2024_Project_List.pdf
PDF 178 KB Posted
- Solicitation number
- RFQ- 24 - 012
- Issued by
- Pinellas County, Florida
About this file
This is a 2024 project list document from Forward Pinellas, a metropolitan planning organization serving the Pinellas County area in Florida, which identifies priority multimodal transportation projects for the region. The document outlines three categories of projects: priority projects under construction or funded for construction/implementation, unfunded multimodal transportation priority projects, and transportation alternatives program priority projects. The City of St. Petersburg, along with FDOT, Pinellas County, and other local municipalities, are the responsible agencies for these initiatives. Projects span various phases including planning, design (PE/PD&E), right-of-way acquisition (ROW), and construction (CST), with timelines ranging from 2019/20 through 2029. Notable major projects include the I-275/SR 93 Howard Frankland Bridge Replacement with express lanes and a multiuse trail, I-275 Express Lanes construction, and multiple Complete Streets upgrades. The document includes approximately 52 active or proposed projects with specific geographic locations, project descriptions, and current status updates.
Funding sources include FDOT allocations, Forward Pinellas grants, PSTA capital funding, and local contributions, with individual project allocations ranging from $250,000 to $1.5 million where specified. Projects designated with an "X" are identified as being on the High Injury Network or at identified hot spots, indicating safety prioritization. Several projects have deferred construction funding by request from the City of St. Petersburg or are pending right-of-way acquisition and environmental review. The document notes that projects may be funded by sources beyond STP (Surface Transportation Program) funds and identifies future priorities that may be drawn from completed corridor studies including SR 60, Alternative US 19, Pasadena Avenue, and US 19 Frontage Roads. Forward Pinellas Systems and Operations Planning receives $600,000 in annual recurring funding, including $100,000 designated for Complete Streets planning projects.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposed Priority FPN Responsible
Agency Project From To Description Funded Phase
Year Funded Status
Project is on High Injury
Network or an
Identified Hot Spot
Source of the Project
256774-2 Phase I – Boy Scout Overpass North of SR 580 Northside Drive CST 2021/22
256774-3 Phase II – Curlew Road Interchange Northside Drive North of CR 95 CST 2021/22
P 422904-2 FDOT I-275/SR 93/Howard Frankland Bridge Replacement
North of SR 687 (4th St. N.)
North of Howard Frankland Bridge
Bridge Replacement, addition of express lanes, and a multiuse trail. Design-Build 2019/20 Underway
Long Range Transportation
Plan
P 424501-2 FDOT I-275 Express Lanes South of SR 694/Gandy Boulevard
North of 4th Street North
Construction of one managed lane in each direction providing interregional connectivity from Gateway Expy and south of Gandy Blvd to Howard Frankland Bridge
Design-Build 2017/18 Underway Long Range
Transportation Plan
PE 2019/20
CST 2021/22
P 440246-1 FDOT U.S. 19 54th Avenue South 22nd Avenue North $1 million Complete Streets upgrade to FDOT resurfacing project to construct a wide sidewalk on west side of roadway
CST 2021/2022 Construction Underway X Forward Pinellas Complete Streets
Program
P 443928-1 Oldsmar St. Petersburg Drive Dartmouth Avenue Bayview Boulevard $1 million to supplement a City of Oldsmar Complete Streets project. CST 2023/24
Forward Pinellas Complete Streets
Program
P 443929-1 Largo Rosery Road Missouri Avenue Eagle Lake Park $1 million to supplement a City of Largo Complete Streets project. CST 2023/24
Forward Pinellas Complete Streets
Program
P 437710-1 FDOT Alt. US 19 South of Curlew Place North of Country Club Add SB left turn lane CST 2023/24 Underway
