Summary
This is an Invitation to Bid (ITB) issued by the Housing Authority of the City of Vancouver (VHA) for fire sprinkler system repair services at the Central Park Place property, a 125-unit, four-story wood-framed multi-family apartment building constructed in 1997. The project addresses recurring pinhole leaks in existing copper sprinkler lines, likely caused by dissimilar metal corrosion. The scope of work is divided into two phases: Phase 01 includes assessment and evaluation of the fire backflow assembly, fire pump, wet standpipe and riser assembly, and existing copper sprinkler lines, with pricing for repair recommendations, timelines, relocation/fire watch requirements, and system flushing; Phase 02 involves pricing for replacement of sprinkler line segments using CPVC pipe in corridors and building spaces, in-unit residential areas, and drywall patching at specified rates per linear foot and square foot. The mandatory pre-bid meeting is scheduled for July 16, 2026, at 9:00 AM PT at 1900 Fort Vancouver Way, Vancouver, WA 98663. Questions and clarifications must be submitted by July 22, 2026, at 5:00 PM PT, with bids due on August 5, 2026, at 2:00 PM PT. The contract will commence upon execution and terminate upon completion of work, with the project planned as an occupied rehabilitation with minimal tenant disruption.
Bids will be evaluated on a pass/fail basis for responsiveness and bidder responsibility, with award to the lowest responsive and responsible bidder providing the best total value. Bidders must possess a minimum of four years' experience in the requested services and maintain an acceptable performance record. All pricing must be inclusive of costs, taxes, permits, and labor; credit card processing fees are the bidder's responsibility. The VHA strongly encourages participation by minority-owned, women-owned, veteran-owned, and small businesses and may require participation in HUD Section 3 programs during construction. The project is subject to Washington State Evergreen Sustainable Development Standards (ESDS) compliance and is not subject to prevailing wage or apprenticeship training requirements. Contractors must maintain commercial general liability insurance of at least $1 million per occurrence, automobile liability insurance of $1 million combined single limit, and workers' compensation insurance as required by state statute. A bid bond equivalent to 5% of the bid price is required for bids exceeding $250,000. All procurement materials are subject to Washington's Public Records Act, and bidders are encouraged to identify any proprietary information requiring confidential treatment.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID (ITB)
2026-017 – Central Park Place Fire Sprinkler System Repair
ANNOUNCEMENT
The Housing Authority of the City of Vancouver (VHA) is issuing this invitation to bid with the intention of awarding a contract for the purchase of services to repair the fire sprinkler system at our Central Park Place property, in accordance with RCW 39.26. A Contract may be awarded to the lowest responsive, responsible bidder. The VHA reserves the right to amend and modify this competitive solicitation.
INTRODUCTION
This competitive solicitation is divided into six (6) sections:
• Section 1 provides a summary table of relevant deadlines for responding to the competitive solicitation and identifies contact information for this procurement.
• Section 2 provides important information about the procurement that is designed to help interested bidders evaluate the potential opportunity, including the purpose of the procurement, the form of the resulting Contract, and potential contract sales.
• Section 3 identifies how VHA will evaluate the bids.
• Section 4 identifies how to prepare and submit a bid for this competitive solicitation, including detailed instructions regarding what to submit and how to submit your bid.
• Section 5 details the applicable requirements to file a complaint, request a debrief conference, or file a protest regarding this competitive solicitation.
• Section 6 provides information pertaining to doing business with the VHA, including
VHA’s efforts to enable Washington’s small and diverse businesses to compete for and participate in procurements for goods/services.
E-PROCUREMENT
The VHA has partnered with Public Purchase for the posting of business opportunities. Vendors must register with Public Purchase to receive email notifications, view, and download solicitation documents, and submit responses. Please visit www.vhausa.com/procurement for details. Solicitation documentation obtained from any other source is considered unofficial.
SECTION 1 – DEADLINES, QUESTIONS, AND MODIFICATION
SOLICITATION DEADLINES
The following table identifies important dates for this Invitation to Bid:
Solicitation Issue Date: July 1, 2026
Pre-Bid Meeting:
(mandatory)
July 16, 2026, at 9:00 AM (PT) Address:
1900 Fort Vancouver Way Vancouver, WA 98663
Questions/Clarifications Due Date: July 22, 2026, at 5:00 PM (PT)
Bid Due Date and Time: August 5, 2026, at 2:00 PM (PT)
QUESTIONS
Questions or concerns regarding this competitive solicitation must be direct to Procurement and submitted electronically through Public Purchase. Questions raised at any pre-bid meeting and during the Q&A period will be answered and posted to Public Purchase as received or as an addendum. Communication about this solicitation with any VHA employee other than Procurement staff may disqualify your bid.
MODIFICATION
The VHA reserves the right to amend and modify this competitive solicitation. Only bidders who have properly registered and downloaded the original competitive solicitation directly via Public Purchase will receive notifications of amendments and other correspondence pertinent to this competitive solicitation.
SECTION 2 – INFORMATION ABOUT THE PROCUREMENT
PURPOSE
The purpose of this competitive solicitation is to receive competitive bids to evaluate and, as appropriate, award a Contract for VHA to procure services to repair the fire sprinkler system at our Central Park Place property specific goods and/or services as set forth herein.
CONTRACT
The form of the Contract that will be awarded as a result of this competitive solicitation is attached as Attachment C – A104 (Sample Contract). This Contract shall commence upon the date of execution and terminate when work is complete.
