20220237-WQ InfrastructureCompleteSetSealed-R2-2.pdf
PDF 40 MB Posted
- Attached to
- Water Quality Infrastructure Improvements
- Solicitation number
- 202578378
- Issued by
- Denver County, Denver City, Colorado
About this file
The document is a comprehensive 100% design phase set of engineering plans and technical specifications for the Denver International Airport (DEN) Water Quality Infrastructure Improvements project, prepared by SurvWest, LLC and Shrewsberry & Associates, LLC. The project involves constructing two distinct water quality and detention pond sites: a regional water quality pond southwest of the 75th Avenue and Gun Club Road intersection, and a consolidated water quality pond north of the WorldPort #12 Building. The design documents, dated January 21, 2025, include detailed engineering drawings, erosion control plans, site grading, stormwater drainage improvements, and specifications for decommissioning existing water quality ponds. The project is driven by DEN's annual erosion control Capital Improvement Plan (CIP) to improve stormwater infrastructure in compliance with Denver Revised Municipal Code.
The project encompasses extensive civil engineering work, including earthwork, grading, storm drainage line construction, concrete work, and erosion control measures across approximately 140 acres. The first site will eliminate three existing water quality ponds, while the second site will consolidate and replace two existing ponds. The design set includes detailed technical specifications for pond construction, outlet structures, maintenance roads, forebays, erosion control, and site restoration. The technical documents provide comprehensive guidance for contractors, including installation requirements, materials specifications, erosion control phasing, seeding mixes, and construction sequencing. The project appears to be funded through the airport's capital improvement budget and is part of the airport's ongoing infrastructure enhancement and environmental compliance efforts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB 202578378 Final v2.pdf | ||
| Division 2 - DEN WQ Improvements IFB.pdf | ||
| Summary of Quantities IFB - Water Quality Infrastructure Improvements.xlsx | XLSX spreadsheet | |
| Division 1 - DEN WQ Improvements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Denver International Airport
100% DESIGN PHASE
Issue Date: Jan. 21, 2025
WATER QUALITY INFRASTRUCTURE IMPROVEMENTS
SECOND CREEK REGIONAL POND & WORLDPORT POND
SurvWest, LLC
6501 EAST BELLEVIEW AVE., SUITE 300
ENGLEWOOD, CO 80111
720-259-9316 www.survwest.com
Shrewsberry & Associates, LLC
2696 SOUTH COLORADO BLVD, SUITE 460
DENVER, COLORADO 80222
720-235-0605 www.shrewsusa.com
DESIGN CONTRACT NO.: 202265738
1670 BROADWAY, SUITE 3400
DENVER, CO 80202-4824
(303)-764-1520 www.hdrinc.com
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DESIGNER OF RECORD
20220237-1SCOV-01
W
AT
ER
Q
U
AL
IT
Y
IN
FR
AS
TR
U C
TU
R
E
IM
PR
O
VE
M
EN
TS
AS INDICATED
JAN. 21, 2025
HFST
X-XX-XXXX-XXX-XXXX
202265738
TBD
20220237-1SCOV-01
FRD
COVER SHEET
C001
Sheet Index Sheet Number Sheet Title
C001 COVER SHEET
C002 DEN GENERAL NOTES
C003-C004
C101-C104 SURVEY CONTROL DIAGRAM
C201 OVERALL POND SITE
C202 SECOND CREEK REGIONAL WQ POND
C203 WORLDPORT WQ POND
C300-C301 DITCH PLAN AND PROFILES
C302-C305 STORM PLAN & PROFILES
C204 GUN CLUB ON RAMP & SITE READINESS POND DECOMMISSION
C205 75th AVE POND DECOMMISSION
C206 WORLDPORT POND DECOMMISSION
C500 SECOND CREEK POND DETAILS
C501 WORLDPORT POND DETAILS
C900 EROSION CONTROL GENERAL NOTES
C901 EROSION CONTROL PHASING NOTES
C902 EROSION CONTROL KEY MAP
C903-C907 INITIAL-INTERIM EROSION CONTROL
C908-C911 FINAL EROSION CONTROL
STANDARD PLANS LIST
C502 STORM DETAILS
C006
SAQ SECOND CREEK & WORLDPORT PLANS
C400 SECOND CREEK REGIONAL WQ FOREBAY DETAILS
C401 WORLDPORT WQ FOREBAY DETAILS
C402 SECOND CREEK REGIONAL WQ MAINTENANCE ROAD
C207-C208 SECOND CREEK POND SECTIONS
C209-C210 WORLDPORT POND SECTIONS
SECOND CREEK REGIONAL OUTLET DETAILS
WORLDPORT OUTLET DETAILS
C503-C504
C505-C506
C600-C601 SECOND CREEK REGIONAL POND FOREBAY DETAILS
C602-C603 WORLDPORT POND FOREBAY DETAILS
C604 SECOND CREEK POND DETAILS
C605-C608 SECOND CREEK OUTLET DETAILS
C609-C610 WORLDPORT OUTLET DETAILS
C005 TABULATIONS
1 63
1/15/25
Lovema Architect
CCD PROJECT MASTER: 2025-PM-0000049
CCD EROSION CONTROL PERMIT: 2025-EC-0000016
1. THE CONTRACTOR SHALL HAVE ONSITE AT ALL TIMES, ONE COPY OF THE APPROVED PLANS, ONE COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND COPIES OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB.
2. PRIOR TO THE START OF CONSTRUCTION, THE DEN PM SHALL HOLD A PRE-CONSTRUCTION MEETING.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL NECESSARY PERMITS ARE IN PLACE PRIOR TO BEGINNING ANY WORK AND OBTAINING A DEWATERING PERMIT IF WATER IS ENCOUNTERED WHILE DOING UNDERGROUND EXCAVATIONS. NO ADDITIONAL TIME WILL BE ALLOTTED TO OBTAIN ANY PERMITS, AND NO ADDITIONAL COMPENSATION SHALL BE PAID FOR ANY FEES AND WORK, BUT SUCH COSTS SHALL BE INCLUDED IN THE WORK. CONTRACTOR SHALL SUBMIT THE SOP PERMIT APPLICATION TO
DENVER ROWS MINIMUM OF 7 DAYS PRIOR TO NEEDING THE PERMIT.
4. THE CONTRACTOR IS RESPONSIBLE FOR BEING AWARE OF, NOTIFYING, COORDINATING AND SCHEDULING ALL INSPECTIONS REQUIRED FOR FINAL APPROVALS AND PROJECT ACCEPTANCE. ALL WORK, INCLUDING CORRECTION WORK, IS SUBJECT TO
NOTIFICATION AND INSPECTION REQUIREMENTS.
5. PROPOSED FINISHED GROUND ELEVATIONS FOR ITEMS TO BE ADJUSTED, RESET, OR MODIFIED SHALL BE FIELD VERIFIED BY THE
CONTRACTOR.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY.
7. THE CONTRACTOR SHOULD REMOVE MATERIALS AND EQUIPMENT FROM THE ROADWAY RIGHT-OF-WAY AT THE CLOSE OF DAILY OPERATIONS. THE TRAFFIC CONTROL PLAN (TCP) MUST INCLUDE PROTECTIVE MEASURES WHERE MATERIALS AND EQUIPMENT MAY BE STORED IN THE RIGHT-OF-WAY, AND SHALL ENSURE A MINIMUM OF FIVE FEET OF PEDESTRIAN CLEARANCE ON SIDEWALKS. THE
CONTRACTOR SHALL NOT STOCKPILE MATERIAL IN THE CLEAR ZONE OF THE TRAVELED WAY.
8. ALL EQUIPMENT IS TO REMAIN ON THE ROAD SURFACE, PAVED PARKING AREAS, OR AREAS OF DISTURBANCE AS SHOWN ON THE PLANS. ANY OFF-ROAD STAGING AREAS MUST BE PRE-APPROVED BY THE ENGINEER. IF THE ENGINEER APPROVES A STAGING AREA, IT MUST BE RETURNED TO ITS EXISTING CONDITION OR BETTER AFTER IT IS NO LONGER NEEDED AT NO ADDITIONAL COST TO THE
PROJECT.
9. IF ANY OF THE CONTRACTOR'S OPERATIONS DESTROY OR DAMAGE ANY PROPERTY, PUBLIC OR PRIVATE, THE CONTRACTOR SHALL PROMPTLY REPAIR OR REPLACE SUCH PROPERTY, TO THE SATISFACTION OF THE PROJECT MANAGER, BEFORE THE CITY WILL ACCEPT OR PAY FOR THE WORK PERFORMED UNDER THE CONTRACT. IF THE CONTRACTOR FAILS TO REPAIR OR REPLACE SUCH PROPERTY, THE CITY, AT THE SOLE DISCRETION OF THE EXECUTIVE DIRECTOR OR DESIGNEE, MAY UNDERTAKE SUCH REPAIR OR REPLACEMENT AND DEDUCT THE COST OF THE SAME FROM AMOUNTS PAYABLE TO THE CONTRACTOR UNDER THE CONTRACT.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF RECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE, AND AVAILABLE TO THE DEN PM AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL SUBMIT RECORD DRAWINGS, IN A PDF OR AN AUTOCAD COMPATIBLE FORMAT, TO THE CITY AS DETERMINED BY THE CITY INSPECTOR.
THE PRODUCTION OF THESE DOCUMENTS WILL NOT BE PAID FOR SEPARATELY, BUT SHALL BE INCLUDED IN THE COST OF THE WORK.
11. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, ALL STORM DRAIN INLETS, LATERALS, MAINS AND OTHER STORM RUNOFF APPURTENANCES WITHIN THE PROJECT LIMITS SHALL BE CLEARED OF SEDIMENT AND DEBRIS IN ACCORDANCE WITH DENVER WASTEWATER MANAGEMENT DEPARTMENT STANDARDS. AFTER CONSTRUCTION, THE CONTRACTOR SHALL REMOVE ANY SEDIMENT
OR DEBRIS FROM THE STORM SEWER SYSTEM AT NO COST TO THE CITY.
12. PRIOR TO FINAL ACCEPTANCE, ALL DISTURBED PORTIONS OF ROADWAY RIGHT-OF-WAY SHALL BE CLEANED UP AND RESTORED TO
THEIR ORIGINAL CONDITION, SUBJECT TO CITY APPROVAL.
