2024.05.21 Union Hall HVAC and Window Replacement Specifications.pdf

PDF 7 MB Posted

Attached to
Union Hall Elementary School HVAC and Window Replacement
Solicitation number
67390
Issued by
Patrick County, Chatham Town, Virginia

About this file

This document is a project manual for the Union Hall Elementary School HVAC and Window Replacement project in Pittsylvania County, Virginia. The Pittsylvania County School Board is seeking bids from qualified contractors to complete a full overhaul of the school's HVAC system and replace all windows. The project has a base bid for the HVAC and window work, as well as an alternate for additional ceiling replacement and an owner's contingency allowance. Bids are due by 2:00 PM on June 10, 2024, and the contract will be awarded to the lowest responsive and responsible bidder. The successful contractor will be required to provide performance and payment bonds, and the targeted substantial completion date is July 31, 2026.

The bid solicitation does not mention any set-aside designations or restrictions on the types of organizations that can respond. It also does not provide information on any incumbent vendors or current contractors, or any existing infrastructure or technology that requires integration. The total award value or budget range for the project is not specified in the available documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PCS SPEC NO. 23-24/005

DEWBERRY REFERENCE NO. 50169908

PROJECT MANUAL

Pittsylvania County Schools Union Hall Elementary HVAC and Window Replacement Pittsylvania County, VA

MAY 21, 2024

PREPARED BY

Dewberry Engineers Inc.

551 Piney Forest Road Danville, VA 24540 434.797.4497

MECHANICAL

ELECTRICAL

TABLE OF CONTENTS TOC - 1

UNION HALL ELEMENTARY SCHOOL HVAC AND WINDOW REPLACEMENT 50169908

TABLE OF CONTENTS*

*Red text indicates sections that were added or revised during pre-bid period

ADVERTISEMENT FOR BIDS

INVITATION TO BID

INSTRUCTIONS TO BIDDERS (AIA 701-1997)

SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

BID PROPOSAL

GENERAL CONDITIONS (AIA 201-2007)

SUPPLEMENTARY CONDITIONS

AGREEMENT (AIA A101-2007)

SPECIFICATIONS

011000 SUMMARY 011000-1

012100 ALLOWANCES 012100-1

012300 ALTERNATES 012300-1

012500 SUBSTITUTION PROCEDURES 012500-1

012600 CONTRACT MODIFICATION PROCEDURES 012600-1

012900 PAYMENT PROCEDURES 012900-1

013100 PROJECT MANAGEMENT AND COORDINATION 013100-1

013200 CONSTRUCTION PROGRESS DOCUMENTATION 013200-1

013300 SUBMITTAL PROCEDURES 013300-1

015000 TEMPORARY FACILITIES AND CONTROLS 015000-1

016000 PRODUCT REQUIREMENTS 016000-1

017300 EXECUTION 017300-1

017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419-1

017700 CLOSEOUT PROCEDURES 017700-1

017839 PROJECT RECORD DOCUMENTS 017839-1

017900 DEMONSTRATION AND TRAINING 017900-1

TECHNICAL SPECIFICATIONS

ARCHITECTURAL

048100 UNIT MASONRY ASSEMBLIES 048100-1

081113 HOLLOW METAL DOORS AND FRAMES 081113-1

084113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 084113-1

084114 INSULATED METAL WINDOW PANELS 084114-1

087100 DOOR HARDWARE 087100-1

088000 GLAZING 088000-1

092216 NON-STRUCTURAL FRAMING 092216-1

092900 GYPSUM BOARD 092216-1

095113 ACOUSTICAL CEILINGS 095113-1

MECHANICAL

230100 HVAC GENERAL WORK REQUIREMENTS 230100-1

230200 HVAC SYSTEMS OWNER TRAINING 230200-1

230300 HVAC UNDERGROUND UTILITIES WORK REQUIREMENTS 230300-1

230500 HVAC FIRESTOPPING 230500-1

TABLE OF CONTENTS TOC - 2

230511 HVAC ELECTRICAL PROVISIONS 230511-1

230513 HVAC EQUIPMENT MOTORS 230513-1

230514 VARIABLE SPEED CONTROLLERS 230514-1

230516 EXPANSION FITTINGS AND LOOPS 230516-1

230517 SLEEVES AND SLEEVE SEALS 230517-1

230519 PIPING INSTRUMENTS AND GAGES 230519-1

230529 HANGERS AND SUPPORTS 230529-1

230533 HEAT TRACING 230533-1

230548 HVAC SEISMIC, WIND AND VIBRATION CONTROLS 230548-1

230553 HVAC SYSTEMS IDENTIFICATION 230553-1

230555 HVAC PIPING SYSTEMS FLUSHING AND TESTING 230555-1

230593 TESTING, ADJUSTING AND BALANCING 230593-1

230713 DUCT AND DUCTED EQUIPMENT INSULATION 230713-1

230719 PIPING AND PIPED EQUIPMENT INSULATION 230719-1

231126 FUEL GAS PIPING 231126-1

232113 HYDRONIC PIPING 232113-1

232116 HYDRONIC PIPING SPECIALTIES 232116-1

232119 HYDRONIC PIPING VALVES 232119-1

232123 HYDRONIC PUMPS 232123-1

232133 UNDERGROUND HYDRONIC PIPING 232133-1

232500 HVAC WATER TREATMENT 232500-1

233100 AIR DISTRIBUTION SYSTEM CLEANING 233100-1

233113 METAL DUCTS 233113-1

233300 METAL DUCT ACCESSORIES 233300-1

233400 HVAC FANS 233400-1

233713 DIFFUSERS, GRILLES, AND REGISTERS 233713-1

233723 GRAVITY VENTILATORS 233723-1

233813 COMMERCIAL KITCHEN HOODS 233813-1

234100 PARTICULATE AIR FILTRATION – STANDARD EFFICIENCY 234100-1

235216 CONDENSING BOILERS 235216-1

236426 AIR-COOLED CHILLERS 236426-1

237316 MODULAR AIR HANDLING UNITS 237316-1

238116 DUCTLESS MINI-SPLIT SYSTEMS 238116-1

238216 AIR COILS 238216-1

238219 FAN COIL UNITS 238219-1

238223 UNIT VENTILATORS 238223-1

238236 FIN TUBE RADIATION HEATERS 238236-1

238239 UNIT HEATERS 238239-1

239000 BAS GENERAL REQUIREMENTS 239000-1

239010 BAS INSTRUMENTATION 239010-1

239020 BAS FIELD CONTROLLERS 239020-1

239040 BAS FRONT-END SOFTWARE AND HARDWARE 239040-1

239210 ENERGY AND FLOW METERS 239210-1

ELECTRICAL

260100 BASIC ELECTRICAL REQUIREMENTS 260100-1

260500 BASIC ELECTRICAL MATERIALS AND METHODS 260500-1

260519 CONDUCTORS AND CABLES 260519-1

260526 GROUNDING AND BONDING 260526-1

260529 HANGERS AND SUPPORTS 260529-1

TABLE OF CONTENTS TOC - 3

260533 RACEWAY AND BOXES 260533-1

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 260553-1

260571 POWER SYSTEM STUDY 260571-1

262416 PANELBOARDS 262416-1

262726 WIRING DEVICES 262726-1

262813 FUSES 262813-1

262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 262816-1

END OF TABLE OF CONTENTS

ADVERTISEMENT FOR BIDS

Pittsylvania County School Board will receive sealed bids for the Union Hall Elementary School

HVAC and Window Replacement Project. Bids will be accepted until 2:00 p.m. June 10, 2024 at the School Board Office, 39 Bank Street SE, Chatham, VA 24531.