Forward Pinellas Congestion
Management Process
P 445649-1 St. Petersburg 22nd Street South 9th Avenue S 5th Avenue South $1 million for St. Petersburg Complete Streets Project CST 2027/28 Construction funding deferred by request from City
Forward Pinellas Complete Streets
Program
P 446142-1 PSTA Bus Replacement Capital Funding N/A N/A Up to $1.5 million of capital funding for PSTA Bus Replacements Capital 2024/25 PSTA
P 447535-1 Dunedin Skinner Boulevard Complete Streets Alt US 19 SR 580 $1 million for complete streets project CST 2023/24
Forward Pinellas Complete Streets
Program
P 448486-1 FDOT
Alt US 19 and Bayshore Boulevard @ SR 536/Curlew/Causeway
Intersection improvements DSB 2023 Alt 19 Corridor Study
PE 2022
CST 2024
PRIORITY PROJECTS UNDER CONSTRUCTION OR FUNDED FOR CONSTRUCTION/IMPLEMENTATION
Operational and safety improvements along the corridor. Design underway X
Forward Pinellas Complete Streets
Program P 445681-1 FDOT Drew Street Complete Streets Osceola Avenue E. of US 19
Pinellas CountyP 440093-3 Pinellas County Pinellas Trail Loop 126th Ave N Ulmerton Road South Gap - Phase 1 CST 2023/24
South Gap - Phase 2, 3, 4 CST 2026 Pinellas County
Advantage Pinellas Active Transportation
Plan
P 440093-2 Pinellas County Pinellas Trail Loop Ulmerton Road Belleair Road
N/A Construction of a bicycle/pedestrian overpass over SR 60 near Bayshore. CST 2023/24 Design underway X
Underway Pinellas County
P 437498-1 FDOT Courtney Campbell Causeway Trail Overpass
SR 60/Gulf-to-Bay Boulevard at Bayshore Boulevard
X
P 4377362 Pinellas County Phase II - Park/Starkey Sidewalks Ulmerton Road East Bay Drive
Construction of continuous sidewalks along both sides of corridor
P FDOT
US 19/SR 55 (including Republic Dr Overpass and Curlew Road Interchanges) Long Range
Transportation Plan
Construction of grade separated roadway improvements Underway
2024 FORWARD PINELLAS MULTIMODAL TRANSPORTATION PROJECT PRIORITIES
Approved by the Forward Pinellas Board on June 10, 2024
Forward Pinellas$1 million for St. Petersburg Complete Construction funding deferred by P 445649-1 St. Petersburg 22nd Street South 9th Avenue S 5th Avenue South CST 2027/28 Complete StreetsStreets Project g request from City p Program
Agency Project From To Description Funded Phase
Year Funded Status
Project is on High Injury
Network or an
Identified Hot Spot
Source of the Project
P 449099-1 St. Petersburg St. Pete Complete Streets project on 22nd St S 18th Ave S 11th Ave S $1 million for complete streets project CST 2027/28 Construction funding deferred by request from City
Forward Pinellas Complete Streets
Program
P 440254-1 FDOT SR 693/Pasadena Ave/66th St N Central Ave N Tyrone Blvd Operational improvements along the corridor CST 2022 Underway
FDOT Pasadena Ave Corridor
Study
PE 23/24
CST 25/26
PE 23/24
CST 25/26
PE 2026
CST 27/28
PE 2026
CST 27/28
P 450689-1 Pinellas County 62nd Ave Complete Streets 49th Street 34th Street Up to $1M for the Pinellas County 62nd Ave N Complete Streets Project CST 27/28 N/A
Forward Pinellas Complete Streets Grant Program
PE 2024/25
CST 27/28
P 449853-1 PSTA Regional Vanpools N/A N/A $250,000 for additional vanpool services (not to fund existing services) Operations 27/28 N/A Forward Pinellas
Call for Projects
P 444244-1 FDOT 4th Street Trail Connection Gandy Boulevard Big Island Gap Bridge Trail connection to the Howard Frankland Bridge CST 24/25 N/A
Forward Pinellas Active
Transportation Plan
P 444243-1 FDOT Ulmerton Trail Connection Fountain Parkway North I-275 Trail connection to the Howard
Frankland Bridge CST 24/25 N/A X
Forward Pinellas Active
Transportation Plan
P 448807-1 PSTA Downtown Clearwater Intermodal Center N/A N/A PSTA Intermodal Center for the downtown Clearwater area. Capital 23/24 Planning estimate cost of $29M PSTA
P 444064-1 FDOT SR 580 Corridor Study Alt US 19 SR 584 Operational and safety improvements along the corridor. Planning 2019/20
Corridor study underway.
