2019803 Roadway Plans_Part 3 of 3.pdf

PDF 19 MB Posted

Attached to
CR-880 and Sam Senter Rd over SFWMD Ocean Canal
Solicitation number
IFB 360 2019803 3
Issued by
Palm Beach County, Florida

About this file

Summary of CR-880 and Sam Senter Rd Bridge Replacement Project Plans

This document is a set of roadway construction plans (Part 3 of 3) prepared by the Palm Beach County Engineering and Public Works Department for intersection improvements and bridge replacement at CR-880 and Sam Senter Road over the SFWMD Ocean Canal (L-13 Canal) in Florida. The project involves replacing an existing bridge over the SFWMD L-13 Canal with a new bridge structure, widening CR-880 with turn lanes and wider paved shoulders, and improving the Sam Senter Road intersection. The plans detail canal reshaping and stabilization work including approximately 5,264 cubic yards of canal excavation and 2 cubic yards of canal embankment for both the SFWMD L-13 Canal (Ocean Canal) and the Highland Glades Water Control District N Canal. The roadway construction extends 0.85 miles along CR-880 and includes new roadside swales, drainage structures, rigid inclusions, and geogrid reinforcement layers. The project encompasses a total disturbed area of 8.21 acres within a 9.21-acre site.

The construction plans include detailed cross-sections, elevation data (referenced to NAVD 1988 datum), slope stabilization specifications, and erosion control measures. The project requires riprap installation along canal side slopes in accordance with SFWMD specifications, with construction phased to include temporary and permanent sediment and erosion controls. The plans indicate three outfall locations discharging to the Ocean Canal, N Canal, and an agricultural ditch, with estimated drainage areas ranging from 0.36 to 7.95 acres. The design was prepared by Stanley Group engineers (Amin Ahmed, P.E. No. 52564) and approved on August 22, 2024, with all work subject to SFWMD, U.S. Army Corps of Engineers, and Highland Glades Water Control District permits and specifications. Runoff coefficients vary from 0.71 before construction to 0.80 after construction, and the contractor must develop and maintain a comprehensive stormwater pollution prevention plan throughout all construction phases.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C/L L-13 CANAL

R/W LINE

SFWMD

R/W LINE

SFWMD

0.65

EL. 14.08EL. 14.08

EL. 0.65

0.23

R/W LINE

SFWMD

R/W LINE

SFWMD

C/L L-13 CANAL

EL. 14.08EL. 14.08

EL. -0.71

20+76.67

21+01.67

-4

-2

-4

-2

-4

-2

-4

-2

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803ROADWAY\RDXSRD03A.DGN

Excavation

Canal

Embankment

Canal

2.1

0.0

1.0

0.0

234.5

290.7

393.4

472.6

SFWMD L-13 CANAL

CROSS SECTIONS

SFWMD

R/W LINE

SFWMD

EL. 14.08EL. 14.08

EL. -2.06

0.98

C/L L-13 CANAL

C/L L-13 CANAL

R/W LINE

SFWMD

R/W LINE

SFWMD

EL. 14.08EL. 14.08

EL. -3.42

1.70

EL. 14.08

21+26.67

-4

-2

-4

-2

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803ROADWAY\RDXSRD03A.DGN

21+51.67

-4

-2

-4

-2

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

A AV V

Excavation

Canal

Embankment

Canal

0.0

0.0

0.0

0.0

627.4

936.9

724.2

927.4

SFWMD

R/W LINE

SFWMD

EL. 14.08EL. 14.08

EL. -3.42

1.99

R/W LINE

SFWMD

R/W LINE

SFWMD

EL. 14.08EL. 14.08

EL. -2.42

2.11

C/L L-13 CANAL

EL. 14.08

-8

-6

-4

-2

21+76.67

22+00.00

-10

-8

-6

-4

-2

-10

-4

-2

-4

-2

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803ROADWAY\RDXSRD03A.DGN

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

A AV V

Excavation

Canal

Embankment

Canal

0.0

0.0

0.0

0.0

1066.4

1052.9

915.6

808.3

2.01

R/W LINE

SFWMD

R/W LINE

SFWMD

EL. 14.08EL. 14.08

EL. -1.42

2.01

1.21

R/W LINE

SFWMD

R/W LINE

SFWMD

EL. 14.08

EL. -1.42

1.21

C/L L-13 CANAL

22+23.33

22+48.33

-4

-2

-4

-2

-4

-2

-4

-2

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803ROADWAY\RDXSRD03A.DGN

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

A AV V

Excavation

Canal

Embankment

Canal

0.0

0.0

0.0

0.0

817.9

394.7

561.4

270.8

SFWMD

R/W LINE

SFWMD

EL. 14.08

EL. -0.73

0.93

0.77

C/L L-13 CANAL

R/W LINE

SFWMD

R/W LINE

SFWMD

EL. 14.08

EL. -0.04

22+73.33

22+98.33

-4

-2

-4

-2

-4

-2

-4

-2

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY 90

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803ROADWAY\RDXSRD03A.DGN

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

A AV V

Excavation

Canal

Embankment

Canal

0.0

0.0

0.0

0.8

190.3

156.7

160.7

132.6

0.65

SFWMD

R/W LINE

SFWMD

C/L L-13 CANAL

EL. 14.08

EL. 0.65

23+23.33

-4

-2

-4

-2

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803ROADWAY\RDXSRD03A.DGN

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

A AV V

Excavation

Canal

Embankment

Canal

TOTAL CANAL EXCAVATION: 5264 CY

1.7

0.0 0.0

129.7

TOTAL CANAL EMBANKMENT: 2 CY

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

NONE

ROADWAY\L-13 CANAL DETAILS.DGN

DETAILS

SFWMD L-13 CANAL

EL. 14.08

FABRIC

FILTER

4'

