2026_Small_Diameter_ACP_Sanitary_Sewer_Rehabilitation_Project_-_Plan_Set_(reduced).pdf

PDF 19 MB Posted

Attached to
2026 Small Diameter ACP Sewer Rehabilitation Project
Solicitation number
2026-IFB-055
Issued by
Cook County, Illinois

About this file

This is a plan set document for the Village of Schaumburg, Illinois' 2026 Small Diameter Asbestos Cement Pipe (ACP) Sewer Rehabilitation Project. The project encompasses sanitary sewer rehabilitation work across Cook County and includes pre-construction surface televising, sewer cleaning and televising of approximately 19,115 lineal feet, cured-in-place pipelining (CIPP) of 14,340 lineal feet of 8-inch diameter pipe and 4,300 lineal feet of 10-inch diameter pipe, installation of 262 internal service lateral reinstatements, lateral cleaning and televising of 66 locations, installation of 9 cleanouts, dye testing of 5 parcels, air testing and grouting of 96 service connections, and cutting of 11 protruding taps and 5 protruding taps using a Schwalm robot. The plan set contains 42 sheets organized to include a cover sheet, general notes, summary of quantities, rehabilitation schedules (sheets 4-14), sewer rehabilitation details (sheets 15-37), traffic control plans (sheets 38-41), and utility details (sheet 42). The project is designed for construction in July 2026 and was prepared by engineering professionals registered in Illinois. Sealed bids are due by Friday, August 28, 2026, at 10:00 a.m. through the Village's e-Procurement Portal (OpenGov).

The plan set specifies construction standards and details for underground utility locations, requiring utility locating services through J.U.L.I.E. (1-800-892-123). The project includes traffic control and protection as a lump sum bid item and contains a contingent cash allowance for unforeseen conditions. The rehabilitation schedule documents identify specific manholes, pipe materials (primarily asbestos cement with some vitrified clay pipe and cast iron segments), depths, active and capped services, and special conditions including root intrusions, debris, corrosion, and structural defects requiring targeted rehabilitation methods. The plan set utilizes standard engineering scales for full-size plans, with notation that reduced-sized plans do not conform to standard scales. Erosion control and staging requirements are detailed in the general notes, and paving specifications are included for areas where surface restoration is necessary upon project completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \1

C ov er .d w g

VILLAGE OF SCHAUMBURG

2026 SMALL DIAMETER ASBESTOS CEMENT PIPE (ACP)

SEWER REHABILITATION PROJECT

LOCATION MAP

(NOT TO SCALE)

FULL SIZE PLANS HAVE BEEN PREPARED USING STANDARD

ENGINEERING SCALES. REDUCED SIZED PLANS WILL NOT

CONFORM TO STANDARD SCALES.