Recommendations will be programmed once identified.
X FDOT SR 580
Corridor Study
P 449398-1 Pinellas County Duke Energy Trail SR 60 Crossing SR 60 N/A Construction of a bicycle/pedestrian overpass or enhanced trail crossing. CST 2023/24 Design underway X
Forward Pinellas Active
Transportation Plan
P 452899-1 St. Petersburg 1st Avenue South Intersection Improvements 7th St 2nd St
Bicycle/pedestrian safety intersection modifications at the intersections of 1st Ave S and 7th, 5th and 2nd Sts in Downtown St. Petersburg
CST 2029
Forward Pinellas Complete Streets
Program
P 450969-2 FDOT Sidewalk Gaps on State Roadways Countywide Countywide Construction of sidewalks to fill gaps along the State roadways CST 2025 X FDOT Sidewalk Gap Analysis
Program
P 449109-1 FDOT I-275 N of 38th Ave N N of 4th St Construction of 2 express lanes in each direction. CST 2025 X
Long Range Transportation
Plan
Construction of separated bicycle lanes, trail, bike boulevard and pedestrian crossings
Forward Pinellas Active
Transportation Plan
P 449125-1 St. Petersburg 18th Ave S 37th St 16th Street
Intersection modifications to improve safety. N/A X FDOT Alt 19
Corridor StudyP 451098-1 FDOT Alt 19 Intersection Improvements Walsingham N/A
Intersection modifications to improve safety. N/A X FDOT Alt 19
Corridor StudyP 451096-1 FDOT Alt 19 Intersection Improvements East Bay N/A
Intersection modifications to improve safety. N/A X FDOT Alt 19
Corridor StudyP 451097-1 FDOT Alt 19 Intersection Improvements Rosery Road N/A
Construction of concrete medians and pedestrian crossings. N/A X FDOT Alt 19
Corridor StudyP 451073-1 FDOT Alt 19 Median Modifications Wilson Rd. Curlew Rd.
Forward PinellasSt. Pete Complete Streets project Construction funding deferred by P 449099-1 St. Petersburg 18th Ave S 11th Ave S $1 million for complete streets project CST 2027/28 Complete Streetson 22nd St S g request from City p Program
Forward Pinellas Active trail, bike boulevard and pedestrian Transportationcrossings p Plan
P 449125-1 St. Petersburg 18th Ave S 37th St 16th Street
CST 27/28
Construction of separated bicycle lanes, p y
Bicycle/pedestrian safety intersection Forward Pinellas1st Avenue South Intersection y p y modifications at the intersections of 1stP 452899-1 St. Petersburg 7th St 2nd St CST 2029 Complete StreetsImprovements Ave S and 7th, 5th and 2nd Sts in p ProgramDowntown St. Petersburg
Agency Project From To Description Funded Phase
Year Funded Status
Project is on High Injury
Network or an
Identified Hot Spot
Source of the Project
1 439338-5 Forward Pinellas Systems and Operations Planning Funds N/A N/A $600,000 annually for planning activities N/A N/A Annual request N/A
2 446142-1 PSTA
Bus Replacement Capital Funding, including Associated Charging Infrastructure
N/A N/A
Up to $1.5 million of capital funding for PSTA Bus Replacements and associated charging infrastructure, including Solar PV, battery storage and chargers.
N/A N/A Annual Request PSTA
3 N/A St. Petersburg Grand Central District Curb Extensions 27th St 21st St
Construction of curb extensions at three unsignalized intersections along Central Ave: 21st St., 23rd St. and 27th St.
N/A N/A Forward Pinellas Complete Streets
Program
4 4528997-1 St. Petersburg Salt Creek Trail Various Locations Construction of a bike path/trail from 18th Ave S to Salt Creek PE 2026/27
Forward Pinellas Active
Transportation Plan
5 N/A PSTA 34th St Transit Capital N/A N/A
Capital funding for transit station enhancements including transit signal priority improvements, passenger information screens and other bus stop amenities.
Funding request under review X 34th St Corridor Study
6 N/A Pinellas County 28th Street North 30th Ave N Roosevelt Boulevard Construction of a separated multiuse trail, in conjunction with a section of bike boulevard.
