTENSIONS USED IN THIS SPREADSHEET. | |
| THE ITEMS AND QUANTITIES ABOVE, SHALL GOVERN OVER THE PLANS. | |
| PAY ITEM FOOTNOTES IN CONSTRUCTION PLANS SHALL ALSO BE INCLUDED IN ITEM UNIT PRICE. | |
| Note # | PAY ITEM FOOTNOTES |
| 1 | All costs for Maintenance of Traffic (MOT) and mobilization shall be considered incidental to, and shall be included in, unit prices for the pay items. |
| 2 | All items shall include cost to furnish and install unless otherwise noted. |
| 3 | FDOT Item numbers are for use in determining eligibility for price adjustment per General Provision 9-2 only. |
| 4 | Epoxy required to install RPM's on concrete, and Thermoplastic and bituminous required to install RPM's on asphalt, are incidental to the Reflective Pavement marker line items. |
| 5 | Preliminary layout of striping locations shall be considered incidental to, and shall be included in, unit prices for the pay items. |
| 6 | All items shall include cost to furnish an install. |
| 7 | Linear Foot (LF) units are net lengths. |
&"Times New Roman,Bold"&14PROPOSAL FORM
&"Times New Roman,Bold"&14P-&P
File details come from the government source that posted it. Updated .