This document is a Bid Sheet for an Asphalt Repairs contract opportunity issued by the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis (solicitation number W91QF4-24-B-0002).

The Bid Sheet outlines various asphalt repair and concrete work items with associated Unified Facilities Guide Specifications, units of measure, and estimated quantities for the base year and two option years. Bid items include hot mix asphalt, milling, crack sealing, curb and gutter replacement, sidewalk repairs, and other related asphalt and concrete work. Contractors must provide unit prices for each line item. A site visit is scheduled for May 8, 2024, and questions are due by May 15, 2024. The Government will issue an amendment with responses approximately 15 days prior to the bid closing date. Pricing adjustments for asphalt and emulsified asphalt are allowed. Contractor markup for work inside controlled prisons is 10%. Payment and performance bonds are required for task orders over $35,000 and $150,000.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

ASPHALT REPAIRS - BIDDING SCHEDULE
BASE YEAR
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREAsphalt Unit PricesQUANTITYTOTAL COST
0001Hot Mix Asphalt Leveling Course32 12 16Hot Mix AsphaltTONS$ - 0800$ - 0
0002Hot Mix Asphalt (2" )(< 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 01000$ - 0
0003Hot Mix Asphalt (2")(≥ 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 0800$ - 0
0004Hot Mix Asphalt (6")(< 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 01000$ - 0
0005Hot Mix Asphalt (6")(100-1000 TONS)32 12 16Hot Mix AsphaltTONS$ - 0100$ - 0
0006Hot Mix Asphalt (6")(≥ 1000 TONS)32 12 16Hot Mix AsphaltTONS$ - 04600$ - 0
0007Hot Mix Asphalt (8")(< 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 0100$ - 0
0008Hot Mix Asphalt (8")(≥ 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 0500$ - 0
0009Emulsified Asphalt (SS-1HP)32 12 13TackSQYD$ - 0600000$ - 0
0010Milling (2")(< 10 TONS)(Maintenance Patches)32 01 16.71Cold Milling Asphalt PavingTONS$ - 0500$ - 0
0011Milling (2")(≥ 10 TONS)32 01 16.71Cold Milling Asphalt PavingTONS$ - 02000$ - 0
0012Milling (4")32 01 16.71Cold Milling Asphalt PavingTONS$ - 050$ - 0
0013Asphalt Base Patching (in conjunction with Mill and Overlay)32 12 16Hot Mix AsphaltTONS$ - 0200$ - 0
0014Full Depth Asphalt Patching32 12 16Hot Mix AsphaltTONS$ - 0400$ - 0
0015Ultrathin Bonded Asphalt Surface (UBAS), Thoroughfare (5/8")32 12 36.26 23Ultrathin Bonded Asphalt SurfaceSQYD$ - 06000$ - 0
0016Ultrathin Bonded Asphalt Surface (UBAS), Residential (5/8")32 12 36.26 23Ultrathin Bonded Asphalt SurfaceSQYD$ - 02000$ - 0
0017Milling (5/8")32 01 16.71Cold Milling Asphalt PavingTONS$ - 06000$ - 0
0018Asphalt Rejuvenator - Liquid32 01 13.64Bituminous Pavement Liquid RejunvenatingGAL$ - 02000$ - 0
0019Asphalt Rejuvenator - Treated Pavement32 01 13.64Bituminous Pavement Liquid RejunvenatingSQYD$ - 020000$ - 0
0020Asphalt Price AdjustmentN/ANO BIDTON$ - 00$ - 0
0021Emulsified Asphalt Price AdjustmentN/ANO BIDTON$ - 00$ - 0
0022Replace Curb and Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$ - 0500$ - 0
0023New Curb and Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$ - 0300$ - 0
0024Replace Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$ - 0200$ - 0
0025Replace Sidewalk Ramps32 16 19Concrete Curbs Gutters and SidewalksSQYD$ - 015$ - 0
0026Replace Sidewalk Ramps (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$ - 015$ - 0
0027Asphalt Crack Sealing (>1/8" and ≤1/2")(Route and Seal with Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$ - 04000$ - 0
0028Asphalt Crack Sealing (>1/2" and <1")(Seal with Fiber-Reinforced Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$ - 01000$ - 0
0029Asphalt Crack Sealing (≥1" and <2")(Seal with Fiber-Reinforced Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$ - 0500$ - 0
0030Construct Aggregate Sub-base (< 5 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$ - 0100$ - 0
0031Construct Aggregate Sub-base (5 CUYD to 50 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$ - 0300$ - 0
0032Construct Aggregate Sub-base (> 50 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$ - 01000$ - 0
0033Aggregate for Shoulders (AS-1)32 11 23Aggregate Base Courses and Aggregate ShouldersTONS$ - 0100$ - 0
0034Fine Grading for New Road Work31 00 00EarthworkSQYD$ - 01000$ - 0
0035Excavation and Fill for construction31 00 00EarthworkCUYD$ - 01000$ - 0
0036Dirt spoils or fill for repair or new road work remove from or bring on postHaulingCUYD$ - 01000$ - 0
0037Manipulation32 11 13.13Lime Treated SubgradeSQYD$ - 02000$ - 0
0038Quicklime32 11 13.13Lime Treated SubgradeTONS$ - 030$ - 0
0039Pavement Marking Paint Type III4" Yellow line (Without Glass Bead)32 17 23Pavement MarkingsLNFT$ - 05000$ - 0
00404" White Line (Without Glass Bead)32 17 23Pavement MarkingsLNFT$ - 05000$ - 0
00414" Yellow line32 17 23Pavement MarkingsLNFT$ - 010000$ - 0
00424" White Line32 17 23Pavement MarkingsLNFT$ - 02000$ - 0
004318" white Line32 17 23Pavement MarkingsLNFT$ - 0500$ - 0
004424" white Line32 17 23Pavement MarkingsLNFT$ - 0500$ - 0
0045Symbol: Thru Arrow32 17 23Pavement MarkingsEACH$ - 010$ - 0
0046Symbol: Turn Arrow32 17 23Pavement MarkingsEACH$ - 020$ - 0
0047Symbol: Turn and Thru Arrow32 17 23Pavement MarkingsEACH$ - 05$ - 0
0048Symbol: Sharrow32 17 23Pavement MarkingsEACH$ - 015$ - 0
0049Symbol: Handicap32 17 23Pavement MarkingsEACH$ - 030$ - 0
0050Symbol: RR Crossing32 17 23Pavement MarkingsEACH$ - 04$ - 0
0051Word "ONLY"32 17 23Pavement MarkingsEACH$ - 010$ - 0
0052Pavement Marking MethacrylateYellow (Airfield Markings)32 17 23Pavement MarkingsSQFT$ - 02500$ - 0
0053White (Airfield Markings)32 17 23Pavement MarkingsSQFT$ - 02000$ - 0
0054Black (Airfield Markings)32 17 23Pavement MarkingsSQFT$ - 01000$ - 0
00554" Yellow line32 17 23Pavement MarkingsLNFT$ - 010000$ - 0
00564" White Line32 17 23Pavement MarkingsLNFT$ - 02000$ - 0
005718" white Line32 17 23Pavement MarkingsLNFT$ - 0500$ - 0
005824" white Line32 17 23Pavement MarkingsLNFT$ - 0500$ - 0
0059Symbol: Thru Arrow32 17 23Pavement MarkingsEACH$ - 010$ - 0
0060Symbol: Turn Arrow32 17 23Pavement MarkingsEACH$ - 020$ - 0
0061Symbol: Turn and Thru Arrow32 17 23Pavement MarkingsEACH$ - 05$ - 0
0062Symbol: Sharrow32 17 23Pavement MarkingsEACH$ - 010$ - 0
0063Symbol: RR Crossing32 17 23Pavement MarkingsEACH$ - 04$ - 0
0064Word "ONLY"32 17 23Pavement MarkingsEACH$ - 010$ - 0
0065Grinding for Pavement Markings32 17 23Pavement MarkingsSQFT$ - 01000$ - 0
0066Pavement Marking Removal32 17 23Pavement MarkingsSQFT$ - 01000$ - 0
0067Paint Removal, Airfields32 01 11.51Rubber and Paint Removal for Airfield PavementsSQFT$ - 02000$ - 0
0068Rubber Removal from Airfields32 01 11.51Rubber and Paint Removal for Airfield PavementsSQFT$ - 01000$ - 0
0069Survey to Correct Road ProfileSTA$ - 05$ - 0
0070Install Manhole Adjustment Rings33 40 00Storm Drainage UtilitiesEACH$ - 08$ - 0
0071Adjust Inlet Height33 40 00Storm Drainage UtilitiesLNFT$ - 050$ - 0
0072Seed, Tall Fescue and Fertilizer32 92 19SeedingSQYD$ - 0200$ - 0
0073Core Drill (4") Pavement SamplingN/AN/AEACH$ - 020$ - 0
0074New PCCP 6” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0075New PCCP 6” Thick 25 to 100 Square YardsSQYD$ - 075$ - 0
0076New PCCP 6” Thick over 100 Square YardsSQYD$ - 050$ - 0
0077New PCCP 8” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0078New PCCP 8” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0079New PCCP 8” Thick 8” Thick over 100 Square YardsSQYD$ - 050$ - 0
0080New PCCP 10” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0081New PCCP 10” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0082New PCCP 10” Thick over 100 Square YardsSQYD$ - 050$ - 0
0083Replace PCCP 6” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0084Replace PCCP 6” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0085Replace PCCP 6” Thick over 100 Square YardsSQYD$ - 050$ - 0
0086Replace PCCP 8” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0087Replace PCCP 8” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0088Replace PCCP 8” Thick over 100 Square YardsSQYD$ - 050$ - 0
0089Replace PCCP 10” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0090Replace PCCP 10” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0091Replace PCCP 10” Thick over 100 Square YardsSQYD$ - 050$ - 0
0092Saw Cut Concrete or Asphalt 4” ThickLNFT$ - 0100$ - 0
0093Saw Cut Concrete or Asphalt 6” ThickLNFT$ - 0100$ - 0
0094Saw Cut Concrete or Asphalt 8” ThickLNFT$ - 0100$ - 0
0095Sealing PCCP Joints (>1/8" to 1/2")LNFT$ - 0100$ - 0
0096Sealing PCCP Cracks (>1/2" to 1")LNFT$ - 0100$ - 0
0097Sealing PCCP Cracks (>1" to 2")LNFT$ - 0100$ - 0
0098Reinforcing Steel03 20 00.10Concrete ReinforcingLBS$ - 02000$ - 0
0099Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS$ - 02000$ - 0
0100Woven Wire Steel Fabric 6x6-W6xW603 20 00.10Concrete ReinforcingSQYD$ - 0500$ - 0
0101Woven Wire Steel Fabric 4x4-W4xW403 20 00.10Concrete ReinforcingSQYD$ - 0500$ - 0
0102Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT$ - 0100$ - 0
0103Silt Fence01 57 19Temporary Environmental ControlsLNFT$ - 0500$ - 0
0104Biodegradable Log01 57 19Temporary Environmental ControlsLNFT$ - 0100$ - 0
0105Filter Sock01 57 19Temporary Environmental ControlsLNFT$ - 0100$ - 0
0106Erosion Control Material (Class I)01 57 19Temporary Environmental ControlsSQYD$ - 01000$ - 0
0107Erosion Control Material (Class II)01 57 19Temporary Environmental ControlsSQYD$ - 01000$ - 0
0108Porous Asphalt Pavement (4")TONS$ - 01000$ - 0
0109Porous Asphalt Pavement BaseCUYD$ - 02000$ - 0
0110Slurry SealSQYD$ - 014000$ - 0
0111MicrosurfacingSQYD$ - 014000$ - 0
0112Asphalt Price Index Adjustment (Fill In Values Below)N/ANO BIDLSNANA$ - 0

SUBTOTAL $ - 0

FILL IN
B - Tons of Asphalt
C - % of virgin asphalt binder
D - Asphalt index when task order awarded
E - Asphalt index at time of contract bid
Work Inside Controlled Prisons markup10%Work inside USDB or JRCF?No$ - 0
0113Payment & Performance Bond - On Task Order at or over $35,000.00%$ - 0$ - 0
0114Payment & Performance Bond - On Task Order at or over $150,000.00%$ - 0$ - 0
TOTAL$ - 0
"Contractor fill name of ASPHALT job here (Type or Handwritten)"
CONTRACTOR NOTES:

OY1

ASPHALT REPAIRS - BIDDING SCHEDULE
BASE YEAR
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREAsphalt Unit PricesQUANTITYTOTAL COST
0001Hot Mix Asphalt Leveling Course32 12 16Hot Mix AsphaltTONS$ - 0800$ - 0
0002Hot Mix Asphalt (2" )(< 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 01000$ - 0
0003Hot Mix Asphalt (2")(≥ 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 0800$ - 0
0004Hot Mix Asphalt (6")(< 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 01000$ - 0
0005Hot Mix Asphalt (6")(100-1000 TONS)32 12 16Hot Mix AsphaltTONS$ - 0100$ - 0
0006Hot Mix Asphalt (6")(≥ 1000 TONS)32 12 16Hot Mix AsphaltTONS$ - 04600$ - 0
0007Hot Mix Asphalt (8")(< 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 0100$ - 0
0008Hot Mix Asphalt (8")(≥ 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 0500$ - 0
0009Emulsified Asphalt (SS-1HP)32 12 13TackSQYD$ - 0600000$ - 0
0010Milling (2")(< 10 TONS)(Maintenance Patches)32 01 16.71Cold Milling Asphalt PavingTONS$ - 0500$ - 0
0011Milling (2")(≥ 10 TONS)32 01 16.71Cold Milling Asphalt PavingTONS$ - 02000$ - 0
0012Milling (4")32 01 16.71Cold Milling Asphalt PavingTONS$ - 050$ - 0
0013Asphalt Base Patching (in conjunction with Mill and Overlay)32 12 16Hot Mix AsphaltTONS$ - 0200$ - 0
0014Full Depth Asphalt Patching32 12 16Hot Mix AsphaltTONS$ - 0400$ - 0
0015Ultrathin Bonded Asphalt Surface (UBAS), Thoroughfare (5/8")32 12 36.26 23Ultrathin Bonded Asphalt SurfaceSQYD$ - 06000$ - 0
0016Ultrathin Bonded Asphalt Surface (UBAS), Residential (5/8")32 12 36.26 23Ultrathin Bonded Asphalt SurfaceSQYD$ - 02000$ - 0
0017Milling (5/8")32 01 16.71Cold Milling Asphalt PavingTONS$ - 06000$ - 0
0018Asphalt Rejuvenator - Liquid32 01 13.64Bituminous Pavement Liquid RejunvenatingGAL$ - 02000$ - 0
0019Asphalt Rejuvenator - Treated Pavement32 01 13.64Bituminous Pavement Liquid RejunvenatingSQYD$ - 020000$ - 0
0020Asphalt Price AdjustmentN/ANO BIDTON$ - 00$ - 0
0021Emulsified Asphalt Price AdjustmentN/ANO BIDTON$ - 00$ - 0
0022Replace Curb and Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$ - 0500$ - 0
0023New Curb and Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$ - 0300$ - 0
0024Replace Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$ - 0200$ - 0
0025Replace Sidewalk Ramps32 16 19Concrete Curbs Gutters and SidewalksSQYD$ - 015$ - 0
0026Replace Sidewalk Ramps (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$ - 015$ - 0
0027Asphalt Crack Sealing (>1/8" and ≤1/2")(Route and Seal with Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$ - 04000$ - 0
0028Asphalt Crack Sealing (>1/2" and <1")(Seal with Fiber-Reinforced Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$ - 01000$ - 0
0029Asphalt Crack Sealing (≥1" and <2")(Seal with Fiber-Reinforced Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$ - 0500$ - 0
0030Construct Aggregate Sub-base (< 5 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$ - 0100$ - 0
0031Construct Aggregate Sub-base (5 CUYD to 50 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$ - 0300$ - 0
0032Construct Aggregate Sub-base (> 50 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$ - 01000$ - 0
0033Aggregate for Shoulders (AS-1)32 11 23Aggregate Base Courses and Aggregate ShouldersTONS$ - 0100$ - 0
0034Fine Grading for New Road Work31 00 00EarthworkSQYD$ - 01000$ - 0
0035Excavation and Fill for construction31 00 00EarthworkCUYD$ - 01000$ - 0
0036Dirt spoils or fill for repair or new road work remove from or bring on postHaulingCUYD$ - 01000$ - 0
0037Manipulation32 11 13.13Lime Treated SubgradeSQYD$ - 02000$ - 0
0038Quicklime32 11 13.13Lime Treated SubgradeTONS$ - 030$ - 0
0039Pavement Marking Paint Type III4" Yellow line (Without Glass Bead)32 17 23Pavement MarkingsLNFT$ - 05000$ - 0
00404" White Line (Without Glass Bead)32 17 23Pavement MarkingsLNFT$ - 05000$ - 0
00414" Yellow line32 17 23Pavement MarkingsLNFT$ - 010000$ - 0
00424" White Line32 17 23Pavement MarkingsLNFT$ - 02000$ - 0
004318" white Line32 17 23Pavement MarkingsLNFT$ - 0500$ - 0
004424" white Line32 17 23Pavement MarkingsLNFT$ - 0500$ - 0
0045Symbol: Thru Arrow32 17 23Pavement MarkingsEACH$ - 010$ - 0
0046Symbol: Turn Arrow32 17 23Pavement MarkingsEACH$ - 020$ - 0
0047Symbol: Turn and Thru Arrow32 17 23Pavement MarkingsEACH$ - 05$ - 0
0048Symbol: Sharrow32 17 23Pavement MarkingsEACH$ - 015$ - 0
0049Symbol: Handicap32 17 23Pavement MarkingsEACH$ - 030$ - 0
0050Symbol: RR Crossing32 17 23Pavement MarkingsEACH$ - 04$ - 0
0051Word "ONLY"32 17 23Pavement MarkingsEACH$ - 010$ - 0
0052Pavement Marking MethacrylateYellow (Airfield Markings)32 17 23Pavement MarkingsSQFT$ - 02500$ - 0
0053White (Airfield Markings)32 17 23Pavement MarkingsSQFT$ - 02000$ - 0
0054Black (Airfield Markings)32 17 23Pavement MarkingsSQFT$ - 01000$ - 0
00554" Yellow line32 17 23Pavement MarkingsLNFT$ - 010000$ - 0
00564" White Line32 17 23Pavement MarkingsLNFT$ - 02000$ - 0
005718" white Line32 17 23Pavement MarkingsLNFT$ - 0500$ - 0
005824" white Line32 17 23Pavement MarkingsLNFT$ - 0500$ - 0
0059Symbol: Thru Arrow32 17 23Pavement MarkingsEACH$ - 010$ - 0
0060Symbol: Turn Arrow32 17 23Pavement MarkingsEACH$ - 020$ - 0
0061Symbol: Turn and Thru Arrow32 17 23Pavement MarkingsEACH$ - 05$ - 0
0062Symbol: Sharrow32 17 23Pavement MarkingsEACH$ - 010$ - 0
0063Symbol: RR Crossing32 17 23Pavement MarkingsEACH$ - 04$ - 0
0064Word "ONLY"32 17 23Pavement MarkingsEACH$ - 010$ - 0
0065Grinding for Pavement Markings32 17 23Pavement MarkingsSQFT$ - 01000$ - 0
0066Pavement Marking Removal32 17 23Pavement MarkingsSQFT$ - 01000$ - 0
0067Paint Removal, Airfields32 01 11.51Rubber and Paint Removal for Airfield PavementsSQFT$ - 02000$ - 0
0068Rubber Removal from Airfields32 01 11.51Rubber and Paint Removal for Airfield PavementsSQFT$ - 01000$ - 0
0069Survey to Correct Road ProfileSTA$ - 05$ - 0
0070Install Manhole Adjustment Rings33 40 00Storm Drainage UtilitiesEACH$ - 08$ - 0
0071Adjust Inlet Height33 40 00Storm Drainage UtilitiesLNFT$ - 050$ - 0
0072Seed, Tall Fescue and Fertilizer32 92 19SeedingSQYD$ - 0200$ - 0
0073Core Drill (4") Pavement SamplingN/AN/AEACH$ - 020$ - 0
0074New PCCP 6” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0075New PCCP 6” Thick 25 to 100 Square YardsSQYD$ - 075$ - 0
0076New PCCP 6” Thick over 100 Square YardsSQYD$ - 050$ - 0
0077New PCCP 8” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0078New PCCP 8” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0079New PCCP 8” Thick 8” Thick over 100 Square YardsSQYD$ - 050$ - 0
0080New PCCP 10” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0081New PCCP 10” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0082New PCCP 10” Thick over 100 Square YardsSQYD$ - 050$ - 0
0083Replace PCCP 6” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0084Replace PCCP 6” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0085Replace PCCP 6” Thick over 100 Square YardsSQYD$ - 050$ - 0
0086Replace PCCP 8” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0087Replace PCCP 8” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0088Replace PCCP 8” Thick over 100 Square YardsSQYD$ - 050$ - 0
0089Replace PCCP 10” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0090Replace PCCP 10” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0091Replace PCCP 10” Thick over 100 Square YardsSQYD$ - 050$ - 0
0092Saw Cut Concrete or Asphalt 4” ThickLNFT$ - 0100$ - 0
0093Saw Cut Concrete or Asphalt 6” ThickLNFT$ - 0100$ - 0
0094Saw Cut Concrete or Asphalt 8” ThickLNFT$ - 0100$ - 0
0095Sealing PCCP Joints (>1/8" to 1/2")LNFT$ - 0100$ - 0
0096Sealing PCCP Cracks (>1/2" to 1")LNFT$ - 0100$ - 0
0097Sealing PCCP Cracks (>1" to 2")LNFT$ - 0100$ - 0
0098Reinforcing Steel03 20 00.10Concrete ReinforcingLBS$ - 02000$ - 0