Each bid shall be accompanied by a certified check of the bidder, payable to the Owner, or a Bid

Bond in the amount of five (5%) percent of the bid.

A Performance Bond and a Payment Bond, each in the amount of 100 percent of the Contract

Amount with a corporate surety approved by the Owner, shall be required for the faithful performance of the Contract.

No bid may be withdrawn for a period of sixty (60) calendar days subsequent to the receipt of bids without written consent of the Owner. The Owner reserves the right to reject any and all bids, to waive any informalities in the bidding process and to make as a whole or any part of the work that is most advantageous to the School System.

Contract Documents: Electronic copies of contract documents available per request via email to

Amanda Schlichting at aschlichting@dewberry.com. Questions concerning this advertisement shall be directed to Amanda Schlichting at aschlichting@dewberry.com.

mailto:aschlichting@dewberry.com

INVITATION TO BID ITB - 1

INVITATION TO BID

Project Owner: Pittsylvania County School Board

Project Architect: Dewberry Engineers Inc.

551 Piney Forest Road

Danville, Virginia 24540

(434) 797-4497

Project Description: Union Hall Elementary School

HVAC and Window Replacement Project

Project Location: Union Hall Elementary School

100 Union Hall Elementary Circle

Chatham, VA 24531

Bid Due Date and Time: June 10, 2024 at 2:00 p.m.

Bid Bond Requirements: Five Percent of Bid Amount

A. Bid Proposals: Sealed Bids will be received by the owner for the above referenced project.

Bids will be accepted until 2:00 p.m. June 10, 2024 at the School Board Office, 39 Bank Street

SE, Chatham, VA 24531.

B. Electronic Contract Documents: Obtain by request via email to aschlichting@dewberry.com.

C. Contract Documents may be reviewed at the following locations:

1. Dewberry Engineers Inc.

551 Piney Forest Road

Danville, Virginia 24540

2. Pittsylvania County Schools

39 Bank Street SE

D. Questions: All contractor questions will need to be addressed to the architect (Amanda

Schlichting, aschlichting@dewberry.com) by Friday, May 31 at noon so that the final addendum can be issued by Wednesday, June 5. Once the addendum is issued the architect will answer only questions that are clarifications to the construction documents.

E. Submission of Bids: Bids shall be submitted on the enclosed Bid Proposal form, completed in full in ink or typewritten (one copy only). Proposals shall be enclosed in a sealed envelope, addressed to the Owner, and be clearly marked “Proposal for Union Hall Elementary School

HVAC and Window Replacement Project.” The name, address, and license number of the

Bidder shall also be clearly marked on the envelope.

INVITATION TO BID ITB - 2

F. Bid Bond: Each Bid shall be accompanied by a Bid Bond, payable to the Owner, in the amount of five percent of the total Bid. As soon as the Bids have been recorded, the Owner will return the bonds of all except the three lowest responsible Bidders. When the Agreement is executed, with the successful Bidder, the bonds of the remaining Bidders will be returned. The Bid Bond of the successful Bidder will be retained until the Labor and Materials Payment Bond and

Performance Bond have been executed and approved, after which it will be returned.

1. A certified check may be used in lieu of a sealed surety Bid Bond.

G. Bid Opening: The Bids will be opened in a Public Opening of Bids at the designated time and location.

1. It is the intent of the Owner to award a contract to the lowest responsive and responsible bidder provided the bid has been submitted in accordance with the requirements of the bidding documents and does not exceed available funds. The low bidder will be determined by the total bid price, including bid alternates. Each Bidder is required to submit with his bid the information requested in AIA Document A305 “Contractor’s

Qualification Statement”.

2. The Owner may waive any informalities or irregularities or reject any or all Bids and rebid the Project.

3. Any Bid may be withdrawn or modified prior to the scheduled time for the opening of

Bids.

4. Any Bid received after the time and date specified shall not be considered and will be returned to the Bidder unopened.

5. Unless otherwise noted, no Bidder may withdraw a Bid within 60 days after the actual date of the opening thereof. Should the Contract not be awarded within this specified time period, the time may be extended by mutual agreement of the Owner and the Bidder.

H. Licenses: All Contractors are hereby notified that they must have proper licenses under the state laws governing their respective trades.

1. If a Contract is for $40,000 or more, or if the total value of all construction, removal, repair, or improvements undertaken by the Bidder within any 12-month period is

$300,000 or more, the bidder is required under Title 54, Chapter 7, Code of Virginia

(1950) as amended, to show evidence of being licensed as a "Class A Contractor." If a

Contract is $1,500 or more but less than $40,000, the bidder is required to show evidence of being licensed as a "Class B Contractor."

I. Withdrawal of Bid Due to Error: A Bidder may withdraw his Bid from consideration if the prices therein are substantially lower than the other Bids due solely to a clerical mistake, provided the Bid was submitted in good faith, and the mistake was not an error in judgment, and was actually due to an unintentional arithmetic error or an unintentional omission of a quantity of work, labor, or material made directly in the compilation of the Bid. Any unintentional arithmetic error or unintentional omission can be clearly shown by objective evidence drawn from inspection of original work papers, documents, and materials used in the preparation of the

Bid sought to be withdrawn.

INVITATION TO BID ITB - 3

1. In accordance with Section 11-54 A. (ii) of the Code of Virginia, the Bidder shall submit to the Owner his original work papers, documents and materials used in preparation of the

Bid within 24-hours after the Bid Opening. Any clerical mistake shall be proved only from the original work papers, documents, and materials delivered by the Bidder in person or by registered mail. The Bidder shall have 2 hours after the Opening of Bids within which to claim in writing any mistake as defined herein and withdraw his Bid. The

Contract shall not be awarded by the Owner until the 2-hour period has elapsed.

J. Negotiation With Lowest Bidder: If award of a contract to the lowest responsive and responsible bidder is precluded because of limitations on available funds, under the provisions of Section 2.2-4318 of the Code of Virginia (the Public Procurement Act), the Owner reserves the right to negotiate with such bidder to obtain a contract price within the available funds. This may involve changes in either the features or the scope of the work. Negotiations with such bidder may include reducing the quantity, quality, or other cost saving mechanisms. The Owner shall notify the bidder that such a situation exists and the Owner and bidder shall then conduct their negotiations in person, by mail, by telephone or by any means they find convenient. If an acceptable contract can be negotiated, the changes to the Invitation for Bid Documents agreed upon in the negotiations shall be summarized in a “Post Bid Modification” and included in the contract. If an acceptable contract cannot be negotiated, the Owner shall terminate negotiations and reject all bids.

K. Pursuant to Section 22.1 – 296.1 of the Code of Virginia, 1950, as amended, prior to the execution of this agreement, the Contractor shall provide written certification that all of its employees utilized in this agreement have not been convicted of a felony or any offense involving the sexual molestation or physical or sexual abuse or rape of a child.

L. Time of Completion: Bidder agrees to begin work on this project on June 17, 2024 and obtain substantial completion on or before July 31, 2026.

M. Liquidated Damages: Bidder agrees to pay as Liquidated Damages the sum of one hundred and fifty dollars ($150) for each consecutive calendar day that the Project extends beyond the designated date for Substantial Completion.

N. Pursuant to Section 2.2-4311.1 of the Code of Virginia, 1950, as amended, prior to the execution of this agreement, the Contractor shall provide written certification that they do not and shall not during the performance of the contract knowingly employ an unauthorized alien defined in the Federal Immigration Reform and Control Act of 1986.