3:1 SLOPE

1'

2'

RIP-RAP

RUBBLE

PLAN

AND STABILIZATION

CANAL RESHAPING

SEE SFWMD L-13

CANAL SLOPE VARIES

STONE

BEDDING

1:1 SLOPE

1:1 SLOPE

SLOPE STABILIZATION

SFWMD L-13 CANAL

NOT TO SCALE

GRADE

EXISTING

PLAN

AND STABILIZATION

CANAL RESHAPING

SEE SFWMD L-13

ELEVATION VARIES

CANAL BOTTOM

NOT TO SCALE

TOE-IN DETAIL

CANAL SIDE SLOPES

SLOPE STABILIZATION

SFWMD L-13 CANAL

STONE

BEDDING

RIP-RAP

RUBBLE

FABRIC

FILTER

1:1 SLOPE

24"

1:1 SLOPE

GRADE

EXISTING

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

(EXCAVATION AND BACKFILLING)

SPECIFICATION SECTION 02220

02370 (RIPRAP SYSTEM) AND SFWMD

WITH SFWMD SPECIFICATION SECTION

CONSTRUCT RIPRAP IN ACCORDANCE

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

11 P I

S

T A

.0

-1

-2

-1

-2

.0

14.08

14.08

0- 1-

.4

.4

-1.42

-3.42

-3.42

N

0 5 20

Feet

L

C

A N

A L

S F

W M

D

SAM SENTER RD.

¡ CONSTRUCTION

LEGEND:

CANAL STABILZATION

DENOTES RUBBLE RIP-RAP

N CANAL

HGWCD

STA. 12+50.00

STA. 11+63.35

ROADWAY\N CANAL RESHAPING PLAN.DGN

¡ CONSTRUCTION

FROM SAM SENTER ROAD

STATIONS AND OFFSETS ARE

NOTE:

SAM SENTER ROAD

STABILZATION PLAN

RESHAPING AND

SEE SFWMD L-13 CANAL

STABILZATION PLAN

RESHAPING AND

SEE SFWMD L-13 CANAL

EL. 14.08

CANAL BANK SLOPE

STABILZATION

RUBBLE RIP-RAP

END N CANAL

INDEX NO. 521-001

PER FDOT STANDARD PLAN

WITH DRAINAGE SLOTS @ 4' O.C.

38" SHOULDER BARRIER

R=45'

BEGIN APPROACH SLAB

END BRIDGE

STA. 11+73.35

END APPROACH SLAB

STA. 14+00.00

MATCH EXISTING

SAM SENTER ROAD

END CONSTRUCTION

GUARDRAIL TL-3

R=7.8'

32.62' RT

+68.76

EL. 14.08

EL. 14.08

30.80' RT

+00.00

EL. 14.08

29.70' RT

+25.00

EL. 14.08

28.20' RT

+50.00

24.96' RT

+60.35

EL. 14.08

BANK SLOPE

2:1 CANAL

STABILIZATION PLAN

RESHAPING AND

HGWCD N CANAL

R/W LINE

HGWCD

R/W LINE

SFWMD

SLOPE

CANAL BANK

BOTTOM OF

86.7'

R/W LINE

SFWMD

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

(EXCAVATION AND BACKFILLING)

SPECIFICATION SECTION 02220

02370 (RIPRAP SYSTEM) AND SFWMD

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

NONE

NOT TO SCALE

DETAILS

HGWCD N CANAL

ROADWAY\N CANAL DETAILS.DGN

2:1 SLOPE

FABRIC

FILTER

DISTRICT R/W LINE

WATER CONTROL

HIGHLAND GLADES

DISTRICT R/W LINE

WATER CONTROL

HIGHLAND GLADES

SAM SENTER ROAD

� CONSTRUCTION

130'

INDEX NO. 521-001

PER FDOT STANDARD PLAN

WITH DRAINAGE SLOTS @ 4' O.C.

38" SHOULDER BARRIER

VARIES 22' TO 20.67'

VARIES 34.1' TO 34.6'

2'

4'

CANAL BOTTOM

GRADE

EXISTING

2'

1:1 SLOPE

STONE

BEDDING

RIP-RAP

RUBBLE

1:1 SLOPE

STA. 11+73.35 TO STA. 12+50.00

SAM SENTER ROAD

AND SLOPE STABILIZATION

HGWCD N CANAL RESHAPING

NOT TO SCALE

SAM SENTER ROAD

� CONSTRUCTION

GUARDRAIL

2:1 SLOPE

STA. 12+50.00 TO STA. 14+00.00

SAM SENTER ROAD

HGWCD N CANAL RESHAPING

VARIES 20.67' TO 16.52' 4'