BACKGROUND
Built in 1997, Central Park Place is a 125 unit four-story wood framed multi-family apartment building consisting of Single Room Occupancies (SRO) and Studio style dwelling units. The building underwent a major rehabilitation in 2021 and as part of that renovation, the original copper sprinkler lines serving as a combination dry (attic) / wet (building) system were not replaced. As such we are continuing to deal with and address sporadic pin hole leaks throughout the building in these existing lines. From our internal assessment / review by local vendors the leaks appear to be a condition of dissimilar metals present somewhere within the water lines.
SCOPE OF WORK
This project is planned to be an occupied rehab, with a phased approach to repairs.
Phase 01 Work:
Our goal with Phase 01 work is to identify root cause of issue, repair as much of this issue as feasible with as little to no relocation to tenants as possible. We are requesting an assessment and review of existing head in equipment to identify faulty assemblies or dissimilar metal couplings that could be introducing rust or dissimilar metal into the water line, equipment to be inspected includes but is not limited to:
Provide pricing to evaluate (01-03) pieces of head end equipment, and how you’d approach repairing / replacing any faulty parts. (04) Provide price to scope existing wet sprinkler lines and OR a description as to why this service is not necessary at this time.
• 01 Existing Fire Backflow Assembly o Provide a recommendation for repair o Estimated timeline o Will this work require relocation OR fire watch?
o Flush system once work is complete to eliminate remaining debris?
• 02 Existing Fire Pump o Provide a recommendation for repair o Estimated timeline o Will this work require relocation OR fire watch?
o Flush system once work is complete to eliminate remaining debris?
• 03 Existing Wet 4” Standpipe and 2.5” Riser assembly o Provide a recommendation for repair o Estimated timeline o Will this work require relocation OR fire watch?
o Flush system once work is complete to eliminate remaining debris
• 04 A proposal to scope existing wet copper sprinkler lines o Verification that this scoping will be able to identify most vulnerable existing sprinkler lines to help us arrange how we will phase the repairs o IF scoping does not provide this level of information to building owner then this scope can be omitted
Phase 02 Pricing:
Our goal with Phase 02 proposals is to look at financial impact of replacing full segments of existing sprinkler lines and the impacts it will have on existing tenants in the building. Our preference for this phase of work would be that it is performed as an occupied rehab with as minimal disruption to tenants as possible. We are looking for the following line items to be broken out independently.:
Provide Phase 02 pricing as outlined below
• Corridors & Misc. Building Spaces – $______________ (l.f.) Linear Foot cost break down per 50’-0” section of new CPVC sprinkler line replacing existing copper sprinkler line in corridors and all remaining building spaces including but not limited too: Common shower, Garbage, Offices, Toilet Room, Elev. Equipment room, Storage, Electrical, Vestibule, Sidewall conditions under exterior building canopies, Lobby, Kitchen, Multipurpose room, Meeting room, Stairwells, Laundry, Mechanical, Computer, Janitor, Managers Unit, Vending: (pricing assumes)
All new necessary pipe hangers Demo and removal of existing system Temporary shut offs necessary to complete work Assumes concealed sprinkler heads, sprinkler head covers and flexible whips or similar devices to connect heads to new CPVC line to make it fully function
Estimated timeline for repair per 50’-0” section of line Confirm if this work requires relocation OR temporary fire watch?
Assumes coordination with Fire Department and local jurisdictions to confirm / adjust water pressure to support any pipe diameter changes from switching from copper to CPVC
Assumes any commissioning of system once repairs are complete
• In Unit – $______________(l.f.) Linear Foot cost break down per 50’-0” section of new CPVC sprinkler line replacing existing copper sprinkler line within residential units: (pricing assumes)
Assumes from “T” connection in corridor to end of line within that unit All new necessary pipe hangers Demo and removal of existing system Temporary shut offs necessary to complete work Assumes concealed sprinkler heads, sprinkler head covers and flexible whips or similar devices to connect heads to new CPVC line to make it fully function
Estimated timeline for repair per 50’-0” section of line Confirm if this work requires relocation OR temporary fire watch?
Assumes coordination with Fire Department and local jurisdictions to confirm / adjust water pressure to support any pipe diameter changes from switching from copper to CPVC
Assumes any commissioning of system once repairs are complete
• Drywall Patching – Per square foot pricing: (this price represents a turn key / full dollar amount to demo and remove / replace existing drywall, and all necessary painting, patching, texturing, inspection and permitting necessary at the following conditions)
• Per Square Foot Price at (2 layer) 2-hour wall / ceiling assemblies:
• 2 layer rated assembly per sqft. $________________
• Per Square Foot Price at (1 layer) wall / ceiling assemblies:
• 1 layer rated assembly per sqft. $________________
SECTION 3 – BID EVALUATION
Bids for this competitive solicitation will be evaluated as described below.
• Bidder responsiveness, performance requirements, price factors, and responsibility, will be evaluated based on the process described herein.
• Any bidder whose bid is determined to be non-responsive will be rejected and will be notified of the reasons for this rejection.
• Procurement reserves the right to: (1) Request clarification regarding any bid; (2) Waive any informality; (3) Reject any or all bids, or portions thereof; (4) Accept any portion of the bid unless the bidder stipulates all or nothing in their bid; (5) Cancel the Competitive Solicitation and, if desired, re-solicit bids; and/or (6) Negotiate with the lowest responsive and responsible bidder(s) to determine if such bid can be improved.