O. Employment Discrimination: During the performance of this contract, if such contract is for more than $10,000, the contractor agrees as follows:

a. The contractor will not discriminate against any employee or applicant for employment because of race, religion, color, sex, national origin, age, disability or any other basis prohibited by state law relating to discrimination in employment, except where there is a bona fide occupational qualification reasonably necessary to

INVITATION TO BID ITB - 4

the normal operation of the contractor. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause.

b. The contractor, in all solicitations or advertisements for employees placed by or on behalf of the contractor, will state that such contractor is an equal opportunity employer.

c. Notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this section.

d. The contractor will include the provisions of the foregoing paragraphs a, b, and c, in every subcontract or purchase order of over $10,000.00, so that the provisions will be binding upon each subcontractor or vendor.

P. Drug Free Workplace: During the performance of this contract, if such contract is for more than $10,000, the contractor agrees to (i) provide a drug-free workplace for the contractor’s employees; (ii) post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the contractor’s workplace and specifying the actions that will be taken against employees for violations of such prohibition; (iii) state in all solicitations or advertisements for employees placed by or on behalf of the contractor that the contractor maintains a drug-free workplace; and

(iv) include the provisions of the foregoing clauses in every subcontract or purchase order of over $10,000, so that the provisions will be binding upon each subcontractor or vendor.

Q. Contractor’s Certification of Requirements Code of Virginia: Contractor awarded the project shall sign and return with signed contract.

END OF INVITATION TO BID

SUPPLEMENTARY INSTRUCTIONS TO BIDDERS SIB - 1

SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

The following supplements modify the "Instructions to Bidders", AIA Document A701-1997. Where a portion of the Instructions to Bidders is modified or deleted by these Supplementary Instructions, the unaltered portions of Instructions to Bidders shall remain in effect.

i) Article 2; Bidders Representations

(1) 2.1

(a) Add the following Subparagraph 2.1.5 to 2.1:

2.1.5 The Bidder certifies that this Bid Proposal has been arrived at independently, without consultation, communication, or agreement with any other Bidder concerning any matter relating to this Bid.

ii) Article 3; Bidding Documents

(1) 3.1 Copies

(a) Delete Subparagraph 3.1.1 and substitute the following:

3.1.1 Bidders may obtain complete sets of the Bidding Documents from the issuing office designated in the Invitation to Bid.

iii) Article 5; Consideration of Bids

(1) 5.3 Acceptance of Bid (Award)

(a) Add the following Subparagraphs 5.3.3, 5.3.4, and 5.3.5 to 5.3:

5.3.3 The party to whom the contract is awarded shall be required to execute the

Agreement and obtain the Performance Bond and Labor and Material Payment

Bond within 10 calendar days from the date when the Notice of Award is delivered to the bidder. The Notice of Award shall be accompanied by the necessary

Agreement and Bond forms. In case of failure of the Bidder to execute the

Agreement, the Owner may consider the Bidder in default, in which case the Bid

Bond accompanying the Proposal shall become the property of the Owner.

5.3.4 The Owner, within 10 calendar days of receipt of acceptable Performance

Bond, Labor and Material Payment Bond, and Agreement signed by the party to whom the Contract was awarded, will sign the Agreement and return an executed copy to such party. Should the Owner not execute the Agreement within such period, the Bidder may, by written notice, withdraw the signed Agreement. Such notice of withdrawal shall be effective upon receipt of the notice by the Owner.

5.3.5 The Notice to Proceed shall be issued within 10 calendar days of the execution of the Agreement by the Owner. Should there be reasons why the Notice to Proceed cannot be issued within such period, the time may be extended by mutual agreement between the Owner and Contractor. If the Notice to Proceed has

SUPPLEMENTARY INSTRUCTIONS TO BIDDERS SIB - 2

not been issued within the 10 day period or within the period mutually agreed upon, the Contractor may terminate the Agreement without further liability on the part of either party.

END OF SUPPLEMENTARY INSTRUCTIONS TO BIDDERS

BID PROPOSAL BP-1

BID PROPOSAL

TO: Pittsylvania County Public Schools

39 Bank Street, SE

FROM: __________________________________________________________________

FOR: Pittsylvania County Public Schools

Union Hall Elementary School

HVAC and Window Replacement Project

The undersigned, having visited the site of the project named above and being familiar with local conditions affecting the cost of work and all the requirements of the contract documents, including addenda, proposes to enter into a contract for the following Contract Prices to furnish all labor, materials, equipment, supervision, taxes and all else necessary for completion of the Work in accordance with the

Contract Documents.

1. Base Bid – Union Hall Elementary School

a. Lump Sum Bid for Union Hall Elementary School HVAC and $

Window Replacements as described in the contract documents.

b. Alternate #1: Additional Ceiling Replacement per A-131A & A-131B $

c. Allowance #1: Owner’s Contingency $ 50,000.00

2. Total Bid Amount – Union Hall Elementary School

a. Lump Sum Bid for Union Hall Elementary School (1a + 1b + 1c)

Dollars ($ )

Bidder must provide bids for parts 1 and 2 above. Failure to do so will be grounds for rejection of bid.

The bidder agrees to commence the Work under this Contract on June 17, 2024 and obtain Substantial

Completion on or before July 31, 2026. The Bidder further agrees to pay as Liquidated Damages the sum of $150 for each consecutive calendar day that the project extends beyond the specified date for

Substantial Completion.

Attached to this Bid Proposal is a sealed surety Bid Bond or a certified check in the amount of

__________________________________________ Dollars ($_______________________) the total of which is 5 percent of the Total Base Bid price.

The following addenda are acknowledged:

Addendum No. ____; dated ________________

BID PROPOSAL BP-2

Unless otherwise noted, the Bidder agrees that this Bid Proposal may not be withdrawn, in whole or in part, for a period of 60 calendar days after the actual date of the opening thereof. If the withdrawal of

Bids is allowed by State or Federal Law holding jurisdiction over the Bid, then said withdrawal must be in accordance with those regulations.

Respectfully Submitted:

By _________________________________________________________________

(Signature)

Title ________________________________________________________________

(Type or Print Name and Title)

Name of Bidder______________________________________________________

Business Address_____________________________________________________

Date of Bid__________________________________________________________

Contractor’s Phone Number_____________________________________________

Contractor’s Classification and License Number_____________________________

Attest______________________________________________________________

Signature & Title Date

Contractor’s Seal (If Applicable)

AIA

Document A201® – 2017

General Conditions of the Contract for Construction

AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 16:42:37 ET on 02/05/2024 under Order No.3104239940 which expires on 12/04/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents®

Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.

User Notes: (1883328052)

ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed.

This document has important legal consequences.

Consultation with an attorney is encouraged with respect to its completion or modification.

For guidance in modifying this document to include supplementary conditions, see AIA Document A503™, Guide for Supplementary

Conditions.

ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.

for the following PROJECT:

(Name and location or address)

THE OWNER:

(Name, legal status and address)

THE ARCHITECT:

(Name, legal status and address)

TABLE OF ARTICLES

1 GENERAL PROVISIONS

2 OWNER

3 CONTRACTOR

4 ARCHITECT

5 SUBCONTRACTORS

6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS

7 CHANGES IN THE WORK

8 TIME

9 PAYMENTS AND COMPLETION

10 PROTECTION OF PERSONS AND PROPERTY

11 INSURANCE AND BONDS

12 UNCOVERING AND CORRECTION OF WORK

13 MISCELLANEOUS PROVISIONS

14 TERMINATION OR SUSPENSION OF THE CONTRACT

15 CLAIMS AND DISPUTES

AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 16:42:37 ET on 02/05/2024 under Order No.3104239940 which expires on 12/04/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents®

INDEX

(Topics and numbers in bold are Section headings.)

Acceptance of Nonconforming Work

9.6.6, 9.9.3, 12.3

Acceptance of Work

9.6.6, 9.8.2, 9.9.3, 9.10.1, 9.10.3, 12.3

Access to Work

3.16, 6.2.1, 12.1

Accident Prevention

Acts and Omissions

3.2, 3.3.2, 3.12.8, 3.18, 4.2.3, 8.3.1, 9.5.1, 10.2.5, 10.2.8, 13.3.2, 14.1, 15.1.2, 15.2

Addenda

1.1.1

Additional Costs, Claims for

3.7.4, 3.7.5, 10.3.2, 15.1.5

Additional Inspections and Testing

9.4.2, 9.8.3, 12.2.1, 13.4

Additional Time, Claims for

3.2.4, 3.7.4, 3.7.5, 3.10.2, 8.3.2, 15.1.6

Administration of the Contract

3.1.3, 4.2, 9.4, 9.5

Advertisement or Invitation to Bid

1.1.1

Aesthetic Effect

4.2.13

Allowances

3.8

Applications for Payment

4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5.1, 9.5.4, 9.6.3, 9.7, 9.10

Approvals

2.1.1, 2.3.1, 2.5, 3.1.3, 3.10.2, 3.12.8, 3.12.9, 3.12.10.1, 4.2.7, 9.3.2, 13.4.1

Arbitration

8.3.1, 15.3.2, 15.4

ARCHITECT

Architect, Definition of

4.1.1

Architect, Extent of Authority

2.5, 3.12.7, 4.1.2, 4.2, 5.2, 6.3, 7.1.2, 7.3.4, 7.4, 9.2, 9.3.1, 9.4, 9.5, 9.6.3, 9.8, 9.10.1, 9.10.3, 12.1, 12.2.1, 13.4.1, 13.4.2, 14.2.2, 14.2.4, 15.1.4, 15.2.1

Architect, Limitations of Authority and Responsibility

2.1.1, 3.12.4, 3.12.8, 3.12.10, 4.1.2, 4.2.1, 4.2.2, 4.2.3, 4.2.6, 4.2.7, 4.2.10, 4.2.12, 4.2.13, 5.2.1, 7.4, 9.4.2, 9.5.4, 9.6.4, 15.1.4, 15.2

Architect’s Additional Services and Expenses

2.5, 12.2.1, 13.4.2, 13.4.3, 14.2.4

Architect’s Administration of the Contract

3.1.3, 3.7.4, 15.2, 9.4.1, 9.5

Architect’s Approvals

2.5, 3.1.3, 3.5, 3.10.2, 4.2.7

Architect’s Authority to Reject Work

3.5, 4.2.6, 12.1.2, 12.2.1

Architect’s Copyright

1.1.7, 1.5

Architect’s Decisions

3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 4.2.14, 6.3, 7.3.4, 7.3.9, 8.1.3, 8.3.1, 9.2, 9.4.1, 9.5, 9.8.4, 9.9.1, 13.4.2, 15.2

Architect’s Inspections

3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 13.4

Architect’s Instructions

3.2.4, 3.3.1, 4.2.6, 4.2.7, 13.4.2

Architect’s Interpretations

4.2.11, 4.2.12

Architect’s Project Representative

4.2.10

Architect’s Relationship with Contractor

1.1.2, 1.5, 2.3.3, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5, 3.7.4, 3.7.5, 3.9.2, 3.9.3, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.2, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 12, 13.3.2, 13.4, 15.2

Architect’s Relationship with Subcontractors

1.1.2, 4.2.3, 4.2.4, 4.2.6, 9.6.3, 9.6.4, 11.3

Architect’s Representations

9.4.2, 9.5.1, 9.10.1

Architect’s Site Visits

3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.4

Asbestos

10.3.1

Attorneys’ Fees

3.18.1, 9.6.8, 9.10.2, 10.3.3

Award of Separate Contracts

6.1.1, 6.1.2

Award of Subcontracts and Other Contracts for

Portions of the Work

5.2

Basic Definitions

1.1

Bidding Requirements

1.1.1

Binding Dispute Resolution

8.3.1, 9.7, 11.5, 13.1, 15.1.2, 15.1.3, 15.2.1, 15.2.5, 15.2.6.1, 15.3.1, 15.3.2, 15.3.3, 15.4.1

Bonds, Lien

7.3.4.4, 9.6.8, 9.10.2, 9.10.3

Bonds, Performance, and Payment

7.3.4.4, 9.6.7, 9.10.3, 11.1.2, 11.1.3, 11.5

Building Information Models Use and Reliance

1.8

Building Permit

3.7.1

Capitalization

1.3

Certificate of Substantial Completion

9.8.3, 9.8.4, 9.8.5

AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 16:42:37 ET on 02/05/2024 under Order No.3104239940 which expires on 12/04/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents®

Certificates for Payment

4.2.1, 4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7, 9.10.1, 9.10.3, 14.1.1.3, 14.2.4, 15.1.4

Certificates of Inspection, Testing or Approval

13.4.4

Certificates of Insurance

9.10.2

Change Orders

1.1.1, 3.4.2, 3.7.4, 3.8.2.3, 3.11, 3.12.8, 4.2.8, 5.2.3, 7.1.2, 7.1.3, 7.2, 7.3.2, 7.3.7, 7.3.9, 7.3.10, 8.3.1, 9.3.1.1, 9.10.3, 10.3.2, 11.2, 11.5, 12.1.2

Change Orders, Definition of

7.2.1

CHANGES IN THE WORK

2.2.2, 3.11, 4.2.8, 7, 7.2.1, 7.3.1, 7.4, 8.3.1, 9.3.1.1, 11.5

Claims, Definition of

15.1.1

Claims, Notice of

1.6.2, 15.1.3

CLAIMS AND DISPUTES

3.2.4, 6.1.1, 6.3, 7.3.9, 9.3.3, 9.10.4, 10.3.3, 15, 15.4

Claims and Timely Assertion of Claims

15.4.1

Claims for Additional Cost

3.2.4, 3.3.1, 3.7.4, 7.3.9, 9.5.2, 10.2.5, 10.3.2, 15.1.5

Claims for Additional Time

3.2.4, 3.3.1, 3.7.4, 6.1.1, 8.3.2, 9.5.2, 10.3.2, 15.1.6

Concealed or Unknown Conditions, Claims for

3.7.4

Claims for Damages

3.2.4, 3.18, 8.3.3, 9.5.1, 9.6.7, 10.2.5, 10.3.3, 11.3, 11.3.2, 14.2.4, 15.1.7

Claims Subject to Arbitration

15.4.1

Cleaning Up

3.15, 6.3

Commencement of the Work, Conditions Relating to

2.2.1, 3.2.2, 3.4.1, 3.7.1, 3.10.1, 3.12.6, 5.2.1, 5.2.3, 6.2.2, 8.1.2, 8.2.2, 8.3.1, 11.1, 11.2, 15.1.5

Commencement of the Work, Definition of

8.1.2

Communications

3.9.1, 4.2.4

Completion, Conditions Relating to

3.4.1, 3.11, 3.15, 4.2.2, 4.2.9, 8.2, 9.4.2, 9.8, 9.9.1, 9.10, 12.2, 14.1.2, 15.1.2

COMPLETION, PAYMENTS AND

Completion, Substantial

3.10.1, 4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, 12.2, 15.1.2

Compliance with Laws

2.3.2, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 9.6.4, 10.2.2, 13.1, 13.3, 13.4.1, 13.4.2, 13.5, 14.1.1, 14.2.1.3, 15.2.8, 15.4.2, 15.4.3

Concealed or Unknown Conditions

3.7.4, 4.2.8, 8.3.1, 10.3

Conditions of the Contract

1.1.1, 6.1.1, 6.1.4

Consent, Written

3.4.2, 3.14.2, 4.1.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3, 13.2, 15.4.4.2

Consolidation or Joinder

15.4.4

CONSTRUCTION BY OWNER OR BY

SEPARATE CONTRACTORS

1.1.4, 6

Construction Change Directive, Definition of

7.3.1

Construction Change Directives

1.1.1, 3.4.2, 3.11, 3.12.8, 4.2.8, 7.1.1, 7.1.2, 7.1.3, 7.3, 9.3.1.1

Construction Schedules, Contractor’s

3.10, 3.11, 3.12.1, 3.12.2, 6.1.3, 15.1.6.2

Contingent Assignment of Subcontracts

5.4, 14.2.2.2

Continuing Contract Performance

15.1.4

Contract, Definition of

1.1.2

CONTRACT, TERMINATION OR

SUSPENSION OF THE

5.4.1.1, 5.4.2, 11.5, 14

Contract Administration

3.1.3, 4, 9.4, 9.5

Contract Award and Execution, Conditions Relating to

3.7.1, 3.10, 5.2, 6.1

Contract Documents, Copies Furnished and Use of

1.5.2, 2.3.6, 5.3

Contract Documents, Definition of

1.1.1

Contract Sum

2.2.2, 2.2.4, 3.7.4, 3.7.5, 3.8, 3.10.2, 5.2.3, 7.3, 7.4, 9.1, 9.2, 9.4.2, 9.5.1.4, 9.6.7, 9.7, 10.3.2, 11.5, 12.1.2, 12.3, 14.2.4, 14.3.2, 15.1.4.2, 15.1.5, 15.2.5

Contract Sum, Definition of

9.1

Contract Time

1.1.4, 2.2.1, 2.2.2, 3.7.4, 3.7.5, 3.10.2, 5.2.3, 6.1.5, 7.2.1.3, 7.3.1, 7.3.5, 7.3.6, 7, 7, 7.3.10, 7.4, 8.1.1, 8.2.1, 8.2.3, 8.3.1, 9.5.1, 9.7, 10.3.2, 12.1.1, 12.1.2, 14.3.2, 15.1.4.2, 15.1.6.1, 15.2.5

Contract Time, Definition of

8.1.1

CONTRACTOR

Contractor, Definition of

3.1, 6.1.2

Contractor’s Construction and Submittal

Schedules

3.10, 3.12.1, 3.12.2, 4.2.3, 6.1.3, 15.1.6.2

AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 16:42:37 ET on 02/05/2024 under Order No.3104239940 which expires on 12/04/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents®

Contractor’s Employees

2.2.4, 3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3, 11.3, 14.1, 14.2.1.1

Contractor’s Liability Insurance

11.1

Contractor’s Relationship with Separate Contractors and Owner’s Forces

3.12.5, 3.14.2, 4.2.4, 6, 11.3, 12.2.4

Contractor’s Relationship with Subcontractors

1.2.2, 2.2.4, 3.3.2, 3.18.1, 3.18.2, 4.2.4, 5, 9.6.2, 9.6.7, 9.10.2, 11.2, 11.3, 11.4

Contractor’s Relationship with the Architect

1.1.2, 1.5, 2.3.3, 3.1.3, 3.2.2, 3.2.3, 3.2.4, 3.3.1, 3.4.2, 3.5.1, 3.7.4, 3.10, 3.11, 3.12, 3.16, 3.18, 4.2, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 12, 13.4, 15.1.3, 15.2.1

Contractor’s Representations

3.2.1, 3.2.2, 3.5, 3.12.6, 6.2.2, 8.2.1, 9.3.3, 9.8.2

Contractor’s Responsibility for Those Performing the

Work

3.3.2, 3.18, 5.3, 6.1.3, 6.2, 9.5.1, 10.2.8

Contractor’s Review of Contract Documents

3.2

Contractor’s Right to Stop the Work

2.2.2, 9.7

Contractor’s Right to Terminate the Contract

14.1

Contractor’s Submittals

3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 9.2, 9.3, 9.8.2, 9.8.3, 9.9.1, 9.10.2, 9.10.3

Contractor’s Superintendent

3.9, 10.2.6

Contractor’s Supervision and Construction

Procedures

1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4, 7.1.3, 7.3.4, 7.3.6, 8.2, 10, 12, 14, 15.1.4

Coordination and Correlation

1.2, 3.2.1, 3.3.1, 3.10, 3.12.6, 6.1.3, 6.2.1

Copies Furnished of Drawings and Specifications

1.5, 2.3.6, 3.11

Copyrights

1.5, 3.17

Correction of Work

2.5, 3.7.3, 9.4.2, 9.8.2, 9.8.3, 9.9.1, 12.1.2, 12.2, 12.3, 15.1.3.1, 15.1.3.2, 15.2.1

Correlation and Intent of the Contract Documents

1.2

Cost, Definition of

7.3.4

Costs

2.5, 3.2.4, 3.7.3, 3.8.2, 3.15.2, 5.4.2, 6.1.1, 6.2.3, 7.3.3.3, 7.3.4, 7.3.8, 7.3.9, 9.10.2, 10.3.2, 10.3.6, 11.2, 12.1.2, 12.2.1, 12.2.4, 13.4, 14

Cutting and Patching

3.14, 6.2.5

Damage to Construction of Owner or Separate

Contractors

3.14.2, 6.2.4, 10.2.1.2, 10.2.5, 10.4, 12.2.4

Damage to the Work

3.14.2, 9.9.1, 10.2.1.2, 10.2.5, 10.4, 12.2.4

Damages, Claims for

3.2.4, 3.18, 6.1.1, 8.3.3, 9.5.1, 9.6.7, 10.3.3, 11.3.2, 11.3, 14.2.4, 15.1.7

Damages for Delay

6.2.3, 8.3.3, 9.5.1.6, 9.7, 10.3.2, 14.3.2

Date of Commencement of the Work, Definition of

8.1.2

Date of Substantial Completion, Definition of

8.1.3

Day, Definition of

8.1.4

Decisions of the Architect

3.7.4, 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 6.3, 7.3.4, 7.3.9, 8.1.3, 8.3.1, 9.2, 9.4, 9.5.1, 9.8.4, 9.9.1, 13.4.2, 14.2.2, 14.2.4, 15.1, 15.2

Decisions to Withhold Certification

9.4.1, 9.5, 9.7, 14.1.1.3

Defective or Nonconforming Work, Acceptance, Rejection and Correction of

2.5, 3.5, 4.2.6, 6.2.3, 9.5.1, 9.5.3, 9.6.6, 9.8.2, 9.9.3, 9.10.4, 12.2.1

Definitions

1.1, 2.1.1, 3.1.1, 3.5, 3.12.1, 3.12.2, 3.12.3, 4.1.1, 5.1, 6.1.2, 7.2.1, 7.3.1, 8.1, 9.1, 9.8.1, 15.1.1

Delays and Extensions of Time

3.2, 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4, 8.3, 9.5.1, 9.7, 10.3.2, 10.4, 14.3.2, 15.1.6, 15.2.5