FOR UNDERGROUND UTILITY LOCATIONS CALL

J.U.L.I.E. 1-800-892-0123

LICENSE #062-071408

EXPIRES 04/30/2027

2655 WARRENVILLE RD

SUITE 225

DOWNERS GROVE, IL

60515

EXPIRESREGISTERED P.E., STATE OF ILLINOIS

FOR CONSTRUCTION

JULY 2026

INDEX OF SHEETS

1 COVER

2 GENERAL NOTES

3 SUMMARY OF QUANTITIES

4-14 REHABILITATION SCHEDULE

15-37 SEWER REHABILITATION

38-41 TRAFFIC CONTROL

42 DETAILS

11/30/2027

PROJECT NO. 11-3846-03

COUNTY TOTAL

SHEETS

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \2

G en er al

N ot es .d w g

11-3846-03

KL

YG

PH

COOK

JULY 2026

GENERAL NOTES

UTILITIES NOTES

WATER AND SEWER NOTES

EROSION CONTROL

TRAFFIC CONTROL AND STAGING

PAVING NOTES

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \3

S um m ar y of

Q ua nt iti es .d w g

11-3846-03

KL

YG

PH

COOK

JULY 2026

SUMMARY OF QUANTITIES

ITEM NO. BID DESCRIPTION UNIT OF

MEASURE

TOTAL

QUANTITY

1 PRE-CONSTRUCTION SURFACE TELEVISING L SUM 1

2 PRE-CONSTRUCTION SEWER CLEANING AND TELEVISING LF 19,115

3 CUT PROTRUDING TAP EACH 11

4 CUT PROTRUDING TAP WITH SCHWALM ROBOT EACH 5

5 CURED-IN-PLACE PIPELINING, 8" DIAMETER LF 14,340

6 CURED-IN-PLACE PIPELINING, 10" DIAMETER LF 4,300

7 INTERNAL SERVICE LATERAL REINSTATEMENT EACH 262

8 SPECIALTY LINER, 8” (122 LF) - 6” (10 LF) – 8” (44 LF) EACH 1

9 DYE TESTING OF PARCELS EACH 5

10 LATERAL LAUNCH PARCELS EACH 5

11 LATERAL CLEANING & TELEVISING EACH 66

12 LATERAL TELEVISING (PUSH CAMERA) LF 50

13 CLEANOUT INSTALLATION EACH 9

14 ROOT CUTTING FROM CLEANOUT EACH 9

15 AIR TEST AND GROUT SERVICE CONNECTION, 5-FOOT EACH 96

16 CURED-IN-PLACE LATERAL LINER INSTALLATION, 8"x 6", 5-FOOT EACH 61

17 CURED-IN-PLACE LATERAL LINER INSTALLATION, 10"x 6", 5-FOOT EACH 2

18 CURED-IN-PLACE LATERAL LINER INSTALLATION, 8"x 8", 10-FOOT EACH 3

19 ADDITIONAL CIPP LATERAL LINER, 6" LF 25

20 ADDITIONAL CIPP LATERAL LINER, 8" LF 10

21 TRAFFIC CONTROL AND PROTECTION L SUM 1

22 CONTINGENT CASH ALLOWANCE L SUM 1

Note: Pay item quantities contain buffer and may not match rehabilitation schedule quantities exactly.

CIPP Lining Lateral Rehabilitation

Asset ID USMH DSMH Location Diameter

(in.) Material Length (ft) USMH Depth (ft)

DSMH

Depth (ft)

Exhibit Grid Number Y/N

Number of Active

Services

Number of Capped Services

Transition Liner

(Diam. (in.))

Transition from USMH

(ft)

Lateral from

USMH (ft) DS Clock Position Comments Capped Clean &

Televise Lateral

Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

A007:A009 A007 A009 Bladon Rd. 8 AC 406.7 8.1 8.3 1 Y 9 0

27.5 9 X

28.5 3 X

102.4 9 X

103.7 3 X

189.2 3 X

190.3 9 X

267.6 9 DAE / Roots X X

268.4 3 DAE / Roots X X

348.9 2 Roots X X

A009:A012 A009 A012 Bladon Rd. 8 AC 331.1 8.3 8.6 1 Y 7 0

84.1 3 X

85.2 9 DAE X X

137.5 3 X

190.7 3 X

191.6 9 DAE X X

273.0 3 X

274.6 9 X

A010:A011 A010 A011 Churchill Rd. 8 AC 439.3 6.9 8.1 1 Y 11 0

1.0 3 X

61.5 3 X

62.7 9 X

139.6 3 X

141.0 9 X

220.7 3 X

222.0 9 X

293.9 3 Roots / offset X X

295.2 10 DAE (50%) X X

367.4 3 X

368.8 9 X

Totals

CIPP

Diameter

(in.)

CIPP Liner (LF)

Lateral Rein-statements

Specialty Liner (ea.)

Lateral Clean and

TV

Lateral Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

8 1178 27 0 7 20

0 0

10 0 0

*includes segments not scheduled for lining Clean and

TV (LF)* 1178

COUNTY TOTAL

SHEETS

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \4

R eh ab ilit at io n Sc he du le (1

).d w g

11-3846-03

KL

YG

PH

COOK

JULY 2026

SANITARY SEWER REHABILITATION SCHEDULE

MATERIAL LEGEND

AC - Asbestos Cement CAS - Cast Iron VCP - Vitrified Clay Pipe

Other abbreviations used in comments correspond to PACP survey observation codes.

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \5

R eh ab ilit at io n Sc he du le (2

).d w g

11-3846-03

KL

YG

PH

COOK

JULY 2026

SANITARY SEWER REHABILITATION SCHEDULE

CIPP Lining Lateral Rehabilitation

Asset ID USMH DSMH Location Diameter

(in.) Material Length (ft) USMH Depth (ft)

DSMH

Depth (ft)

Exhibit Grid Number Y/N

Number of Active

Services

Number of Capped Services

Transition Liner

(Diam. (in.))

Transition from USMH

(ft)

Lateral from

USMH (ft) DS Clock Position Comments Capped Clean &

Televise Lateral

Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

A011:A012 A011 A012 Churchill Rd. 8 AC 392.7 8.1 8.6 1 Y 10 0

10.2 3 DAE X X

11.4 9 X

72.8 3 X

75.1 9 X

147.4 3 X

149.0 9 X

229.9 3 X

232.3 9 X

324.9 9 X

388.6 9 X

B013:B014 B013 B014 Colony Lake Dr. 8 AC 390.4 11.4 7.3 4 Y 17 1

24.2 3

27.6 9

70.0 3

73.5 9

102.6 3

106.2 9

135.1 3

138.7 9

207.1 9

210.2 3 No Active Service to

Parcel X

239.8 9

243.0 3

285.5 3

302.1 9 TBI X

328.1 3

331.4 9

343.4 3

373.3 9

Totals

CIPP

Diameter

(in.)

CIPP Liner (LF)

Lateral Rein-statements

Specialty Liner (ea.)

Lateral Clean and

TV

Lateral Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

8 784 27 0 1 9

0 1

10 0 0

*includes segments not scheduled for lining Clean and

TV (LF)* 784

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \6

R eh ab ilit at io n Sc he du le (3

).d w g

11-3846-03

KL

YG

PH

COOK

JULY 2026

SANITARY SEWER REHABILITATION SCHEDULE

CIPP Lining Lateral Rehabilitation

Asset ID USMH DSMH Location Diameter

(in.) Material Length (ft) USMH Depth (ft)

DSMH

Depth (ft)

Exhibit Grid Number Y/N

Number of Active

Services

Number of Capped Services

Transition Liner

(Diam. (in.))

Transition from USMH

(ft)

Lateral from

USMH (ft) DS Clock Position Comments Capped Clean &

Televise Lateral

Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

B026:B037 B026 B037 Longboat Ct. 8 AC 406.8 10.8 8.7 3 Y 15 0

45.3 9

47.9 3

77.4 9

77.9 3

110.1 9

113.4 3

142.9 9

197.4 3

199.1 9

227.2 3

228.1 9

269.2 3

271.0 9

324.9 9

380.7 9

B032:B033 B032 B033 Colony Lake Dr. 8 AC 237.4 12.4 14 3 Y 10 0

29.5 3

32.7 9

61.9 9

65.1 3

107.7 3

108.3 9

149.8 3

179.0 3

220.5 3

221.8 9

B037:B038 B037 B038 Longboat Ln. 8 AC 109 8.7 9.1 3 Y 3 1

4.3 9

33.9 9 X

40.3 9

84.1 9 X

Totals

CIPP

Diameter

(in.)

CIPP Liner (LF)

Lateral Rein-statements

Specialty Liner (ea.)

Lateral Clean and

TV

Lateral Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

8 754 28 0 0 0

0 1

10 0 0

TV (LF)* 754

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \7

R eh ab ilit at io n Sc he du le (4

).d w g

11-3846-03

KL

YG

PH

COOK

JULY 2026

SANITARY SEWER REHABILITATION SCHEDULE

CIPP Lining Lateral Rehabilitation

Asset ID USMH DSMH Location Diameter

(in.) Material Length (ft) USMH Depth (ft)

DSMH

Depth (ft)

Exhibit Grid Number Y/N

Number of Active

Services

Number of Capped Services

Transition Liner

(Diam. (in.))

Transition from USMH

(ft)

Lateral from

USMH (ft) DS Clock Position Comments Capped Clean &

Televise Lateral

Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

B049:B050 B049 B050 Bayshore Dr. 8 AC 251.6 10.1 12.3 4 Y 0 0

B050:B051 B050 B051 Bayshore Dr. 8 AC 93 12.3 11.8 4 Y 2 0

53.7 9

83.0 9

B051:B052 B051 B052 Bayshore Dr. 8 AC 60.4 11.8 11.5 4 Y 3 0

23.5 3

24.9 9

39.6 9

C200:C201 C200 C201 Portland Dr 8 VCP 81 8 7 2 Y 0 0

C216:C223 C216 C223 N Walnut Ln 8 VCP 187 8.5 10.7 2 Y 1 0 191.6 6 Drop

Connection

(10 LF)

X X

E237:E238 E237 E238 Brockton Ln. 8 AC 272.2 4.9 8.3 9 Y 9 2

4.5 3 Roots X X

47.6 3 DAE X

49.1 10 DAE X

120.5 3 X

121.9 10 X

121.9 2 Protruding X X X

125.0 11 Protruding X X X

141.4 1 X

175.1 3 X

218.1 3 Roots X X

219.2 9 Roots X X

E238:E239 E238 E239 Brockton Ln. 8 CIPP 302.5 8.3 9 9 N 7 0

18.7 3 Roots

(100%) X X

20.7 9 Fine roots X X

103.2 3 DAE X X

104.3 9 X

156.5 9 X

239.8 3 X

241.1 9 Minor offset X X

H117:H118 H117 H118 Plymouth Ln 8 VCP 208 4.7 4.1 10 Y 2 0

34.6 9 X

36.8 3 Fine roots X X

Totals

CIPP

Diameter

(in.)