• The following summary chart provides an overview of the process and evaluation criteria (which are further described below) to determine eligibility for a Contract award:
BID RESPONSIVENESS: Bids will be reviewed – on a pass/fail basis – to determine whether the bid is ‘responsive’ to this competitive solicitation. This means that Procurement will review each bid to determine whether the bid is complete – i.e., does the bid include each of the required bid submittals, are the submittals complete, signed, legible. Procurement reserves the right to determine whether a bid is responsive – i.e., to determine a bidder’s compliance with the requirements specified in this competitive solicitation and to waive informalities in a bid. An informality is an immaterial variation from the exact requirements of the competitive solicitation, having no effect or merely a minor or negligible effect on quality, quantity, or delivery of the goods or the quality, capability, or performance of the services being procured, and the correction or waiver of which would not affect the relative standing of, or be otherwise prejudicial, to bidders.
A bid tabulation will be published detailing the bids received; however, the VHA will perform further analysis and may ask for additional documentation. Bidders must not construe the bid tabulation as an award, impending award, attempt to negotiate, etc. If a bidder acts or fails to act as a result of such notification, it does so at its own risk and expense.
BIDDER RESPONSIBILITY ANALYSIS: For responsive bids, Procurement must determine whether the bidder is a ‘responsible bidder.’ Accordingly, Procurement will make reasonable inquiry to determine bidder responsibility on a pass/fail basis. In determining bidder responsibility, Procurement will consider the following statutory elements:
• Bidder’s ability, capacity, and skill to perform the contract or provide the service required;
• Bidder’s character, integrity, reputation, judgment, experience, and efficiency;
• Bidder’s ability to perform the contract within the time specified;
• Bidder’s performance quality pertaining to previous contracts or services;
• Bidder’s compliance with laws relating to the contract or services;
• Whether, within the three-year period immediately preceding the date of the competitive solicitation, bidder has been determined by a final and binding citation and notice of assessment issued by the Washington State Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of chapter 49.46, 49.48, or 49.52 RCW; and
• Such other information as may be secured having a bearing on the decision to award the Contract.
See RCW 39.26.160(2)(a)-(g). In addition, Procurement may consider the following:
• Financial Information: Procurement may request financial statements, credit ratings, references, record of past performance, clarification of bidder’s bid, on-site inspection of bidder's or subcontractor's facilities, or other information as necessary to determine bidder’s capacity to perform and the enforceability of bidder’s contractual commitments. Failure to respond to these requests may result in a bid being rejected as non-responsive.
• References: Procurement reserves the right to use references to confirm satisfactory customer service, performance, satisfaction with service/product, knowledge of products/service/industry and timeliness. Any negative or unsatisfactory reference can be reason for rejecting a bidder as non-responsible.
BID PRICING EVALUATION: Procurement will evaluate bid pricing by reviewing and comparing the submitted bid prices provided in Attachment B – Bid Form.
WASHINGTON STATE PROCUREMENT PRIORITIES & PREFERENCES: In furtherance of Washington’s business inclusion objectives, the Vancouver Housing Authority will evaluate bids and proposals on the basis of overall best value, with consideration afforded to Washington small businesses, certified veteran owned businesses, and minority-and-women-owned business enterprises. To be eligible for consideration, bidders and proposers must provide certification of their qualifying status as required under Attachment A – Bidder Profile and Certification.
CONTRACT NEGOTIATIONS: The VHA may negotiate with the lowest-priced, responsive, responsible bidder to finalize the Contract and to determine if the bid may be improved. If, after a reasonable period of time, the VHA, in its sole judgement, cannot reach agreement on acceptable Contract terms with such bidder, the VHA may suspend negotiations and undertake negotiations with the next highest scored responsive, responsible bidder as determined by the evaluations.
INTENT TO AWARD ANNOUNCEMENT: The VHA will determine the responsive and responsible bidder who best meets the competitive solicitation requirements and presents the best total value, including price, as calculated consistent with the instructions set forth in Attachment B – Bid Form, and other factors as set forth in this competitive solicitation including any applicable state procurement priority or preference.
• Upon Intent to Award announcement, bidders may request a debrief conference as specified in Section 5.
CONTRACT AWARD
Subject to protests, if any, the VHA and the lowest-priced, responsive and responsible bidder will enter into a Contract as set forth in Attachment C – A104 (Sample Contract). An award is made and a contract formed by signature of the awarding agency and the awarded bidder on the Contract. Following the Contract award, all bidders registered in Public Purchase will receive a notification delivered to the bidder’s email address provided in the bidder’s profile in Public Purchase. A Notice of Award will be posted to Public Purchase for review.
BID INFORMATION AVAILABILITY
Upon Intent to Award announcement, all bid submissions and all bid evaluations are subject to public disclosure pursuant to Washington’s Public Records Act. See RCW 39.26.030(2). Upon Intent to Award announcement, all bid evaluations will be posted to Public Purchase.
SECTION 4 - HOW TO PREPARE AND SUBMIT A BID FOR THIS COMPETITIVE SOLICITATION
PRE-BID CONFERENCE
Procurement will host a pre-bid conference at the time set forth in this competitive solicitation.
Attendance is mandatory. Bidders, however, are encouraged to attend and participate. The purpose of the pre-bid conference is to clarify the competitive solicitation as needed and raise any issues or concerns that bidders may have. If changes to the competitive solicitation are required as a result of the pre-bid conference, Procurement will post an amendment to this competitive solicitation to Public Purchase. Assistance for disabled, blind, or hearing-impaired persons who wish to attend the pre-bid conference is available with prior arrangement by contacting Procurement.