13. NO WORK SHALL BE PERMITTED ON WEEKENDS WITHOUT PRIOR AUTHORIZATION OR UNLESS OTHERWISE SPECIFIED. THE CITY MAY RESTRICT WORK IN THE RIGHT-OF-WAY DURING ADVERSE WEATHER CONDITIONS OR DURING PERIODS OF HIGH TRAFFIC VOLUME.
14. NO CLEATED OR TRACKED EQUIPMENT MAY WORK IN OR MOVE OVER PAVED SURFACES WITHOUT MATS.
15. WHERE FENCES IN THE RIGHT-OF-WAY MUST BE REMOVED OR CUT TO FACILITATE CONSTRUCTION, APPROVAL MUST FIRST BE GIVEN BY THE CITY. EXISTING RIGHT-OF-WAY/FENCE LINE MUST BE ESTABLISHED BY GOOD SURVEY PRACTICES. FENCES SHALL BE
REPLACED IN KIND ACCORDING TO CITY FENCING STANDARDS.
16. PROTECTION AND REPLACEMENT OF STREET IMPROVEMENTS ARE THE RESPONSIBILITY OF THE CONTRACTOR UNTIL THESE
IMPROVEMENTS ARE FULLY COMPLETED AND ACCEPTED BY THE CITY.
17. IF DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED ON THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE PROJECT MANAGER IMMEDIATELY.
18. ALL NEW CONSTRUCTION TO BE ADJUSTED IN THE FIELD AS REQUIRED TO ACCOMMODATE EXISTING CONDITIONS, AND TO PROVIDE ADEQUATE DRAINAGE MUST BE APPROVED BY THE PROJECT MANAGER PRIOR TO THE START OF THE WORK.
1. ALL SEWER PIPES SHALL BE INSTALLED WITH CLASS B BEDDING AT A MINIMUM.
2. THE CONTRACTOR PERFORMING WORK ON ANY PUBLIC OR PRIVATE STORM SEWER FACILITY OR APPURTENANCE MUST BE PROPERLY TRADE LICENSED AS A COMPANY AND HAVE A LICENSED PLUMBER OR CERTIFIED JOURNEYMAN DRAINLAYER ON SITE
DURING THE WORK.
3. MATERIALS DELIVERY TO THE SITE: ACCESS MUST BE MAINTAINED FOR ALL SEWER MANHOLES DURING CONSTRUCTION. MINIMUM ACCESS TO EACH MANHOLE IS A 20-FOOT-WIDE LANE FROM THE NEAREST PUBLIC RIGHT-OF-WAY, CENTERED AT THE MANHOLE INCLUDING A TO FOOT RADIUS AROUND THE MANHOLE AND 22.0 FEET OF VERTICAL CLEARANCE.
4. CITY & COUNTY OF DENVER (CCD) STORM AND/OR SANITARY SEWERS HAVE BEEN IDENTIFIED AND LABELED AS SUCH ON THESE
CONSTRUCTION PLANS.
5. ALL CITY & COUNTY OF DENVER (CCD) STORM AND/OR SANITARY SEWERS, INCLUDING MANHOLE ADJUSTMENTS, ARE TO BE INSPECTED BY CCD MAINLINE INSPECTIONS. YOU MUST CALL MAINLINE INSPECTIONS @ (303) 446-3722, A MINIMUM OF 24 HOURS PRIOR TO THE PRECONSTRUCTION MEETING AND PRIOR TO STARTING ANY WORK. SEWER LOCATES CAN BE REQUESTED BY CALLING
(303) 446-3744. ALL CCD STORM AND/OR SANITARY SEWERS MUST BE CONSTRUCTED IN ACCORDANCE WITH CURRENT
CCD-WASTEWATER MANAGEMENT DIVISION (WMD) STANDARD DETAILS AND SPECIFICATIONS.
6. THERE SHALL BE NO STOCKPILING OR SIDE CASTING OF WASTE MATERIAL INCLUDING, BUT NOT LIMITED TO PAINT CHIPS, ASPHALT, OR CONCRETE ADJACENT TO ANY DRAINAGEWAYS (INCLUDING DRY DRAINAGEWAYS). PAINT MATERIAL REMOVED IN THE COURSE OF RESTRIPING SHALL BE PROPERLY CONTAINED AND DISPOSED OF TO PREVENT SUCH MATERIALS FROM ENTERING WATERS OF THE
STATE.
GENERAL NOTES
DRAINAGE
CITY AND COUNTY OF DENVER NOTES
1. ANY DAMAGE TO AN EXISTING STRUCTURE MUST BE REPORTED TO THE DEN PROJECT MANAGER FOR RECORDING.
2. THE CONTRACTOR STAGING AREA MUST BE APPROVED BY THE DEN PROJECT MANAGER PRIOR TO CONSTRUCTION.
3. SPILL KITS ARE REQUIRED FOR FUEL OR LIQUIDS. ANY AMOUNT OF SPILLS SHALL BE REPORTED TO 303-342-4200.
4. CDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION PROJECT SPECIAL PROVISIONS, DEN DIVISION 1 PROVISIONS AND STANDARD SPECIAL PROVISIONS CONTROL THE CONSTRUCTION OF THIS PROJECT. ORDER OF PRECEDENCE FOR SPECIFICATIONS IS AS FOLLOWS: DEN DIVISION 1 PROVISIONS, PROJECT SPECIAL PROVISIONS, STANDARD SPECIAL PROVISIONS, CDOT STANDARD
SPECIFICATIONS, CITY AND COUNTY OF DENVER TRANSPORTATION STANDARDS AND DETAILS.
5. WHEN THE CONTRACT DOES NOT INCLUDE PAY ITEMS FOR ANY WORK OR SUBMITTALS THAT ARE LISTED IN THESE PLANS, THIS WORK
WILL NOT BE PAID FOR SEPARATELY BUT SHALL BE INCLUDED IN THE WORK.
6. THE CONTRACTOR SHALL NOTIFY THE PROJECT MANAGER OF ANY PROBLEM IN CONFORMING TO THE APPROVED PLANS FOR ANY
ELEMENT OF THE PROPOSED IMPROVEMENTS PRIOR TO ITS CONSTRUCTION.
7. ALL MATERIAL USED ON THIS PROJECT SHALL BE ON THE CDOT APPROVED PRODUCTS LIST OR APPROVED BY THE DEN PROJECT
MANAGER PRIOR TO CONSTRUCTION.
8. NO EXCAVATION WORK SHALL BEGIN UNTIL THE CONTRACTOR HAS OBTAINED, AT THEIR EXPENSE, ANY PERMITS REQUIRED TO PERFORM
THE PROPOSED WORK.
9. THE CONTRACTOR SHALL KEEP THE WORK AREA DRY OF STANDING WATER AND SHALL KEEP THE EXCAVATION AREAS FREE FROM STORM
RUNOFF. CONTRACTOR SHALL ADHERE TO ALL PERMIT REQUIREMENTS.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCEPTANCE AND CONTROL OF ALL SURFACE AND SUBSURFACE DRAINAGE AND GROUNDWATER ENTERING THE PROJECT AREA. ANY REWORK OR MATERIALS DUE TO LACK OF THIS MAINTENANCE SHALL BE REPAIRED
AT THE CONTRACTOR'S EXPENSE.
11. THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN THE LIMITS OF DISTURBANCE SHOWN ON THE PLANS. ANY DISTURBANCE BEYOND THESE LIMITS SHALL BE RESTORED TO THE ORIGINAL CONDITION BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. CONSTRUCTION ACTIVITIES IN ADDITION TO THE NORMAL CONSTRUCTION PROCEDURE SHALL INCLUDE THE PARKING OF VEHICLES OR EQUIPMENT, DISPOSAL OF LITTER, AND ANY OTHER ACTION WHICH WOULD ALTER EXISTING CONDITIONS.
12. ANY DAMAGE TO 75TH AVENUE OR GUN CLUB ROAD SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
13. ANY DAMAGE TO PRESENT FACILITIES AND UTILITIES SHALL BE REPAIRED IMMEDIATELY AND PRIOR TO CONTINUING OTHER WORK.
14. ANY MUD OR OTHER MATERIAL TRACKED OR OTHERWISE DEPOSITED ON THE ROADWAY SHALL BE REMOVED DAILY OR AS ORDERED BY
THE DEN PROJECT MANAGER.
15. THE CONTRACTOR SHALL NOT PARK EQUIPMENT OVERNIGHT OUTSIDE THE WORK ZONE LIMITS WITHOUT APPROVED TRAFFIC CONTROL
DEVICES IN PLACE AND THE APPROVAL OF THE DEN PROJECT MANAGER.
16. CONTAINMENT AND CLEAN UP OF EQUIPMENT FUEL, OIL, AND LUBRICANT LEAKS: CONTRACTOR SHALL INSPECT AND CERTIFY EQUIPMENT AND VEHICLES DAILY TO ENSURE PETROLEUM, OILS AND LUBRICANTS (POL) ARE NOT LEAKING ONTO THE SOIL OR PAVEMENT.
ABSORBENT MATERIAL OR CONTAINERS APPROVED BY THE ENGINEER SHALL BE USED TO PREVENT LEAKING POL FROM REACHING THE SOIL OR PAVEMENT. CONTRACTOR SHALL HAVE READY APPROVED ABSORBENT MATERIAL OR CONTAINERS OF SUFFICIENT CAPACITY TO CONTAIN ANY LEAKING POL THAT CAN REASONABLY BE FORESEEN. ALL MATERIALS RESULTING FROM POL LEAKAGE CONTROL AND CLEANUP SHALL BE THE PROPERTY OF THE CONTRACTOR AND REMOVED FROM THE SITE. THE COST FOR CONTROL AND CLEANUP OF POL LEAKS SHALL NOT BE PAID FOR SEPARATELY BUT SHALL BE INCLUDED IN THE COST OF THE WORK.
17. CONTRACTOR SHALL NEITHER STAGE NOR PARK EQUIPMENT AT ANY TIME OFF THE ROADWAYS/SHOULDERS OR ON VEGETATED AREA, ON PRAIRIE DOG HOLES, OR WITHIN 100 FEET OF WATERWAYS. CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR STAGING AREAS.
CONTRACTOR SHALL COMPLETE WORK IN ONE LOCATION BEFORE THEY MOVE TO ANOTHER LOCATION.
18. THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN THE LIMITS OF DISTURBANCE. LIMITS OF DISTURBANCE SHALL BE DETERMINED BY THE ENGINEER AND THE CONTRACTOR. ANY DISTURBANCES BEYOND THESE LIMITS SHALL BE RESTORED TO THE ORIGINAL CONDITION BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE. DISTURBANCES WITHIN THE LIMITS SHALL BE RESTORED BY THE CONTRACTOR AND SHALL BE INCLUDED IN THE COST OF THE WORK. CONSTRUCTION ACTIVITIES IN ADDITION TO NORMAL CONSTRUCTION PROCEDURE SHALL INCLUDE THE PARKING OF VEHICLES OR EQUIPMENT, DISPOSAL OF LITTER, AND ANY OTHER ACTION WHICH WOULD ALTER EXISTING CONDITIONS. ANY OFF-ROAD STAGING AREAS MUST BE PRE-APPROVED BY THE
ENGINEER.
19. AT ANY IRRIGATED LANDSCAPES, NO OFF-ROAD PARKING, STAGING, OR WORK SHALL OCCUR UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL REPLACE ANY DAMAGED LANDSCAPE, INCLUDING GRASS, IRRIGATION SYSTEM COMPONENTS, TREES, SHRUBS AND GROUND COVERS TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE. IMPACTS TO ANY OTHER AREA WILL BE AT CONTRACTOR'S EXPENSE. SOD SHALL MATCH EXISTING. THE CONTRACTOR SHALL COORDINATE WITH DEN PM AT LEAST FIVE (5) WORKING DAYS IN ADVANCE OF ANY DISTURBANCE IN THE AREA. NO LANDSCAPE SHALL BE WITHOUT WATER SERVICES DURING THE GROWING SEASON. IF THE IRRIGATION SERVICE IS INTERRUPTED FOR MORE THAN THREE DAYS, THE CONTRACTOR SHALL BE LIABLE TO HAND/TRUCK WATER. IF IRREPARABLE DAMAGE TO LANDSCAPED AREAS OCCURS, CONTRACTOR WILL BE RESPONSIBLE FOR THE PLANT REPLACEMENT IN THE AFFECTED AREA. LANDSCAPE RESTORATION SHALL BE CONSIDERED COMPLETE WHEN THE LANDSCAPE AND IRRIGATION SYSTEM IS RESTORED TO ITS ORIGINAL CONDITION AND APPROVED BY THE MAINTAINING PERSONNEL. ALL REPAIR WORK, TO ANY IRRIGATION COMPONENTS, SHALL BE INSPECTED BY THE DEN PM PRIOR TO BURIAL AND ACCEPTANCE OF SAID WORK.
20. ALL WORK IN THE AIRPORT ROW SHALL MEET CCD TRAFFIC ENGINEERING STANDARDS, LATEST ADDITION.
21. THE USE OF TYPICAL TRAFFIC CONTROL PLANS (TCP) IS LIMITED TO USE ON LOCAL OR RESIDENTIAL STREETS. SITE SPECIFIC METHODS OF HANDLING TRAFFIC (MHT) ARE REQUIRED FOR LANE OR SIDEWALK CLOSURES ON COLLECTOR OR ARTERIAL STREETS.
22. ALL IMPACTED LANDSCAPING TO BE RESTORED BY THE CONTRACTOR.
23. DEN QUALITY INSPECTORS SHALL BE USED TO INSPECT APPLICABLE SANITARY AND STORM INFRASTRUCTURE. PRE-WORK MEETING ARE RECOMMENDED FOR ANY SANITARY AND STORM INFRASTRUCTURE CONSTRUCTION OR MODIFICATION. DEN ADHERES TO CCD WMD STANDARD DETAILS/SPECS TO THE EXTENT APPLICABLE; HOWEVER, THERE ARE REQUIRED MODIFICATIONS TO THOSE STANDARDS ON
AIRPORTS.
24. THE CONTRACTOR SHALL KEEP THE WORK AREA DRY OF STANDING WATER AND SHALL KEEP THE EXCAVATION AREAS FREE FROM STORM
RUN-OFF.
25. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCEPTANCE AND CONTROL OF ALL SURFACE AND SUBSURFACE DRAINAGE AND
GROUNDWATER ENTERING THE PROJECT SITE.
26. THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN THE LIMITS OF CONSTRUCTION.
27. ALL CLEAN SOIL EXCAVATED FROM THE SITE MAY BE HAULED TO THE DEN SOUTH SOIL STOCKPILE.
28. AGGREGATE BASE COURSE (CLASS 6) MAY BE SOURCED FROM THE DEN SOUTH RECYCLE YARD AT NO COST TO THE CONTRACTOR.
PAYMENT FOR AGGREGATE BASE COURSE (CLASS 6) SHALL INCLUDE IN TRUCKING COSTS ONLY.
GENERAL NOTES
SAFETY NOTES
1. OPEN FLAME WELDING OR TORCH CUTTING OPERATIONS ARE PROHIBITED UNLESS ADEQUATE FIRE AND SAFETY PRECAUTIONS HAVE
BEEN TAKEN AND THE PROCEDURE APPROVED BY THE DEN PROJECT MANAGER. IF ALLOWED, HOT WORKS PERMIT IS REQUIRED FROM
THE DENVER FIRE DEPARTMENT.
2. THERE SHALL BE NO PERMANENT WASTE SITES ON AIRPORT PROPERTY. ANY TEMPORARY WASTE AREA WILL BE APPROVED BY THE DEN PROJECT MANAGER AND SHALL BE KEPT IN A NEAT CONDITION. DEN MAY DIRECT THE CONTRACTOR TO REMOVE WASTE IF NOT
PROPERLY MAINTAINED.
3. CONSTRUCTION DURING THE PROJECT MAY BE HALTED AT ANY TIME BY THE DEN PROJECT MANAGER IF IT IS DETERMINED TO BE IN THE BEST INTEREST OF DEN OR SAFETY. THE CONTRACTOR MAY BE DIRECTED TO REMOVE EQUIPMENT AND/OR EVACUATE THE SITE IN THE EVENT OF NECESSARY EMERGENCY OPERATIONS. NECESSARY EXTENSIONS IN CONTRACT TIME MAY BE GRANTED OR A STOP WORK ORDER WILL BE ISSUED DUE TO THESE DELAYS, HOWEVER, THERE WILL BE NO ADJUSTMENTS IN CONTRACT PRICE DUE TO THESE
DELAYS.
4. THE EMERGENCY NUMBER TO CALL FOR ANY INCIDENT ON THE PROJECT OR AIRPORT SHALL BE THE DEN EMERGENCY NUMBER, 303-342-4211.
5. EQUIPMENT TALLER THAN 40' SHALL NOT BE USED UNLESS SPECIFICALLY APPROVED BY DEN.
SECURITY NOTES
1. MATERIALS DELIVERY TO THE SITE: ALL CONTRACTOR'S MATERIAL ORDERS FOR DELIVERY TO THE WORK SITE WILL USE THE STREET
NAME ASSIGNED TO THE ACCESS POINT AT THE CONTRACTOR'S STAGING SITE AS A DELIVERY ADDRESS.
2. CONSTRUCTION AREA LIMITS: THE LIMITS OF CONSTRUCTION, MATERIAL STORAGE AREAS, PLANT SITE, EQUIPMENT STORAGE AREA, PARKING AREA AND OTHER AREAS DEFINED AS REQUIRED FOR THE CONTRACTOR'S EXCLUSIVE USE DURING CONSTRUCTION SHALL BE MARKED BY THE CONTRACTOR. TEMPORARY BARRICADES, FLAGGING AND FLASHING WARNING LIGHTS WILL BE REQUIRED AT CRITICAL ACCESS POINTS. TYPE OF MARKING AND WARNING DEVICES SHALL BE APPROVED BY THE DEN PROJECT MANAGER.
1. PRIOR TO BEGINNING WORK ON THE PROJECT, THE CONTRACTOR'S SURVEYOR SHALL PERFORM A SURVEY TO VERIFY ALL SURVEY CONTROL POINTS, CITY OF DENVER RANGE POINTS, SECTION CORNERS, AND BENCHMARKS AS LISTED ON THE SURVEY CONTROL DATA.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING ALL LAND SURVEY MONUMENTS REMOVED OR DISTURBED BY PROJECT ACTIVITY OR NEGLIGENCE ON THE PART OF THE CONTRACTOR. THE CONTRACTOR IS REQUIRED TO FOLLOW COLORADO STATE LAW REGARDING SURVEY MONUMENTS. THE CONTRACTOR SHALL RETAIN A COLORADO LICENSED PROFESSIONAL LAND SURVEYOR TO RESET ANY AFFECTED SURVEY MONUMENTS. THIS WILL NOT BE PAID SEPARATELY BUT SHALL BE INCLUDED IN THE WORK UNLESS SPECIFIED OTHERWISE IN SECTION 629. FOR FURTHER INFORMATION CONTACT DEN - SURVEY DEPARTMENT, SUPERVISOR CHRIS BROOKS (303-342-4486).
2. THE USE OF CONTROL MONUMENTS FOR CONSTRUCTION STAKING OTHER THAN THOSE SHOWN ON THE PLANS OR APPROVED BY DEN SURVEY IS PROHIBITED, AND USE OF SUCH MONUMENTS IS AT THE CONTRACTOR'S SOLE RISK.
3. PROPOSED FINISHED GROUND ELEVATIONS FOR ITEMS TO BE ADJUSTED, RESET OR MODIFIED SHALL BE FIELD VERIFIED, RECORDED, AND SUBMITTED TO DEN PM BY THE CONTRACTOR.
SURVEY
1. UTILITY INFORMATION AS SHOWN ON THE PLAN SHEETS IS PLOTTED FROM THE BEST AVAILABLE INFORMATION. THE CONTRACTOR SHALL CALL 811 FOR UTILITY LOCATIONS AT LEAST TWO (2) WORKING DAYS PRIOR TO ANY DIGGING, NOT INCLUDING THE DAY OF ACTUAL
CONTRACT.
2. ALL CONFLICTING UTILITIES SHALL BE EXPOSED BY THE CONTRACTOR PRIOR TO CONSTRUCTION AND INSPECTED BY THE ENGINEER TO VERIFY CONFORMANCE WITH THE PLANS. THIS PARTICULARLY APPLIES TO CULVERT CROSSINGS AND OTHER UNDERGROUND WORK TO BE COMPLETED ON THIS PROJECT BY THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF UTILITY RELOCATION BY UTILITY COMPANIES, IF REQUIRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING UTILITIES DURING CONSTRUCTION AND SHALL HOLD THE CITY AND COUNTY OF DENVER HARMLESS FOR DAMAGES ARISING FROM THE CONTRACTOR'S
FAILURE TO ADEQUATELY PROTECT EXISTING UTILITIES.