DISTRICT R/W LINE

WATER CONTROL

HIGHLAND GLADES

DISTRICT R/W LINE

WATER CONTROL

HIGHLAND GLADES

130'VARIES 34.6' TO 37.1'

GRADE

EXISTING

GRADE

EXISTING

MATCH

NOT TO SCALE

STONE

BEDDING

RIP-RAP

RUBBLE

FABRIC

FILTER

1:1 SLOPE

24"

1:1 SLOPE

GRADE

EXISTING

TOE-IN DETAIL

CANAL SIDE SLOPE

SLOPE STABILIZATION

HGWCD N CANAL

(EXCAVATION AND BACKFILLING)

SPECIFICATION SECTION 02220

02370 (RIPRAP SYSTEM) AND SFWMD

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

2019803

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

DRAINAGE\SWPPP01.DGN

PREVENTION PLAN

STORMWATER POLLUTIONA.A.

NONE

R.B.

R.O.

1.D. RUNOFF DATA:

1.C. AREA ESTIMATES:

1.B. SEQUENCE OF MAJOR SOIL DISTURBING ACTIVITIES:

1.A. NATURE OF CONSTRUCTION ACTIVITY

1. SITE DESCRIPTION

CONSTRUCTION.

BY SPECIFICATION SECTION 104, AND REPORTS OF INSPECTIONS MADE DURING

NARRATIVE, THE CONTRACTOR'S APPROVED EROSION CONTROL PLAN REQUIRED

THIS NARRATIVE DESCRIPTION, THE DOCUMENTS REFERENCED IN THIS

COMPLETE STORMWATER POLLUTION PREVENTION PLAN INCLUDES SEVERAL ITEMS:

(CALLED THE KEY SHEET) CONTAINS AN INDEX TO THE OTHER SHEETS. THE

CONSTRUCTION PLANS. THE FIRST SHEET OF THE CONSTRUCTION PLANS

BRIDGE CONSTRUCTION, THE DESIGN STANDARDS, AND OTHER SHEETS OF THESE

CONTAINS REFERENCES TO THE STANDARD SPECIFICATIONS FOR ROAD AND

THE FOLLOWING NARRATIVE OF THE STORMWATER POUUTION PREVENTION PLAN

1.E. SITE MAP:

1.F. RECEIVING WATERS:

NAMES. THERE ARE NO WETLAND AREAS ON THE PROJECT SITE.

SEE ITEMS 1.D FOR THE OUTFALL LOCATIONS AND RECEIVING WATER

TOTAL AREA TO BE DISTURBED: 8.21 ACRES.

TOTAL SITE AREA: 9.21 ACRES.

COMPOSED OF SHELL AND LIMEROCK FRAGMENTS.

A THICK SILTY TO CLAYEY PEAT LAYER BELOW A LAYER OF SAND

CONSTRUCTION PLANS. IN GENERAL, THE SOILS ARE COMPOSED OF

FOR THESE ARE IDENTIFIED ON THE KEY SHEET OF THESE

ARE SHOWN IN THE ROADWAY SOIL SURVEY SHEET(S). THE NUMBERS

SOILS DATA: THE RESULTS OF THE SOIL BORINGS ALONG THE ROADWAY

0.80AFTER:

VARIES 0.71 TO 0.80DURING:

0.71BEFORE:

RUNOFF COEFFICIENTS:

2.A. EROSION AND SEDIMENT CONTROLS:

2.0 CONTROLS

PROPOSED BRIDGE TYPICAL SECTION INTO THE EXISTING TWO LANE SECTION.

NORTH ALONG SAM SENTER ROAD OVER THE OCEAN CANAL TO TRANSITION THE

THE PROJECT LENGTH ALONG CR 880 IS 0.85 MILES. THE PROJECT EXTENDS

BE IMPROVED WITH TURN LANES AND WIDER PAVED SHOULDER, ALONG CR 880.

IS INCLUDED ALONG THE CANAL SIDE SLOPES. THE ROAD INTERSECTION WILL

THE OCEAN CANAL WILL BE WIDENED UNDER THE NEW BRIDGE AND REVETMENT

BRIDGE OVER THE SFWMD L-13 CANAL (OCEAN CANAL) WITH A NEW BRIDGE STRUCTURE.

ROAD. THE PURPOSE OF THE PROJECT IS TO REPLACE THE EXISTING SAM SENTER

THIS PROJECT IS LOCATED AT THE INTERSECTION OF CR 880 AND SAM SENTER

WITH ROADWAY WORK.

SWALES. CONSTRUCT DRAINAGE STRUCTURES. PERFORM EARTHWORK ASSOCIATED

AND GEOGRID REINFORCEMENT LAYERS. WIDEN ROAD. CONSTRUCT ROADSIDE

2. CLEAR AND GRUB CR 880, RECONSTRUCT ROADWAY WITH RIGID INCLUSIONS

BRIDGE AND CANAL WORK.

RIP RAP ALONG CANAL SIDE SLOPES. PERFORM EARTHWORK ASSOCIATED WITH

OCEAN CANAL TO PROPOSED CONDITIONS AND CONSTRUCT NEW BRIDGE. INSTALL

1. CLEAR AND GRUB SAM SENTER ROAD, REMOVE EXISTING BRIDGE, GRADE THE

SEQUENCE OF ACTIVITIES:

AFTER ALL UPSTREAM AREAS ARE STABILIZED.

OTHER WORK FOR THE CONSTRUCT/ON PHASE. REMOVE PERIMETER CONTROLS ONLY

AND GRUBBING NECESSARY FOR INSTALLATION OF CONTROLS BUT BEFORE BEGINNING

FOR EACH CONSTRUCTION PHASE, INSTALL PERIMETER CONTROLS AFTER CLEARING

APPROVED BY THE ENGINEER.

EQUAL OR BETTER AT CONTROLLING EROSION AND TRAPPING SEDIMENT AND IS

BELOW, UNLESS THE CONTRACTOR PROPOSES A DIFFERENT SEQUENCE THAT IS

CONTRACTOR SHALL FOLLOW THE SEQUENCE OF MAJOR ACTIVITIES DESCRIBED

A DETAILED SEQUENCE OF CONSTRUCTION FOR ALL CONSTRUCTION ACTIVITIES. THE

IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL PROVIDE

RECEIVING WATER NAME: N CANAL.

EST. DRAINAGE AREA SIZE: 0.36 ACRES

LOCATION: LATITUDE 26° 40' 43"N LONGITUDE 80° 32' 19"W

C-51 FROM FRENCHDRAIN, PIPE TO CANAL IS AT STATION 243+00

#3 DESCRIPTION: SAM SENTER ROAD - ROADWAY.

RECEIVING WATER NAME: OCEAN CANAL.

EST. DRAINAGE AREA SIZE: 1.0 ACRES

LOCATION: LATITUDE 26° 40' 42"N LONGITUDE 80° 32' 14"W

#2 DESCRIPTION: CR 880 - ROADWAY.

RECEIVING WATER NAME: AGRICULTURAL DITCH.

EST. DRAINAGE AREA SIZE: 7.95 ACRES

LOCATION: LATITUDE 26° 40' 40"N LONGITUDE 80° 32' 20"W

#1 DESCRIPTION: CR 880 - ROADSIDE SWALES.

THERE ARE THREE OUTFALLS.

OUTFALL INFORMATION:

SHEET FLOW ALONG THE NORTH SIDE OF CR 880.

THE PROJECT ALSO DISCHARGES TO THE OCEAN CANAL VIA

ROAD VIA DRAINAGE SLOTS CAST IN THE PROPOSED BARRIE WALL.

SURFACE WATERS WILL OCCUR ALONG EAST SIDE SAM SENTER

DISCHARGE POINTS TO SURFACE WATERS: DISCHARGE TO

THIS IS SHOWN ON THE DRAINAGE MAP AND THE PLAN SHEETS.

SURFACE WATERS THAT FLOW THROUGH THE PROJECT SITE. .

SURFACE WATERS: THE OCEAN CANAL AND THE N CANAL ARE

THE TYPICAL SECTION SHEETS AND THE PLAN SHEETS.

MENTIONED ABOVE. PERMANENT STABILZATION IS SHOWN ON

ARE SHOWN IN THE SAME LOCATION AS THE TEMPORARY CONTROLS

AREAS TO BE STABILIZED: TEMPORARY STABILIZATION PRACTICES

MANAGEMENT CONTROLS.

SWALES ARE THE PRIMARY PERMANENT STORMWATER

LOCATIONS OF PERMANENT CONTROLS: THE PROPOSED ROADSIDE

ARE PROVIDED IN THE SUMMARY OF QUANTITY SHEETS.

SUMMARIES OF TEMPORARY EROSION AND SEDIMENT CONTROL ITEMS

PLAN SHEETS AND THE CANAL DETAIL SHEETS. TABLES PROVIDING

LOCATIONS OF TEMPORARY CONTROLS: THESE ARE SHOWN ON THE

OVERBUILD/MILLING/RESURFACING AND MIONR WIDENING OPERATIONS.

CR 880 WILL BE UNDISTURBED EXCEPT DURING THE RECONSTRUCTION,

AREAS NOT TO BE DISTURBED: THE EXISTING ROADWAY ALONG

ABOVE OR BELOW GROUND WILL BE DISTURBED.

WHERE PERMANENT FEATURES ARE SHOWN TO BE CONSTRUCTED

SHEETS, AND THE CANAL CROSS SECTION SHEETS. ANY AREAS

INDICATED ON THE PLAN-PROFILE SHEETS, THE CROSS SECTION

AREAS OF SOIL DISTURBANCE: THE AREAS TO BE DISTURBED ARE

DITCH IS FROM WEST TO EAST.

CANAL IS FROM WEST TO EAST. THE FLOW OF THE AGRICULTURAL

N CANAL IS FROM NORTH TO SOUTH. THE FLOW OF THE OCEAN

THE ARE CANAL CROSS SECTIONS SHEETS. THE FLOW OF THE

SECTIONS SHEETS, THE PLAN AND THE PROFILE SHEETS AND

SLOPES: THE SLOPES OF THE SITE CAN BE SEEN IN THE CROSS

SWALES. NO OFFSITE AREAS CONTRIBUTE FLOW TO THE PROJECT.