BIDDER COMMUNICATIONS
During the competitive solicitation process, all bidder communications regarding this competitive solicitation must be directed to Procurement. Bidders should rely only on this competitive solicitation and written amendments to this competitive solicitation issued by Procurement. In no event will oral communications regarding this competitive solicitation be binding.
• Bidders are encouraged to make any inquiry regarding the competitive solicitation as early in the process as possible to allow Procurement to consider and, if warranted, respond to the inquiry. If a bidder does not notify Procurement of an issue, exception, addition, or omission, such issue, exception, addition, or omission may be considered to be waived by the bidder for protest purposes.
• If bidder inquiries result in changes to the competitive solicitation, written amendments will be issued and posted on Public Purchase.
• Unauthorized bidder contact regarding this competitive solicitation with other VHA employees may result in bidder disqualification.
PRICING
Bid prices must include all cost components needed for the goods and/or services as described in this competitive solicitation. See Attachment B – Bid Form. A bidder’s failure to identify all costs in a manner consistent with the instructions in this competitive solicitation is sufficient grounds for disqualification.
• Inclusive Pricing: Bidders must identify and include all cost elements in their pricing. In the event that bidder is awarded a Contract, the total price for the goods and/or services shall be bidder’s price as submitted. Except as provided in the Contract, there shall be no additional costs of any kind.
• Credit Cards (P-Cards): In the event that bidder is awarded a Contract, the total price for the goods and/or services shall be the same regardless of whether Purchasers make payment by cash, credit card, or electronic payment. Bidder shall bear, in full, any processing or surcharge fees associated with the use of credit cards or electronic payment.
REQUIRED BID SUBMITTALS
This section identifies the bid submittals that must be provided to Procurement to constitute a responsive bid. The submittals must be delivered as set forth below. Bids that do not include the submittals identified below may be rejected as nonresponsive. In addition, a bidder’s failure to complete any submittal as instructed may result in the bid being rejected. Bidders may not provide unsolicited materials. For any supplemental materials expressly required by Procurement in writing, bidders must identify such supplemental materials with the bidder’s name.
• ATTACHMENT A – BIDDER’S PROFILE AND CERTIFICATION
This document requires bidder information for the awarding agency’s contract administration purposes. Complete the certification, along with any exceptions or required explanations, and submit it with the bid to Procurement.
• ATTACHMENT B – BID FORM
This document requires confirmation of the bidder’s goods and/or services and/or bidder’s performance meets or exceeds the detailed specifications/qualifications.
Complete the information required and submit it with the bid to Procurement.
• ATTACHMENT C – A104 (SAMPLE CONTRACT)
This document identifies the terms and conditions that will govern the resulting Contract.
BID FORMAT
Bids must be complete, legible, signed, and follow all instructions stated in the competitive solicitation. Unless otherwise specified in writing, documents included with an electronic bid must be prepared in MS Word, MS Excel, or Adobe PDF. Where required to do so, bidders may sign using either a physical or electronic signature.
SUBMITTING BIDS
Bids must be submitted electronically via Public Purchase. Mailed or emailed bids will not be accepted. Please visit www.vhausa.org/procurement for submittal instructions.
SECTION 5 - COMPLAINT AND PROTEST REQUIREMENTS
COMPLAINTS
Bidders wishing to voice objections to this Invitation to Bid must submit their complaint in accordance with criteria set forth below. Failure by the bidder to raise a complaint at this stage may waive its right for later consideration. Procurement will consider all complaints but is not required to modify or cancel the solicitation. If bidder complaints result in substantive changes, written amendments will be issued.
A complaint may be based only on one or more of the following grounds: (a) The competitive solicitation unnecessarily restricts competition; (b) The competitive solicitation evaluation or scoring process is unfair or flawed; or (c) The competitive solicitation requirements are inadequate or insufficient to prepare a response.
A complaint must: (a) Be submitted to and received by Procurement no less than five (5) business days prior to the deadline for bid submittal; and (b) Be in writing. A complaint should clearly articulate the basis of the complaint and include a proposed remedy. When a complaint is received, Procurement will consider all the facts available and respond in writing prior to the http://www.vhausa.org/procurement deadline for bid submittals, unless more time is needed. Procurement is required to promptly post the response to a complaint on Public Purchase.
Procurement’s response to the complaint is final and not subject to administrative appeal.
Issues raised in a complaint may not be raised again during the protest period. Furthermore, any issue, exception, addition, or omission not brought to the attention of Procurement prior to bid submittal may be deemed waived for protest purposes.
PROTESTS
Following a Debrief Conference, a bidder may protest the award of a Contract. A protest may be based only on one or more of the following: (a) Bias, discrimination, or conflict of interest on the part of an evaluator; (b) Error in computing evaluation scores; or (c) Non-compliance with any procedures described in the competitive solicitation.
Any bidder may protest an award. A protest must: (a) Be submitted to and received by the Protest Officer specified below, within five (5) business days after the protesting bidder’s Debriefing Conference; (b) Be in writing; (c) Include a specific and complete statement of facts forming the basis of the protest; and (d) Include a description of the relief or corrective action requested.