3. ALL UTILITY ADJUSTMENTS IDENTIFIED WILL BE PERFORMED BY CONTRACTOR, INCLUDING WATER VALVES, ETC.
UTILITY
1. CONTRACTOR SHALL TAKE REASONABLE MEASURES TO PREVENT PARTICULATE MATTER FROM BECOMING AIRBORNE AND TO PREVENT THE VISIBLE DISCHARGE OF FUGITIVE PARTICULATE EMISSIONS BEYOND THE PROPERTY LINE FROM WHICH THE EMISSIONS ORIGINATE.
THE MEASURE TAKEN MIST BE EFFECTIVE AT ALL TIMES ON THE SITE, INCLUDING PERIODS OF INACTIVITY SUCH AS EVENINGS, WEEKENDS, AND HOLIDAYS AS WELL AS ANY OTHER PERIOD OF INACTIVITY.
2. DURING ANY SOIL DISTURBING ACTIVITIES, IF UNKNOWN/UNIDENTIFIED UNDERGROUND STORAGE TANKS, DRUMS, ODOROUS SOIL, STAINED SOIL, ASBESTOS-CEMENT PIPE (TRANSIT), BUILDING DEBRIS, OR WASTE MATERIALS ARE ENCOUNTERED, CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE AREA OF THE DISCOVERY UNTIL DENVER DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT (DDPHE) MAKES A DETERMINATION OF HOW TO PROCEED. CONTRACTOR SHALL IMMEDIATELY NOTIFY DDPHE OF THE DISCOVERY AT (720) 460-8376. CONTACT DEN PM, WHO WILL NOTIFY DEN ENVIRONMENTAL SERVICES. CONTRACTOR SHOULD NOT BE REPORTING DIRECTLY TO ANY EXTERNAL AGENCIES, INCLUDING DDPHE, ON DEN PROJECTS. DEN ENVIRONMENTAL SERVICES HAS PROTOCOLS TO HANDLE
SUCH SITUATIONS AND WILL NOTIFY EXTERNAL AGENCIES AS APPLICABLE.
3. THE CONTRACTOR SHALL DIRECT NOT-RECYCLABLE, NON-HAZARDOUS MANIFESTED SPECIAL WASTES FROM CCD-OWNED OR CONTROLLED PROPERTY OR FACILITIES TO THE DENVER ARAPAHOE DISPOSAL SITE (DADS) LANDFILL FOR DISPOSAL, FOLLOWING THE REQUIREMENTS ND PROCEDURAL GUIDANCE PER CCD EXECUTIVE ORDER 115. LABORATORY ANALYTICAL RESULTS WILL BE REQUIRED PRIOR TO DADS ACCEPTANCE FOR SOIL AND POSSIBLY OTHER MATERIALS; EARLY TESTING IS RECOMMENDED. PLEASE CONTACT DEN
ENVIRONMENTAL.
ENVIRONMENTAL
1. WATER SHALL BE USED AS A DUST PALLIATIVE WHERE REQUIRED. LOCATIONS SHALL BE ORDERED AND WILL NOT BE PAID FOR
SEPARATELY.
2. EXCAVATION REQUIRED FOR THE COMPACTION OF BASES OF CUTS AND FILLS WILL BE CONSIDERED SUBSIDIARY TO THAT OPERATION
AND WILL NOT BE PAID FOR SEPARATELY.
3. THE INSPECTOR MAY ALLOW HAND OPERATED COMPACTION EQUIPMENT, SUCH AS JUMPING JACK OR HEAVY ROLLER, FOR PROOF ROLLING, OR FOLLOWING CDOT 203.08 CRITERIA IN TIGHT SPACES, DEPENDING ON THE SIDE OF THE CONSTRUCTION AREA.
EARTHWORK
1. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING ADEQUATE TRAFFIC CONTROL THROUGHOUT THE PROJECT, INCLUDING PROPER TRAFFIC CONTROL DEVICES AND PERSONNEL. A TRAFFIC CONTROL PLAN (TCP) IS SUBJECT TO CITY APPROVAL PRIOR TO COMMENCING WORK ON ROADWAY RIGHT-OF-WAY. A COPY OF APPROVED TCPS MUST BE AVAILABLE ON SITE DURING WORK.
TRAFFIC CONTROL IS TO BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). SITE SPECIFIC PLANS ARE REQUIRED ON COLLECTOR AND ARTERIAL STREETS, AND MUST SHOW ALL EXISTING FEATURES.
2. ALL PAVEMENT MARKINGS MUST BE INSTALLED ACCORDING TO MANUFACTURER'S SPECIFICATIONS.
TRAFFIC
1. EXISTING ACCESS POINT TO THE SITE SHALL BE MAINTAINED DURING CONSTRUCTION AND CONSTRUCTION SHOULD NOT IMPACT THE
DAILY OPERATIONS OF ADJACENT SITES.
2. LOCATION OF TEMPORARY FENCING SHALL NOT IMPACT EXISTING SPACE OR OPERATIONS OF ADJACENT RENTAL CAR FACILITIES..
CONSTUCTION PHASING
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DESIGNER OF RECORD
20220237-1SDNT-01
W
AT
ER
Q
U
AL
IT
Y
IN
FR
AS
TR
U C
TU
R
E
IM
PR
O
VE
M
EN
TS
AS INDICATED
JAN. 21, 2025
HFST
X-XX-XXXX-XXX-XXXX
202265738
TBD
20220237-1SDNT-01
DENVER
GENERAL NOTES
C002 2 63
1/15/25
PROJECT QUANTITIES
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DESIGNER OF RECORD
20220237-1SDNT-01
W
AT
ER
Q
U
AL
IT
Y
IN
FR
AS
TR
U C
TU
R
E
IM
PR
O
VE
M
EN
TS
AS INDICATED
JAN. 21, 2025
HFST
X-XX-XXXX-XXX-XXXX
202265738
TBD
20220237-1SDNT-01
FRD
SECOND CREEK
SUMMARY OF ALL
QUANTITIES
C003
OFOF3 63
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DESIGNER OF RECORD
20220237-1SDNT-01
W
AT
ER
Q
U
AL
IT
Y
IN
FR
AS
TR
U C
TU
R
E
IM
PR
O
VE
M
EN
TS
AS INDICATED
JAN. 21, 2025
HFST
X-XX-XXXX-XXX-XXXX
202265738
TBD
20220237-1SDNT-01
FRD
WORLDPORT
SUMMARY OF ALL
QUANTITIES
C004
OFOF4 63
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DESIGNER OF RECORD
20220237-1SDNT-01
W
AT
ER
Q
U
AL
IT
Y
IN
FR
AS
TR
U C
TU
R
E
IM
PR
O
VE
M
EN
TS
AS INDICATED
JAN. 21, 2025
HFST
X-XX-XXXX-XXX-XXXX
202265738
TBD
20220237-1SDNT-01
FRD
TABULATIONS
C005 5 63
STANDARD PLAN NO.
STANDARDS PLANS LISTSTANDARD
PLANS LIST Standard Sheet No. 1 of 1
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DESIGNER OF RECORD
20220237-1SDNT-01
W
AT
ER
Q
U
AL
IT
Y
IN
FR
AS
TR
U C
TU
R
E
IM
PR
O
VE
M
EN
TS
AS INDICATED
JAN. 21, 2025
HFST
X-XX-XXXX-XXX-XXXX
202265738
TBD
20220237-1SDNT-01
STANDARDS
PLANS LIST
C006 6 63
PIER
HH
H H
H H
H
H H
H H
H H
H
H
H
SR SR
H H
H
H
H H
H H
H
H H
H H
H
H H
H H
H H
H
H
H H
H H
H
H H
H H
H
H H
H H
H
H H
H H
H H
H
H
H H
H H
H
H H
H H
H
H H
H H
HG GD
LL
H H
H H
H
HG GD
SR SR
SR
SR
H
H H
H H
H H
H H
H H
H
H H
H
H H
H H
H
HH
H H
H
H H
H H
H H
H H
H
H H
H H
H H
H H
L
L
R
SR
SR
SRSR
SRSR
SR
SR
SR
SR
SR
SR SR
SR
SR
SR
SR
SR
C
B
L L
L
F K F
K
B K
K K
K
B
.0
0'
HK
H K HK
LB
F B K
K
D G
FFF
R
R
R
R R
R
K
K K
R
R R
R
R R
R R
R
R
R R
R
RR
RK
KR
H H
K K
K
K
H H
K
K
R
R
R
R R
H H
H
RR
L
K R
3.
R
H
L
H
R
K L
L L
G
B
B D GGDD GGGHH DDHH DDDHD GG
F
F
R
R R
R
R R
D
K K
R R R R
R R R R R R R R R
F
K
F
F F
H H
D
R R R R R
R R R
R
R
H
H H
H
H H
H H
B
H H
H
H H
H H
H
H
H H
H H
H
H H
H
R
R
R
K
R R
R
R
R
R R
H
H
H H
H
H
H
H H
H
H
H
H
H
H
H H
H
F
F
F
K
K K
H H
H
H
H H
H H
H
H
R R
R R
R
R GK
DK
H H
H
H
H H
H
H
H H
A
R
R
R
R
R
R
R
R
R
R R
R
LL
R
B
B
B
B
.7
5'
.5
0'
D
D K
K
KK
K
K
D
= 92.50'
FFFF F
K
G G
G D
D
R R R
R R R
R
R
R
B
R
R R
R
R R
R
R R
R R
R
R
R
R
R
R
K K
K
K K
K K
R
R R
L
R
R
R
R
H
27.50'
R R
R
.7
5'
F
F
F
F
F
FF
K
H
H
H
H H
H
H
H H
H
H
H H
B
L
L
L
L
B
B
R
R
R
R
R
R R
R R
R R
R
R R
R
R
R R
R
R R
R R
R
R R
H H
H H
H H
H
H H
H
H H
H
H H
H H
H H
H H
H
D G
G
B
H
G
G D
L L
D K
D
G
G D R
R
FFFFFFF R R
R R
RR
R
RRR
D G
R
H
H H
H H
H H
H H
H H
H
H H
H H
H H
H
HH
H
H
H H
H H
H H
H H
H H
H
H H
H H
H
L
L
H
H H
H H
H H
HH
G
G D
SR
SR
H
H
H
H H
H
H H
H H
H
HH
H H
H
H H
H H
H H
H H
H
H H
H H
H H
H H
HH
H
H H
H H
H H
H H
H
L
L
DIRT PARKING
VOLLYBALLCOURT
PB
PB
PBPB
PB
PB
PB
PB
GAS
GAS
APRON
APRON
X
X
X
X
X
X
X
X
X
X X X X X X X X X X
X
X
X
X
XX X X X X X X
X
X
X
X X X
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DESIGNER OF RECORD
P240017 - SHREW-DEN
W
AT
ER
Q
U
AL
IT
Y
IN
FR
AS
TR
U C
TU
R
E
IM
PR
O
VE
M
EN
TS
AS INDICATED
October 28th, 2024
JCG
Project Control Diagram
C101
E-
(T
O
LL
R O
AD
GU
N
C
LU
B
RD
MAIN
TERMINAL
PENA BLVD.PENA BLVD.