THE ROADWAY TRAVEL LANES, PAVED SHOULDER AND ROADSIDE

CONVEYED TO THE EXISTING OUTFALLS VIA SHEET FLOW FROM

WILL REMAIN SO DURING AND AFTER CONSTRUCTION. RUNOFF IS

DRAINAGE PATTERNS: THE PROJECT AREA IS GENERALLY FLAT AND

IDENTIFIED ON THE KEY SHEET OF THESE CONSTRUCTION PLANS.

THE SHEET NUMBERS FOR THE PLAN SHEETS REFERENCED ARE

LOCATION OF THE REQUIRED INFORMATION IS DESCRIBED BELOW.

THE CONSTRUCTION PLANS ARE BEING USED AS THE SITE MAPS. THE

BARRIER.

TEMPORARY SOD, FLOATING TURBIDITY BARRIER AND STAKED SEDIMENT

PERFORM EARTHWORK ASSOCIATED WITH ROADWAY WORK. PROVIDE

CONSTRUCT ROADSIDE SWALES. CONSTRUCT DRAINAGE STRUCTURES.

INCLUSIONS AND GEOGRID REINFORCEMENT LAYERS. WIDEN ROAD.

CLEAR AND GRUB CR 880, RECONSTRUCT ROADWAY WITH RIGID

PHASE II

SEDIMENT BARRIER.

PROVIDE TEMPORARY SOD, FLOATING TURBIDITY BARRIER AND STAKED

PERFORM EARTHWORK ASSOCIATED WITH BRIDGE AND CANAL WORK.

NEW BRIDGE. INSTALL RIP RAP ALONG CANAL SIDE SLOPES.

GRADE THE OCEAN CANAL TO PROPOSED CONDITIONS, CONSTRUCT

CLEAR AND GRUB SAM SENTER ROAD, REMOVE EXISTING BRIDGE AND

PHASE I

TO COMMENCING WORK WITHIN THE CANAL AND ON THE BRIDGE.

TEMPORARY FLOATING TURBIDITY BARRIER IN THE CANAL PRIOR

ALL UPSTREAM AREAS ARE STABILIZED. THIS INCLUDES USE OF

CONSTRUCTION PHASE. REMOVE PERIMETER CONTROLS ONLY AFTER

OF CONTROLS BUT BEFORE BEGINNING OTHER WORK FOR THE

AFTER CLEARING AND GRUBBING NECESSARY FOR INSTALLATION

FOR EACH CONSTRUCTION PHASE, INSTALL PERIMETER CONTROLS

CONTROLS ONLY AFTER ALL UPSTREAM AREAS ARE STABILIZED.

OTHER WORK FOR THE CONSTRUCTION PHASE. REMOVE PERIMETER

NECESSARY FOR INSTALLATION OF CONTROLS BUT BEFORE BEGINNING

INSTALL PERIMETER CONTROLS AFTER CLEARING AND GRUBBING

NEED FOR BETTER PRACTICES. FOR EACH CONSTRUCTION PHASE,

VARIATION, CHANGES IN CONSTRUCTION ACTIVITIES, AND THE

THE CONTRACTOR SHALL MODIFY THE PLAN TO ADAPT TO SEASONAL

SUBJECT TO APPROVAL BY THE ENGINEER. AS WORK PROGRESSES,

OR MODIFY THEM IN THE SEDIMENT AND EROSION CONTROL PLAN,

CONTRACTOR MAY CHOSE TO ACCEPT THE FOLLOWING GUIDELINES

GUIDELINES ARE BASED ON THE CONSTRUCTION PLANS. THE

TRAFFIC CONTROL (TTC) PLAN. THE FOLLOWING RECOMMENDED

PRACTICES BASED ON THE CONTRACTOR'S PROPOSED TEMPORARY

SHALL DESCRIBE THE PROPOSED STABILIZATION AND STRUCTURAL

IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

2019803

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

DRAINAGE\SWPPP02.DGN

PREVENTION PLAN

STORMWATER POLLUTIONA.A.

NONE

R.B.

R.O.

2.A.1 STABILIZATION PRACTICES:

2.A.2 STRUCTURAL PRACTICES:

2.B. STORMWATER MANAGEMENT

2.C.1 WASTE DISPOSAL:

2.C OTHER CONTROLS:

SURFACE WATERS, OR WETLANDS.

CONSTRUCTION MATERIALS OFF THE PROJECT SITE BUT NOT IN

DISPOSING OF SOLID MATERIALS INCLUDING BUILDING AND*

MANUFACTURER.

ACCORDING TO EPA'S STANDARD PRACTICES AS DETAILED BY THE

DISPOSING OF ALL FERTILIZER OR OTHER CHEMICAL CONTAINERS*

PROJECT DURING CONSTRUCTION ACTIVITIES.

PROVIDING LITTER CONTROL AND COLLECTION WITHIN THE*

APPROVED BY THE ENGINEER:

SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS OTHERWISE

TO WATERS OF THE UNITED STATES. THE PROPOSED METHODS

DISCHARGE OF SOLID MATERIALS, INCLUDING BUILDING MATERIALS,

SHALL DESCRIBE THE PROPOSED METHODS TO PREVENT THE

IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR

2.C.2 OFF-SITE VEHICLE TRACKING & DUST CONTROL:

SANITARY SEWER, OR SEPTIC TANK REGULATIONS:

2.C.3 STATE AND LOCAL REGULATIONS FOR WASTE DISPOSAL,

2.C.4 FERTILIZERS AND PESTICIDES:

SUBSECTIONS OF SECTION 570 OF THE SPECIFICATIONS.

THE PROPOSED PROCEDURES SHALL COMPLY WITH APPLICABLE

DESCRIBE THE PROCEDURES FOR APPLYING FERTILIZERS AND PESTICIDES.

IN THE SEDIMENT ANO EROSION CONTROL PLAN, THE CONTRACTOR SHALL

2.C.5 TOXIC SUBSTANCES:

MIGRATION, STORAGE, AND DISPOSAL OF THESE SUBSTANCES.

THE JOB AND PROVIDE A PLAN ADDRESSING THE GENERATION, APPLICATION,

PROVIDE A LIST OF TOXIC SUBSTANCES THAT ARE LIKELY TO BE USED ON

IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL

2.D.4 APPROVED STATE AND LOCAL PERMITS:

3.0 MAINTENANCE:

AND REPLACE DAMAGED BARRIER MATERIAL AS REQUIRED.

INSPECT THE BARRIERS AND ANCHOR SYSTEMS AT ALL LOCATIONS. REPAIR

TURBIDITY BARRIERS: MAINTAIN PER SECTION 104. REGULARLY*

AREAS.

RECOMMENDATIONS OR WHEN WATER PONDS IN UNACCEPTABLE AMOUNTS OR

SEDIMENT BARRIERS : REMOVE SEDIMENT AS PER MANUFACTURER'S*

ANTICIPATE REPLACING SILT FENCE ON 12 MONTH INTERVALS.

SILT FENCE: MAINTAIN PER SECTION 104. THE CONTRACTOR SHOULD*

COMPLY WITH THE FOLLOWING:

THROUGHOUT CONSTRUCTION. THE MAINTENANCE PLAN SHALL AT A MINIMUM,

PROVIDE A PLAN FOR MAINTAINING ALL EROSION AND SEDIMENT CONTROLS

IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL

4.0 INSPECTIONS:

5.0 NON-STORMWATER DISCHARGES:

* SOD IN ACCORDANCE WITH SPECIFICATION SECTION 570.

* RIP-RAP IN ACCORDANCE WITH SPECIFICATION SECTION 530.

* ASPHALT OR CONCRETE SURFACE.

PERMANENT:

SECTION 104 AND THE EROSION AND SEDIMENT CONTROL HANDBOOK.

* FLOATING TURBIDITY BARRIER IN ACCORDANCE WITH SPECIFICATION

AND THE EROSION AND SEDIMENT CONTROL HANDBOOK.

* TURF AND SOD IN ACCORDANCE WITH SPECIFICATION SECTION 104

SECTION 104 AND THE EROSION AND SEDIMENT CONTROL HANDBOOK.

* ARTIFICIAL COVERINGS IN ACCORDANCE WITH SPECIFICATION

TEMPORARY:

UNLESS OTHERWISE APPROVED BY THE ENGINEER.

STABILZATION PRACTICES SHALL INCLUDE AT LEAST THE FOLLOWING,

ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED. THE

MORE THAN 7 DAYS, IN PORTIONS OF THE SITE WHERE CONSTRUCTION

STABILIZATION MEASURES AS SOON AS PRACTICAL, BUT IN NO CASE

TO CONTROL EROSION. THE CONTRACTOR SHALL INITIATE ALL

SHALL DESCRIBE THE PROPOSED STABILIZATION PRACTICES PROPOSED

IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR

* SOD.

* ROADSIDE SWALES.

PERMANENT:

EROSION AND SEDIMENT CONTROL HANDBOOK.

* SOIL TRACKING PREVENTION DEVICE IN ACCORDANCE WITH THE

SEDIMENT CONTROL HANDBOOK AND SPECIFICATION SECTION 104.

* INLET PROTECTION IN ACCORDANCE WITH THE EROSION AND

SEDIMENT CONTROL HANDBOOK AND SPECIFICATION SECTION 104.

* SEDIMENT BARRIERS IN ACCORDANCE WITH THE EROSION AND

TEMPORARY:

UNLESS OTHERWISE APPROVED BY THE ENGINEER:

STRUCTURAL PRACTICES SHALL INCLUDE AT LEAST THE FOLLOWING,

PLACE BEFORE DISTURBING SOIL UPSTREAM OF THE CONTROL. THE

FROM EXPOSED AREAS OF THE SITE. SEDIMENT CONTROLS SHALL BE IN

SEDIMENT AND OTHERWISE PREVENT THE DISCHARGE OF POLLUTANTS

DESCRIBE THE PROPOSED STRUCTURAL PRACTICES TO CONTROL OR TRAP

IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL

APPLICABLE DESIGN STANDARDS.

GLADES WATER CONTROL DISTRICT. ALL FACILITIES COMPLY WITH

FLORIDA WATER MANAGEMENT DISTRICT AND APPROVED BY HIGHLAND

IMPROVEMENTS. THE FACILITIES HAVE BEEN PERMITTED BY SOUTH

OF CR 880 TO MANAGE STORMWATER FROM THE PROPOSED ROADWAY

ROADSIDE SWALES WILL BE CONSTRUCTED ALONG THE SOUTH SIDE

AND HIGHLAND GLADES WATER CONTROL DISTRICT.

CORPS OF ENGINEERS, SOUTH FLORIDA WATER MANAGEMENT DISTRICT

THIS PROJECT HAS OBTAINED APPROVAL FROM THE UNITED STATES ARMY

MEASURES, AS APPROVED BY THE ENGINEER.

DISCHARGING POLLUTANTS, THE CONTRACTOR SHALL PROVIDE ADDITIONAL

ARE NOT SUFFICIENT TO MINIMIZE EROSION, RETAIN SEDIMENT, AND PREVENT

INDICATE THAT THE INSTALLED STABILIZATION AND STRUCTURAL PRACTICES

THAT INDICATE ITEMS ARE NOT IN GOOD WORKING ORDER. IF INSPECTIONS

THE CONTRACTOR SHALL INITIATE REPAIRS WITHIN 24 HOURS OF INSPECTIONS

LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE. *

STORMWATER MANAGEMENT SYSTEMS. *

STRUCTURAL CONTROLS. *

PRECIPITATION.

AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO*

DISTURBED AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED. *

POINTS OF DISCHARGE TO MUNICIPAL SEPARATE STORM DRAIN SYSTEMS. *

POINTS OF DISCHARGE TO WATERS OF THE UNITED STATES. *

STORMWATER POLLUTION PREVENTION PLAN.

INSPECT THAT CONTROLS INSTALLED IN THE FIELD AGREE WITH THE LATEST

BE CONDUCTED AT LEAST ONCE EVERY MONTH. THE CONTRACTOR SHALL ALSO

WHERE SITES HAVE BEEN PERMANENTLY STABILIZED, INSPECTIONS SHALL

SHALL INSTALL AND MAINTAIN RAIN GAUGES AND RECORD THE DAILY RAINFALL.

OF A STORM THAT IS 0.50 INCHES OR GREATER. TO COMPLY, THE CONTRACTOR

ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE END

QUALIFIED PERSONNEL SHALL INSPECT THE FOLLOWING ITEMS AT LEAST

PERMITTED OUTFALL STRUCTURES.

AND REGULATIONS CONCERNING THIS PRACTICE INCLUDING THE USE OF

DEWATER/NG METHOD MUST MEET ALL FEDERAL, STATE, AND LOCAL LAWS, RULES

PRIOR TO DISCHARGE INTO ADJACENT SURFACE WATERS. THE CONTRACTOR'S

IF DEWATERING IS REQUIRED, THAT PROVIDES PRETREATMENT OF EFFLUENT

IT IS THE CONTRACTOR'S RESPONSIBILITY TO DEVELOP A DEWATERING SYSTEM,

THE COULD OCCUR DUE TO THE CONSTRUCTION OF THIS PROJECT.

DEVELOP AN EROSION CONTROL PLAN TO ADDRESS N0N-STORMWATER DISCHARGES

DETERMINE COURSE OF ACTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO

THE CONTRACTOR SHALL CONTACT THE COUNTY PROJECT ENGINEER WHO WILL

DURING CONSTRUCTION, THE CONTRACTOR IS TO CEASE OPERATIONS IN THAT AREA.

IF THE CONTRACTOR ENCOUNTERS CONTAMINATED SOIL OR GROUNDWATER

MEASURES TO PREVENT POLLUTION OF THESE NON-STORMWATER DISCHARGES.

FIGHTING ACTIVITIES). THE CONTRACTOR SHALL DESCRIBE THE PROPOSED

ALL ANTICIPATED NON-STORMWATER DISCHARGES (EXCEPT FLOWS FROM FIRE

IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL IDENTIFY

SUCH AS EXCAVATION AND MILLING OPERATIONS.

USING ROADWAY SWEEPERS DURING DUST GENERATING ACTIVITIES*

STANDARD 106.

STABILIZING CONSTRUCTION ENTRANCES ACCORDING TO DESIGN*

REMOVING EXCESS DIRT FROM ROADS DAILY. *

COVERING LOADED HAUL TRUCKS WITH TARPAULINS.*

APPROVED BY THE ENGINEER.

METHODS SHALL INCLUDE AT LEAST THE FOLLOWING, UNLESS OTHERWISE

TRACKING OF SEDIMENTS AND GENERATING DUST. THE PROPOSED

DESCRIBE THE PROPOSED METHODS FOR MINIMIZING OFFS/TE VEHICLE

IN THE SEDIMENT AND EROSION CONTROL PLAN, THE CONTRACTOR SHALL

SUCH AS EXCAVATION AND MILLING OPERATIONS.

USING ROADWAY SWEEPERS DURING DUST GENERATING ACTIVITIES*

SEPTIC SYSTEMS.

AND LOCAL REGULATIONS FOR WASTE DISPOSAL, AND SANITARY SEWER OR

DESCRIBE THE PROPOSED PROCEDURES TO COMPLY WITH APPLICABLE STATE

IN THE SECTION 104 EROSION CONTROL PLAN, THE CONTRACTOR SHALL

OH CATV

OH CATV

13 KV OE

13 KV OE

13 KV OE

OH CATV

13 KV OE

OH

TEL

OH TEL

OH TEL

OH TEL

24" R

CP

80P

A

.0

P C

S

T A

.3

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

1"=200'

A.A.

2019803

08/22/24

R.O.

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

D.H. 102

EROSION CONTROL PLAN

8.5

8.5

8.5

8.5

8.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

8.5

8.5 8.5

8.5

8.5

10.5

10.5

10.5 10.5

10.5

8.5

8.5

10.5

10.5

10.5

N

DRAINAGE\EROSION01.DGN

0 50 200

Feet

CR 880

BEGIN PROJECT

STA. 76+00.00

CR 880

¡ CONSTRUCTION

R/W LINE

SFWMD

R/W LINE

R/W LINE

SFWMD

M A T

C H

L

IN

E

A .0

CR 880

¡ CONSTRUCTION

A C C E S S R

O A D

S-11

S-10

SFWMD L-13 CANAL

S A

M

S E

N T E R

R

D

C R

LEGEND:

STA. 76+00.00

STA. 76+00.00

STA. 91+43.84

STA. 91+92.38

BARRIER

BEGIN SEDIMENT

BARRIER

BEGIN SEDIMENT

BARRIER

END SEDIMENT

BARRIER

BEGIN SEDIMENT

DENOTES SEDIMENT BARRIER

DENOTES INLET PROTECTION DEVICE

DITCH

DITCH

DITCH DITCH DITCH

DITCH

DITCH

DITCH DITCH

D

IT

C H

T/B

B/B

B/B

T/B

T/B

T/B

B/B

B/B

T/B

B/B

T/B

B/B

T/B

B/B

T/B

B/B

B/B

T/B

B/B

T/B

T/B

B/B

B/B

T/B

T/B

B/B

B/B

T/B

W/L

T/B

T/B

W/L

W/L

S/B

EOP

EOP

EOP

EOP

T/B

S/B

W/L

T/B

W/L

T/B

EOP

EOP

T/B

S/B

T/B

T/B

B/B

B/B

W/L

T/B

EOP

EOP

T/B

S/B

DITCH

T/B

B/B

T/B

B/B

W/L

T/B

EOP

EOP

T/B

S/B

W/L

W/L S/B

T/B

T/B

S/B

T/B

T/B

S/B

W/L

T/B

EOP

T/B

S/B

EOP

W/L

T/B

EOP

T/B

S/B

EOP

W/L

T/B

EOP

T/B

S/B

EOP

W/L

T/B

EOP

T/B

S/B

EOP

W/L S/B

W/L

W/L

S/B

UNPAVED ROAD

U N P

A V E

D

R

O A

D

S B

W L E

O P

E O P

S B

S B T B

W L

W L

S B

T B

T/B

T/B

T/B

E O P

E O P

T B

W L

W L

S B

T B

S B

S B

COM

OH C

ATV

13 KV OE OH CATV 13 KV OE OH CATV

K

V

O

E

13 KV OE OH CATV

13 KV OE

13 KV OE OH CATV

13 KV OE

K V

O

OH TEL OH TEL OH TEL

OH TEL

36" CMP

95 P T

S

T A

.8

100 105 P

A

.1

110 115

PI STA. 11+85.00

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

1"=200'

A.A.

2019803

08/22/24

R.O.

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

D.H. 102

EROSION CONTROL PLAN

8.5 8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5 8.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

8.5

8.5

10.5

10.5

10.5

8.5

8.5

10.5

10.5

10.5

8.5

8.5

10.5

10.5

10.5

N

0 50

Feet

DRAINAGE\EROSION02.DGN

M A

T C

H L I N

A

.0

0 R/W LINE

CR 880

STA. 118+85.53

CR 880

¡ CONSTRUCTION

END PROJECT

R/W LINE

SFWMD

R/W LINE

SFWMD

CR 880

¡ CONSTRUCTION

SAM SENTER RD

¡ CONSTRUCTION

STA. 14+00.00

SAM SENTER ROAD

END CONSTRUCTION

S A

M

S

E N

T

R

R D

S-13

S-12

S-15

S-14

SFWMD L-13 CANAL

H G

W C

D

N

C

N A

L

LEGEND:

DENOTES SEDIMENT BARRIER

DENOTES INLET PROTECTION DEVICE

DENOTES FLOATING TURBIDITY BARRIER

STA. 99+11.59

BARRIER

BEGIN SEDIMENT

BARRIER

END SEDIMENT

STA. 99+50.94

BARRIER

END SEDIMENT

STA. 118+85.53

STA. 118+85.53

BARRIER

END SEDIMENT

STA. 98+60.00

BARRIER

END SEDIMENT

BARRIER

BEGIN SEDIMENT

STA. 99+50.94

STA. 12+00.00

BARRIER

BEGIN SEDIMENT

BARRIER

END SEDIMENT

STA. 14+00.00

200' 160'

STA. 14+00.00

BARRIER

TURBIDITY

END FLOATING

BARRIER

TURBIDITY

FLOATING

BEGIN

BARRIER

TURBIDITY

FLOATING

END

092-Roadway Plans
093-Roadway Plans
094-Roadway Plans
095-Roadway Plans
096-Roadway Plans
097-Roadway Plans
098-Roadway Plans
099-Roadway Plans
100-Roadway Plans
101-Roadway Plans
102-Roadway Plans
103-Roadway Plans
104-Roadway Plans

File details come from the government source that posted it. Updated .