N/A N/A Alignment Review Underway
Forward Pinellas Active
Transportation Plan
7 N/A St. Petersburg Duke Energy Trail Roosevelt Overpass
Roosevelt Blvd./Carillon N/A
Construction of a bicycle/pedestrian overpass at Roosevelt Blvd near Carillon
N/A N/A Alignment Review Underway
Forward Pinellas Active
Transportation Plan
424501-7 South of 54th Avenue South I-375 Lane continuity improvements throughout the corridor. ROW 2020/21
449109-2 I-375 S of 38th Ave N Add two express lanes in each direction and lane continuity improvements. PE 2025
9 448513-1 FDOT Dunedin Causeway Operational Improvements
Honeymoon Island State Park Alt US 19 Operational improvements to mitigate congestion on the Dunedin Causeway N/A N/A Funding for improvements at park entrance needed
Congestion Management
Process
10 445650-1 FDOT SR 60 Corridor Study Clearwater Beach Roundabout Veterans Expressway
Study to identify operational, safety and multimodal improvements in the SR 60 corridor
N/A N/A X Forward Pinellas SR 60 Mobility
Study
11 N/A FDOT Gulf Boulevard Sidewalk Improvements 195th Street Walsingham Road Construction of sidewalk with drainage improvements PE 23/24 Project pending ROW acquisition Town of Indian Shores
12 N/A Pinellas
County/Safety Harbor
Sunset Point Rd./Main St Alt US 19 Phillippe Parkway Construction of a separated multiuse trail, in conjunction with a section of bike boulevard.
N/A N/A Alignment Review Underway
Forward Pinellas Active
Transportation Plan
13 N/A Pinellas County Duke Energy Trail Gandy/4th St Overpass 4th Street Gandy Blvd
Construction of a bicycle/pedestrian overpass at 4th/Gandy to connect to Gandy Bridge/Loop.
N/A N/A Alignment Review Underway X
Forward Pinellas Active
Transportation Plan
8 FDOT I-275 Project being divided into segments to align with state funding.
Long Range Transportation
Plan
UNFUNDED MULTIMODAL TRANSPORTATION PRIORITY PROJECTS
Construction of curb extensions at three Forward PinellasGrand Central District Curb3 N/A St. Petersburg 27th St 21st St unsignalized intersections along Central N/A N/A Complete StreetsExtensions g g Ave: 21st St., 23rd St. and 27th St.
p Program
Forward Pinellas Construction of a bike path/trail from Active4 4528997-1 St. Petersburg Salt Creek Trail Various Locations PE 2026/27p 18th Ave S to Salt Creek Transportation p
Plan
Forward PinellasConstruction of a bicycle/pedestrianDuke Energy Trail Roosevelt Roosevelt Active 7 N/A St. Petersburg N/A y p overpass at Roosevelt Blvd near N/A N/A Alignment Review UnderwayOverpass Blvd./Carillon Transportationp Carillon p
Plan
Agency Project From To Description Funded Phase
Year Funded Status
Project is on High Injury
Network or an
Identified Hot Spot
Source of the Project
441250-2
15 N/A FDOT I-175 I-275/SR 93 4th Street PDE Study of corridor alternatives. Planning 2025 Scope Development Underway
Downtown St.
Petersburg
Network Mobility Analysis
16 N/A St. Petersburg 8th and 9th Sts 5th Ave S 5th Ave N
Resurfacing of the 8th/9th St One-Way pair. Includes bicycle and pedestrian enhancements along both corridors and signalization improvements for transition to bi-directional traffic.
N/A N/A
Downtown St.
Petersburg
Network Mobility Analysis
17 N/A FDOT 3rd and 4th Streets 5th Ave S 5th Ave N
Resurfacing of the 3rd/4th St One-Way pair. Includes bicycle and pedestrian enhancements along both corridors and signalization improvements for transition to bi-directional traffic.
PE 2029
Downtown St.
Petersburg
Network Mobility Analysis
18 N/A PSTA Alt 19 Transit Enhancements Grand Central Station Downtown Clearwater Operational funding and capital improvements for premium transit enhancements along the Alt 19 corridor.