JA
CK
SO
N
G
AP
RD
KEYMAP
N.T.S.
SECOND
CREEK
GENERAL NOTES
1. This Project Control Diagram is not a boundary survey of the adjoining property and is prepared for DEN purposes only.
2. This plan set is subject to change and may not be the most current set.
It is the user's responsibility to verify with DEN that this set is the most current. The information contained on the attached drawing is not valid unless this copy bears on original signature of the Professional Land Surveyor hereon named.
3. Refer to the M-629-1 Survey Monuments of the Standard Plans found in The Colorado Department of Transportation, M & S Standards for typical survey monument descriptions.
4. Any person who knowingly removes, alters, or defaces any public land survey monument and/or boundary monument or accessory, commits a class two (2) misdemeanor pursuant to C.R.S. section 18-4-508.
5. Notice: According to Colorado law, you must commence any legal action based upon any defect in this survey within three years after you first discover such defect. In no event may any action based upon any defect in this survey be commenced more than ten years from the date of the certification shown hereon.
6. Dates of field Survey: 04/10/2024 Through 10/21/2024
7. This survey does not constitute a title search by survwest or the surveyor of record.
8. The unit used in the preparation of this plan is the U.S. Survey foot as defined by the United States Department of Commerce, National Institute of Standards and Technology.
WORLD PORT AND SECOND CREEK PONDS
PROJECT CONTROL DIAGRAM
PIER
PIER
H
H
H H
H H
H H
H H
H H
H H
H H
SR SR
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
G GD
LL
H H
H H
H
HG GD
SR
SR
SR
SR
H
H H
H H
H
H
H H
H
H
H H
H H
H
H
H H
H
H H
H H
H
H H
H
H H
H
H H
H
H
H H
H
H
H H
H
L
L
R
SR
SR
SRSR
SRSR
SR
SR
SR
SR
SR
SR SR
SR
SR
SR
SR
SR
C
B
L L L
F K F
K
B
K K
K K
B
.0 0'
H K
H K HK
LB
F B
K K
D
G
FFF
R
R
R R
R R
K K
K
R
R R
R R
R R
R
R
RR
R
R R
R
RK
K R
H H
K K
K
K
H H
K K
R R
R R
R H
H H
R
R
L
K R
3.
R
H
L
H R
K L
L L
G
B
B D GGDD GGGHH DDHH DDDHD GG
F F
R R
R
R
R R
D
K K
R R R R R
R R R R R R R R
F
K
F F
F H
H D
R R R R
R
R R R
R R
H H
H
H H
H H
H
B
H H
H H
H H
H H
H H
H H
H
H H
H H
R R
R
K
R R
R R
R
R R
H H
H H
H
H H
H H
H
H H
H
H H
H H
H
F F
F K
K K
H H
H H
H H
H H
H H
R R R
R
R R
G K
D K
H H
H H
H H
H H
H H
A
R R
R R
R R
R R
R R
R R
LL
R
B B
B B
.7
5'
.5
0'
D
D K
K
KK
K K
D
= 92.50'
FFFF F
K
G G
G D
D
R R R
R
R R
R
R
R
B
R
R
R
R
R R
R
R R
R
R
R
R
R
R
R
R
K K
K K
K K
K
R
R
R
L
R
R
R
R
H
27.50'
R
R R
.7
5'
F F
F
F
F F
F
K
H H
H H
H H
H H
H H
H H
H
B
L
L
L
L
B
B
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R
R R
R R
R R
R
H
H H
H H
H H
H H
H H
H
H H
H H
H
H
H H
H
H
D G
G
B
H
G
G D
L
L
D K
D G
G D R
R
FFFFFFF
R
R R
R R
R
RRRR
D G
R
H
H H
H H
H
H
H
H H
H
H
H H
H H
H
H
H H
H
H H
H H
H
H H
H
H H
H H
H
H
H
H H
H
L
L
H
H
H H
H H
H H
H
G
G
D
SR
SR
H
H
H
H H
H H
H
H H
H
H H
H H
H
H H
H
H H
H
H H
H
H
H H
H
H
H H
H H
H
H
H
H H
H
H
H H
H
H
L
L
DIRT PARKING
VOLLYBALL
COURT
PB
PB
PB
PB
PB
PB
PB
PB
GAS
GAS
APRON
APRON
X
X
X X
X
X X
XX X X X X X X X X
X X
X
X X
X
XX X X X X X X
X
X X
X X X
E-
(T
O
LL
R O
AD
GU
N
C
LU
B
RD
MAIN
TERMINAL
PENA BLVD.PENA BLVD.
JA
CK
SO
N
G
AP
RD
SECOND
CREEK
PARCELS OF LAND LOCATED IN THE SOUTHEAST QUARTER OF SECTION 31,
TOWNSHIP 02 SOUTH, RANGE 65 WEST AND SOUTHEAST QUARTER OF SECTION 36,
TOWNSHIP 02 SOUTH, RANGE 66 WEST OF THE 6th P.M.
CITY AND COUNTY OF DENVER, STATE OF COLORADO
PROJECT LOCATION MAP
NOT TO SCALE
SITE AREAS
COORDINATE SYSTEM
Basis of Bearings: Bearings used in the calculations of coordinates are based on a grid bearing of S88°46'27"E from DEN No. 786, to Control Point No. 5, a set #5 rebar with a 2" aluminum cap. The survey data was obtained from a Global Positioning System (GPS) survey.
Basis of Elevations: Project elevations are based on Control Point DEN No. 786, having an elevation of 5,395.96'. Geoid 12B (Conus) was used to determine elevations based on static GPS observations.
Coordinates shown are based upon the DEN local projection coordinate system.
Project Mapping Projection:
Transverse Mercator Zone: DEN_LOCAL Datum: WGS 1984 Central Point False Northing = 200,000.000 Central Point False Easting = 600,000.000 Latitude of Origin = 39°52'30.00000" N Central Meridian = 104°39'45.00000" W Units: US Survey Feet
SURVEYOR'S STATEMENT
I, **********************, A LICENSED PROFESSIONAL LAND SURVEYOR IN THE STATE OF COLORADO, ON THE BASIS OF MY KNOWLEDGE, INFORMATION AND BELIEF, DO HEREBY STATE THAT AS A RESULT OF A LAND SURVEY MADE UNDER MY RESPONSIBLE CHARGE IN *****************, TO NORMAL STANDARDS OF CARE OF A PROFESSIONAL LAND SURVEYOR PRACTICING IN THE STATE OF COLORADO, THIS TOPOGRAPHIC
SURVEY WAS MADE. THIS TOPOGRAPHIC SURVEY DOES NOT CONSTITUTE A TITLE SEARCH BY
SURVWEST, LLC TO DETERMINE OWNERSHIP OF THIS TRACT, VERIFY THE DESCRIPTION SHOWN, VERIFY THE COMPATIBILITY OF THIS DESCRIPTION WITH THAT OF ADJACENT TRACTS OR VERIFY EASEMENTS OF
RECORD.
FOR AND ON BEHALF OF SURVWEST, LLC
HH
H H
H H
H H
H H
H
H
H H
H H
SR SR
H H
H H
H H
H H
H
H H
H H
H
H H
H H
H
H H
H H
H
H H
H H
H
H H
H H
H H
H
H
H H
H H
H
H H
H H
H
H H
H H
H
H H
H H
H
H H
HG GD
LL
H
H
H H
H
HG GD
SR SR
SR
SR
H
H
H H
H H
H H
H H
H H
H
H H
H H
H H
HH
H
H
H
H H
H H
H H
H H
H H
H H
H H
H H
HH
L
L
R
SR
SR
SRSR
SRSR
SR
SR
SR
SR
SR
SR SR
SR
SR
SR
SR
SR
C
B
L L
L
F K F
K
B
K
K K
K
B
.0
0'
H K
H K HK
LB
F B K
K
D
G
FFF
R
R
R
R R
R
K
K K
R
R R
R
R R
R R
R
R
R R R
RR
RK
KR
H H
K K
K
K
H H
K K
R
R
R
R R
H H
H
RR
L
K R
3.
R
H
L
H
R
K L
L L
G
B
B D GGDD GGGHH DDHH DDDHD GG
F
F
R
R R
R
R R
D
K K
R R R R
R
R R R R R R R R
F
K
F
F F
H H
D
R R R R R
R R R
R
R
H
H H
H
H H
H H
B
H H
H H
H H
H H
H
H H
H H
H
H H
H
R
R
R
K
R R
R
R
R
R R
H
H
H H
H
H
H
H H
H
H
H
H
H
H
H H
H
F
F
F
K
K K
H H
H
H
H H
H H
H
H
R R
R R
R
R GK
DK
H H
H
H
H H
H
H
H
H
A
R
R
R
R
R
R
R
R
R
R R
R
LL
R
B
B
B
B
.7
5'
.5
0'
D
D K
K
KK
K
K
D
= 92.50'
FFFF F
K
G
G
G D
D
R R
R
R R R
R
R
R
B
R
R R R
R R
R
R R R
R
R
R
R R
R
R
K K
K
K
K
K K
R
R R
L
R
R R
R H
27.50'
R R
R
.7
5'
F
F
F
F
F
FF
K
H
H
H H
H H
H
H H
H
H
H
H
B
L
L
L
L
B
B
R
R R
R
R
R
R
R
R R
R
R
R R
R
R R
R
R
R R
R
R R
R R
H
H H
H H
H H
H
H H
H H
H H
H H
H H
H H
H
H
D G
G
B
H
G
G D
L
L
D K
D
G
GD
R R
FFFFFFF R R
R
R
RR
R
RRR
D G
R
H
H
H H
H H
H H
H H
H H
H H
H H
HH
H
H H
H H
H
H H
H H
H H
H H
H H
H H
H H
H
L
L
H
H H
H
HH
H
H
H
G
G D
SR
SR
H H
H
H
H H
H H
H H
HH
H
H
H
H H
H H
H H
H H
H H
H H
H H
H H
HH
H
H H
H
H H
H H
H H
H H
L
L
DIRT PARKING
VOLLYBALLCOURT
PB PB
PBPB
PB
PB
PB
PB
GAS
GAS
APRON
APRON
X
X
X
X
X
X
X
XX X X X X X X X X X X
X
X
X X
XX X X X X X X
X
X
X
X X X
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DESIGNER OF RECORD
P240017 - SHREW-DEN
W
AT
ER
Q
U
AL
IT
Y
IN
FR
AS
TR
U C
TU
R
E
IM
PR
O
VE
M
EN
TS
AS INDICATED
October 28th, 2024
JCG
Project Control Diagram
C102
E-
(T
O
LL
R O
AD
GU
N
C
LU
B
RD
MAIN
TERMINAL
PENA BLVD.PENA BLVD.
JA
CK
SO
N
G
AP
RD
KEYMAP
N.T.S.
SECOND
CREEK
WORLD PORT AND SECOND CREEK PONDS
PROJECT CONTROL DIAGRAM
PARCELS OF LAND LOCATED IN THE SOUTHEAST QUARTER OF SECTION 31,
TOWNSHIP 02 SOUTH, RANGE 65 WEST AND SOUTHEAST QUARTER OF SECTION 36,
TOWNSHIP 02 SOUTH, RANGE 66 WEST OF THE 6th P.M.
CITY AND COUNTY OF DENVER, STATE OF COLORADO
CP 6
CP 7
CP 8
CP 9
CP 10
DEN 877
Peña Blvd.
Gun Club Rd.
N77°19'31"E
DEN 786
1555.25'
0 50' 100' 150' 200' 1" = 100'
PIER
PIER
HH
H H
H H
H H
H H
H
H
H H
H H
SR SR
H H
H H
H H
H H
H
H H
H H
H
H H
H H
H
H H
H H
H
H H
H H
H
H H
H H
H H
H
H
H H
H H
H
H H
H H
H
H H
H H
H
H H
H H
H
H H
HG GD
LL
H
H
H H
H
HG GD
SR SR
SR
SR
H
H
H H
H H
H H
H H
H H
H
H H
H H
H H
HH
H
H
H
H H
H H
H H
H H
H H
H H
H H
H H
HH
L
L
R
SR
SR
SRSR
SRSR
SR
SR
SR
SR
SR
SR SR
SR
SR
SR
SR
SR
C
B
L L
L
F K F
K
B
K
K K
K
B
.0
0'
H K
H K HK
LB
F B K
K
D
G
FFF
R
R
R
R R
R
K
K K
R
R R
R
R R
R R
R
R
R R R
RR
RK
KR
H H
K K
K
K
H H
K K
R
R
R
R R
H H
H
RR
L
K R
3.
R
H
L
H
R
K L
L L
G
B
B D GGDD GGGHH DDHH DDDHD GG
F
F
R
R R
R
R R
D
K K
R R R R
R
R R R R R R R R
F
K
F
F F
H H
D
R R R R R
R R R
R
R
H
H H
H
H H
H H
B
H H
H H
H H
H H
H
H H
H H
H
H H
H
R
R
R
K
R R
R
R
R
R R
H
H
H H
H
H
H
H H
H
H
H
H
H
H
H H
H
F
F
F
K
K K
H H
H
H
H H
H H
H
H
R R
R R
R
R GK
DK
H H
H
H
H H
H
H
H
H
A
R
R
R
R
R
R
R
R
R
R R
R
LL
R
B
B
B
B
.7
5'
.5
0'
D
D K
K
KK
K
K
D
= 92.50'
FFFF F
K
G
G
G D
D
R R
R
R R R
R
R
R
B
R
R R R
R R
R
R R R
R
R
R
R R
R
R
K K
K
K
K
K K
R
R R
L
R
R R
R H
27.50'
R R
R
.7
5'
F
F
F
F
F
FF
K
H
H
H H
H H
H
H H
H
H
H
H
B
L
L
L
L
B
B
R
R R
R
R
R
R
R
R R
R
R
R R
R
R R
R
R
R R
R
R R
R R
H
H H
H H
H H
H
H H
H H
H H
H H
H H
H H
H
H
D G
G
B
H
G
G D
L
L
D K
D
G
GD
R R
FFFFFFF R R
R
R
RR
R
RRR
D G
R
H
H
H H
H H
H H
H H
H H
H H
H H
HH
H
H H
H H
H
H H
H H
H H
H H
H H
H H
H H
H
L
L
H
H H
H
HH
H
H
H
G
G D
SR
SR
H H
H
H
H H
H H
H H
HH
H
H
H
H H
H H
H H
H H
H H
H H
H H
H H
HH
H
H H
H
H H
H H
H H
H H
L
L
DIRT PARKING
VOLLYBALLCOURT
PB PB
PBPB
PB
PB
PB
PB
GAS
GAS
APRON
APRON
X
X
X
X
X
X
X
XX X X X X X X X X X X
X
X
X X
XX X X X X X X
X
X
X
X X X
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DESIGNER OF RECORD
P240017 - SHREW-DEN
W
AT
ER
Q
U
AL
IT
Y
IN
FR
AS
TR
U C
TU
R
E
IM
PR
O
VE
M
EN
TS
AS INDICATED
October 28th, 2024
JCG
Project Control Diagram
C103
E-
(T
O
LL
R O
AD
GU
N
C
LU
B
RD
MAIN
TERMINAL
PENA BLVD.PENA BLVD.
JA
CK
SO
N
G
AP
RD
KEYMAP
N.T.S.
SECOND
CREEK
WORLD PORT AND SECOND CREEK PONDS
PROJECT CONTROL DIAGRAM
PARCELS OF LAND LOCATED IN THE SOUTHEAST QUARTER OF SECTION 31,
TOWNSHIP 02 SOUTH, RANGE 65 WEST AND SOUTHEAST QUARTER OF SECTION 36,
CP 1
CP 5
CP 2
CP 4
CP 3
DEN 840
DEN 786 BASIS OF BEARINGS
S88°46'27"E, 2683.09'
S81°33'58"E, 1058.81'
Peña Blvd.
0 50' 100' 150' 200' 1" = 100'
PIER
PIER
HH
H H
H H
H H
H H
H
H
H H
H H
SR SR
H H
H H
H H
H H
H
H H
H H
H
H H
H H
H
H H
H H
H
H H
H H
H
H H
H H
H H
H
H
H H
H H
H
H H
H H
H
H H
H H
H
H H
H H
H
H H
HG GD
LL
H
H
H H
H
HG GD
SR SR
SR
SR
H
H
H H
H H
H H
H H
H H
H
H H
H H
H H
HH
H
H
H
H H
H H
H H
H H
H H
H H
H H
H H
HH
L
L
R
SR
SR
SRSR
SRSR
SR
SR
SR
SR
SR
SR SR
SR
SR
SR
SR
SR
C
B
L L
L
F K F
K
B
K
K K
K
B
.0
0'
H K
H K HK
LB
F B K
K
D
G
FFF
R
R
R
R R
R
K
K K
R
R R
R
R R
R R
R
R
R R R
RR
RK
KR
H H
K K
K
K
H H
K K
R
R
R
R R
H H
H
RR
L
K R
3.
R
H
L
H
R
K L
L L
G
B
B D GGDD GGGHH DDHH DDDHD GG
F
F
R
R R
R
R R
D
K K
R R R R
R
R R R R R R R R
F
K
F
F F
H H
D
R R R R R
R R R
R
R
H
H H
H
H H
H H
B
H H
H H
H H
H H
H
H H
H H
H
H H
H
R
R
R
K
R R
R
R
R
R R
H
H
H H
H
H
H
H H
H
H
H
H
H
H
H H
H
F
F
F
K
K K
H H
H
H
H H
H H
H
H
R R
R R
R
R GK
DK
H H
H
H
H H
H
H
H
H
A
R
R
R
R
R
R
R
R
R
R R
R
LL
R
B
B
B
B
.7
5'
.5
0'
D
D K
K
KK
K
K
D
= 92.50'
FFFF F
K
G
G
G D
D
R R
R
R R R
R
R
R
B
R
R R R
R R
R
R R R
R
R
R
R R
R
R
K K
K
K
K
K K
R
R R
L
R
R R
R H
27.50'
R R
R
.7
5'
F
F
F
F
F
FF
K
H
H
H H
H H
H
H H
H
H
H
H
B
L
L
L
L
B
B
R
R R
R
R
R
R
R
R R
R
R
R R
R
R R
R
R
R R
R
R R
R R
H
H H
H H
H H
H
H H
H H
H H
H H
H H
H H
H
H
D G
G
B
H
G
G D
L
L
D K
D
G
GD
R R
FFFFFFF R R
R
R
RR
R
RRR
D G
R
H
H
H H
H H
H H
H H
H H
H H
H H
HH
H
H H
H H
H
H H
H H
H H
H H
H H
H H
H H
H
L
L
H
H H
H
HH
H
H
H
G
G D
SR
SR
H H
H
H
H H
H H
H H
HH
H
H
H
H H
H H
H H
H H
H H
H H
H H
H H
HH
H
H H
H
H H
H H
H H
H H
L
L
DIRT PARKING
VOLLYBALLCOURT
PB PB
PBPB
PB
PB
PB
PB
GAS
GAS
APRON
APRON
X
X
X
X
X
X
X
XX X X X X X X X X X X
X
X
X X
XX X X X X X X
X
X
X
X X X
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DESIGNER OF RECORD
P240017 - SHREW-DEN
W
AT
ER
Q
U
AL
IT
Y
IN
FR
AS
TR
U C
TU
R
E
IM
PR
O
VE
M
EN
TS
AS INDICATED
October 28th, 2024
JCG
Project Control Diagram
C104
E-
(T
O
LL
R O
AD
GU
N
C
LU
B
RD
MAIN
TERMINAL
PENA BLVD.PENA BLVD.
JA
CK
SO
N
G
AP
RD
KEYMAP
N.T.S.
