2024 01 25 GISD Transition Center Boiler Replacement Addendum #1.pdf

PDF 102 KB Posted

Attached to
Transition Center Boiler Replacement
Solicitation number
RFP - GIS - 240000000931
Issued by
Genesee County, Flint City, Michigan

About this file

This document is Addendum #1 to the GISD Transition Center Boiler Replacement project, which is being managed by UBS Project No. 034.23.03 in Genesee County, Michigan and the City of Flint. The addendum clarifies that the mechanical contractor shall act as the "General Contractor" and is responsible for coordinating all necessary trades to deliver a completed product to the owner. It also specifies that the fire/smoke alarm work shall be completed by Siemens Controls, and the temperature controls work shall be completed by All Area Mechanical LLC. The addendum further addresses questions received during the bidding process, including allowing Thirdcoast TAB to bid as the TAB Agency and providing guidance on alternative boiler manufacturers.

The project requires the mechanical contractor to be responsible for the boiler replacement work, including coordination of carpentry, fire alarm, temperature controls, electrical, and structural trades. The project is scheduled to be bid on January 30, 2024, and the addendum indicates that no further questions will be accepted prior to the bid opening.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum #1

PROJECT: GISD Transition Center Boiler Replacement

UBS PROJECT NO: 034.23.03

DATE OF ADDENDUM: 01.25.2024

1. The mechanical contractor shall act as the “General Contractor” on this project and is responsible to contain all necessary trades including but not limited carpentry, fire alarm, temperature controls, electrical, structural, etc. to deliver a completed product to the owner.

2. Fire/Smoke Alarm scope is a siemens system. All fire/smoke alarm work shall be completed by

Siemens controls and carried by the mechanical contractor. Please contact Tom Kidder at Siemens for a direct quote. Tom.Kidder@siemens.com.

3. The temperature controls system is Carrier. All temperature controls work shall be completed by

All Area Mechanical LLC. Please contact Gary Mckay for a direct quote.

GM@allareamechanical.com.

4. The following questions were addressed during the bidding process. No more questions will be received/responded prior to bid opening on 01/30/2024.

1. We are requesting to be included as a bidder for Spec 23 0593 (Testing, Adjusting, and

Balancing) for the Genesee ISD Transition Center Boiler Replacement project. We meet the TAB Agency qualifications in that we specialize in the testing, adjusting, and balancing of systems specified in that section and we are certified by NEBB, the National Environmental Balancing Bureau. In addition, we have completed or are working on projects in school systems throughout the state including Flint and the surrounding area.

i. Response: Thirdcoast TAB to be allowed as bidder. Contact: Carol Helsel – chelsel@thirdcoasttab.com .

2. Is an alternative boiler manufacturer allowed?

i. Response: Refer to specifications for allowed manufacturers. If a voluntary deduct is offered for a manufacturer deviation. Please provide the add/deduct cost associated.