N/A N/A X Advantage Alt 19
ROW 2026
20 257086-1 FDOT SR 694/Gandy Boulevard 40th Street East of I-275 (SR 93) Construction of frontage roads and a ramp from NB I-275 to WB Gandy Blvd. ENV 2021/22 CST unfunded X
Long Range Transportation
Plan
22 445376-1 Pinellas County 126th Avenue North US 19/SR 55 34th Street Construction of 2 lane divided continuous roadway N/A N/A PDE Underway Pinellas County
23 N/A Pinellas County Duke Energy Trail SR 580 Crossing SR 580 N/A Construction of a bicycle/pedestrian overpass or enhanced trail crossing. N/A N/A N/A X
Forward Pinellas Active
Transportation Plan
ROW 2026
Long Range
Transportation Plan
South of Lake Street Capacity, operational and safety improvements with pedestrian crossings every 1/4 mile.
Design Underway ROW and CST unfunded X
CST unfunded X Long Range
Transportation Plan
25 433796-1 FDOT US 19/SR 55 (including Klosterman Interchange)
South of Timberlane Road
Pinellas County
24 433797-1 FDOT US 19/SR 55 (including Alderman Interchange)
North of Nebraska Avenue
South of Timberlane Road
Capacity, operational and safety improvements with pedestrian crossings every 1/4 mile.
Design Underway
Gandy Blvd Shared Use Bike Path/Trail PE 2024/25 CST unfunded
CST unfunded X Long Range
Transportation Plan
21 440093-4 Pinellas County Pinellas Trail Loop- San Martin Segment 83rd Ave N
19 433799-1 FDOT US 19/SR 55 (including Tampa and Nebraska Interchanges) South of CR 95 South of Pine Ridge
Way West
Construction of grade separated roadway interchanges with frontage roads and pedestrian crossings every 1/4 mile.
Design Underway
Construction of grade separated overpass at Brighton Bay Blvd. and a trail facility crossing Tampa Bay in the corridor.
PE 2024/25 ROW and CST unfunded X Long Range
Transportation Plan
14 256931-4 FDOT SR 694/ Gandy Boulevard East of 4th Street West of Gandy Bridge
Resurfacing of the 8th/9th St One-Way Downtown St.g pair. Includes bicycle and pedestrian Petersburg 16 N/A St. Petersburg 8th and 9th Sts 5th Ave S 5th Ave N p y p enhancements along both corridors and N/A N/A g
Network Mobility g signalization improvements for Analysisg p transition to bi-directional traffic.
Agency Project From To Description Funded Phase
Year Funded Status
Project is on High Injury
Network or an
Identified Hot Spot
Source of the Project
26 435914-2 FDOT U.S. 19 66th Avenue North 118th Avenue North Operational improvements along the corridor ROW 2023/24 Corridor study underway; partial ROW funding in work program X FDOT US 19
SEIS
27 256998-1 FDOT SR 686/Roosevelt Boulevard I-275/SR 93
West of 9th Street North/Dr Martin Luther King Jr Street North
Construction of a connector road between the Gateway Express and Roosevelt Blvd.
Design Underway CST unfunded X Long Range
Transportation Plan
28 N/A St. Petersburg Cross Bay Ferry N/A N/A Capital funding for Cross Bay Ferry services N/A N/A N/A Forward Pinellas
Call for Projects
29 N/A St. Petersburg Martin Luther King Jr St S 30th Ave S 7th Ave S Multimodal corridor improvements to moderate traffic speeds and provide a separated bike lane
N/A N/A N/A X Forward Pinellas Call for Projects
30 N/A Clearwater Integrated Waterborne Transportation System - Phase 1
Clearwater Beach Maria Dunedin Marina
NEPA Assessment, design and construction of 5 dock facilities and the acquisition of 5 vessels.
N/A N/A N/A
Forward Pinellas Waterborne
Transportation Subcommittee
31 450673-1 FDOT 78th Avenue 49th St 34th Street Multimodal corridor improvements PE 2029 N/A Forward Pinellas Call for Projects
32 N/A Pinellas Park 78th Avenue 66th St 49th St Multimodal corridor improvements N/A N/A Forward Pinellas Call for Projects
33 N/A St. Petersburg 22nd Ave N. 58th Street 4th Street Intersection modifications and signal timing enhancements N/A N/A Forward Pinellas
Call for Projects
34 N/A Pinellas County Belleair Rd Keene Road US 19 Multimodal corridor improvements N/A N/A Forward Pinellas Call for Projects
3) Projects on this priority list need not be limited to STP funds and may be funded by other available funding sources.
4) Future priorities may be drawn from the following completed corridor studies: SR 60, Alt US 19, Pasadena Ave and US 19 Frontage Roads. Corridor studies along SR 580 and 5th Ave/Alt 19 are currently underway.
1) Project #1 is intended for recurring annual funding of $600,000. This includes $100,000 for Complete Streets planning projects. This annual allotment will be set aside as higher priority projects are considered in the development of the annual FDOT Work Program. A portion of this funding is intended to support annual survey efforts to support the regional travel demand model and other transportation planning initiatives.
2) DSB = Design-Build (combines construction and design/preliminary engineering phases to reduce costs and expedite construction); PD&E-Project Development and Environment; DGN-Design; ROW-Right of Way; CST-Construction; ENV-Environmental; FY-Fiscal Year; TIP-Transportation Improvement Program; LRTP-Long Range Transportation Plan; CMAQ-Congestion Mitigation and Air Quality Improvement Program; NEPA - National Environmental Policy Act
Capital funding for Cross Bay Ferry Forward Pinellas28 N/A St. Petersburg Cross Bay Ferry N/A N/A N/A N/A N/Ap services Call for Projects
Multimodal corridor improvements to Forward Pinellas29 N/A St. Petersburg Martin Luther King Jr St S 30th Ave S 7th Ave S p moderate traffic speeds and provide a N/A N/A N/A X Call for Projectsp separated bike lane
Intersection modifications and signal Forward Pinellas33 N/A St. Petersburg 22nd Ave N. 58th Street 4th Street N/A N/Atiming enhancements Call for Projects
Priority Project Number
Responsible Agency Project From To Description Funded
Phase Year
Funded Status
P 4374981 City of
Clearwater/FDOT /SUNTrail
Courtney Campbell Causeway Recreational Trail Overpass SR 60/Gulf-to-Bay Blvd at
Bayshore Blvd N/A Pedestrian/Trail Overpass Construction FY 2024 Design underway
P 4400932 Pinellas County Pinellas Trail Loop Phase 3
Ulmerton Rd Belleair Rd Shared Use Bike Path/Trail PE; CST FY 2022; 2024 Construction deferred from
FY 2023/24 to FY 2025/26
P 4400933 Pinellas County Pinellas Trail Loop Phase 4 126th Ave N Ulmerton Rd Shared Use Bike Path/Trail CST FY 2024 Design underway
P 4429551 Pinellas County 42nd Ave N Sidewalk Project 46th St N 35th St N Sidewalk CST FY 2023 Construction underway
P 4412151 City of
St. Petersburg 71st St N Trail - Pinellas Trail Connector Fred Marquis Pinellas Trail 38th Ave N Shared Use Bike
Path/Trail PE; CST FY 2024 Design underway
P 4473741 City of St. Petersburg 28th St Complete Streets Fred Marquis Pinellas Trail 1st Ave N Complete Streets
Treatments PE; CST FY 2024; 2026 Construction in FY 2025/26
P 447375-1 City of St.
Petersburg Central Ave Complete Streets 34th St 31st St Complete Streets
Treatments PE; CST FY 2024; 2026 Construction in FY 2025/26
P 447376-1 City of St.
Petersburg 22nd St S. Complete Streets 5th Ave S 1st Ave N Complete Streets
Treatments PE; CST FY 2026; 2028 Design deferred, per request from City
P 449037-1 Pinellas Park North side of 118th Ave N Belcher Rd 62nd St N 1.6 mile long 8 foot wide trail CST FY 2025 Design underway by City
P 449035-1 City of St.
Petersburg 28th St. 1st Ave N 13th Ave N 0.9 mile long separated bike lanes PE; CST FY 2023; 2026 Design underway
P 449036-1 City of St.