After reviewing the protest and available facts, the Protest Officer will issue a written response within ten (10) business days from receipt of the protest, unless additional time is needed. The protest decision is final and not subject to administrative appeal. If the protesting bidder does not accept VHA’s protest response, the bidder may seek relief in Clark County Superior Court.
COMMUNICATION DURING COMPLAINTS AND PROTESTS
With the exception of protests, all communications about this competitive solicitation, including complaints and debriefs, must be addressed to Procurement unless otherwise directed. Protests must be addressed to the Protest Officer.
All complaints, debrief conference requests, and protests must:
1. Be in writing;
2. Be signed by the complaining, requesting, or protesting bidder or an authorized agent;
3. Be delivered within the time frame(s) outlined herein;
4. Identify the Competitive solicitation number;
5. Conspicuously state “Complaint,” “Debrief,” or “Protest” in any subject line of any correspondence or email; and
6. Be sent to the address identified below.
All complaints and protests must (a) State all facts and arguments on which the complaining or protesting bidder is relying as the basis for its action; and (b) Include any relevant documentation or other supporting evidence.
TO SUBMIT A COMPLAINT, please send an email message to Procurement at the following email address: procurement@vhausa.com. The email message must include “Complaint” in the subject line of the email message. Alternatively, mail the complaint to Procurement at the following address: Vancouver Housing Authority, 2500 Main Street, Vancouver, WA 98660.
TO SUBMIT A PROTEST, please send an email message to the Protest Officer at the following email address: procurement@vhausa.com. The email message must include “Protest” and the solicitation number in the subject line of the email message. Alternatively, mail the protest to the Protest Officer at the following address: Vancouver Housing Authority, 2500 Main Street, Vancouver, WA 98660.
SECTION 6 - DOING BUSINESS WITH THE VHA
PUBLIC WORKS
NOT USED.
FEDERAL WAGE REQUIREMENTS
NOT USED.
SECTION 3 REQUIREMENTS
NOT USED.
TAXES
This project is not retail sales tax exempt. Applicable taxes must be included in the total bid amount.
CONTRACTING AND WORKFORCE GOALS AND REQUIREMENTS
VHA has a desire to maximize the Project’s contributions to larger economic development goals in Southwest Washington wherever feasible. This includes identifying opportunities for the use of local contractors, subcontractors, and local workforce in the Project. Due to potential funding sources for the projects, the selected firm may need to participate in one or a combination of the following programs:
• WA STATE PREVAILING WAGES: The project is not subject to WA State Prevailing Wage requirements.
• APPRENTICESHIP TRAINING PROGRAM: The project is not subject to apprentice training and program requirements.
• SECTION 3, M/WBE, VETERAN-OWNED, AND SMALL BUSINESS: VHA strongly encourages minority-owned and women-owned businesses, veteran owned, socially and economically disadvantaged businesses, HUD Section 3 businesses, and small mailto:procurement@vhausa.com mailto:procurement@vhausa.com businesses to submit or to participate in a subcontracting capacity on VHA contracts. For the purposes of evaluating this ITB, the General Contractor does not need to be a Section 3 business, however the selected firm may be required to participate in Section 3 program implementation during construction.
Provide documentation of M/WBE, Veteran Owned or Small Business designation, or other similar certifications(s) (if applicable).
• SUSTAINABILITY GOALS: The project shall be subject to meeting sustainability goals as defined by the State of Washington Evergreen Sustainable Development Standards (ESDS). The ESDS requires coordination throughout the design, development, and construction process to ensure compliance. The General Contractor of the Project will be required to demonstrate the construction meets all applicable ESDS requirements.
ESDS information can be downloaded from https://www.commerce.wa.gov.
VHA anticipates creating an ESDS Plan and Guideline/Checklist shortly after selecting a General Contractor. Selected General Contractor will be expected to participate in an ESDS Design Charrette organized by the architect.
WASHINGTON’S PUBLIC RECORDS ACT
All documents (written and electronic) submitted as part of this procurement are public records. Unless statutorily exempt from disclosure, such records are subject to disclosure if requested. See RCW 42.56, Public Records Act. Bidders are strongly discouraged from unnecessarily submitting sensitive information (e.g., information that bidder might categorize as ‘confidential,’ ‘proprietary,’ ‘sensitive,’ ‘trade secret,’ etc.).
• If, in bidder’s judgment, Washington’s Public Records Act provides an applicable statutory exemption from disclosure for certain portions of bidder’s bid, please mark the precise portion(s) of the relevant page(s) of the bid that bidder believes are statutorily exempt from disclosure and identify the precise statutory basis for exemption from disclosure.
• In addition, if, in bidder’s judgment, certain portions of bidder’s bid are not statutorily exempt from disclosure but are sensitive because these particular portions of bidder’s bid (NOT including pricing) include highly confidential, proprietary, or trade secret information (or the equivalent) that bidder protects through the regular use of confidentiality or similar agreements and routine enforcements through court enforcement actions, please mark the precise portion(s) of the relevant page(s) of bidder’s bid that include such sensitive information.
In the event that the awarding agency receives a public records disclosure request pertaining to information that bidder has submitted and marked either as (a) statutorily exempt from disclosure; or (b) sensitive, the awarding agency, prior to disclosure, will do the following:
• The awarding agency’s Public Records Officer will review any records marked by bidder as statutorily exempt from disclosure. In those situations, where the designation https://www.commerce.wa.gov/ comports with the stated statutory exemption from disclosure, the awarding agency will redact or withhold the document(s) as appropriate.