SECOND
CREEK
WORLD PORT AND SECOND CREEK PONDS
PROJECT CONTROL DIAGRAM
PARCELS OF LAND LOCATED IN THE SOUTHEAST QUARTER OF SECTION 31,
TOWNSHIP 02 SOUTH, RANGE 65 WEST AND SOUTHEAST QUARTER OF SECTION 36,
X
X X
X X
X X
XXXXXXXXXX
X X
X X
X X
X X
X X
X X
W W W W W W W W W
W W
E E E E E E
E E E E E E EE E E E E E E E E E E E E
D
LP
E E
E E E E E E E E E E E E
E
E
E
E
E
E E E E E E
E E
E
E
E E
E
E E
E E E E E E E E E E E E E
E
E
E
E
E
E E E E E E
E E
E
E
E E
E
E
E E
E
E E
E E
E E
E E
E E E E E E E E E E E E E E E E E E E E E E
TRTRTRTRLPLP
TR
E E E E E E E E
E E
E E
E E
E
E E
E EE
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
FO FO FO FO
FO FO FO FO FO FO FO FO
E E
E
E E E E E E E E
IRR
IRR IRR IRR
W W
W W
W W
W W
W W
W W
E E
W W
W
FOFO FO
EFO
E E E E E E E E
E E
STIV
RIM: 5293.74'
INV* 17'' STP IN (W): 5292.24'
STMH
RIM: 5350.16'
INV* 5' RCP IN (S): 5341.96'
INV* 5' RCP OUT (NW): 5341.76'
RIM: 5311.19'
INV* 36'' RCP OUT (SW): 5304.87'
TYPE: 36'' RCP
ST
ST
ST
ST
ST
TYPE: 36'' RCP OUT TO WEST
5' RCP OUT S.W. @ WING WALL
TYPE: 5' RCP OUT TO NW
TYPE: FES
ST
TYPE: 24" RCP/FES OUT TO W
W W W W W W W W W W WTH
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
SDG
SD
G
SDG
SD
G
SD
G
SD
G
SDG SDG
ST
ST
ST
ST
ST
ST
ST
ST
ST
SAGSAGSAGSAGSAG
STSTSTSTSTST
SD
G
SD
G
SDGSDG
ST
ST
ST
ST
ST
ST
ST
ST
SAGSAGSAGSAG
SAG
SAG
36" RCP
36" RCP
" R
CP
" R
CP
" R
CP
60" RCP
60" R
CP
36" RCP
G
W W
W W
W W
W W
W
G G
G G
E E
E E
E E
E E
FO
SDGSDGSDG
SD
G
SD
G
SD
G
ST
ST
SD
G ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
W W
W W
W W
G G
G G
E E
E E
E E
E E
FO
PIER
PIER
H
H
H H
H H
H H
H H
H H
H H
H H
SR SR
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
G GD
LL
H H
H H
H H
G GD
SR
SR
SR
SR
H
H H
H H
H H
H
H H
H H
H
H
H
H H
H H
H
H H
H H
H H
H
H
H
H H
H H
H
H H
H
H H
H H
H
L
L
R
SR
SR
SRSR
SRSR
SR
SR
SR
SR
SR
SR SR
SR
SR
SR
SR
SR
C
B
L L L
F K F
K
B
K K
K K
B
.0 0'
H K
H K HK
LB
F
B K
K
D G
FF
F
R
R
R R
R R
K K
K
R
R R
R R
R R
R
R
RR
R
R
RR
RK
K R
H H
K K
K
K
H H
K K
R R
R R
R H
H H
R
R L
K R
3.
R
H
L
H R
K L
L
L
G
B
B D GGDD GGGHH DDHH DDDHD GG
F F
R R
R
R
R
R
D
K K
R
R R R R
R R R R R R R R
F
K
F F
F H
H D
R R R R R
R R R R
R H
H H
H H
H H
H
B
H H
H H
H H
H H
H H
H H
H H
H H
H
R R
R
K
R R
R R
R
R R
H H
H H
H
H H
H H
H
H H
H
H H
H H
H
F F
F K
K K
H H
H H
H H
H H
H H
R R R
R
R R
G K
D K
H H
H H
H H
H H
H H
A
R R
R R
R R
R R
R R
R R
LL
R
B B
B B
.7
5'
.5
0'
D
D K
K
KK
K K
D
= 92.50'
FFFF F
K
G G
G D
D
R R
R
R
R R
R
R
R B
R
R
R
R
R
R
R
R R R
R
R
R
R
R
R
R K
K
K
K K
K K
R
R
R
L
R
R
R
R H
27.50'
R
R
R
.7
5'
F
F
F
F
F F
F
K
H H
H H
H H
H H
H H
H H
H
B
L
L
L
L
B
B
R
R R
R
R
R R
R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R
R R
R
H H
H
H
H H
H H
H
H
H
H
H H
H H
H H
H
H H
H
D G
G
B
H
G
G D
L
L
D
K
D G
G D R
R
F
FF
F
FF
F R
R R
R R
RR
RRR
D G
R
H H
H H
H
H
H
H H
H H
H
H H
H H
H H
H
H H
H
H H
H H
H H
H
H H
H H
H
H
H
H H
H
L
L
H
H H
H H
H H
H
H
G
G D
SR
SR
H
H H
H
H
H
H H
H H
H
H H
H H
H H
H
H
H
H H
H H
H
H H
H
H H
H H
H H
H
H H
H H
H
H H
H H
H
L
L
DIRT PARKING
VOLLYBALLCOURT
PB PB
PBPB
PB
PB
PB
PB
GAS
GAS
APRON
APRON
X
X
X
X
X X
X
XX X X X X X X X X X X
X X
X
X
XX X X X X X X
X X
X
X X X
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DESIGNER OF RECORD
20220237-1SDRP-01
W
AT
ER
Q
U
AL
IT
Y
IN
FR
AS
TR
U C
TU
R
E
IM
PR
O
VE
M
EN
TS
AS INDICATED
JAN. 21, 2025
HFST
X-XX-XXXX-XXX-XXXX
202265738
TBD
E-
(T
O
LL
R O
AD
G U
N C
LU
B
R D
MAIN
TERMINAL
PENA BLVD.PENA BLVD.
JA
C
KS
O
N G
AP
R
D
KEYMAP
N.T.S.
SECOND
CREEK
20220237-1SDRP-01
FRD
SECOND CREEK
OVERALL
POND SITE
C201
SITE
SECOND CREEK
REGIONAL WATER
QUALITY POND
PENA BLVD INBOUND
N . G
U N
C
LU
B R
D
FLOODPLAIN
FUTURE 75TH &
GUN CLUB SITE
READINESS
(BY OTHERS)
PR. POND MAINTENANCE PATH
PR. POND MAINTENANCE PATH
PR. DITCH
EX. 36" WATER CONDUIT
PR. DROP STRUCTURE
PR. INLET
EX. STORM PIPE
TO REMAIN
PR. STORM MH
PR. DITCH
PR. STORM F.E.S.
PR. STORM PIPE
PR. OUTLET
STRUCTURE
PR. STORM F.E.S.
PR. STORM PIPE
PR. STORM MH
EX. STORM F.E.S.
E. 75TH AVE.
PR. STORM PIPE
TO BE REMOVED BY OTHERS
DURING SITE READINESS
LIMITS OF GUN CLUB SITE READINESS
PROJECT (TYP.)
LIMITS OF GUN CLUB SITE READINESS
PROJECT (TYP.)
LIMITS OF GUN CLUB SITE READINESS
PROJECT (TYP.)
FEMA FIRM PANEL NO. 0800460128G
EFF. 11/17/2005
LOMR 15-08-1063P
EFF. 2/29/2016
EX. INLET
PR. STORM MH
NOTES:
FLOOD HAZARD AREA INFORMATION AS
SHOWN ON FEMA FIRM, MAP NO. 0800460128G,
MAP REVISED FEBRUARY 29, 2016
EX. 75TH AVE. ROADSIDE POND
EX. SITE READINESS POND
SEE INSET BELOW FOR GUN CLUB
ON-RAMP POND
N . G
U N
C
LU
B R
D
GUN CLUB ON-RAMP POND
EX. GUN CLUB ON RAMP POND
Xref ..\7.1.1 Base\Details\SDRP01-Legend.dwg
TO BE REMOVED BY OTHERS
DURING SITE READINESS
EX. STORM SEWER
INSTALLED DURING SITE
READINESS
TO BE REMOVED BY OTHERS
DURING SITE READINESS
11 63
W
TYPE: 36'' RCP
ST
ST
ST
ST
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W
TH W
W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
36" RCP
36" RCP
" R
CP
02 53
529152925293
4:
4:1
4:1
4:
4:1
4:1
4:1 4:1
4:1
4:1
4:
4:
7:
4:
4:1
4:1
4:1
4:
4:1
4:1
4:1
4:
10:1
8:1
7:1
N: 184069.787 E: 583121.343
EL: 5299.00
N: 184051.021 E: 583370.528
EL: 5300.00
N: 184106.995 E: 583541.332
EL: 5301.33
N: 183946.125 E: 583602.795
EL: 5302.00
N: 183884.887 E: 583540.560
EL: 5302.00
N: 183919.314 E: 583159.752
EL: 5300.00
N: 184097.636 E: 583058.065
EL: 5299.00
N: 184209.088 E: 583128.224
EL: 5300.00
N: 184111.971 E: 583533.833
EL: 5301.33
N: 184059.596 E: 583371.625
EL: 5300.00
N: 184078.665 E: 583520.679
EL: 5301.00
N: 184085.161 E: 583514.557
EL: 5301.00
N: 184058.795 E: 583452.773
EL: 5300.33
N: 184067.714 E: 583451.568
EL: 5300.33
N: 184069.258 E: 583604.309
EL: 5302.00
N: 184164.536 E: 583528.692
EL: 5302.00
N: 184185.232 E: 583239.050
EL: 5299.99
N: 184218.795 E: 583176.522
EL: 5300.00
N: 183882.144 E: 583107.589
EL: 5301.00
N: 184032.888 E: 582990.878
EL: 5299.00
N: 184133.337 E: 583004.947
EL: 5302.00
N: 184225.078 E: 583105.226
EL: 5307.00
N: 184115.486 E: 583031.506
EL: 5307.00
N: 184051.028 E: 583031.340
EL: 5307.00
N: 183919.068 E: 583125.467
EL: 5307.00
N: 183866.173 E: 583208.185
EL: 5307.00
N: 183890.172 E: 583208.278
EL: 5301.00
N: 183861.148 E: 583541.560
EL: 5308.00
N: 183945.731 E: 583634.792
EL: 5310.00
N: 184052.116 E: 583636.131
EL: 5310.00
N: 184179.337 E: 583065.947
EL: 5307.50
N: 184052.337 E: 583023.947
EL: 5307.50
N: 183912.837 E: 583122.447
EL: 5307.50
N: 183872.173 E: 583161.185
EL: 5307.50
N: 183859.173 E: 583259.685
EL: 5307.50 N: 183858.673
E: 583331.685
EL: 5307.50
N: 183858.673 E: 583398.185
EL: 5307.50
N: 183859.173 E: 583458.185
EL: 5307.50
N: 184125.337 E: 583030.447
EL: 5307.50
N: 184240.837 E: 583108.447
EL: 5307.50
N: 184263.500 E: 583130.500
EL: 5307.50
N: 184199.232 E: 583295.550
EL: 5302.99
N: 184196.000 E: 583393.500
EL: 5305.00
N: 184202.232 E: 583490.550
EL: 5306.99
N: 184216.732 E: 583587.550
EL: 5309.00
N: 184126.020 E: 583653.330
EL: 5314.01
N: 184137.000 E: 583588.000
EL: 5302.00
N: 184155.373 E: 583561.992
EL: 5301.98
N: 184150.475 E: 583569.542
EL: 5301.96
R20.0'
R 221.0'
N: 184078.668 E: 583123.310
EL: 5299.00
R68.0'
R15.0'
R10.0'
R2 0.
