2024.05.31 Union Hall Addendum No. 1.pdf
PDF 29 KB Posted
- Solicitation number
- 67390
- Issued by
- Patrick County, Chatham Town, Virginia
About this file
This document is an Addendum No. 1 for the Request for Proposal (RFP) issued by the Pittsylvania County Schools in Virginia for the HVAC and Window Replacement project at the Union Hall Elementary School. It provides clarification and additional details on the scope of work, including that the base bid will require ceiling replacement only in certain areas, while an alternate bid will cover the cost of replacing all ceilings. The addendum also addresses a question regarding the hardware set for door B100 and a boiler substitution request. The overall project involves a complete overhaul of the school's HVAC equipment and the replacement of all windows, with a targeted substantial completion date of July 31, 2026.
The RFP does not specify any set-aside designations, restrictions on bidder types, or the total award value or budget range for the project. It also does not mention any incumbent vendors or current contractors, or any existing infrastructure or technology that requires integration. Bidders must submit their proposals by 2:00 PM on June 10, 2024, and the contract will be awarded to the lowest responsive and responsible bidder, who will be required to provide performance and payment bonds.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pittsylvania County Schools
Union Hall Elementary School
HVAC and Window Replacement
RFP-23-24/005
Addendum No. 1
May 31, 2024
Note: Please acknowledge receipt of this addendum in your bid proposal in the space provided.
General
Item No. G1: Final Cleaning
a) Question: Will the bidding contractor be required to rewax existing VCT flooring upon completion of work?
Response: Contractor is not required to rewax VCT flooring at completion of work.
Item No. G2: Pre-Bid Meeting Minutes Changes Summary:
• Base bid to include ceiling replacement only in rooms noted in the RCP (hallways, office suite, kitchen, library, etc). In all classrooms, existing ceiling grid and tiles to be removed, stored, and reinstalled after HVAC work is finished.
• Alternate to include the cost for replacing all ceilings in schools.
• One classroom in basement is getting cut into two rooms- a classroom and a mechanical pump room. In this pump room, all finishes are removed and a door is added for access from the classroom.
• All fire-rated walls are assumed and should be field verified.
Architectural
Item No. A1: B100 Hardware Set
a) Question: Specification section 087100, Hardware Set 1.0 refers to a paired opening (101B) while the door schedule on A-111A indicates a single opening for door B100. Can you please provide a hardware set for Door B100?
Response: Please utilize the following hardware set for Door B100:
3 Hinge, Full Mortise TA2714 US26D MK
1 Storeroom Lock 9K37D 14D Patented 626 BE
1 Surface Closer DC6200/DC6210 (TO SUIT) 689 RU
1 Kick Plate K1050 10" CSK US32D RO
1 Door Stop 403/441CU (TO SUIT) US26D RO
3 Silencer 608/609 (TO SUIT) RO
Mechanical
Item No. M1: 235216 Boiler Substitution Request
a) Question: Raypak Model H7-856L is/is not an acceptable substitute for equipment B-1, B-2, and
B-3.
Response: Requested boiler is equipped with a fire-tube style heat exchanger which does not meet the specified water-tube heat exchanger requirements.
Item No. M2: Boiler Vent Stack Height
a) Question: Do you know how high the stack run goes from the boilers?
Response: The roof level is 14 ft above floor level in the boiler room and the boiler stack will terminate about 6 ft above roof level.