• For documents marked ‘sensitive’ or for documents where the awarding agency either determines that no statutory exemption to disclosure applies or is unable to determine whether the stated statutory exemption to disclosure properly applies, the awarding agency will notify bidder, at the address provided in the bid submittal, of the public records disclosure request and identify the date that the awarding agency intends to release the document(s) (including documents marked ‘sensitive’ or exempt from disclosure) to the requester unless the bidder, at bidder’s sole expense, timely obtains a court order enjoining the awarding agency from such disclosure. In the event bidder fails to timely file a motion for a court order enjoining such disclosure, the awarding agency will release the requested document(s) on the date specified. Bidder’s failure properly to identify exempted or sensitive information and timely respond after notice of request for public disclosure has been given shall be deemed a waiver by bidder of any claim that such materials are exempt or protected from disclosure.
SMALL & DIVERSE BUSINESSES
The awarding agency, in accordance with Washington law, encourages small and diverse businesses to compete for and participate in state procurements as contractors and as subcontractors to awarded bidders. See, e.g., RCW 39.19 (OMWBE certified businesses); RCW 43.60A.200 (WDVA certified veteran-owned businesses); and RCW 39.26.005 (Washington small businesses).
• WDVA CERTIFICATION
Bidders may contact the Washington State Department of Veterans’ Affairs (WDVA) for information regarding Certified Veteran-Owned businesses or to become a Certified Veteran-Owned Business. The WDVA can be reached by telephone, (360) 725-2169, or through their website at WDVA. The qualification requirements to be a Certified Veteran-Owned Business are set forth in Attachment A – Bidder’s Profile and Certification.
• WASHINGTON SMALL BUSINESSES
Bidders may contact the VHA about small and diverse business inclusion and qualification as a Washington Small Business. If you qualify as a Washington Small Business, identify yourself as such in Public Purchase. The qualification requirements to self-certify as a Washington Small Business are set forth in Attachment A – Bidder’s Profile and Certification.
INCLUDED EXHIBITS/ATTACHMENTS
EXHIBIT 1 – Standard Insurance Requirements
EXHIBIT 2 – Standard Terms and Conditions
ATTACHMENT A – Bidder’s Profile and Certification
ATTACHMENT B – Bid Form
ATTACHMENT C – A104 (Sample Contract)
ATTACHMENT D – Plans and Property Information
Exhibit 1 - Standard Insurance Requirements
1. Insurance Requirements
a. Contractor’s Insurance. Without limiting Contractor’s indemnification of Owner, Contractor shall maintain at its own expense during the entire term of this Agreement policies of insurance of the types and amounts described below.
b. Commercial General Liability Insurance. Contractor shall maintain commercial general liability insurance providing coverage for bodily injury, property damage, and personal and advertising injury with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1MM per occurrence, and $2MM general aggregate and shall include coverage for completed operations for up to the statutory period. This policy shall include blanket contractual liability. Limits may be achieved through a combination of primary and excess/umbrella policies.
c. Automobile Liability Insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1MM combined single limit for each accident.
d. Workers' Compensation Insurance. Contractor shall maintain Workers Compensation Insurance as required by applicable state statute and Employer’s Liability Insurance, with limits of at least one million dollars ($1,000,000) per accident, employee, and disease.
e. [REMOVE IF NOT APPLICABLE] Professional Liability (Errors & Omissions) Insurance.
Contractor shall maintain professional liability insurance that covers architectural and design services to be performed in connection with this Agreement, in the minimum amount of one million dollars ($1,000,000) per claim and in the aggregate. Any policy inception date, continuity date, or retroactive date must be before the effective date of this agreement and Contractor agrees to maintain continuous coverage through a period no less than three (3) years after completion of the services required by this Agreement.
f. Contractor’s Pollution Liability Insurance. Contractor shall maintain Contractor’s Pollution Liability Insurance providing coverage for bodily injury, property damage, personal injury and environmental site restoration including fines and penalties in accordance with applicable EPA or state regulations in the minimum amount of one million dollars ($1,000,000) per occurrence and annual aggregate. Coverage shall extend to losses from the release or escape of pollutants including discharge of pollutants brought to the site, release of pre-existing pollutants at the site whether sudden or gradual over time and mold resulting from Contractor’s work. Coverage must also extend to first-party clean-up costs, business interruption, loss of rents, and extra expense and include coverage for completed operations up to ten (10) years following project acceptance by Owner.
g. [REMOVE IF NOT APPLICABLE] Aircraft Liability Insurance. Contractor shall maintain aircraft liability insurance, including use of unmanned aircraft (aka drones), in the minimum amount of one million dollars ($1,000,000) per occurrence and annual aggregate.
h. [REMOVE IF NOT APPLICABLE] Installation Floater. Contractor shall maintain an Installation Floater providing coverage for the value of equipment to be installed and shall include Owner as an insured and loss payee. Coverage for testing, water damage, mechanical breakdown, and electrical injury shall be included.
i. [REMOVE IF NOT APPLICABLE] Builder’s Risk. Contractor shall maintain a policy of builder’s risk insurance written on an all risks of direct physical loss basis and covering the 100% full replacement cost of the value of Improvements, which shall include hard and soft costs, equipment, supplies, and materials existing onsite, in transit, or stored at off-site location. [NOTE: may or may not exclude requirement for flood, earthquake, and terrorism coverage]. Policy shall be written on a completed value basis. Policy shall have a deductible approved by Owner and payment of such deductible shall be the responsibility of Contractor. In the event of insurance claims for property damage during construction, the Owner shall be included as Loss Payee to the extent of its interest.
2. Other Provisions of Contractor’s Insurance.
a. Additional Insured Status. Except for professional liability and workers compensation insurance, insurance policies required herein shall provide or be endorsed to provide that Owner and its officers, officials, employees, and agents shall be additional insureds under such policies. This provision shall also apply to any excess liability policies.
b. Waiver of Subrogation. All insurance coverage maintained by Contractor shall be endorsed to waive subrogation against the Owner, including its officers, agents, officials, employees, and volunteers or shall specifically allow the Contractor to waive its rights of subrogation prior to a loss. Contractor hereby waives its rights of recovery against the Owner.
c. Primary Insurance. Contractor’s insurance shall be primary and non-contributory with any insurance maintained by Owner and shall include cross liability or severability of interest.
d. Proof of Insurance. Contractor shall deliver to Owner certificates of insurance on an Acord or equivalent form signed by an authorized representative of the insurers prior to the execution of this Agreement, prior to commencing any work or service, and at least ten (10) days prior to the renewal or replacement of any of the required insurance, or upon reasonable request by Owner. Certificates of insurance must include all required endorsements, including but not limited to additional insured, primary and non-contributory, notice of cancellation, and waiver of subrogation, as applicable. Owner reserves the right to request copies of required insurance policies, as needed.
e. Deductibles and/or Self-insured Retentions. Any self-insured retentions must be declared to and approved by Owner. Payment of deductibles and self-insured retentions maintained by Contractor is the sole responsibility of the Contractor. Deductibles shall not exceed ten thousand dollars ($10,000) each, unless approved by Owner. To the extent Contractor elects to self-insure, subject to Owner’s approval, such self-insurance shall in no way limit liabilities assumed by Contractor in this Agreement, including but not limited to Owner’s status as an additional insured or Contractor waiving rights of recovery or subrogation.
f. Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance in the State in which the Property is located, with an assigned policyholders’ AM Best Rating of A- (or higher) and Financial Size Category Class VII (or larger), unless otherwise approved by the Owner’s Risk Contractor.
g. Notice of Cancellation. Contractor’s insurance shall be endorsed to provide Owner with written notice thirty (30) days prior to cancellation of any required coverage except for non-payment which may be with ten (10) days written notice of cancellation.
h. Contractor’s Property. Contractor is solely responsible for the repair or replacement of Contractor’s personal property and equipment, whether owned or non-owned, used during Contractor’s work.
Owner shall have no responsibility to insure or cover the cost to repair or replace Contractor’s personal property or equipment, regardless of cause of loss.
i. Subcontracted Work. Should Contractor subcontract any of the work under this Agreement, Contractor shall require its subcontractors to carry insurance in types and with limits appropriate for the risk and such policies shall include Owner as an additional insured.
j. Enforcement of Contract Provisions (non estoppel). Contractor acknowledges and agrees that any actual or alleged failure on the part of the Owner to inform Contractor of non-compliance with any requirement imposes no additional obligations on the Owner nor does it waive any rights hereunder.
k. Requirements not Limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type.
l. Owner’s Rights of Enforcement. In the event any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, Owner has the right but not the duty to obtain the insurance it deems necessary, and any premium paid by Owner will be promptly reimbursed by Contractor or Owner will withhold amounts sufficient to pay premium from Contractor payments. In the alternative, Owner may cancel this Agreement.
m. Owner’s Right to Revise Specifications. The Owner reserves the right at any time during the term of the Agreement to change the amounts and types of insurance required by giving the Contractor ninety
(90) days advance written notice of such change. If such change results in substantial additional costs to the Contractor, the Owner and Contractor may renegotiate Contractor’s compensation.
n. Additional Insurance. Contractor may maintain, at its own cost and expense, any additional kind of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work.
Exhibit 2 – Standard Terms and Conditions
1. APPLICABILITY
1.1. If referred to within the text of such, these Standard Terms and Conditions shall be applicable to such solicitation and resulting contract.
1.2. Unless otherwise specified within the solicitation or contract documents, in the event that any provision in any document conflicts with any provision within these Standard Terms and Conditions, the provision in the solicitation or contract document shall govern.
2. DEFINITIONS
2.1. “Owner” OR “Owner’s Agent”. Unless otherwise defined herein and within the ensuing contract, whenever the term “Owner” OR “Owner’s Agent” is used without clearly designating a responsible staff person, the bidder(s) or Contractor shall assume that responsibility for that item rests with the Contracting Officer, Contracting Officer’s Agent, or Owner’s Contracted Agent.
2.2. “ED” is the Executive Director of the Owner; “CEO” is the Chief Executive Officer of the Owner.
2.3. “Contracting Officer” or “CO” shall refer to either the ED, CEO, or the person or Agent that person has delegated such responsibilities to.
2.4. “Contract” refers to the fully executed written agreement that ensues from the solicitation whereas all solicitation documents are included, by reference, as a part of the ensuing contract.
2.5. “Days” unless otherwise directed, shall refer to calendar days.
2.6. “Herein” shall refer to all documents issued pursuant to the noted solicitation, including the solicitation documents, attachments, exhibits, and contract.
2.7. “Offer”, “Bid”, “Proposal”, “Response” and/or “Bid Submittal” is the document that the bidder is required to, as detailed in the solicitation document, deliver to the Owner.