Petersburg 62nd Av S 22nd St S Dr. MLK Jr St 1 mile long bike lanes PE; CST FY 2025; 2027 Construction in FY
2026/27
P 451520-1 Pinellas County 46th St N 38th Ave N 54th Ave N 54th Ave N 1 mile long sidewalks PE; CST FY 2027; 2029 Design advanced
P 450601-1 City of St.
Petersburg 28th St. S. 18th Ave S 5th Ave S 1 mile separated bike lane PE; CST FY 2025; 2028 Construction in FY 2027/28
P 452905-1 City of St.
Petersburg
Pinellas Trail Neighborhood Connections project various locations various locations bike path/trail PE; CST FY 2025; 2027 Construction added in FY
2026/27
Approved by the Forward Pinellas Board on June 10, 2024
2024 FORWARD PINELLAS TRANSPORTATION ALTERNATIVES PROGRAM PRIORITY PROJECTS
PRIORITY PROJECTS UNDER CONSTRUCTION OR FUNDED FOR CONSTRUCTION/IMPLEMENTATION
City of Complete Streets Construction in FYP 4473741 28th St Complete Streets Fred Marquis Pinellas Trail 1st Ave N PE; CST FY 2024; 2026y St. Petersburg p Treatments 2025/26
City of St. Complete Streets Design deferred, perP 447376-1 22nd St S. Complete Streets 5th Ave S 1st Ave N PE; CST FY 2026; 2028y Petersburg p Treatments g p request from City
City of St. 0.9 mile long P 449035-1 28th St. 1st Ave N 13th Ave N PE; CST FY 2023; 2026 Design underwayy Petersburg g separated bike lanes
City of St. Construction in FY P 449036-1 62nd Av S 22nd St S Dr. MLK Jr St 1 mile long bike lanes PE; CST FY 2025; 2027y Petersburg 2026/27
City of St. 1 mile separated Construction in FY P 450601-1 28th St. S. 18th Ave S 5th Ave S PE; CST FY 2025; 2028y Petersburg p bike lane 2027/28
City of St. Pinellas Trail Neighborhood Construction added in FY P 452905-1 various locations various locations bike path/trail PE; CST FY 2025; 2027y Petersburg g Connections project 2026/27
Priority Project Number
Responsible Agency Project From To Description Funded
Phase Year
Funded Status
450603-1 Pinellas County Joe's Creek Trail 46th Ave./Duval Park Blvd./
Main St./50th Ave.
Joe's Creek Trail in Lealman 0.9 mile bike path/trail PE 2029 Design added in FY
2028/29
Sunset Way Corey Ave.
and Beach Plaza from 67th 71st Ave .
3 N/A City of Tarpon Springs
Sunset Connector W Klosterman Rd, Carlton Rd, W.
Curlew PL., Florida Ave., Gulf Rd., Sunset Dr., Fred Howard Causeway
CR 880 at Alt US 19 CR 880, CR 896, CR 369
4.4 mile bike/pedestrian infrastructure improvements
N/A N/A
4 N/A City of Tarpon Springs
Disston Ave. Complete Streets (Phase 1) Klosterman Rd Live Oak Blvd
2.1 mile sidewalk & intersection improvements N/A N/A
5 N/A City of St.
Petersburg 26th Ave S Trail Skyway Trail at 38th St/Perry
Bayou 21st St 1.45 mile shared use trail N/A N/A
6 N/A City of St.
Petersburg
Grand Central District Crossings (citywide at various intersections: 1st Ave N & S at 18th St; 1st Ave N, 1st Ave S…) citywide citywide citywide N/A N/A
0.64 mile ADA compliant sidewalks and bike lanes PE 2029 Design added in FY
2028/29
UNFUNDED TRANSPORTATION ALTERNATIVES PROGRAM PRIORITY PROJECTS
FY = fiscal year; P = programmed
450606-1 St Pete Beach 67th Ave.
City of St. Skyway Trail at 38th St/Perry 1.45 mile 5 N/A 26th Ave S Trail 21st St N/A N/Ay Petersburg y Bayou shared use trail
Grand Central District Crossings (citywide at various City of St. 6 N/A g ( y intersections: 1st Ave N & S at citywide citywide citywide N/A N/Ay
Petersburg 18th St; 1st Ave N, 1st Ave S…)
File details come from the government source that posted it. Updated .