Digital Data Use and Transmission

1.7

Disputes

6.3, 7.3.9, 15.1, 15.2

Documents and Samples at the Site

3.11

Drawings, Definition of

1.1.5

Drawings and Specifications, Use and Ownership of

3.11

Effective Date of Insurance

8.2.2

Emergencies

10.4, 14.1.1.2, 15.1.5

Employees, Contractor’s

3.3.2, 3.4.3, 3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, 10.3.3, 11.3, 14.1, 14.2.1.1

Equipment, Labor, or Materials

1.1.3, 1.1.6, 3.4, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 4.2.6, 4.2.7, 5.2.1, 6.2.1, 7.3.4, 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2

Execution and Progress of the Work

1.1.3, 1.2.1, 1.2.2, 2.3.4, 2.3.6, 3.1, 3.3.1, 3.4.1, 3.7.1, 3.10.1, 3.12, 3.14, 4.2, 6.2.2, 7.1.3, 7.3.6, 8.2, 9.5.1, 9.9.1, 10.2, 10.3, 12.1, 12.2, 14.2, 14.3.1, 15.1.4

AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 16:42:37 ET on 02/05/2024 under Order No.3104239940 which expires on 12/04/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents®

Extensions of Time

3.2.4, 3.7.4, 5.2.3, 7.2.1, 7.3, 7.4, 9.5.1, 9.7, 10.3.2, 10.4, 14.3, 15.1.6, 15.2.5

Failure of Payment

9.5.1.3, 9.7, 9.10.2, 13.5, 14.1.1.3, 14.2.1.2

Faulty Work

(See Defective or Nonconforming Work)

Final Completion and Final Payment

4.2.1, 4.2.9, 9.8.2, 9.10, 12.3, 14.2.4, 14.4.3

Financial Arrangements, Owner’s

2.2.1, 13.2.2, 14.1.1.4

GENERAL PROVISIONS

Governing Law

13.1

Guarantees (See Warranty)

Hazardous Materials and Substances

10.2.4, 10.3

Identification of Subcontractors and Suppliers

5.2.1

Indemnification

3.17, 3.18, 9.6.8, 9.10.2, 10.3.3, 11.3

Information and Services Required of the Owner

2.1.2, 2.2, 2.3, 3.2.2, 3.12.10.1, 6.1.3, 6.1.4, 6.2.5, 9.6.1, 9.9.2, 9.10.3, 10.3.3, 11.2, 13.4.1, 13.4.2, 14.1.1.4, 14.1.4, 15.1.4

Initial Decision

15.2

Initial Decision Maker, Definition of

1.1.8

Initial Decision Maker, Decisions

14.2.4, 15.1.4.2, 15.2.1, 15.2.2, 15.2.3, 15.2.4, 15.2.5

Initial Decision Maker, Extent of Authority

14.2.4, 15.1.4.2, 15.2.1, 15.2.2, 15.2.3, 15.2.4, 15.2.5

Injury or Damage to Person or Property

10.2.8, 10.4

Inspections

3.1.3, 3.3.3, 3.7.1, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 12.2.1, 13.4

Instructions to Bidders

1.1.1

Instructions to the Contractor

3.2.4, 3.3.1, 3.8.1, 5.2.1, 7, 8.2.2, 12, 13.4.2

Instruments of Service, Definition of

1.1.7

Insurance

6.1.1, 7.3.4, 8.2.2, 9.3.2, 9.8.4, 9.9.1, 9.10.2, 10.2.5, 11

Insurance, Notice of Cancellation or Expiration

11.1.4, 11.2.3

Insurance, Contractor’s Liability

11.1

Insurance, Effective Date of

8.2.2, 14.4.2

Insurance, Owner’s Liability

11.2

Insurance, Property

10.2.5, 11.2, 11.4, 11.5

Insurance, Stored Materials

9.3.2

INSURANCE AND BONDS

Insurance Companies, Consent to Partial Occupancy

9.9.1

Insured loss, Adjustment and Settlement of

11.5

Intent of the Contract Documents

1.2.1, 4.2.7, 4.2.12, 4.2.13

Interest

13.5

Interpretation

1.1.8, 1.2.3, 1.4, 4.1.1, 5.1, 6.1.2, 15.1.1

Interpretations, Written

4.2.11, 4.2.12

Judgment on Final Award

15.4.2

Labor and Materials, Equipment

1.1.3, 1.1.6, 3.4, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 5.2.1, 6.2.1, 7.3.4, 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2

Labor Disputes

8.3.1

Laws and Regulations

1.5, 2.3.2, 3.2.3, 3.2.4, 3.6, 3.7, 3.12.10, 3.13, 9.6.4, 9.9.1, 10.2.2, 13.1, 13.3.1, 13.4.2, 13.5, 14, 15.2.8, 15.4

Liens

2.1.2, 9.3.1, 9.3.3, 9.6.8, 9.10.2, 9.10.4, 15.2.8

Limitations, Statutes of

12.2.5, 15.1.2, 15.4.1.1

Limitations of Liability

3.2.2, 3.5, 3.12.10, 3.12.10.1, 3.17, 3.18.1, 4.2.6, 4.2.7, 6.2.2, 9.4.2, 9.6.4, 9.6.7, 9.6.8, 10.2.5, 10.3.3, 11.3, 12.2.5, 13.3.1

Limitations of Time

2.1.2, 2.2, 2.5, 3.2.2, 3.10, 3.11, 3.12.5, 3.15.1, 4.2.7, 5.2, 5.3, 5.4.1, 6.2.4, 7.3, 7.4, 8.2, 9.2, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 9.10, 12.2, 13.4, 14, 15, 15.1.2, 15.1.3, 15.1.5

Materials, Hazardous

10.2.4, 10.3

Materials, Labor, Equipment and

1.1.3, 1.1.6, 3.4.1, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 3.15.1, 5.2.1, 6.2.1, 7.3.4, 9.3.2, 9.3.3, 9.5.1.3, 9.10.2, 10.2.1.2, 10.2.4, 14.2.1.1, 14.2.1.2

Means, Methods, Techniques, Sequences and

Procedures of Construction

3.3.1, 3.12.10, 4.2.2, 4.2.7, 9.4.2

Mechanic’s Lien

2.1.2, 9.3.1, 9.3.3, 9.6.8, 9.10.2, 9.10.4, 15.2.8

Mediation

8.3.1, 15.1.3.2, 15.2.1, 15.2.5, 15.2.6, 15.3, 15.4.1, 15.4.1.1

Minor Changes in the Work

1.1.1, 3.4.2, 3.12.8, 4.2.8, 7.1, 7.4

AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 16:42:37 ET on 02/05/2024 under Order No.3104239940 which expires on 12/04/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents®

MISCELLANEOUS PROVISIONS

Modifications, Definition of

1.1.1

Modifications to the Contract

1.1.1, 1.1.2, 2.5, 3.11, 4.1.2, 4.2.1, 5.2.3, 7, 8.3.1, 9.7, 10.3.2

Mutual Responsibility

6.2

Nonconforming Work, Acceptance of

9.6.6, 9.9.3, 12.3

Nonconforming Work, Rejection and Correction of

2.4, 2.5, 3.5, 4.2.6, 6.2.4, 9.5.1, 9.8.2, 9.9.3, 9.10.4, 12.2

Notice

1.6, 1.6.1, 1.6.2, 2.1.2, 2.2.2., 2.2.3, 2.2.4, 2.5, 3.2.4, 3.3.1, 3.7.4, 3.7.5, 3.9.2, 3.12.9, 3.12.10, 5.2.1, 7.4,

8.2.2 9.6.8, 9.7, 9.10.1, 10.2.8, 10.3.2, 11.5, 12.2.2.1, 13.4.1, 13.4.2, 14.1, 14.2.2, 14.4.2, 15.1.3, 15.1.5, 15.1.6, 15.4.1

Notice of Cancellation or Expiration of Insurance

11.1.4, 11.2.3

Notice of Claims

1.6.2, 2.1.2, 3.7.4, 9.6.8, 10.2.8, 15.1.3, 15.1.5, 15.1.6, 15.2.8, 15.3.2, 15.4.1

Notice of Testing and Inspections

13.4.1, 13.4.2

Observations, Contractor’s

3.2, 3.7.4

Occupancy

2.3.1, 9.6.6, 9.8

Orders, Written

1.1.1, 2.4, 3.9.2, 7, 8.2.2, 11.5, 12.1, 12.2.2.1, 13.4.2, 14.3.1

OWNER

Owner, Definition of

2.1.1

Owner, Evidence of Financial Arrangements

2.2, 13.2.2, 14.1.1.4

Owner, Information and Services Required of the

2.1.2, 2.2, 2.3, 3.2.2, 3.12.10, 6.1.3, 6.1.4, 6.2.5, 9.3.2, 9.6.1, 9.6.4, 9.9.2, 9.10.3, 10.3.3, 11.2, 13.4.1, 13.4.2, 14.1.1.4, 14.1.4, 15.1.4

Owner’s Authority

1.5, 2.1.1, 2.3.32.4, 2.5, 3.4.2, 3.8.1, 3.12.10, 3.14.2, 4.1.2, 4.2.4, 4.2.9, 5.2.1, 5.2.4, 5.4.1, 6.1, 6.3, 7.2.1, 7.3.1, 8.2.2, 8.3.1, 9.3.2, 9.5.1, 9.6.4, 9.9.1, 9.10.2, 10.3.2, 11.4, 11.5, 12.2.2, 12.3, 13.2.2, 14.3, 14.4, 15.2.7

Owner’s Insurance

11.2

Owner’s Relationship with Subcontractors

1.1.2, 5.2, 5.3, 5.4, 9.6.4, 9.10.2, 14.2.2

Owner’s Right to Carry Out the Work

2.5, 14.2.2

Owner’s Right to Clean Up

6.3

Owner’s Right to Perform Construction and to

Award Separate Contracts

6.1

Owner’s Right to Stop the Work

2.4

Owner’s Right to Suspend the Work

14.3

Owner’s Right to Terminate the Contract

14.2, 14.4

Ownership and Use of Drawings, Specifications and Other Instruments of Service

1.1.1, 1.1.6, 1.1.7, 1.5, 2.3.6, 3.2.2, 3.11, 3.17, 4.2.12, 5.3

Partial Occupancy or Use

9.6.6, 9.9

Patching, Cutting and

3.14, 6.2.5

Patents

3.17

Payment, Applications for

4.2.5, 7.3.9, 9.2, 9.3, 9.4, 9.5, 9.6.3, 9.7, 9.8.5, 9.10.1, 14.2.3, 14.2.4, 14.4.3

Payment, Certificates for

4.2.5, 4.2.9, 9.3.3, 9.4, 9.5, 9.6.1, 9.6.6, 9.7, 9.10.1, 9.10.3, 14.1.1.3, 14.2.4

Payment, Failure of

9.5.1.3, 9.7, 9.10.2, 13.5, 14.1.1.3, 14.2.1.2

Payment, Final

4.2.1, 4.2.9, 9.10, 12.3, 14.2.4, 14.4.3

Payment Bond, Performance Bond and

7.3.4.4, 9.6.7, 9.10.3, 11.1.2

Payments, Progress

9.3, 9.6, 9.8.5, 9.10.3, 14.2.3, 15.1.4

PAYMENTS AND COMPLETION

Payments to Subcontractors

5.4.2, 9.5.1.3, 9.6.2, 9.6.3, 9.6.4, 9.6.7, 14.2.1.2

PCB

10.3.1

Performance Bond and Payment Bond

7.3.4.4, 9.6.7, 9.10.3, 11.1.2

Permits, Fees, Notices and Compliance with Laws

2.3.1, 3.7, 3.13, 7.3.4.4, 10.2.2

PERSONS AND PROPERTY, PROTECTION OF

Polychlorinated Biphenyl

10.3.1

Product Data, Definition of

3.12.2

Product Data and Samples, Shop Drawings

3.11, 3.12, 4.2.7

Progress and Completion

4.2.2, 8.2, 9.8, 9.9.1, 14.1.4, 15.1.4

Progress Payments

9.3, 9.6, 9.8.5, 9.10.3, 14.2.3, 15.1.4

AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 16:42:37 ET on 02/05/2024 under Order No.3104239940 which expires on 12/04/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents®

Project, Definition of

1.1.4

Project Representatives

4.2.10

Property Insurance

10.2.5, 11.2

Proposal Requirements

1.1.1

PROTECTION OF PERSONS AND PROPERTY

Regulations and Laws

1.5, 2.3.2, 3.2.3, 3.6, 3.7, 3.12.10, 3.13, 9.6.4, 9.9.1, 10.2.2, 13.1, 13.3, 13.4.1, 13.4.2, 13.5, 14, 15.2.8, 15.4

Rejection of Work

4.2.6, 12.2.1

Releases and Waivers of Liens

9.3.1, 9.10.2

Representations

3.2.1, 3.5, 3.12.6, 8.2.1, 9.3.3, 9.4.2, 9.5.1, 9.10.1

Representatives

2.1.1, 3.1.1, 3.9, 4.1.1, 4.2.10, 13.2.1

Responsibility for Those Performing the Work

3.3.2, 3.18, 4.2.2, 4.2.3, 5.3, 6.1.3, 6.2, 6.3, 9.5.1, 10

Retainage

9.3.1, 9.6.2, 9.8.5, 9.9.1, 9.10.2, 9.10.3

Review of Contract Documents and Field

Conditions by Contractor

3.2, 3.12.7, 6.1.3

Review of Contractor’s Submittals by Owner and

Architect

3.10.1, 3.10.2, 3.11, 3.12, 4.2, 5.2, 6.1.3, 9.2, 9.8.2

Review of Shop Drawings, Product Data and Samples by Contractor

3.12

Rights and Remedies

1.1.2, 2.4, 2.5, 3.5, 3.7.4, 3.15.2, 4.2.6, 5.3, 5.4, 6.1, 6.3, 7.3.1, 8.3, 9.5.1, 9.7, 10.2.5, 10.3, 12.2.1, 12.2.2, 12.2.4, 13.3, 14, 15.4

