The document is an Addendum for Bid Number 2024-SW-21, the Annual Contract for Stormwater Pipe Work issued by the Clayton County Water Authority in Georgia. The Addendum provides answers to questions submitted by bidders, including information on the current contractors under the previous annual contract and a request for copies of the selected work items list. The bid opening for the new annual contract is scheduled for Tuesday, September 3, 2024 at 2:00 pm local time, and a mandatory pre-bid meeting will be held on August 20, 2024. The bid will be evaluated based on a selected work items list, which will be provided once available.
The Addendum also includes the previous annual contract documents for the current contractors, Don Hall Construction, Inc., DAF Concrete, Inc., and Jewel of the South, Inc. The contract opportunity is open to licensed utility contractors, and the Clayton County Water Authority encourages small local, minority, and women-owned businesses to participate. The bid package is available electronically, and a hardcopy can be requested for a $25 fee.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Annual Contract for Stormwater Pipe Work _ RF.pdf | ||
| ADD 2 EXH A.pdf | ||
| SW Pipe Work _ Addendum No_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1600 Battle Creek Road, Morrow, GA 30260
ADDENDUM #1
DATE August 23, 2024
BID NUMBER 2024-SW-21
BID OPENING DATE Tuesday, September 3, 2024 at 2:00 p.m. (local time)
ADDENDUM MUST BE SIGNED AND INCLUDED IN YOUR RESPONSE TO THE RFB.
Item 1 – Questions:
1. Since this year the contracts are separated into 2 annual contracts, please send copies previous bids for the contractors that have the current Annual Contract for General Pipe Work:
Primary Contractor – Don Hall Construction, Inc.
Back-up Contractor – DAF Concrete, Inc.
Back-up Contractor – Jewel of the South, Inc.
Answer: Please see the attached contracts attached hereto as Exhibit A.
2. Please send a copy of the selected work item list used to evaluate bid submittals from the previous Annual Contract for General Pipe Work.
Answer: The Selected Work Items List will be provided once available.
Acknowledgment of receipt of this addendum must be signed and included in your bid response.
COMPANY NAME
SIGNATURE
DATE
EXHIBIT A
2023-SW-18 CONTRACTS
Don Hall Construction, Inc
DAF Concrete, Inc.
Jewel of the South, Inc.
SEE SEPARATE ATTACHEMENT
File details come from the government source that posted it. Updated .