0'
R5.0'
N: 184072.574 E: 583203.775
EL: 5299.33
N: 184063.599 E: 583203.095
EL: 5299.33
N: 184068.067 E: 583203.439
EL: 5299.00 N: 184055.309
E: 583371.077
EL: 5299.67
N: 184063.253 E: 583452.171
EL: 5300.00
N: 184081.913 E: 583517.618
EL: 5300.67
N: 184109.487 E: 583537.577
EL: 5301.00
N: 184074.227 E: 583122.327
EL: 5298.67
R
2.
2'
N: 184075.206 E: 583049.197
EL: 5298.77
N: 184088.833 E: 583116.153
EL: 5299.00
N: 184096.976 E: 583111.363
EL: 5299.00
N: 184092.905 E: 583113.758
EL: 5298.67
N: 184148.629 E: 583154.688
EL: 5299.33
N: 184149.661 E: 583145.747
EL: 5299.33
N: 184149.140 E: 583150.205
EL: 5299.00
N: 184179.073 E: 583145.053
EL: 5299.14
1.
1.
0.40% 0.98%
0.
N: 184067.340 E: 583025.731
EL: 5306.16
N: 184067.235 E: 583032.397
EL: 5304.03
N: 184083.700 E: 583032.655
EL: 5303.62
N: 184083.804 E: 583025.990
EL: 5305.42
PIER
PIER
H
H
H H
H H
H H
H H
H H
H H
H H
SR SR
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H
H
H H
H H
H H
H H
H H
H H
H H
H H
H H
H H
G GD
LL
H H
H H
H H
G GD
SR
SR
SR
SR
H
H
H H
H
H H
H H
H H
H
H H
H H
H
H H
H H
H H
H
H
H
H H
H H
H H
H
H
H H
H H
H H
H
H
L
L
R
SR
SR
SRSR
SRSR
SR
SR
SR
SR
SR
SR SR
SR
SR
SR
SR
SR
C
B
L
L L
F K F
K
B
K K
K K
B
.0 0'
H K
H K HK
L
B
F B
K K
D
G
F
FF
R
R
R R
R R
K K
K
R
R R
R R
R R
R
R
RR
R
R R
R
RK
K R
H H
K K
K
K
H H
K K
R R
R R
R H
H H
R
R L
K R
3.
R
H
L
H R
K L
L
L
G
B
B D GGDD GGGHH DDHH DDDHD GG
F F
R R
R
R
R
R
D
K
K
R R R R R
R R R R R R R R
F
K
F F
F H
H D
R R R R R
R R R R
R H
H H
H H
H H
H
B
H H
H H
H H
H H
H H
H H
H H
H H
H
R R
R
K
R R
R R
R
R R
H H
H H
H
H H
H H
H
H H
H
H H
H H
H
F F
F K
K K
H H
H H
H H
H H
H H
R R R
R
R R
G K
D K
H H
H H
H H
H H
H H
A
R R
R R
R R
R R
R R
R R
LL
R
B B
B B
.7
5'
.5
0'
D
D K
K
KK
K K
D
= 92.50'
FFFF F
K
G G
G D
D
R R
R
R
R R
R
R
R B
R
R
R
R
R
R
R
R R R
R
R
R
R
R
R
R K
K K
K K
K K
R
R
R
L
R
R
R
R H
27.50'
R R
R
.7
5'
F F
F
F
F F
F K
H H
H H
H H
H H
H H
H H
H
B
L
L
L
L
B
B
R
R R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R
R R
R
H
H H
H H
H
H H
H H
H H
H
H H
H
H H
H H
H
H
D G
G
B
H
G
G D
L
L
D K
D
G
G D R
R
FF
FF
FF
F R R
R R R
RR
RRR
D G
R
H H
H
H
H H
H H
H
H H
H H
H H
H
H H
H
H H
H H
H H
H
H H
H H
H
H
H
H H
H H
H H
L
L
H
H H
H
H H
H H
H
G
G D
SR
SR
H
H H
H H
H H
H
H H
H H
H H
H
H
H
H H
H H
H H
H
H
H H
H H
H H
H
H H
H H
H
H H
H H
H H
H
H
L
L
DIRT PARKING
VOLLYBALLCOURT
PB PBPBPB
PB
PB
PB
PB
GAS
GAS
APRON
APRON
X X
X X
X
X
X
XX X X X X X X X X X X
X
X
X
X
XX X X X X X X
X
X
X
X X X
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DENVER
INTERNATIONAL
AIRPORT
CITY & COUNTY
of DENVER
ISSUE RECORD
NO. BY PURPOSE DATE CKD
SCALE
DATE
DRAWN BY:
CHECKED BY:
FAA AIP NO:
WORK BREAKDOWN NO.
DESIGN CONTRACT NO.
CONST. CONTRACT NO.
VOLUME NO.
SHEET TITLE
SHEET NO.
CADD FILE NO.
LASE
EV
NE
D
FO
R
DNA
YT I C
YTOC NU
OF
DESIGNER OF RECORD
20220237-1SDRP-01
W
AT
ER
Q
U
AL
IT
Y
IN
FR
AS
TR
U C
TU
R
E
IM
PR
O
VE
M
EN
TS
AS INDICATED
JAN. 21, 2025
HFST
X-XX-XXXX-XXX-XXXX
202265738
TBD
E-
(T
O
LL
R O
AD
G U
N C
LU
B
R D
MAIN
TERMINAL
PENA BLVD.PENA BLVD.
JA
C
KS
O
N G
AP
R
D
KEYMAP
N.T.S.
SECOND
CREEK
20220237-1SDRP-01
FRD
SECOND CREEK
REGIONAL WQ
POND
C202
SITE
PR.8' WIDE CONC. TRICKLE
CHANNEL
SEE DETAILS
PR. CONCRETE FOREBAY A
SEE DETAILS
PR. CONCRETE FOREBAY B
SEE DETAILS
REMOVE EXST. 36" F.E.S.
PR. 4' DIA. MH CONNECT
TO EXISTING STORM.
PR. OVERFLOW WEIR
SEE DETAILS
PR. 409.2 CY
SOIL RIPRAP D50=9"
PR. 12' WIDE CONCRETE PAVED
MAINTENANCE PATH
SEE DETAILS
PR. F.E.S
100-YR FLOODPLAIN
100-YR FLOODPLAIN
PR. OUTLET
STRUCTURE/
WATER QUALITY
SEE DETAILS
EX. 36" WATER CONDUIT
PR. BERM
PR. BERM
PR
. B
ER
M
PR. STORM PIPE
PR. STO
RM
PIPE
PR. F.E.S
PR. 12' WIDE CONCRETE PAVED
MAINTENANCE PATH
SEE DETAILS
0.4%
1.12%
PR. 12' WIDE ABC
CLASS 6
MAINTENANCE
PATH
SEE DETAILS
PR. BOULDER
RUNDOWN
SEE DETAILS
CUTOFF WALL FOR
OVERFLOW WEIR
SEE DETAILS
12 63
X X
X X
XXXXXXXXXX
D
S
S
SAMH
RIM: 5367.94'
INV* 1.2' RCP IN (W): 5346.424'
INV* 1.2' RCP OUT (E): 5346.224'
TW
FH
S
WM
M D
D
G
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
E E E E E E E E E E E E E E E E E E E E E E E
E E
E E
E E
E E
E E
E E
E E
E E
G
G G
G
G G
G G
G G
G G
G G
G G
G G
G G
G
G
G
G
G G
G G
G G
G G
G G
G G
G G
G G G
G G
G G
G G
G
G
G
G
G
G
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
SAMH
RIM: 5372.52'
INV* 1.2' RCP/PVC IN (W): 5345.42'
INV* 1.2' RCP/PVC IN (SE): 5345.42'
INV* 1.2' RCP/PVC OUT (NE): 5345.29'
STMH
RIM: 5368.28'
INV* 18'' CPP IN (SE): 5359.58'
INV* 18'' CPP IN (SW): 5360.13'
INV* 24'' CPP OUT (E): 5367.51'
INV* 30'' CPP OUT (W): 5356.48'
INV* 24" DI IN (E): 5361.91'
INV* 24" CPP OUT (W): 5357.22'
INV* 24" CPP IN (E): 5356.48'
24" CPP
ST
ST
ST
INV* 18" CPP OUT (NW): 5367.29'
ST
ST
ST
ST
ST
ST
ST
INV* 18" CPP OUT (NE): 5358.81'
SAG
SAG
SAG
SAG
SAG
SAG
SAG
SAG
W
SAG
SAG
SAG SAG SAG
ST
ST
ST
ST
30" CPP
24" CPP
24" CPP
18" CPP
18" CPP
24" CPP
24" CPP
15" RCP
15" RCP
15" RCP
15" RCP
15" RCP
15" RCP
" C
PP
15" RCP
W W W W W W W W W W W W W
W
20" STEEL
536453
5370 5370
4:
4:
4:1
12:1
4:
4:
4:
4:1
3:1
4:
4:1
4:
4:1
4:
4:
4:1
3.
6%
0.
3%
3.
0%
0.
8%
0.
3%
0.
1%
0.1%4:1
4:1
4:1
N: 184593.087 E: 589970.737
EL: 5356.98
N: 184608.644 E: 589848.549
EL: 5356.00
N: 184607.286 E: 589859.678
EL:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .