This is a plumbing plan drawing (sheet P-200) for the Appalachian Hills Visitor Center in Morgan County, Ohio, prepared by DS Architecture and Osborn Engineering. The drawing shows detailed domestic water plumbing plans for both Level 1 and Level 2 of the visitor center, including piping layouts, fixtures, and a domestic water service isometric diagram. The plans are dated July 8, 2024 and marked as "Conformed Documents," with previous revisions dating back to June 30, 2023.

The technical specifications show a 2-inch cold water main supply with backflow preventers for both the building principal supply and livestock water supply, with expected incoming pressure of approximately 94 PSIG. The plans detail various plumbing fixtures including lavatories (LAV-1), water closets (WC-1), urinals (UR-1), and drinking fountains (EWC-1) throughout the facility. The drawing includes specific installation requirements such as pressure reducing valves (PRV-1) set to 65 PSIG and 75 PSIG, and notes that all equipment and piping installed below 8'-06" above finished floor must be confined to designated areas marked by dashed lines.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

C

D

E

F

G

H

1 2 3 4

Vestibule

Vending

Educational Support

Stair

MS-1 LAV-1

LAV-1

LAV-1WC-1

WC-1

WC-1

UR-1

UR-1

UR-1

EWH-1

Restroom

Restroom

Restroom

J.C.

I.E. -3'-04"

HB-1

EWC-1

HB-1

HB-1

HB-2

3/4" CW

2" CW

2" CW

C W

S-2

HB-1

Info / Retail

Reception

Exhibition Space

1" CW UP

P-1

BV-1

A

B

C

D

E

F

G

H

1 2 3

Mechanical

Resource Room

Exterior Exhibit Gallery

S-1

3/4" CW

IT Room

1" CW

2" BFP-1

BUILDING PRINCIPAL

BACKFLOW PREVENTER

2" BFP-1

LIVESTOCK WATER SUPPLY

BACKFLOW PREVENTER

2" CW

2" CW

2" CW TO BLDG.

2" FULL PORT

BALL VALVE

(TYP)

2" CW

2" CW PRV-1

SET TO 65 PSIG

PRV-1

SET TO 75 PSIG

EXPECTED INCOMING

PRESSURE ≈ 94 PSIG.

130 East Chestnut Street, Suite 401 | Columbus, OH 43215

(614) 556-4272 www.osborn-eng.com

© Copyright 2023 DS Architecture, LLC. All rights reserved.

Kent, Ohio

PROJECT #: DNR-230024

ISSUE DATE:

Issue Description:

Revision Schedule

DS ARCH I TECT R EU

Cleveland, Ohio

DS Architecture is a Limited Liability Company

SCALE:

REVISED:

DESIGNED BY:

CHECKED BY:

DRAWN BY:

APPROVED BY:

APPALACHIAN HILLS

VISITOR CENTER

MORGAN COUNTY 7

/1 /2

:5

:1

P M

1/8" = 1'-0"

P-200DOMESTIC WATER PLUMBING PLANS

(OEC-J20221324.000)

07/08/2024

Conformed Documents

JEK

DS

DVL

MWM 07/08/2024

GENERAL SHEET NOTES

1. THESE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL

EXTENT OF THE WORK. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR COORDINATION AND PROPER INSTALLATION OF ALL PLUMBING

SYSTEMS. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY

OFFSETS AND FITTINGS WHICH MAY BE REQUIRED DUE TO SPACE

CONSTRAINTS OR OTHER CONDITIONS.

2. THE CONTRACTOR SHALL PROVIDE ALL MISCELLANEOUS

SUPPORTING STEEL, ETC. FOR THE PROPER INSTALLATION OF ALL

PLUMBING SYSTEMS.

3. THE CONTRACTOR SHALL COORDINATE FLOOR, WALL, AND ROOF

PENETRATIONS, ETC. WITH GENERAL TRADES.

4. THE CONTRACTOR SHALL VERIFY ALL CLEARANCES PRIOR TO

FABRICATION OF ANY WORK.

5. PIPING SHALL NOT BE LOCATED ABOVE ANY ELECTRICAL PANELS OR

EQUIPMENT.

SHEET KEY NOTES:#

1. DOMESTIC COLD AND HOT WATER SUPPLY BELOW GRADE.

2. 2" WATER SUPPLY TO 05'-00" BEYOND BUILDING FOR CONTINUATION BY

SITE UTILITY CONTRACTOR.

3. MOUNT AT 24" ABOVE FINISHED FLOOR LEVEL OF ADJACENT RAMP.

4. 2" WATER SUPPLY FOR LIVESTOCK TO 5'-00" BEYOND BUILDING. CAP

PIPING AT TERMINATION POINT AND PROVIDE MEMORIAL FOR FUTURE

LOCATING, CONNECTION AND EXTENSION BY OTHERS.

5. (2) BFP-1, PRINCIPAL AND LIVESTOCK STACKED; SEE 2/P-200 FOR

DOMESTIC WATER SERVICE ISOMETRIC FOR ADDITIONAL DETAILS

6. ALL EQUIPMENT AND PIPING INSTALLED BELOW 8'-06" A.F.F. SHALL BE

INSTALL AND CONFINED TO THE AREA WITHIN THE DASHED LINE.

7. 3/4" COLD AND HOT WATER UP FROM BELOW SLAB TO SECOND FLOOR.

SCALE: 1/8" = 1'-0"

LEVEL 1 DOMESTIC WATER PLAN

SCALE: 1/8" = 1'-0"

LEVEL 2 DOMESTIC WATER PLAN

SCALE:

DOMESITC WATER SERVICE ISOMETRIC

# DATE DESCRIPTION

A 06/30/2023 Schematic Design Pkg.

1 09/08/2023 Revised Schematic Design Pkg.

B 11/17/2023 Design Development Pkg.

C 03/08/2024 CD Pricing Package

D 03/18/2024 Plan Review and Permit

E 04/15/2024 100% for Owner Review

F 05/06/2024 Issued for Bid

2 05/09/2024 Addendum #1

G 07/08/2024 Confromed Documents jkerber Highlight jkerber Highlight jkerber Highlight jkerber Highlight