This is a security camera work summary and estimate document prepared for John Wayne Airport (JWA), a facility operated by the County of Orange in California, as part of a Construction Manager-at-Risk (CMAR) solicitation for facilities security improvements. The project encompasses the replacement and modernization of security systems at JWA, including installation of a new fiber-optic loop and supporting IT infrastructure, replacement of the existing video surveillance system with additional cameras, and complete replacement of the airport's access control system. The document provides draft plans and key plans showing example locations for video and surveillance system installations across multiple airport areas, including Terminal C Level 1 (Arrival), Parking B2 Level 0, and Airfield locations. The RFP submission deadline is Friday, July 17, 2026, at 2:00 pm, with all questions or requests for interpretation due by the same date and time. Respondents must submit proposals electronically through the County's eProcurement Portal only, with facsimile and email submissions not permitted.
The document does not contain specific pricing information, set-asides, incumbent contractor details, or funding amounts and sources. The project schedule is subject to change and will be communicated to all respondents via addenda through the County's eProcurement Portal. Qualified respondents must meet minimum qualifications and requirements as detailed in the full RFP and Scope of Work documents. Technical assistance for uploading proposals is available through procurement-support@opengov.com or the help portal at https://help.procurement.opengov.com/en/.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECURITY CAMERA WORK SUMMARY
GENERAL NOTES:
T hi s do cu m en t w as c re at ed b y an a pp lic at io n th at is n’ t l ic en se d to u se n ov aP D
F
P ur ch as e a lic en se to g en er at e P
D F fi le s w ith ou t t hi s no tic e.
DRAFT - N
OT FOR CONSTRUCTION
http://www.novapdf.com/
M A
TC
H
LI
N
E
SE
E
SH
EE
T
KEY PLAN: NTS
TERMINAL C
LEVEL 1 (ARRIVAL)
VIDEO AND SURVEILLANCE SYSTEM
GENERAL NOTES:
EXAMPLE LOCATION - TERMINAL
DRAFT - N
KEY PLAN: NTS
M A
TC
H
LI
N
E
SE
E
SH
EE
T
PARKING B2
LEVEL 0
VIDEO AND SURVEILLANCE SYSTEM
GENERAL NOTES:
EXAMPLE LOCATION - PARKING
AIRFIELD LOCATION
KEY PLAN: NTS
GENERAL NOTES:
M A
TC
H
LI
N
E
SE
E
SH
EE
T
MATCHLINE SEE SHEET 7
VIDEO AND SURVEILLANCE SYSTEM
EXAMPLE LOCATION - AIRFIELD
File details come from the government source that posted it. Updated .