20250515_IFB_Plans_set.pdf

PDF 64 MB Posted

Attached to
WRC: Fairview Water Main Improvements
Solicitation number
Oak-0000000914
Issued by
Michigan

About this file

The government file 20250515_IFB_Plans_set.pdf appears to be an Invitation for Bid (IFB) related to the Water Resources Commission (WRC) Fairview Water Main Improvements project in Michigan. The project involves comprehensive water infrastructure upgrades, including the installation of approximately 1,850 linear feet of 6-inch CIPP water main, 1,100 linear feet of 8-inch CIPP water main, 1,650 linear feet of 16-inch CIPP water main, 8,700 linear feet of 8-inch HDPE SDR 11 water main via horizontal directional drilling (HDD), and various other water main installations using open cut (OC) and ductile iron water main (DIWM) methods. The project also includes 12,500 linear feet of water main abandonment, installation of 58 valves and wells, 38 hydrants, 29 connections to existing water mains, 31,300 square yards of cold milling existing HMA pavement, and 40 sewer lateral connection repairs.

While specific pricing details are not provided in the available file, the project appears to be a substantial municipal infrastructure improvement initiative. The comprehensive scope suggests significant investment in water system modernization and rehabilitation. The project involves multiple installation techniques and addresses various infrastructure components, indicating a complex and multi-faceted approach to water main improvements. The scale and nature of the work suggest this is a publicly funded infrastructure project aimed at enhancing water distribution capabilities and infrastructure resilience in the Fairview area of Michigan.

View the file

Other files

File Type Posted
Fairview Main Improvements Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .