2025-009 Ridgeview Loop Overlay - Scope of Work.pdf

PDF 356 KB Posted

Attached to
2025-009 - Ridgeview Loop Overlay State and local contract opportunity
Solicitation number
2025-009
Issued by
El Paso County, Colorado

About this file

The document is a Scope of Work for the 2025-009 Ridgeview Loop Overlay project issued by Elbert County Government's Public Works Department in Colorado. The project involves comprehensive roadway surface rehabilitation and utility improvements, specifically targeting asphalt and infrastructure enhancements. The scope includes six primary work components: full-depth asphalt patching (256 linear feet across 16 patches), crack patching (1,464 linear feet), asphalt planing at 7 concrete driveway and 2 roadway tie-ins, HMA leveling course placement (13,053 square yards), HMA surface course application (13,053 square yards), and valve adjustments and rebuilds involving 7 valve adjustments and 7 valve rebuilds.

The project requires all work to conform to Elbert County standards and specifications, with payment to be made per contract unit pricing and verified through field measurement and inspection. The contractor will be responsible for furnishing all labor, equipment, and materials necessary to complete the work, including site restoration and cleanup upon project completion. Technical specifications include use of hot mix asphalt (HMA) with specific gradation and performance grade requirements (GR Sx, PG 58-28, N75), and the incorporation of crushed concrete as specified. The comprehensive scope suggests a detailed infrastructure improvement project focused on enhancing road surface quality and utility infrastructure within the designated project area.

View the file

Other files for this state and local contract opportunity

Other files attached to 2025-009 - Ridgeview Loop Overlay, newest first.
File Type Posted
2025-009 - Addendum 2 - Vendor Questions.pdf PDF
2025-009 Ridgeview Loop Overlay - IFB.pdf PDF
2025-009 - Addendum 1 - Vendor Questions.pdf PDF
Ridgeview Loop in Wild Pointe.png PNG image

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Elbert County Government Public Works Department

11330 CO-86, PO Box 116

Kiowa, CO 80117 Office: 303-621-3157

2025-009 Ridgeview Loop Overlay

Scope of Work: Asphalt and Utility Improvements

This project includes roadway surface rehabilitation and utility adjustments in designated areas as outlined below. The contractor shall furnish all labor, equipment, and materials required to complete the following work to the satisfaction of Elbert County.

1. Full-Depth Asphalt Patching

• Quantity: 256.00 LF (16 patches, approximately 12' x 12' each)

• Work Includes:

o Removal and disposal of existing pavement and base o Placement of 6.0" aggregate base o Placement of 4.0" hot mix asphalt (HMA), Class 6 base course (GR Sx, PG 58-28, N75) o Incorporation of crushed concrete as specified

2. Crack Patching

• Quantity: 1,464.00 LF

• Work Includes:

o Cutting/removal of deteriorated pavement o Placement of 2.0" HMA patch (GR Sx, PG 58-28, N75) o Full disposal of excavated material

3. Asphalt Planing (Edge Milling)

• Locations:

o 7 concrete driveway tie-ins o 2 roadway tie-ins

• Work Includes:

o Edge milling to provide smooth transition between surfaces o Coordination with paving operations

4. HMA Leveling Course

• Quantity: 13,053 SY

• Work Includes:

o Placement of 0.5" leveling course (GR Sx, PG 58-28, N75) o Ensuring a smooth surface for final lift application

5. HMA Surface Course

• Quantity: 13,053 SY

• Work Includes:

o Placement of 2.0" surface lift (GR Sx, PG 58-28, N75) o Compaction and finish to meet project specifications

6. Valve Adjustments and Rebuilds

• Adjustments: 7 valves o Replace top sections and adjust to final grade (FG)

• Rebuilds: 7 valves o Excavate and replace both bottom and top sections o Adjust to FG

All work must meet Elbert County standards and specifications. Site restoration and cleanup will be required upon completion of work in each area. Payment will be made per contract unit pricing and verified by field measurement and inspection.