2026057 Pay Item Worksheet.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Pavement Marking Continuing Services
Solicitation number
IFB 360 2026057 1
Issued by
Palm Beach County, Florida

About this file

This is a Pay Item Worksheet for PBC Project #2026057, a Pavement Marking Continuing Services construction contract in Florida. The project encompasses six lots of pavement marking materials and services organized by type: thermoplastic pavement marking lines in various colors and widths (Lot 1), raised reflective pavement markers in amber, white, and red (Lot 2), paint traffic lines in multiple colors and configurations (Lot 3), pavement marking removal services (Lot 4), preformed cold plastic markings (Lot 5), and miscellaneous items including rumble strips, contrast tape, flexible delineators, and foil back tape (Lot 6). The worksheet itemizes 74 pay items with specified quantities in units such as linear feet, square yards, gallons, each, and nautical miles. The scope includes furnishing and installation of all materials, with maintenance of traffic and mobilization costs considered incidental to unit prices.

The Pay Item Worksheet requires bidders to submit unit prices for each pay item, with the total bid calculated by multiplying unit prices by quantities; however, all price fields currently display zero values, indicating this is a blank proposal form awaiting bidder input. All costs for preliminary striping layout, maintenance of traffic, and mobilization are to be included in the unit prices. For reflective pavement marker installation, epoxy is required for concrete surfaces while thermoplastic and bituminous materials are required for asphalt surfaces, with these costs considered incidental to the marker line items. FDOT item numbers are provided for determining eligibility for price adjustment purposes only. The worksheet explicitly notes that item descriptions and quantities in the worksheet shall govern over any conflicting information in the construction plans, and pay item footnotes included in the construction plans are also incorporated into the unit prices.

View the file

Other files

File Type Posted
2026057 Spec.pdf PDF
Alternate Format Availability.pdf PDF
RFI Form.docx DOCX document
Qualifications and Experience Package Form.pdf PDF
OSBD Schedules and Instructions.pdf PDF
RFI Form.pdf PDF
Qualifications and Experience Package Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2026057 Proposal Form

BID PROPOSAL
PAVEMENT MARKING CONTINUING SERVICES CONSTRUCTION
CONTRACT
PBC PROJECT #2026057
#FDOT ITEM NUMBERITEM DESCRIPTIONQTYUNITSUNIT PRICEAMOUNT
LOT 1 - Thermoplastic
Thermoplastic Pavement Marking Lines - Colors & Widths as Indicated
1711-11-101White, 6"360NM$ - 0
2711-11-201Yellow, 6"240NM$ - 0
3711-11-102White, 8"24NM$ - 0
4711-11-202Yellow, 8"24,000LF$ - 0
5711-11-103White, 12"19,200LF$ - 0
6711-11-104White, 18"14,400LF$ - 0
7711-11-204Yellow, 18"19,200LF$ - 0
8711-11-105White, 24"24,000LF$ - 0
9711-11-141White, 6" (2 x 4 Skip)120GM$ - 0
10711-11-241Yellow, 6" (2 x 4 Skip)24GM$ - 0
11711-11-141White, 6" (6 x 10 Skip)24GM$ - 0
12711-11-241Yellow, 6" (6 x 10 Skip)26GM$ - 0
13711-11-131White, 6" (10 x 30 Skip)14GM$ - 0
14711-11-231Yellow, 6" (10 x 30 Skip)14GM$ - 0
15920-711-2Green, Bike Lane Marking, Pre-formed1,600SY$ - 0
Arrows & Messages; as Indicated; White Only
16711-11-17Turn Arrow24,000EA$ - 0
17711-11-17Straight Arrow7,200EA$ - 0
18711-11-17Straight/Turn Arrows; Combination4,800EA$ - 0
19711-11Yield Triangles450EA$ - 0
20711-11-16MERGE Message3,600EA$ - 0
21711-11-16RXR Message2,280EA$ - 0
22711-11-16SCHOOL Message4,800EA$ - 0
23711-11-16ONLY Message2,880EA$ - 0
24711-11-16U-TURN Message1,200EA$ - 0
25711-11-16HANDICAP Message600EA$ - 0
26711-11-16YIELD Message150EA$ - 0
27711-11Bike Lane Symbol with Arrow3,600EA$ - 0
28711-11-16DO NOT BLOCK Message250EA$ - 0
29711-11-16BUS Message200EA$ - 0
30711-11-16SOUTH Message500EA$ - 0
31711-11-16NORTH Message500EA$ - 0
32711-11-16STOP Message350EA$ - 0
33711-11-16RAMP Message1,400EA$ - 0
SUBTOTAL (LOT 1)$ - 0
LOT 2 - Raised Reflective Pavement Markers (see footnotes for application) - Colors & Types as Indicated
34706-1-3Amber; Bi-Directional72,000EA$ - 0
35706-1-3White & Red; Bi-Directional48,000EA$ - 0
36706-1-3Amber & Red; Bi-Directional52,000EA$ - 0
SUBTOTAL (LOT 2)$ - 0
LOT 3 - Paint
Traffic Paint Lines - Colors, Types, and Widths as Indicated
37710-90White, 4"1,440LF$ - 0
38710-90Yellow, 4"1,440LF$ - 0
39710-90White, 6"144NM$ - 0
40710-90Blue, 6"2,880LF$ - 0
41710-90Black, 6"72,000LF$ - 0
42710-90Yellow, 6"72NM$ - 0
43710-90White, 8"1,440LF$ - 0
44710-90Yellow, 8"23,040LF$ - 0
45710-90White, 12"13,920LF$ - 0
46710-90White, 18"6,624LF$ - 0
47710-90Yellow, 18"3,600LF$ - 0
48710-90White, 24"12,960LF$ - 0
49710-90White, 6" (2 x 4 Skip)5GM$ - 0
50710-90Yellow, 6" (2 x 4 Skip)0.25GM$ - 0
51710-90White, 6" (6 x 10 Skip)3.60GM$ - 0
52710-90Yellow, 6" (6 x 10 Skip)0.25GM$ - 0
53710-90White, 6" (10 x 30 Skip)48GM$ - 0
54710-90Yellow, 6" (10 x 30 Skip)48GM$ - 0
55710-90Reflective Paint - Island Nose - Yellow24SY$ - 0
Arrows & Messages: White
56710-90Turn Arrow1,056EA$ - 0
57710-90Straight/Combination Arrow528EA$ - 0
58710-90Message (ONLY; SCHOOL; MERGE; YIELD & Straight Arrow)750EA$ - 0
SUBTOTAL (LOT 3)$ - 0
LOT 4 - Pavement Marking Removal
59N/ATraffic Paint2,880SF$ - 0
60711-17Thermoplastic24,000SF$ - 0
61N/ACold Plastic (Preformed)14,400LF$ - 0
62713-17Construction Tape96,000LF$ - 0
63N/APavement Markers21,888EA$ - 0
SUBTOTAL (LOT 4)$ - 0
LOT 5 - Preformed Cold Plastic
64N/AWhite or Yellow, 6"5,760LF$ - 0
65N/AWhite, 8"1,440LF$ - 0
66N/AWhite or Yellow, 12"288LF$ - 0
67N/AWhite or Yellow, 18"288LF$ - 0
68N/AWhite, 24"288LF$ - 0
69N/AMessage, White (ONLY; SCHOOL; MERGE; U-TURN; YIELD; Bike Lane Symbol w/Arrow)150EA$ - 0
70N/ATurn Arrow, White132EA$ - 0
SUBTOTAL (LOT 5)$ - 0
LOT 6 - Miscellaneous
71701-1Thermoplastic Rumble Strips (Index 518)950EA$ - 0
72N/A9" Contrast Tape6,500LF$ - 0
73705-11Flexible Delineators (All Types)10,500EA$ - 0
74N/AFoil Back Tape25,680LF$ - 0
SUBTOTAL (LOT 6)$ - 0
TOTAL BID$ - 0
THE COUNTY DOES NOT GUARANTEE THE ACCURACY OF THE FORMULAS AND EXTENSIONS USED IN THIS SPREADSHEET.
THE ITEMS AND QUANTITIES ABOVE, SHALL GOVERN OVER THE PLANS.
PAY ITEM FOOTNOTES IN CONSTRUCTION PLANS SHALL ALSO BE INCLUDED IN ITEM UNIT PRICE.
Note #PAY ITEM FOOTNOTES
1All costs for Maintenance of Traffic (MOT) and mobilization shall be considered incidental to, and shall be included in, unit prices for the pay items.
2All items shall include cost to furnish and install unless otherwise noted.
3FDOT Item numbers are for use in determining eligibility for price adjustment per General Provision 9-2 only.
4Epoxy required to install RPM's on concrete, and Thermoplastic and bituminous required to install RPM's on asphalt, are incidental to the Reflective Pavement marker line items.
5Preliminary layout of striping locations shall be considered incidental to, and shall be included in, unit prices for the pay items.
6All items shall include cost to furnish an install.
7Linear Foot (LF) units are net lengths.

&"Times New Roman,Bold"&14PROPOSAL FORM

&"Times New Roman,Bold"&14P-&P

File details come from the government source that posted it. Updated .