2.8. “Offeror”, “Bidder”, “Prospective Bidder”, “Prospective Offeror” and/or “Respondent”, all terms which may be used interchangeably, is the prospective bidder or prospective offeror, firm or individual who has been notified of a solicitation and/or who has requested and/or received solicitation documents and is considering responding with a bid or offer. An offeror, bidder, or respondent is a firm or individual who has submitted a bid or offer in response to a solicitation.
3. INSTRUCTIONS TO BIDDERS / OFFERORS
3.1. RIGHTS RESERVED - Owner reserves the right to waive as an informality any irregularities in submittals and/or to reject any or all Bids. Owner requests that firms refrain from requesting public disclosure of information until a contract has been executed as a measure to best protect the solicitation process, particularly in the event of a cancellation or re-solicitation.
3.2. COST OF PREPARING BID/OFFER - Owner will not be liable for any costs incurred by Respondent in the preparation and presentation of Bid/Offer.
3.3. BID ACCEPTANCE - A Bidder must be determined responsive and responsible for their Bid to be accepted.
A responsive Bidder meets all the requirements of the bidding documents. A responsible Bidder is one that is capable and qualified to perform the work.
3.4. BID BOND – A bid bond is required for any bids over $250,000 and may be required for bids of a lesser amount based on funding requirements. Unless otherwise stated within the solicitation, Bidder shall submit with their bid a bid guarantee equivalent to 5% of the bid price if their bid exceeds $250,000.
3.5. REQUIREMENTS – A Bidder must be both responsive and responsible for their Bid to be accepted. A responsive Bidder submits their Bid before the due date and time noted in the solicitation, accurately and completely provides all information and documentation required. A responsible bidder meets the requirements of the solicitation.
3.5.1. DEBARMENT - The Contractor and its principals must not be debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded by any Federal, State or local government department.
Owner will check for debarment prior to awarding a contract. A firm’s Bid may only be accepted if Respondent is not listed as being debarred. If your firm is awarded a contract that exceeds $25,000 it must also provide a Debarment Certification. In such case, this form will be provided to the Bidder. In some solicitations this certification is included in the bid form.
3.5.2. EXPERIENCE - Bidder must have had four years minimum experience providing the products and services as described in the Scope of Work and been in business for at least four years.
3.5.3. ACCEPTABLE RECORD - Bidder must have an acceptable record of past performance, which includes but is not limited to, quality of work, ability to complete projects on time, and compliance with contractual obligations.
3.5.4. WASHINGTON STATE BUSINESS – Bidder must be registered to conduct business in the State of Washington, have a current Washington State business license, and have an active L&I account in good standing, if applicable.
3.6. BID DUE DATE - Bid due date shall include a date and time (Pacific Standard Time), that bids are required to be submitted. Bids received after the bid due date will be rejected. Bid due date may be extended by Owner through an Addendum. Be sure to ask any questions before the questions and clarifications due date as the Owner or Owner’s Agent might not otherwise have time to respond.
3.7. SUBMISSION PROCEDURE - Bidders shall be solely responsible for delivery of their bids in the manner prescribed in the solicitation. Any bids in excess of $10,000 must be submitted on forms prepared by the Owner.
3.8. PRE-BID AND OTHER MEETINGS – Unless stated otherwise in solicitation documents, pre-bid meetings are not required. A potential bidder may request another pre-bid meeting if unable to attend on the original date stated in the solicitation. Pre-bid meetings are scheduled to allow potential bidders the ability to view the site conditions and for the owner to present a summary of key elements of the solicitation.
3.9. INTERPRETATIONS – No oral interpretation will be made to any bidder as to the meaning of any part of the solicitation documents. Questions from bidders must be made in writing and submitted to the solicitation contact in the manner stated in the solicitation.
3.10. QUESTIONS AND CLARIFICATIONS – Unless stated otherwise in the solicitation documents, Bidders are required to submit questions and requests for clarifications no less than six business days prior to the bid due date. All questions must be made in writing. All responses to questions will be made in writing. Any potential Bidder who has discussion with Owner or Owner’s Agent without a follow-up email confirming discussed items must contact the solicitation contact in writing to request written clarification.
3.11. CORRESPONDENCE – Owner will make every effort to respond to written questions within 1 business day.
3.12. SUBCONTRACTOR LIST - A complete list of subcontractors may be requested of lowest bidders. Failure to render a subcontractor list and bid breakdown within 2 business days may, at Owner’s election, result in rejection of bid. Bid breakdown must show material, labor, profit, overhead costs in enough detail to confirm that all work has been included in bid price.
3.13. NEGOTIATIONS - Small purchases (those under $250,000) are not sealed bidding and the Owner may negotiate price and other terms of purchases when appropriate.
3.13.1. The scope and extent of the negotiations are a matter of the Owner’s judgment. The Owner may inform an offeror that its price is considered too high, or too low, and reveal the results of the analysis supporting that conclusion. “Auctioning” (revealing one offeror’s price in an attempt to get the offeror to lower their price) is prohibited.
3.14. PROTEST – All disputes and claims must comply strictly with the procedures and timeliness set forth in the solicitation, bidding documents, contracts, any legal requirement, and this section. No discussion or negotiation of claims by Owner or any representation or communication, whether verbal or in writing, shall in any way constitute a waiver of these procedures or timeliness or of VHA’s legal rights or defenses.
3.14.1. Resolution and Exhaustion Requirement: It is the policy of the Owner…