2021610 Pay Item Worksheet.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Congress Avenue Bridge over SFRTA Railroad
Solicitation number
IFB 360 2021610 2
Issued by
Palm Beach County, Florida

About this file

This is a Pay Item Worksheet for a construction project in Palm Beach County, Florida, specifically for the Congress Avenue Bridge over SFRTA Railroad (PBC Project #2021610). The worksheet outlines bid proposal line items and quantities for roadway construction work, including mobilization, maintenance of traffic with pedestrian accommodation, steel sleeve removal and post hole patch repair (585 each), traffic barrier repairs for top surface (10 linear feet) and face repair (14 square feet), installation of Type R fencing at 5.1 to 6.0 feet height (1,835 linear feet), dynamic load test support, and removal of existing bridge fencing (1,835 linear feet). The document also identifies contingency items including damaged reinforcement repair (51 each), variable message signs for non-maintenance of traffic purposes (20 days), and traffic control officer hours for non-maintenance of traffic work (48 hours).

Pricing for all line items has not been populated in the worksheet, with all unit prices and amounts listed as blank or zero dollars. All pay items must adhere to the latest FDOT Standard Plans and Palm Beach County Construction Standards, with detailed measurement and payment provisions outlined in project technical specifications. The worksheet includes the requirement that all costs for mobilization and maintenance of traffic be considered incidental to and included in unit prices for pay items, and that all items include furnishing and installation costs unless otherwise noted. Non-shrink grout costs are specified as incidental to steel sleeve removal, traffic barrier top surface repair, and traffic barrier face repair work. FDOT pay item numbers are provided for reference purposes only.

View the file

Other files

File Type Posted
Alternate Format Availability.pdf PDF
Qualifications and Experience Package Form.pdf PDF
2021610 Spec Book.pdf PDF
2021610 Addendum 1.pdf PDF
RFI Form.docx DOCX document
2021610 Plans.pdf PDF
RFI Form.pdf PDF
Qualifications and Experience Package Form.docx DOCX document
OSBD Schedules and Instructions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pay Item Worksheet

BID PROPOSAL
CONGRESS AVENUE BRIDGE OVER SFRTA RAILROAD
CONTRACT
PBC PROJECT #2021610
PBC NUMBERFDOT PAY ITEM NUMBERITEM DESCRIPTIONQTYUNITSUNIT PRICEAMOUNT
ROADWAY ITEMS
10101-1Mobilization1LS$ - 0
20102-1Maintenance of Traffic (including Pedestrian MOT)1LS$ - 0
3-Steel Sleeve Removal & Post Hole Patch Repair585EA$ - 0
4-Traffic Barrier Top Surface Repair10LF$ - 0
5-Traffic Barrier Face Repair14SF$ - 0
60550-10-325Fencing (Type R) (5.1' - 6.0' Height) (Vertical)1,835LF$ - 0
370Dynamic Load Test Support (See SP's)- 0EA$ - 0
7-Removal of Existing Bridge Fencing1,835LF$ - 0
SUBTOTAL (ROADWAY)$ - 0
CONTINGENCY ITEMS
8-Damaged Reinforcement Repair51EA$ - 0
90102-99Variable Message Sign (Non-MOT)20DA$ - 0
100102-14Traffic Control Officer (Non-MOT)48HR$ - 0
SUBTOTAL (CONTINGENCY)$ - 0
TOTAL BID$ - 0
THE COUNTY DOES NOT GUARANTEE THE ACCURACY OF THE FORMULAS AND EXTENSIONS USED IN THIS SPREADSHEET.
THE ITEMS AND QUANTITIES ABOVE, SHALL GOVERN OVER THE PLANS.
PAY ITEM FOOTNOTES IN CONSTRUCTION PLANS SHALL ALSO BE INCLUDED IN ITEM UNIT PRICE.
Note #FDOT Pay Item #PAY ITEM FOOTNOTES
1AllAll pay items to adhere to the latest FDOT Standard Plans and Palm Beach County Constructions Standards. See project technicals specifications for further measurement and payment provisions.
2AllAll costs for Maintenance of Traffic (MOT) and Mobilization shall be considered incidental to, and shall be included in, unit prices for pay items.
3AllAll items shall include cost to furnish and install unless otherwise noted.
4AllFDOT Item numbers are for reference only.
5-The cost of Non-Shrink Grout is incidental to Steel Sleeve Removal & Post Hole Patch Repair, Traffic Barrier Top Surface Repair and Traffic Barrier Face Repair.

&"Times New Roman,Bold"&14PROPOSAL FORM

&"Times New Roman,Bold"&14P-&P

File details come from the government source that posted it. Updated .