0099Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS$ - 02000$ - 0
0100Woven Wire Steel Fabric 6x6-W6xW603 20 00.10Concrete ReinforcingSQYD$ - 0500$ - 0
0101Woven Wire Steel Fabric 4x4-W4xW403 20 00.10Concrete ReinforcingSQYD$ - 0500$ - 0
0102Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT$ - 0100$ - 0
0103Silt Fence01 57 19Temporary Environmental ControlsLNFT$ - 0500$ - 0
0104Biodegradable Log01 57 19Temporary Environmental ControlsLNFT$ - 0100$ - 0
0105Filter Sock01 57 19Temporary Environmental ControlsLNFT$ - 0100$ - 0
0106Erosion Control Material (Class I)01 57 19Temporary Environmental ControlsSQYD$ - 01000$ - 0
0107Erosion Control Material (Class II)01 57 19Temporary Environmental ControlsSQYD$ - 01000$ - 0
0108Porous Asphalt Pavement (4")TONS$ - 01000$ - 0
0109Porous Asphalt Pavement BaseCUYD$ - 02000$ - 0
0110Slurry SealSQYD$ - 014000$ - 0
0111MicrosurfacingSQYD$ - 014000$ - 0
0112Asphalt Price Index Adjustment (Fill In Values Below)N/ANO BIDLSNANA$ - 0

SUBTOTAL $ - 0

FILL IN
B - Tons of Asphalt
C - % of virgin asphalt binder
D - Asphalt index when task order awarded
E - Asphalt index at time of contract bid
Work Inside Controlled Prisons markup10%Work inside USDB or JRCF?No$ - 0
0113Payment & Performance Bond - On Task Order at or over $35,000.00%$ - 0$ - 0
0114Payment & Performance Bond - On Task Order at or over $150,000.00%$ - 0$ - 0
TOTAL$ - 0
"Contractor fill name of ASPHALT job here (Type or Handwritten)"
CONTRACTOR NOTES:

OY2

ASPHALT REPAIRS - BIDDING SCHEDULE
BASE YEAR
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREAsphalt Unit PricesQUANTITYTOTAL COST
0001Hot Mix Asphalt Leveling Course32 12 16Hot Mix AsphaltTONS$ - 0800$ - 0
0002Hot Mix Asphalt (2" )(< 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 01000$ - 0
0003Hot Mix Asphalt (2")(≥ 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 0800$ - 0
0004Hot Mix Asphalt (6")(< 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 01000$ - 0
0005Hot Mix Asphalt (6")(100-1000 TONS)32 12 16Hot Mix AsphaltTONS$ - 0100$ - 0
0006Hot Mix Asphalt (6")(≥ 1000 TONS)32 12 16Hot Mix AsphaltTONS$ - 04600$ - 0
0007Hot Mix Asphalt (8")(< 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 0100$ - 0
0008Hot Mix Asphalt (8")(≥ 100 TONS)32 12 16Hot Mix AsphaltTONS$ - 0500$ - 0
0009Emulsified Asphalt (SS-1HP)32 12 13TackSQYD$ - 0600000$ - 0
0010Milling (2")(< 10 TONS)(Maintenance Patches)32 01 16.71Cold Milling Asphalt PavingTONS$ - 0500$ - 0
0011Milling (2")(≥ 10 TONS)32 01 16.71Cold Milling Asphalt PavingTONS$ - 02000$ - 0
0012Milling (4")32 01 16.71Cold Milling Asphalt PavingTONS$ - 050$ - 0
0013Asphalt Base Patching (in conjunction with Mill and Overlay)32 12 16Hot Mix AsphaltTONS$ - 0200$ - 0
0014Full Depth Asphalt Patching32 12 16Hot Mix AsphaltTONS$ - 0400$ - 0
0015Ultrathin Bonded Asphalt Surface (UBAS), Thoroughfare (5/8")32 12 36.26 23Ultrathin Bonded Asphalt SurfaceSQYD$ - 06000$ - 0
0016Ultrathin Bonded Asphalt Surface (UBAS), Residential (5/8")32 12 36.26 23Ultrathin Bonded Asphalt SurfaceSQYD$ - 02000$ - 0
0017Milling (5/8")32 01 16.71Cold Milling Asphalt PavingTONS$ - 06000$ - 0
0018Asphalt Rejuvenator - Liquid32 01 13.64Bituminous Pavement Liquid RejunvenatingGAL$ - 02000$ - 0
0019Asphalt Rejuvenator - Treated Pavement32 01 13.64Bituminous Pavement Liquid RejunvenatingSQYD$ - 020000$ - 0
0020Asphalt Price AdjustmentN/ANO BIDTON$ - 00$ - 0
0021Emulsified Asphalt Price AdjustmentN/ANO BIDTON$ - 00$ - 0
0022Replace Curb and Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$ - 0500$ - 0
0023New Curb and Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$ - 0300$ - 0
0024Replace Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$ - 0200$ - 0
0025Replace Sidewalk Ramps32 16 19Concrete Curbs Gutters and SidewalksSQYD$ - 015$ - 0
0026Replace Sidewalk Ramps (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$ - 015$ - 0
0027Asphalt Crack Sealing (>1/8" and ≤1/2")(Route and Seal with Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$ - 04000$ - 0
0028Asphalt Crack Sealing (>1/2" and <1")(Seal with Fiber-Reinforced Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$ - 01000$ - 0
0029Asphalt Crack Sealing (≥1" and <2")(Seal with Fiber-Reinforced Asphalt)32 01 17.61Sealing Cracks in Asphalt PavingLNFT$ - 0500$ - 0
0030Construct Aggregate Sub-base (< 5 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$ - 0100$ - 0
0031Construct Aggregate Sub-base (5 CUYD to 50 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$ - 0300$ - 0
0032Construct Aggregate Sub-base (> 50 CUYD)32 11 23Aggregate Base Courses and Aggregate ShouldersCUYD$ - 01000$ - 0
0033Aggregate for Shoulders (AS-1)32 11 23Aggregate Base Courses and Aggregate ShouldersTONS$ - 0100$ - 0
0034Fine Grading for New Road Work31 00 00EarthworkSQYD$ - 01000$ - 0
0035Excavation and Fill for construction31 00 00EarthworkCUYD$ - 01000$ - 0
0036Dirt spoils or fill for repair or new road work remove from or bring on postHaulingCUYD$ - 01000$ - 0
0037Manipulation32 11 13.13Lime Treated SubgradeSQYD$ - 02000$ - 0
0038Quicklime32 11 13.13Lime Treated SubgradeTONS$ - 030$ - 0
0039Pavement Marking Paint Type III4" Yellow line (Without Glass Bead)32 17 23Pavement MarkingsLNFT$ - 05000$ - 0
00404" White Line (Without Glass Bead)32 17 23Pavement MarkingsLNFT$ - 05000$ - 0
00414" Yellow line32 17 23Pavement MarkingsLNFT$ - 010000$ - 0
00424" White Line32 17 23Pavement MarkingsLNFT$ - 02000$ - 0
004318" white Line32 17 23Pavement MarkingsLNFT$ - 0500$ - 0
004424" white Line32 17 23Pavement MarkingsLNFT$ - 0500$ - 0
0045Symbol: Thru Arrow32 17 23Pavement MarkingsEACH$ - 010$ - 0
0046Symbol: Turn Arrow32 17 23Pavement MarkingsEACH$ - 020$ - 0
0047Symbol: Turn and Thru Arrow32 17 23Pavement MarkingsEACH$ - 05$ - 0
0048Symbol: Sharrow32 17 23Pavement MarkingsEACH$ - 015$ - 0
0049Symbol: Handicap32 17 23Pavement MarkingsEACH$ - 030$ - 0
0050Symbol: RR Crossing32 17 23Pavement MarkingsEACH$ - 04$ - 0
0051Word "ONLY"32 17 23Pavement MarkingsEACH$ - 010$ - 0
0052Pavement Marking MethacrylateYellow (Airfield Markings)32 17 23Pavement MarkingsSQFT$ - 02500$ - 0
0053White (Airfield Markings)32 17 23Pavement MarkingsSQFT$ - 02000$ - 0
0054Black (Airfield Markings)32 17 23Pavement MarkingsSQFT$ - 01000$ - 0
00554" Yellow line32 17 23Pavement MarkingsLNFT$ - 010000$ - 0
00564" White Line32 17 23Pavement MarkingsLNFT$ - 02000$ - 0
005718" white Line32 17 23Pavement MarkingsLNFT$ - 0500$ - 0
005824" white Line32 17 23Pavement MarkingsLNFT$ - 0500$ - 0
0059Symbol: Thru Arrow32 17 23Pavement MarkingsEACH$ - 010$ - 0
0060Symbol: Turn Arrow32 17 23Pavement MarkingsEACH$ - 020$ - 0
0061Symbol: Turn and Thru Arrow32 17 23Pavement MarkingsEACH$ - 05$ - 0
0062Symbol: Sharrow32 17 23Pavement MarkingsEACH$ - 010$ - 0
0063Symbol: RR Crossing32 17 23Pavement MarkingsEACH$ - 04$ - 0
0064Word "ONLY"32 17 23Pavement MarkingsEACH$ - 010$ - 0
0065Grinding for Pavement Markings32 17 23Pavement MarkingsSQFT$ - 01000$ - 0
0066Pavement Marking Removal32 17 23Pavement MarkingsSQFT$ - 01000$ - 0
0067Paint Removal, Airfields32 01 11.51Rubber and Paint Removal for Airfield PavementsSQFT$ - 02000$ - 0
0068Rubber Removal from Airfields32 01 11.51Rubber and Paint Removal for Airfield PavementsSQFT$ - 01000$ - 0
0069Survey to Correct Road ProfileSTA$ - 05$ - 0
0070Install Manhole Adjustment Rings33 40 00Storm Drainage UtilitiesEACH$ - 08$ - 0
0071Adjust Inlet Height33 40 00Storm Drainage UtilitiesLNFT$ - 050$ - 0
0072Seed, Tall Fescue and Fertilizer32 92 19SeedingSQYD$ - 0200$ - 0
0073Core Drill (4") Pavement SamplingN/AN/AEACH$ - 020$ - 0
0074New PCCP 6” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0075New PCCP 6” Thick 25 to 100 Square YardsSQYD$ - 075$ - 0
0076New PCCP 6” Thick over 100 Square YardsSQYD$ - 050$ - 0
0077New PCCP 8” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0078New PCCP 8” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0079New PCCP 8” Thick 8” Thick over 100 Square YardsSQYD$ - 050$ - 0
0080New PCCP 10” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0081New PCCP 10” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0082New PCCP 10” Thick over 100 Square YardsSQYD$ - 050$ - 0
0083Replace PCCP 6” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0084Replace PCCP 6” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0085Replace PCCP 6” Thick over 100 Square YardsSQYD$ - 050$ - 0
0086Replace PCCP 8” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0087Replace PCCP 8” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0088Replace PCCP 8” Thick over 100 Square YardsSQYD$ - 050$ - 0
0089Replace PCCP 10” Thick 1 to 25 Square YardsSQYD$ - 050$ - 0
0090Replace PCCP 10” Thick 25 to 100 Square YardsSQYD$ - 050$ - 0
0091Replace PCCP 10” Thick over 100 Square YardsSQYD$ - 050$ - 0
0092Saw Cut Concrete or Asphalt 4” ThickLNFT$ - 0100$ - 0
0093Saw Cut Concrete or Asphalt 6” ThickLNFT$ - 0100$ - 0
0094Saw Cut Concrete or Asphalt 8” ThickLNFT$ - 0100$ - 0
0095Sealing PCCP Joints (>1/8" to 1/2")LNFT$ - 0100$ - 0
0096Sealing PCCP Cracks (>1/2" to 1")LNFT$ - 0100$ - 0
0097Sealing PCCP Cracks (>1" to 2")LNFT$ - 0100$ - 0
0098Reinforcing Steel03 20 00.10Concrete ReinforcingLBS$ - 02000$ - 0
0099Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS$ - 02000$ - 0
0100Woven Wire Steel Fabric 6x6-W6xW603 20 00.10Concrete ReinforcingSQYD$ - 0500$ - 0
0101Woven Wire Steel Fabric 4x4-W4xW403 20 00.10Concrete ReinforcingSQYD$ - 0500$ - 0
0102Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT$ - 0100$ - 0
0103Silt Fence01 57 19Temporary Environmental ControlsLNFT$ - 0500$ - 0
0104Biodegradable Log01 57 19Temporary Environmental ControlsLNFT$ - 0100$ - 0
0105Filter Sock01 57 19Temporary Environmental ControlsLNFT$ - 0100$ - 0
0106Erosion Control Material (Class I)01 57 19Temporary Environmental ControlsSQYD$ - 01000$ - 0
0107Erosion Control Material (Class II)01 57 19Temporary Environmental ControlsSQYD$ - 01000$ - 0
0108Porous Asphalt Pavement (4")TONS$ - 01000$ - 0
0109Porous Asphalt Pavement BaseCUYD$ - 02000$ - 0
0110Slurry SealSQYD$ - 014000$ - 0
0111MicrosurfacingSQYD$ - 014000$ - 0
0112Asphalt Price Index Adjustment (Fill In Values Below)N/ANO BIDLSNANA$ - 0

SUBTOTAL $ - 0

FILL IN
B - Tons of Asphalt
C - % of virgin asphalt binder
D - Asphalt index when task order awarded
E - Asphalt index at time of contract bid
Work Inside Controlled Prisons markup10%Work inside USDB or JRCF?No$ - 0
0113Payment & Performance Bond - On Task Order at or over $35,000.00%$ - 0$ - 0
0114Payment & Performance Bond - On Task Order at or over $150,000.00%$ - 0$ - 0
TOTAL$ - 0
"Contractor fill name of ASPHALT job here (Type or Handwritten)"
CONTRACTOR NOTES:

Totals

Amount
Base Year$0.00
Option Year 1$0.00
Option Year 2$0.00
$0.00