CIPP Liner (LF)

Lateral Rein-statements

Specialty Liner (ea.)

Lateral Clean and

TV

Lateral Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

8 1154 17 0 11 8

0 2

10 0 0

TV (LF)* 1456

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \8

R eh ab ilit at io n Sc he du le (5

).d w g

11-3846-03

KL

YG

PH

COOK

JULY 2026

SANITARY SEWER REHABILITATION SCHEDULE

CIPP Lining Lateral Rehabilitation

Asset ID USMH DSMH Location Diameter

(in.) Material Length (ft) USMH Depth (ft)

DSMH

Depth (ft)

Exhibit Grid Number Y/N

Number of Active

Services

Number of Capped Services

Transition Liner

(Diam. (in.))

Transition from USMH

(ft)

Lateral from

USMH (ft) DS Clock Position Comments Capped Clean &

Televise Lateral

Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

J163:J164 J163 J164 S Salem Dr. 8 AC 146.5 4.4 4 17 Y 1 0 47.1 3 Roots / cracks X X

J170:J171 J170 J171 Brentwood Ct. 8 AC 176.3 6.1 8 16 Y 5 0 8 > 6 > 8 122 - 132

4.1 3 X

7.2 9 X

50.8 3 X

53.8 9 X

97.4 3 DAE X X

J183:J185 J183 J185 Bedford Ct. 8 AC 260 9.5 10.3 16 Y 2 1

75.7 3 Fracture X X

119.4 3 X

132.6 3 TBI / Roots X X X

J185:J187 J185 J187 Brighton Ct. 8 AC 334.6 10.3 13.1 16 Y 3 0

53.5 3 X

126.9 3 DAE X X

180.7 3 DAE /

Fracture X X

J187:J214 J187 J214 Brighton Ct. 8 AC 326.2 13.1 15.6 16 Y 2 0

139.8 3 DAE X X

234.6 3 DAE / Debris X X

J196:J197 J196 J197 Shannock Ln. 8 AC 374.5 6.6 8.3 19 Y 10 0

22.8 3 Debris, broken?

38.9 10

120.1 3 Roots

124.2 9 Roots

165.6 3

208.0 2 Roots

211.3 9

253.5 3 Roots

296.2 9 Roots

337.8 3

J197:J198 J197 J198 Shannock Ln. 8 AC 203.4 8.3 8 19 Y 5 0

4.0 10 Roots

33.0 3 Roots

101.5 9 Roots / soil

119.6 3 Roots

172.2 9 Roots (fine)

J206:J208 J206 J208 Cranbrook Dr. 8 AC 245.7 5.8 10.5 19 Y 3 0

89.7 9

164.7 9 Debris / DAE (30%)

217.9 3

Totals

CIPP

Diameter

(in.)

CIPP Liner (LF)

Lateral Rein-statements

Specialty Liner (ea.)

Lateral Clean and

TV

Lateral Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

8 1891 31 1 8 5

0 1

10 0 0

TV (LF)* 2068

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \9

R eh ab ilit at io n Sc he du le (6

).d w g

11-3846-03

KL

YG

PH

COOK

JULY 2026

SANITARY SEWER REHABILITATION SCHEDULE

CIPP Lining Lateral Rehabilitation

Asset ID USMH DSMH Location Diameter

(in.) Material Length (ft) USMH Depth (ft)

DSMH

Depth (ft)

Exhibit Grid Number Y/N

Number of Active

Services

Number of Capped Services

Transition Liner

(Diam. (in.))

Transition from USMH

(ft)

Lateral from

USMH (ft) DS Clock Position Comments Capped Clean &

Televise Lateral

Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

J206:J269 J206 J269 Belmont Ct. 8 AC 206.7 5.8 6 19 Y 1 0 187.3 9 Fine roots

J209:J210 J209 J210 Matfield Ct. 8 AC 77.3 6 5.4 18 Y 4 0

5.0 3

8.2 9

31.5 3

34.4 9

J226:J227 J226 J227 Groton Ct. 8 AC 134.5 6.2 6.1 18 Y 7 2

16.3 3 Roots, prot. X X X

29.7 9

33.2 3

46.0 9 X

49.4 3 X

52.5 9 Protruding X X X

58.5 3 Protruding X X X

102.1 9

125.5 9

J227:J228 J227 J228 Danvers Ct. 8 AC 244.5 6.1 7.1 18 Y 6 1

12.6 9

95.9 9 X

121.4 9

152.6 3

176.2 9

191.6 9

233.2 3

J228:J229 J228 J229 Pinehurst Ln. 8 AC 298.2 7.1 16.7 18 Y 5 2

131.7 9 X

135.3 11

155.8 9 X

175.2 11

208.6 9

221.6 9

293.6 6 Drop

Connection

(10 LF)

X X

Totals

CIPP

Diameter

(in.)

CIPP Liner (LF)

Lateral Rein-statements

Specialty Liner (ea.)

Lateral Clean and

TV

Lateral Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

8 962 23 0 4 0

0 3

10 0 0

TV (LF)* 962

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \1

R eh ab ilit at io n

Sc he du le

(7 ).d w g

11-3846-03

KL

YG

PH

COOK

JULY 2026

SANITARY SEWER REHABILITATION SCHEDULE

CIPP Lining Lateral Rehabilitation

Asset ID USMH DSMH Location Diameter

(in.) Material Length (ft) USMH Depth (ft)

DSMH

Depth (ft)

Exhibit Grid Number Y/N

Number of Active

Services

Number of Capped Services

Transition Liner

(Diam. (in.))

Transition from USMH

(ft)

Lateral from

USMH (ft) DS Clock Position Comments Capped Clean &

Televise Lateral

Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

J238:J239 J238 J239 Danvers Ct. 8 AC 134.6 5.6 9.1 18 Y 6 0

16.0 9

49.4 3

53.5 9

86.6 3

89.4 9

122.8 9

J243:J245 J243 J245 Fiskeville Ln. 8 AC 394.2 7.6 9.6 18 Y 10 3

14.9 3 Roots, broken X X

17.8 9 1024 Tiverton X X

88.0 3 X

89.4 9 X

157.8 3 X

160.9 9 X

161.3 3 X

201.7 3 Roots X X

203.9 3 X

246.6 9 1012 Tiverton X X

303.6 9 X

337.5 9 X

337.5 3 X

J246:J247 J246 J247 Tiverton Ct. 10 AC 407.8 20.3 22.7 18 Y 2 1

110.9 1 1012 Tiverton X X X

192.8 12 X

222.5 12 X

265.2 12 X

320.7 1 1024 Tiverton X X

J252:J253 J252 J253 Tiverton Ct. 8 AC 326.2 6.7 26.2 20 Y 10 0

4.6 9 X

7.8 3 X

37.2 3 X

66.7 9 Roots X X

69.8 3 X

112.1 9 Roots X X

115.6 3 X

197.4 9 DAE X X

200.5 3 X

268.8 9 1130 Tiverton X X

Totals

CIPP

Diameter

(in.)

CIPP Liner (LF)

Lateral Rein-statements

Specialty Liner (ea.)

Lateral Clean and

TV

Lateral Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

8 855 28 0 6 16

3 0

10 408 1

TV (LF)* 1263

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \1

R eh ab ilit at io n

Sc he du le

(8 ).d w g

11-3846-03

KL

YG

PH

COOK

JULY 2026

SANITARY SEWER REHABILITATION SCHEDULE

CIPP Lining Lateral Rehabilitation

Asset ID USMH DSMH Location Diameter

(in.) Material Length (ft) USMH Depth (ft)

DSMH

Depth (ft)

Exhibit Grid Number Y/N

Number of Active

Services

Number of Capped Services

Transition Liner

(Diam. (in.))

Transition from USMH

(ft)

Lateral from

USMH (ft) DS Clock Position Comments Capped Clean &

Televise Lateral

Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

J253:J254 J253 J254 Tiverton Ct. 8 AC 84.5 7.1 26.2 20 Y 2 0

16.4 2 TBI X X

76.4 6 Drop

Connection

(20 LF)

X X

J254:J255 J254 J255 Tiverton Ct. 10 AC 264 26.2 28.4 20 Y 3 0

33.5 1 1130 Tiverton X X

127.8 1 Do Not Reinstate

196.2 2 Do Not Reinstate

J259:J260 J259 J260 Foxboro Ln. 8 AC 232 7.4 7.4 21 Y 4 0

98.4 3 Roots

112.4 3 Roots

168.9 3 Roots

184.9 3 Roots

J260:J261 J260 J261 Foxboro Ln. 8 AC 238.7 7.4 5.5 21 Y 4 1

10.5 3

39.7 3

82.3 3 Roots

111.7 3 Roots

194.4 3

L090:L093 L090 L093 Desmond Dr 8 AC 355.5 15.8 19.5 22 Y 5 0

72.5 12 Break-in X X

114.2 12 X X

207.7 12 X X

250.4 12 X X

305.2 12 X X

L093:L094 L093 L094 Desmond Dr 8 AC 188.7 19.5 21.1 22 Y 2 0

72.2 1 X X

153.1 1 X X

L094:L095 L094 L095 Desmond Dr 8 AC 223.2 21.1 22.8 22 Y 3 0

97.4 9 X X

139.2 9 Break-in X X

193.7 9 X X

L095:L096 L095 L096 Desmond Dr 8 AC 380.6 22.8 26.1 22 Y 5 0

35.4 9 X X

129.7 9 Corrosion X X

212.0 9 X X

293.3 9 X X

362.5 9 Corrosion/D

AE X X

Totals

CIPP

Diameter

(in.)

CIPP Liner (LF)

Lateral Rein-statements

Specialty Liner (ea.)

Lateral Clean and

TV

Lateral Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

8 1704 28 0 17 1

0 0

10 264 0

TV (LF)* 1968

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \1

R eh ab ilit at io n

Sc he du le

(9 ).d w g

11-3846-03

KL

YG

PH

COOK

JULY 2026

SANITARY SEWER REHABILITATION SCHEDULE

CIPP Lining Lateral Rehabilitation

Asset ID USMH DSMH Location Diameter

(in.) Material Length

(ft)

USMH

Depth (ft)

DSMH

Depth (ft) Exhibit Grid

Number Y/N Number of

Active Services

Number of Capped Services

Transition Liner

(Diam.

(in.))

Transition from USMH

(ft)

Lateral from

USMH (ft) DS Clock Position Comments Capped Clean &

Televise Lateral

Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

M043:M044 M043 M044 Andrew Ln. 8 AC 312.2 18.9 21.1 11 Y 6 0

44.0 1 Roots X X

47.2 11 X

120.7 1 X

123.8 12 Broken X X

197.0 12 X

270.6 12 X

M044:M045 M044 M045 Andrew Ln. 8 AC 116.9 21.1 21.7 11 Y 0 0

M045:M046 M045 M046 Hinkle Ln 8 AC 269.4 21.7 20.2 11 Y 5 3

17.1 2 X X

79.5 11 11 Hinkle X X

82.5 11 11 Hinkle X X

156.4 1 X

159.9 11 X

213.6 2 X

246.7 2 X

M046:M048 M046 M048 Hinkle Ln. 8 AC 55.6 20.2 19.1 11 Y 1 0 26.8 10 X

M048:M052 M048 M052 Hinkle Ln. 8 AC 107.1 19.1 20.6 11 Y 0 0

M052:M053 M052 M053 Salem Dr. 8 AC 125.9 20.6 18.6 11 Y 0 0

M234:M235 M234 M235 W Schaumburg Rd. 8 AC 196.5 9 12.7 12 Y 2 1

18.3 9 X

25.2 2 Offset, DAE X X

48.2 2 X

M235:M236 M235 M236 S Roselle Rd. 8 AC 277.7 12.7 14.2 12 Y 3 1

79.6 2 X

91.9 10 X

92.7 3 Lateral Launch X X X

125.6 3 Lateral Launch X

M236:M237 M236 M237 S Roselle Rd. 8 AC 168.7 14.2 16.2 12 Y 2 0

93.3 2 Severe DAE X X X

127.2 9 X

M237:RJN-M237-A M237 RJN-M237-A S Roselle Rd. 8 AC 272.7 16.2 13.5 13 Y 3 0

30.6 3 X

67.5 9 X

241.4 9 X

RJN-M237-A:M238 RJN-M237-A M238 S Roselle Rd. 8 AC 156.9 13.5 9.4 13 Y 1 0 137.1 9 X

M238:M239 M238 M239 S Roselle Rd. 8 AC 65.3 9.4 8 13 Y 0 0

M239:M240 M239 M240 Roselle Rd. 8 AC 148 8 10.5 13 Y 0 0

M240:M241 M240 M241 Roselle Rd. 8 AC 214.4 10.5 12.4 13 Y 1 0 163.9 3 DAE X X

Totals

CIPP

Diameter

(in.)

CIPP Liner (LF)

Lateral Rein-statements

Specialty Liner (ea.)

Lateral Clean and

TV

Lateral Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

8 2488 24 0 7 19

1 2

10 0 0

TV (LF)* 2488

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \1

R eh ab ilit at io n

Sc he du le

(1 0)

.d w g

11-3846-03

KL 42

YG

PH

COOK

JULY 2026

SANITARY SEWER REHABILITATION SCHEDULE

CIPP Lining Lateral Rehabilitation

Asset ID USMH DSMH Location Diameter

(in.) Material Length (ft) USMH Depth (ft)

DSMH

Depth (ft)

Exhibit Grid Number Y/N

Number of Active

Services

Number of Capped Services

Transition Liner

(Diam. (in.))

Transition from USMH

(ft)

Lateral from

USMH (ft) DS Clock Position Comments Capped Clean &

Televise Lateral

Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

N001:N002 N001 N002 Schaumburg Rd. 8 AC 324.5 8.6 13.3 12 Y 6 3

0.1 3 X

1.4 11 X

50.1 10 X

56.4 1 X

138.2 12 X

163.3 3 X

164.2 10 X

196.5 10 X

250 11 X

N002:M235 N002 M235 Roselle Rd. 8 AC 68.5 13.3 12.7 12 Y 0 0

N065:N066 N065 N066 Lewis Ct. 10 AC 138 22.8 19.9 14 Y 1 0 117.2 1 X

O194:O195 O194 O195 Merlin Dr 8 VCP 385.7 8.9 13.2 23 Y 10 1

22.9 2 X

67.6 10 X

69.5 10 Roots X X

102.4 3 X

135.7 11 Root ball X X

189.6 2 X

204.9 11 Broken, root ball X X

268.9 2 X

272.6 10 X

337.6 2 X

341 10 X

O198:O199 O198 O199 S Plum Grove Rd 10 VCP 279.9 8.4 18.2 23 Y 0 0

P003:P004 P003 P004 N Roselle Rd. 8 AC 146.2 13.7 13.8 12 Y 1 0 104.3 3 X

P004:N002 P004 N002 N Roselle Rd. 8 AC 263.4 13.8 13.3 12 Y 1 0 55.6 9 X

Q267:Q269 Q267 Q269 Thornhill Ct. 8 AC 72.7 9.1 9.5 15 Y 1 0 24.3 3 Point Repair

Q279:Q280 Q279 Q280 Middlebury Ct. 8 AC 285.9 10 7.9 15 Y 5 1

75.5 10

123.6 2 X

131 9 TBI X

136.1 2 X

139.4 10 X

272.8 9

Totals

CIPP

Diameter

(in.)

CIPP Liner (LF)

Lateral Rein-statements

Specialty Liner (ea.)

Lateral Clean and

TV

Lateral Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

8 1547 25 0 3 16

2 1

10 418 0

TV (LF)* 1965

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \1

R eh ab ilit at io n

Sc he du le

(1 1)

.d w g

11-3846-03

KL 42

YG

PH

COOK

JULY 2026

SANITARY SEWER REHABILITATION SCHEDULE

CIPP Lining Lateral Rehabilitation

Asset ID USMH DSMH Location Diameter

(in.) Material Length (ft) USMH Depth (ft)

DSMH

Depth (ft)

Exhibit Grid Number Y/N

Number of Active

Services

Number of Capped Services

Transition Liner

(Diam. (in.))

Transition from USMH

(ft)

Lateral from

USMH (ft) DS Clock Position Comments Capped Clean &

Televise Lateral

Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

Q280:Q283 Q280 Q283 Elmwood Ln. 8 AC 102.7 7.9 8 15 Y 0 0

Q283:Q284 Q283 Q284 Mayfair Ln. 8 AC 318.5 8 6.6 15 Y 3 0

72.3 3

180.3 9

249.4 9

R056:R057 R056 R057 Golf Rd. 10 AC 399.5 12 11.3 5 Y 0 0

R057:R058 R057 R058 Golf Rd. 10 AC 400.9 11.3 13.5 5 Y 0 0

R058:R059 R058 R059 Golf Rd. 10 AC 244.2 13.5 15.9 5 Y 0 0

R059:RJN-R095-A R059 RJN-R095-A National Pkwy 10 AC 149.1 15.9 16.1 5 Y 0 0

R081:R082 R081 R082 Meacham Rd. 8 AC 70.4 8.2 10.1 7 Y 0 0

R082:R083 R082 R083 Meacham Rd. 10 AC 206.1 10.1 8.5 7 Y 0 0

R084:R085 R084 R085 Meacham Rd. 10 AC 159.2 10.7 10.8 7 Y 0 0

R086:R087 R086 R087 Meacham Rd. 10 AC 164.9 9.1 8.8 7 Y 0 0

R087:R089 R087 R089 Meacham Rd. 10 AC 17.7 8.8 8.4 7 Y 0 0

R089:R090 R089 R090 Meacham Rd. 10 AC 142.8 8.4 8.8 6 Y 0 0

R090:R091 R090 R091 Meacham Rd. 10 AC 240.8 8.8 9.6 6 Y 0 0

R091:R092 R091 R092 Meacham Rd. 10 AC 240.8 9.6 10.2 6 Y 0 0

R092:R093 R092 R093 Meacham Rd. 10 AC 395.4 10.2 13 6 Y 0 0

R093:R096 R093 R096 Meacham Rd. 10 AC 260.4 13 16.5 6 Y 0 0

R095:R096 R095 R096 National Pkwy 10 AC 95.2 16.4 16.5 6 Y 0 0

RJN-R095-A:R095 RJN-095-A R095 National Pkwy. 10 AC 88 16.1 16.4 6 Y 0 0

S121:S143 S121 S143 Higgins Rd. 8 AC 103.2 12.7 12.8 8 Y 0 0

S122:S123 S122 S123 Martingale Rd. 8 AC 313.7 10.6 9.4 8 Y 0 0

S123:S124 S123 S124 Martingale Rd. 8 AC 113.5 9.4 12.1 8 Y 0 0

Totals

CIPP

Diameter

(in.)

CIPP Liner (LF)

Lateral Rein-statements

Specialty Liner (ea.)

Lateral Clean and

TV

Lateral Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

8 1022 3 0 0 0

0 0

10 3205 0

*includes segments not scheduled for lining Clean and

TV (LF)* 4227

Grand Totals

CIPP

Diameter

(in.)

CIPP Liner (LF)

Lateral Rein-statements

Specialty Liner (ea.)

Lateral Clean and

TV

Lateral Grouting

CIPP

Lateral Liner

Dye Test Prot. Tap Removal

8 14334 261 1 64 94

5 11

10 4295 1

TV (LF)* 19107

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \1

Se w er

R eh ab ilit at io n (1

).d w g

11-3846-03

KL

YG

PH

COOK

JULY 2026

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \1

Se w er

R eh ab ilit at io n (2

).d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \1

Se w er

R eh ab ilit at io n (3

).d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \1

Se w er

R eh ab ilit at io n (4

).d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \1

Se w er

R eh ab ilit at io n (5

).d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \2

Se w er

R eh ab ilit at io n (6

).d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \2

Se w er

R eh ab ilit at io n (7

).d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \2

Se w er

R eh ab ilit at io n (8

).d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \2

Se w er

R eh ab ilit at io n (9

).d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \2

Se w er

R eh ab ilit at io n (1

0) .d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \2

Se w er

R eh ab ilit at io n (1

1) .d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \2

Se w er

R eh ab ilit at io n (1

2) .d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \2

Se w er

R eh ab ilit at io n (1

3) .d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \2

Se w er

R eh ab ilit at io n (1

4) .d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \2

Se w er

R eh ab ilit at io n (1

5) .d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \3

Se w er

R eh ab ilit at io n (1

6) .d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \3

Se w er

R eh ab ilit at io n (1

7) .d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \3

Se w er

R eh ab ilit at io n (1

8) .d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \3

Se w er

R eh ab ilit at io n (1

9) .d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \3

Se w er

R eh ab ilit at io n (2

0) .d w g

11-3846-03

KL 42

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \3

Se w er

R eh ab ilit at io n (2

1) .d w g

11-3846-03

KL 42

YG

PH

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \3

Se w er

R eh ab ilit at io n (2

2) .d w g

11-3846-03

KL 42

YG

PH

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \3

Se w er

R eh ab ilit at io n (2

3) .d w g

11-3846-03

KL 42

YG

PH

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \3

Tr af fic

C on tro l (

1) .d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \3

Tr af fic

C on tro l (

2) .d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \4

Tr af fic

C on tro l (

3) .d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \4

Tr af fic

C on tro l (

4) .d w g

11-3846-03

KL

YG

PH

COOK

SHEET

NO.

PROJECT NO.

HORIZONTAL:

DESIGNED:

DRAWN:

CHECKED:

DATE:

SCALES

VERTICAL: STA. TO STA.

\\w he

-p an zu ra

1\ O

FF

IC

E-

\W H

EA

TO

N \P

R O

JE

C

TS

\S ch au m bu rg _I

L\

F

Y2 5-

M

W R

D

II

C P

Se rv ic es

\7 .0

D es ig n\

2.

C

AD

\S he et s\

Se w er \4

D et ai ls (1

).d w g

11-3846-03

KL 42

YG

PH

COOK

JULY 2026

UTILITY TRENCH IN NON-PAVED AREAS DETAIL

NTS

CONNECTING SEWER PIPES OF

DISSIMILAR MATERIAL

NTS

PIPE COUPLING DETAIL

NTS

SANITARY TEE / WYE

NTS

File details come from the government source that posted it. Updated .