Royalties, Patents and Copyrights

3.17

Rules and Notices for Arbitration

15.4.1

Safety of Persons and Property

10.2, 10.4

Safety Precautions and Programs

3.3.1, 4.2.2, 4.2.7, 5.3, 10.1, 10.2, 10.4

Samples, Definition of

3.12.3

Samples, Shop Drawings, Product Data and

3.11, 3.12, 4.2.7

Samples at the Site, Documents and

3.11

Schedule of Values

9.2, 9.3.1

Schedules, Construction

3.10, 3.12.1, 3.12.2, 6.1.3, 15.1.6.2

Separate Contracts and Contractors

1.1.4, 3.12.5, 3.14.2, 4.2.4, 4.2.7, 6, 8.3.1, 12.1.2

Separate Contractors, Definition of

6.1.1

Shop Drawings, Definition of

3.12.1

Shop Drawings, Product Data and Samples

3.11, 3.12, 4.2.7

Site, Use of

3.13, 6.1.1, 6.2.1

Site Inspections

3.2.2, 3.3.3, 3.7.1, 3.7.4, 4.2, 9.9.2, 9.4.2, 9.10.1, 13.4

Site Visits, Architect’s

3.7.4, 4.2.2, 4.2.9, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.4

Special Inspections and Testing

4.2.6, 12.2.1, 13.4

Specifications, Definition of

1.1.6

Specifications

1.1.1, 1.1.6, 1.2.2, 1.5, 3.12.10, 3.17, 4.2.14

Statute of Limitations

15.1.2, 15.4.1.1

Stopping the Work

2.2.2, 2.4, 9.7, 10.3, 14.1

Stored Materials

6.2.1, 9.3.2, 10.2.1.2, 10.2.4

Subcontractor, Definition of

5.1.1

SUBCONTRACTORS

Subcontractors, Work by

1.2.2, 3.3.2, 3.12.1, 3.18, 4.2.3, 5.2.3, 5.3, 5.4, 9.3.1.2, 9.6.7

Subcontractual Relations

5.3, 5.4, 9.3.1.2, 9.6, 9.10, 10.2.1, 14.1, 14.2.1

Submittals

3.10, 3.11, 3.12, 4.2.7, 5.2.1, 5.2.3, 7.3.4, 9.2, 9.3, 9.8, 9.9.1, 9.10.2, 9.10.3

Submittal Schedule

3.10.2, 3.12.5, 4.2.7

Subrogation, Waivers of

6.1.1, 11.3

Substances, Hazardous

10.3

Substantial Completion

4.2.9, 8.1.1, 8.1.3, 8.2.3, 9.4.2, 9.8, 9.9.1, 9.10.3, 12.2, 15.1.2

Substantial Completion, Definition of

9.8.1

Substitution of Subcontractors

5.2.3, 5.2.4

Substitution of Architect

2.3.3

Substitutions of Materials

3.4.2, 3.5, 7.3.8

Sub-subcontractor, Definition of

5.1.2

AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 16:42:37 ET on 02/05/2024 under Order No.3104239940 which expires on 12/04/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents®

Subsurface Conditions

3.7.4

Successors and Assigns

13.2

Superintendent

3.9, 10.2.6

Supervision and Construction Procedures

1.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1.3, 6.2.4, 7.1.3, 7.3.4, 8.2, 8.3.1, 9.4.2, 10, 12, 14, 15.1.4

Suppliers

1.5, 3.12.1, 4.2.4, 4.2.6, 5.2.1, 9.3, 9.4.2, 9.5.4, 9.6, 9.10.5, 14.2.1

Surety

5.4.1.2, 9.6.8, 9.8.5, 9.10.2, 9.10.3, 11.1.2, 14.2.2, 15.2.7

Surety, Consent of

9.8.5, 9.10.2, 9.10.3

Surveys

1.1.7, 2.3.4

Suspension by the Owner for Convenience

14.3

Suspension of the Work

3.7.5, 5.4.2, 14.3

Suspension or Termination of the Contract

5.4.1.1, 14

Taxes

3.6, 3.8.2.1, 7.3.4.4

Termination by the Contractor

14.1, 15.1.7

Termination by the Owner for Cause

5.4.1.1, 14.2, 15.1.7

Termination by the Owner for Convenience

14.4

Termination of the Architect

2.3.3

Termination of the Contractor Employment

14.2.2

TERMINATION OR SUSPENSION OF THE

CONTRACT

Tests and Inspections

3.1.3, 3.3.3, 3.7.1, 4.2.2, 4.2.6, 4.2.9, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 10.3.2, 12.2.1, 13.4

TIME

Time, Delays and Extensions of

3.2.4, 3.7.4, 5.2.3, 7.2.1, 7.3.1, 7.4, 8.3, 9.5.1, 9.7, 10.3.2, 10.4, 14.3.2, 15.1.6, 15.2.5

Time Limits

2.1.2, 2.2, 2.5, 3.2.2, 3.10, 3.11, 3.12.5, 3.15.1, 4.2, 5.2, 5.3, 5.4, 6.2.4, 7.3, 7.4, 8.2, 9.2, 9.3.1, 9.3.3, 9.4.1, 9.5, 9.6, 9.7, 9.8, 9.9, 9.10, 12.2, 13.4, 14, 15.1.2, 15.1.3, 15.4

Time Limits on Claims

3.7.4, 10.2.8, 15.1.2, 15.1.3

Title to Work

9.3.2, 9.3.3

UNCOVERING AND CORRECTION OF WORK

Uncovering of Work

12.1

Unforeseen Conditions, Concealed or Unknown

3.7.4, 8.3.1, 10.3

Unit Prices

7.3.3.2, 9.1.2

Use of Documents

1.1.1, 1.5, 2.3.6, 3.12.6, 5.3

Use of Site

3.13, 6.1.1, 6.2.1

Values, Schedule of

9.2, 9.3.1

Waiver of Claims by the Architect

13.3.2

Waiver of Claims by the Contractor

9.10.5, 13.3.2, 15.1.7

Waiver of Claims by the Owner

9.9.3, 9.10.3, 9.10.4, 12.2.2.1, 13.3.2, 14.2.4, 15.1.7

Waiver of Consequential Damages

14.2.4, 15.1.7

Waiver of Liens

9.3, 9.10.2, 9.10.4

Waivers of Subrogation

6.1.1, 11.3

Warranty

3.5, 4.2.9, 9.3.3, 9.8.4, 9.9.1, 9.10.2, 9.10.4, 12.2.2, 15.1.2

Weather Delays

8.3, 15.1.6.2

Work, Definition of

1.1.3

Written Consent

1.5.2, 3.4.2, 3.7.4, 3.12.8, 3.14.2, 4.1.2, 9.3.2, 9.10.3, 13.2, 13.3.2, 15.4.4.2

Written Interpretations

4.2.11, 4.2.12

Written Orders

1.1.1, 2.4, 3.9, 7, 8.2.2, 12.1, 12.2, 13.4.2, 14.3.1

AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 16:42:37 ET on 02/05/2024 under Order No.3104239940 which expires on 12/04/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents®

ARTICLE 1 GENERAL PROVISIONS

§ 1.1 Basic Definitions § 1.1.1 The Contract Documents The Contract Documents are enumerated in the Agreement between the Owner and Contractor (hereinafter the

Agreement) and consist of the Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of the Contract, other documents listed in the Agreement, and Modifications issued after execution of the Contract. A Modification is (1) a written amendment to the Contract signed by both parties, (2) a Change Order, (3) a Construction Change Directive, or (4) a written order for a minor change in the Work issued by the Architect. Unless specifically enumerated in the Agreement, the Contract

Documents do not include the advertisement or invitation to bid, Instructions to Bidders, sample forms, other information furnished by the Owner in anticipation of receiving bids or proposals, the Contractor’s bid or proposal, or portions of Addenda relating to bidding or proposal requirements.

§ 1.1.2 The Contract The Contract Documents form the Contract for Construction. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral. The Contract may be amended or modified only by a Modification. The Contract Documents shall not be construed to create a contractual relationship of any kind (1) between the Contractor and the Architect or the

Architect’s consultants, (2) between the Owner and a Subcontractor or a Sub-subcontractor, (3) between the Owner and…