This document is a comprehensive set of roadway construction plans prepared by the Palm Beach County Engineering and Public Works Department for the Florida Department of Transportation, detailing intersection improvements and bridge replacement work on CR-880 and Sam Senter Road over the SFWMD Ocean (L-13) Canal. The project encompasses roadway improvements along CR-880 from Station 76+00.00 to Station 118+85.53 (approximately 4,673.53 linear feet) and Sam Senter Road from Station 10+12.00 to Station 14+00.00 (approximately 388.23 linear feet), including a new bridge structure over the L-13 Canal with five spans. Key construction elements include mill and resurface operations with overbuild, roadway widening with guardrail installation, rigid inclusion ground stabilization in soft soil areas, drainage structure installation (18-inch concrete pipe culverts and control structures), canal excavation and embankment work totaling 14,111 cubic yards and 39,223 cubic yards respectively, and associated erosion control measures. Major pay items identified in the summary include approximately 287 tons of asphalt concrete friction course, 1,034-1,122 tons of structural course material, 33,032 square yards of geogrid reinforcement, 3,229 square yards of plastic erosion matting, 2,030 tons of rip-rap, and 729 tons of bedding stone, along with mobilization, clearing and grubbing, concrete work, guardrail installation and removal, and traffic control services.

The plans were prepared by Stanley Group engineers under the professional certification of Q. Amin Ahmed, P.E. (License No. 52564) and dated August 22, 2024, with project number 2019803. The vertical datum is North American Vertical Datum of 1988 (NAVD 88), with elevations referenced to NAVD 1988. Construction is designed for a 60 miles-per-hour design speed on CR-880 and 45 miles-per-hour on Sam Senter Road, incorporating superelevation of 7.70 percent through a 1,910-foot radius curve. The plans note that construction of the new bridge will temporarily shut down Sam Senter Road, requiring traffic detour to Airport Road and Duda Road. Utility coordination is required with FP&L Transmission and Distribution, Comcast, and AT&T, with notification requirements and one-call center compliance mandated. The contractor is responsible for traffic maintenance, environmental protection including tree protection and sediment control, monument protection and reset, and coordination with ongoing agricultural crop-spraying activities by Florida Crystals Corporation.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19 20

22 23

252627282930

31 32 33 34 35 36

LOT 1

LOT 4LOT 5

LOT

LOT

LOT

LOT

62 1

7 10

Oc ea n

L-

Canal

L-15

Hooker

PALM

B E

A C

H

YTN

U

O

C

F L

O R I

D A

CHECKED:

P R

O J

E C

T

SHEET:

OF:

PROJECT NO.

F I

E L

D B

O O

K N

O

SCALE:

APPROVED:

DRAWN:

N O

R E

V I

S I

O N

B Y

D A

T E

D R

A W I

N G N

O

D E

S I

G N F I

L E N

A M

E

PROJECT NO.

DATE:

AS SHOWN

A.A.

D.H.

PROFESSIONAL ENGINEER #52564

Florida Department of Transportation.

for the Palm Beach County Engineering Department and the State of compliance with the Design Standards and criteria in effect on this date

I hereby certify that the attached plans and design are in substantial

Q. AMIN AHMED, P.E.

CERTIFICATE OF AUTHORIZATION NO. 1978

(561) 689-7444

WEST PALM BEACH, FL. 33409

1641 WORTHINGTON ROAD, SUITE 400

4,673.53

0.00

4,673.53

4,285.53 0.812

0.025

0.885

0.000

0.885

R

E

R

E

0 1 2

N

MILES

R O

A D

W A

Y

K E

Y S

R D

D G

N

BOBBY POWELL

2019803

2019803

T 44 S

T 43 S

A.A.

R O A

D W

A Y P

R O D U C T

IO

N

P A L

M B

E A

C H C

O U

N T Y

08/22/24

GREGG K. WEISS

MARIA G. MARINO

MARIA SACHS

SA

M S

E N T E R R

O A

D C R A

T

CR 880 AT SAM SENTER ROAD

INTERSECTION IMPROVEMENTS AND BRIDGE REPLACEMENT

R

E

R

E

S A

M

S

E N

T E

R

D

CR 880

C R

STATE OF FLORIDA

BOARD OF COUNTY COMMISSIONERS

COMPONENTS OF CONTRACT PLANS SET

INDEX OF ROADWAY PLANS

SHEET NO. SHEET DESCRIPTION

COUNTY OF PALM BEACH

LOCATION MAP

HAVE CHANGED DUE TO REPRODUCTION.

PLANS PREPARED BY:

P A

L M

BE

ACH

Y T

N U

OC

FLORID

A

DISTRICT 1

DISTRICT 2

DISTRICT 4

DISTRICT 3

DISTRICT 7DISTRICT 6

DISTRICT 5

E N

G

IN

E E R

IN

G A

N D P

U B L

IC

W

O R K S

P O B O X

W E

ST

P

A L

M B

E A

C H F

L O R

ID

A

BRIDGES

NET LENGTH OF PROJECT

EXCEPTIONS

GROSS LENGTH OF PROJECT

LENGTH OF PROJECT

LINEAR FEET MILES

NOTE: THE SCALE OF THESE PLANS MAY

ENGINEER OF RECORD:

DATE

MARCI WOODWARD

SARA BAXTER

ROADWAY (CR 880)

0.048ROADWAY (SAM SENTER RD.) 255.42

STA. 76+00.00

STA. 118+85.53

STA. 10+12.00

STA. 14+00.00

STA. 10+30.77

STA. 11+63.35

132.58

SAM SENTER RD.

END BRIDGE

SAM SENTER RD.

BEGIN BRIDGE

SAM SENTER RD.

BEGIN CONST.

CR 880

BEGIN CONST.

BEGIN PROJECT

SAM SENTER RD.

END CONST.

CR 880

END CONST.

END PROJECT

THE CONTRACT DOCUMENTS FOR THIS PROJECT

GOVERNING SPECIFICATIONS ARE CONTAINED IN

*FOR INFORMATION ONLY

ROADWAY SOIL SURVEY

TWO SPAN GATE

SFWMD STANDARD CIVIL DETAILS VEHICLE BARRIER

EROSION CONTROL PLAN

STORMWATER POLLUTION PREVENTION PLAN

HGWCD N CANAL DETAILS

HGWCD N CANAL RESHAPING AND STABILZATION PLAN

SFWMD L-13 CANAL DETAILS

SFWMD L-13 CANAL CROSS SECTIONS

SFWMD L-13 CANAL PROFILE

SFWMD L-13 CANAL RESHAPING AND STABILIZATION PLAN

CROSS SECTIONS SAM SENTER ROAD

CROSS SECTIONS CR 880

DRAINAGE STRUCTURES

BRIDGE LAYOUT DETAIL

INTERSECTION DETAIL

TURNOUT DETAILS

TURNOUT PROFILES

ROADWAY PLAN / PROFILE

PROJECT LAYOUT

GENERAL NOTES

SUMMARY OF DRAINAGE STRUCTURES

SUMMARY OF QUANTITIES

SUMMARY OF PAY ITEMS

TYPICAL SECTION

DRAINAGE MAP

TITLE SHEET

GR-1 thru GR-6

C2 3 of 3

C2 1 of 3 and

101 thru 102

99 thru 100

90 thru 95

85 thru 87

41 thru 84

39 thru 40

34 thru 36

15 thru 32

SQ-1 thru SQ-3

4 thru 10

2 thru 3

NORTH AMERICAN VERTICAL DATUM (NAVD) 1988

VERTICAL DATUM FOR THIS PROJECT IS

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988

SPECIFIC PURPOSE AND TOPOGRAPHIC SURVEY

STRUCTURAL PLANS

SIGNING AND PAVEMENT MARKING PLANS

ROADWAY PLANS

JOEL FLORES

P

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

1"=200'

A.A.

2019803

08/22/24

R.O.

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

DRAINAGE MAP

R.B. 102

OH CATV

OH CATV

13 KV OE

13 KV OE

13 KV OE

OH CATV

13 KV OE

OH

TEL

OH TEL

OH TEL

OH TEL

24" R

CP

80P I

S

T A

.0

P C

S

T A

.3

V P I

.0

E L

.7

V P I

.0

E L

.0

V P I

.0

E L

.3

V P I

.0

E L

.8

(+) 0.00%

E L

.8

V P

C

.0

400' V.C.

K = 1076

(-) 0.05% (+) 0.08% (-) 0.24% (+) 0.25% (+) 0.00%

S-10

S-11

18" RCP

10.5

8.5

8.5

10.5

10.58.5

8.5

10.5

10.5

8.5 8.5

10.5

N

DRAINAGE\DRMPRD01.DGN

1" = 20' VERT.

SCALE RATIO: 1" = 200' HORIZ.

0 50 200

Feet

NOTES:

CONSTRUCTION PERSONNEL WITH DRAINAGE CONCERNS.

THIS SHEET IS IN THE PLANS FOR DOCUMENTATION AND TO ASSIST

FOR CONSTRUCTION PURPOSES.

DO NOT USE THE INFORMATION ON THE DRAINAGE MAP SHEETS

2.

1.

CR 880

-10

80+00 85+00 90+00 95+00

-10

BEGIN PROJECT

STA. 76+00.00

CR 880

¡ CONSTRUCTION

R/W LINE

SFWMD

R/W LINE

R/W LINE

SFWMD

M A T

C H

L

IN

A .0

BEGIN PROJECT

CR 880

¡ CONSTRUCTION

¡ CONSTRUCTION CR 880

EXISTING GRADE AT

M A

T C

H L I N

E

S

T A

.0

EL. 17.92

STA. 76+00.00

CR 880

¡ CONSTRUCTION

GRADE LINE

PROFILE

COMPANY PARCELS

NEW HOPE SUGAR

A C C E S S R

O A D

NWL 11.08' NAVD

DHW 12.08' NAVD

SFWMD L-13 CANAL

PARCELS

US SUGAR CORP

PARCELS

US SUGAR CORP

DRAINAGE MAP (1 OF 2)

AGRICULTURAL DITCH (TYP)

A1=2.53 ac.

A2=1.66 ac.

S-11

S-10

HIA

TUS S

ECTIO

N L

INE

R E T

S S E C T

IO

N

R E T

S S E C T

IO

N

R E T

S , S

E C T

IO

N

R E T

S , S

E C T

IO

N

S E C T

IO

N

R E T

S

S E C T

IO

N

R E T

S

9.83' NAVD (25YR-3DY)

SWALE AREA 1

BASIN 1

NI

SAB

)YD3

-RY5

2(

DVAN '

87.

AERA

EL

AWS

DITCH (TYP)

AGRICULTURAL

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

1"=200'

A.A.

2019803

08/22/24

R.O.

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

DRAINAGE MAP

R.B. 102

DITCH

DITCH

DITCH DITCH DITCH

DITCH

DITCH

DITCH DITCH

D

IT

C H

T/B

B/B

B/B

T/B

T/B

T/B

B/B

B/B

T/B

B/B

T/B

B/B

T/B

B/B

T/B

B/B

B/B

T/B

B/B

T/B

T/B

B/B

B/B

T/B

T/B

B/B

B/B

T/B

W/L

T/B

T/B

W/L

W/L

S/B

EOP

EOP

EOP

EOP

T/B

S/B

W/L

T/B

W/L

T/B

EOP

EOP

T/B

S/B

T/B

T/B

B/B

B/B

W/L

T/B

EOP

EOP

T/B

S/B

DITCH

T/B

B/B

T/B

B/B

W/L

T/B

EOP

EOP

T/B

S/B

W/L

W/L S/B

T/B

T/B

S/B

T/B

T/B

S/B

W/L

T/B

EOP

T/B

S/B

EOP

W/L

T/B

EOP

T/B

S/B

EOP

W/L

T/B

EOP

T/B

S/B

EOP

W/L

T/B

EOP

T/B

S/B

EOP

W/L S/B

W/L

W/L

S/B

UNPAVED ROAD

U N P

A V E

D

R

O A

D

S B

W L E

O P

E O P

S B

S B T B

W L

W L

S B

T B

T/B

T/B

T/B

E O P

E O P

T B

W L

W L

S B

T B

S B

S B

COM

OH C

ATV

13 KV OE OH CATV 13 KV OE OH CATV

K

V

O

E

13 KV OE OH CATV

13 KV OE

13 KV OE OH CATV

13 KV OE

K V

O

OH TEL OH TEL OH TEL

OH TEL

O R

B

P

G

W .5

E .2

N .1

S

O F

S

R

KING RANCH, INC.

THE EAST 1/2 OF SECTION 3/44/38

TRACT TWO ORB 11524 PG.441

00-38-44-03-00-000-1010

36" CMP

95 P T

S

T A

.8

100 105 P

A

.1

110 115

PI STA. 11+85.00

(+) 0.00% (-) 0.37%

E L

.8

V P I

.0

400' V.C.

K = 1076

E L

.0

V P

T

.0

E L

.0

V P

C

.0

300' V.C.

K = 807

V P I

.0

E L

.5

(-) 0.37% (+) 0.00%

V P

T

.0

E L

.5

(+) 0.00%

V P I

.0

E L

.5

(+) 0.34%

V P I

.0

E L

.3

(-) 0.04%

V P I

.0

E L

.2

V P I

.0

E L

.0

(-) 0.10%

V P I

.0

E L

.3

(+) 0.14% (-) 0.13%

18" RCP

18" RCP

S-12

S-13

S-14

S-15

10.5 8.5

8.5 10.5

10.5

8.5 8.5

10.5

10.5

8.5

8.5

10.5

N

1" = 20' VERT.

SCALE RATIO: 1" = 200' HORIZ.

0 50

Feet

NOTES:

CONSTRUCTION PERSONNEL WITH DRAINAGE CONCERNS.

THIS SHEET IS IN THE PLANS FOR DOCUMENTATION AND TO ASSIST

FOR CONSTRUCTION PURPOSES.

DO NOT USE THE INFORMATION ON THE DRAINAGE MAP SHEETS

2.

1.

DRAINAGE\DRMPRD02.DGN

-10

-10

100+00 105+00 110+00 115+0095+00

M A

T C

H L I

A

.0

0 R/W LINE

CR 880

STA. 118+85.53

CR 880

¡ CONSTRUCTION

END PROJECT

R/W LINE

SFWMD

R/W LINE

SFWMD

CR 880

¡ CONSTRUCTION

SAM SENTER RD

¡ CONSTRUCTION

STA. 10+00.00 =

SAM SENTER ROAD

¡ CONSTRUCTION

STA. 99+19.00

CR 880

¡ CONSTRUCTION

STA. 14+00.00

SAM SENTER ROAD

END CONSTRUCTION

END PROJECT

¡ CONSTRUCTION CR 880

EXISTING GRADE AT

M A

T C

H L I N

E

S

T A

.0

LINE

GRADE

PROFILE

EL. 18.04

STA. 118+85.53

CR 880

¡ CONSTRUCTION

N W

L

.0

N A

V D

D H

W

.0

N A

V D

H G

W C

N A

L

PARCELS

US SUGAR CORP

PARCELS

US SUGAR CORP

PARCELS

US SUGAR CORP

S A

M

S

E N

T

A C

C E

A D

GATE

SFWMD ACCESS

STA. 10+30.77

BEGIN BRIDGE

STA. 11+63.35

END BRIDGE

PARCELS

US SUGAR CORP

NWL 11.08' NAVD

DHW 12.08' NAVD

SFWMD L-13 CANAL

DRAINAGE MAP (2 OF 2)

(TYP)

AGRICULTURAL DITCH

R

E

T

S

S E

C T I O

N

R

E

T

S

S E

C T I O

N

R38E T43S, SECTION 3

R38E T44S, SECTION 3

SECTION 4

R38E T43S, SECTION 4

R38E T44S, A2=1.66 a c.

A4=0.36 ac.

A3=3.66 ac.

S-13

S-12

S-15

S-14

9.91' NAVD (25YR-3DY)

SWALE AREA 3

BASIN 3

BASIN 2

2 AERA ELAWS )YD3-RY52( DVAN '87.9

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

R/W LINE R/W LINE

LIMITS OF CONSTRUCTION

STANDARD CLEARING AND GRUBBING

LIMITS OF CONSTRUCTION

12'

� CONSTRUCTION

2'

SHOULDER

PAVED

SHOULDER

PAVED

MILL, RESURFACE & OVERBUILD WIDENING

AND GRUBBING

STANDARD CLEARING

EXISTING ROADWAY

SOD

2% 3%

12'

2%

TYPICAL SECTION

STA. 76+00.00 TO STA. 80+00.03

4' TO 10'

VARIES

4' TO 10'

VARIES

CR 880

TYPICAL SECTION NO. 1

LINE

GRADE

PROFILE

ROADWAY\TYPSRD01.DGN

SP (TRAFFIC C) (1 1/2")

STRUCTURAL COURSE TYPE

TYPE FC-9.5 (1")

FRICTION COURSE

TACK COAT

COAT AND

R-70 PRIME

6"

VARIES

1"=10'

GUARDRAIL

EXISTING

REMOVE

SOD

VARIES

:12

:1

3'

ELEVATION = 8.50'

SWALE BOTTOM

ELEVATION = 10.50'

BERM TOP

5'

30'

4:1

3:1

3% TO 6%

VARIES

SLOPE

SHOULDER

GROUP 13

OPTIONAL BASE

(98% T180)

SUBGRADE

12" COMPACTED

GROUP 13

OPTIONAL BASE

6"

10:1 MAX.

SLOPE AT

ASPH. PAVT.

2" MISC.

TACK COAT

COAT AND

R-70 PRIME

(98% T180)

SUBGRADE

12" COMPACTED

3'

DEEP POST

GUARDRAIL WITH

5'

SP (TRAFFIC C) (1 1/2")

STRUCTURAL COURSE TYPE

TYPE FC-9.5 (1")

FRICTION COURSE

CR 880

£ SURVEY

VARIES 4.0' TO 13.5'

GRADE

EXISTING

MATCH

3%

VARIES 21.0' TO 29.5' VARIES 86.5' TO 96.0'

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

2.0' TO 4.0'

WIDENING VARIES

VARIES 6.0' TO 19.4'

R/W LINE

GRADE AT

EXISTING

MATCH

VARIES

SLOPE

*PLASTIC EROSION MAT APPLICATION

DESIGN SPEED = 60 MPH

3. RESURFACE WITH FRICTION COURSE TYPE FC-9.5 (1")

TYPE SP (TRAFFIC C) (1.75" AVERAGE DEPTH)

2. OVERBUILD WITH STRUCTURAL COURSE

1. MILLING DEPTH = 1"

NOTES:

13.50 NGVD 29

12.08 NAVD 88

SURFACE ELEVATION:

DESIGN WATER

L-13 CANAL

SFWMD

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

CR 880

TYPICAL SECTION NO. 2

STA. 80+00.03 TO STA. 109+00.11

ROADWAY\TYPSRD02.DGN

TYPICAL SECTION

DESIGN SPEED = 60 MPH

R/W LINE

R/W LINE

LIMITS OF CONSTRUCTION

STANDARD CLEARING AND GRUBBING

LIMITS OF CONSTRUCTION

12'

� CONSTRUCTION

2'

SHOULDER

PAVED

SHOULDER

PAVED

SOD

2% 2%

LINE

GRADE

PROFILE

SP (TRAFFIC C) (1 1/2")

STRUCTURAL COURSE TYPE

TYPE FC-9.5 (1")

FRICTION COURSE

GROUP 7

OPTIONAL BASE

TACK COAT

COAT AND

R-70 PRIME

1"=10'

10' 10'12'

2%

4'

GUARDRAIL

EXISTING

REMOVE

SOD 0' TO 12'

VARIES

:1

2'

GUARDRAIL

6'

:12

:1

3'

1.5'

5'

6"

ELEVATION = 8.50'

SWALE BOTTOM

ELEVATION = 10.50'

BERM TOP

VARIESVARIES

PLATFORM

TRANSFER

LOAD

6' 6' 6' 6'

(TYPICAL)

EACH WAY

AT 6' ON CENTER

RIGID INCLUSION

16" DIAMETER

20' FOOT LONG

ELEVATION

PLATFORM

TRANSFER

BOTTOM OF LOAD

SECTIONS FOR

SEE CROSS

12"

6'

3%3%

6"

3'

6' 6' 6' 6'

EXISTING ROADWAY

PAVT.

ASPH.

2" MISC.

RECONSTRUCTION

10:1 MAX.

SLOPE AT

ASPH. PAVT.

2" MISC.

5' FROM STA. 100+00 TO STA. 109+00.11

7.5' FROM STA. 92+50 TO STA. 98+60

10 FT FROM STA 84+50 TO STA 90+50

5 FT FROM STA. 80+00.03 TO STA. 84+00

SWALE BOTTOM WIDTH:

CR 880

£ SURVEY

13.5' TO 20.7'

VARIES

3%

GRADE

EXISTING

MATCH

2:1 MAX.

VARIES

SLOPE

VARIES 29.5' TO 35.0' VARIES 79.3' TO 86.5'

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

R/W LINE

GRADE AT

EXISTING

MATCH

DEEP POST

GUARDRAIL WITH

3'

MAX

3'

MAX

PLASTIC EROSION MAT APPLICATION

STANDARD PLANS INDEX NO. 000-510

SHOULDER CROSS SLOPE PER FDOT

FOR SUPERELEVATED ROADWAY CONSTRUCT

PER FDOT SPECIFICATIONS SECTION 985-5

SUBGRADE, TYPE B AND TWO LAYERS OF GEOGRID REINFORCEMENT TYPE R-2

3. LOAD TRANSFER PLATFORM TO CONSIST OF A MINIMUM 12" STABILIZED

(STA. 80+00.03)/END LIMIT (STA. 109+10.11) TO CENTER OF NEAREST RI COLUMN

2. RIGID INCLUSION (RI) COLUMN PLACEMENT TO BE 3' OR LESS FROM BEGIN

1. ROADWAY TO BE SUPERELEVATED AT 7.70% THROUGH 1910' RADIUS CURVE

NOTES:

13.50 NGVD 29

12.08 NAVD 88

SURFACE ELEVATION:

DESIGN WATER

L-13 CANAL

SFWMD

STA. 99+65.11 RT TO STA. 108+97.52 RT

OUTSIDE EDGE OF PAVED SHOULDER FROM

FACE OF GUARDRAIL TO BE LOCATED AT

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

CR 880

TYPICAL SECTION NO. 3

STA. 109+00.11 TO STA. 118+85.53

ROADWAY\TYPSRD03.DGN

TYPICAL SECTION

1"=10'

R/W LINE

R/W LINE

LIMITS OF CONSTRUCTION

STANDARD CLEARING AND GRUBBING

LIMITS OF CONSTRUCTION

12'

2'

SHOULDER

PAVED

MILL, RESURFACE & OVERBUILD WIDENING

AND GRUBBING

STANDARD CLEARING

EXISTING ROADWAY

SOD

2% 3%

12'

2%

4' TO 10'

VARIES

LINE

GRADE

PROFILE

SP (TRAFFIC C) (1 1/2")

STRUCTURAL COURSE TYPE

TYPE FC-9.5 (1")

FRICTION COURSE

TACK COAT

COAT AND

R-70 PRIME

VARIES

GUARDRAIL

EXISTING

REMOVE

4'SOD

VARIES

:12

:1

ELEVATION = 8.50'

SWALE BOTTOM

ELEVATION = 10.50'

BERM TOP

5'

30'

4:1

3:1

3% TO 6%

VARIES

SLOPE

SHOULDER

GROUP 13

OPTIONAL BASE

(98% T180)

SUBGRADE

12" COMPACTED

10:1 MAX.

SLOPE AT

ASPH. PAVT.

2" MISC.

5'

� CONSTRUCTION

CR 880

£ SURVEY

20.0' TO 7.1'

VARIES

GRADE

EXISTING

MATCH

2'

SHOULDER

PAVED

GUARDRAIL

EXISTING

REMOVE

SOD

POST

WITH DEEP

GUARDRAIL

R/W LINE

STA. 113+00.00 TO STA. 118+85.53

GUARDRAIL DETAIL

10:1 MAX.

SLOPE AT

ASPH. PAVT.

2" MISC.

VARIES 20.7' TO 34.6' VARIES 80.0' TO 92.9'

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

6.0' TO 23.8'

VARIES

GRADE AT R/W LINE

MATCH EXISTING

R/W LINE

GRADE AT

EXISTING

MATCH

DEEP POST

GUARDRAIL WITH

VARIES

SLOPE

VARIES

SLOPE

DESIGN SPEED = 60 MPH

PLASTIC EROSION MAT APPLICATION*

13.50 NGVD 29

12.08 NAVD 88

SURFACE ELEVATION:

DESIGN WATER

L-13 CANAL

SFWMD

3. RESURFACE WITH FRICTION COURSE FC-9.5 (1")

TYPE SP (TRAFFIC C) (3.50" AVERAGE DEPTH)

2. OVERBUILD WITH STRUCTURAL COURSE

1. MILLING DEPTH = 1"

NOTES:

SHOULDER

PAVED

4' TO 10'

VARIES

3'

6"

3%

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

TYPICAL SECTION NO. 4

OVER L-13 CANAL

SAM SENTER ROAD BRIDGE

ROADWAY\TYPSRD04.DGN

TYPICAL SECTION

N.T.S

DESIGN SPEED = 45 MPH

RAILING

TRAFFIC

RAILING

TRAFFIC

RAILING

TRAFFIC

RAILING

TRAFFIC

T O

P P I N

G

C I P

C

O N

C R

E

SPAN 3 TYPICAL SECTION

SPANS 1 AND 2 - TYPICAL SECTION

(TYP.)

(INDEX NO. 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

(TYP.)

(INDEX NO. 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

INDEX NO. 630-010 (TYP.)

FUTURE UTILITIES PER

3~ 2" Ø PVC CONDUITS FOR

INDEX NO. 630-010 (TYP.)

FUTURE UTILITIES PER

3~ 2" Ø PVC CONDUITS FOR

SAM SENTER RD.

¡ CONSTRUCTION

SAM SENTER RD.

¡ CONSTRUCTION

SPANS 1 & 2)

(CONTINUOUS FOR

CONCRETE SLAB

CAST-IN-PLACE

(PRECAST UNIT) (TYP.)

FLORIDA SLAB BEAM (FSB)

CROWN

¡ BRIDGE/

CROWN

¡ BRIDGE/

VARIES FROM 1.89% TO 2.00%VARIES FROM 1.89% TO 2.00%

1'-4" 1'-4"

VARIES FROM 12'-0" TO 14'-0" VARIES FROM 12'-0" TO 14'-0"

" COPING-TO-COPING2

151'-3

VARIES FROM 0.31% TO 1.89%VARIES FROM 0.31% TO 1.89%

SHOULDERNORTHBOUND LANESOUTHBOUND LANESHOULDER

VARIES FROM 51'-3½" TO 125'-2¾" COPING-TO-COPING

VARIES FROM 25'-7¾" TO 62'-7Ƅ"VARIES FROM 25'-7¾" TO 62'-7Ƅ"

SHOULDER

VARIES FROM 14'-0" TO 43'-10ƃ"

NORTHBOUND LANE

VARIES FROM 14'-0" TO 43'-10ƃ"

SOUTHBOUND LANESHOULDER

STA. 10+78.77 TO STA. 11+15.27

STA. 10+20.77 TO STA. 10+78.77

"4

1VARIES FROM 22'-0" TO 24'-3 "4

1VARIES FROM 22'-0" TO 24'-3

" 4

30'-0" TO 2'-3

VARIES FROM

" 4

30'-0" TO 2'-3

VARIES FROM

" TO 18'-1¾"

1VARIES FROM 10'-3 " TO 18'-1¾"

1VARIES FROM 10'-3

1'-4" 1'-4"

"4

1VARIES FROM 10'-0" TO 10'-3"

1VARIES FROM 10'-0" TO 10'-3

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

TYPICAL SECTION NO. 5

OVER L-13 CANAL

SAM SENTER ROAD BRIDGE

ROADWAY\TYPSRD05.DGN

TYPICAL SECTION

N.T.S

DESIGN SPEED = 45 MPH

RAILING

TRAFFIC

RAILING

TRAFFIC

RAILING

TRAFFICTRAFFIC

RAILING

SPAN 4 TYPICAL SECTION

SPAN 5 - TYPICAL SECTION

(TYP.)

(INDEX NO. 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

(TYP.)

(INDEX NO. 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

INDEX NO. 630-010 (TYP.)

FUTURE UTILITIES PER

3~ 2" Ø PVC CONDUITS FOR

INDEX NO. 630-010 (TYP.)

FUTURE UTILITIES PER

3~ 2" Ø PVC CONDUITS FOR

SAM SENTER RD.

¡ CONSTRUCTION

SAM SENTER RD.

¡ CONSTRUCTION

(PRECAST UNIT) (TYP.)

FLORIDA SLAB BEAM (FSB)

CROWN

¡ BRIDGE/

CROWN

¡ BRIDGE/

CONCRETE SLAB

CAST-IN-PLACE

2.00%

12'-0" 12'-0" 10'-0"

23'-4"

1'-4"

VARIES FROM 46'-8" TO 58'-3" COPING-TO-COPING

1'-4"

SHOULDERNORTHBOUND LANESOUTHBOUND LANE

VARIES FROM 10'-0" TO 22'-2"

SHOULDER

SHOULDERNORTHBOUND LANESOUTHBOUND LANESHOULDER

2.00%2.00%

1'-4"

10'-0" 12'-0" 12'-0"

23'-4" 23'-4"

10'-0"

1'-4"

46'-8" COPING-TO-COPING

10'-0"

5.59%

2.00% TO

FROM

VARIES

2.00%

STA. 11+39.27 TO STA. 11+73.35

STA. 11+15.27 TO STA. 11+39.27

VARIES FROM 23'-4" TO 34'-11"

RADIAL)

(MEASURED

T O

P P I N

G

C I P

C

O N

C R

E

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

TYPICAL SECTION NO. 6

SAM SENTER ROAD

� CONSTRUCTION

12' 12'

SHOULDER

PAVED

2%

LINE

GRADE

PROFILE

2%

SHOULDER

PAVED

STA. 11+73.35 TO STA. 12+50.00

SP (TRAFFIC C) (1 1/2")

STRUCTURAL COURSE TYPE

TYPE FC-9.5 (1")

FRICTION COURSE

ROADWAY\TYPSRD06.DGN

TYPICAL SECTION

1"=10'

& OVERBUILD

RESURFACE

MILL,

10' TO 8.67'

VARIES

WIDTH

6% 6%

3'

6"

TACK COAT

COAT AND

R-70 PRIME

SP (TRAFFIC C) (1 1/2")

STRUCTURAL COURSE TYPE

TYPE FC-9.5 (1")

FRICTION COURSE

TACK COAT

COAT AND

R-70 PRIME

GUARDRAIL

EXISTING

REMOVE

2'

WIDENING

WIDENING

SOD

2'

AND GRUBBING

STANDARD CLEARING

STANDARD CLEARING AND GRUBBING

10' TO 8.67'

VARIES

WIDTH

GRADE

EXISTING

MATCH

VARIES 34.1' TO 34.9'

DISTRICT R/W LINE

WATER CONTROL

HIGHLAND GLADES

130'

DISTRICT R/W LINE

WATER CONTROL

HIGHLAND GLADES

:1

RUBBLE RIP-RAP

BEDDING STONE

GRADE

EXISTING

MATCH

FABRIC

FILTER

DESIGN SPEED = 45 MPH

GROUP 13

OPTIONAL BASE

GROUP 13

OPTIONAL BASE

(98% T180)

SUBGRADE

12" COMPACTED

(98% T180)

SUBGRADE

12" COMPACTED

INDEX NO. 521-001

PER FDOT STANDARD PLAN

WITH DRAINAGE SLOTS @ 4' O.C.

38" SHOULDER BARRIER

N CANAL

HGWCD

GRADE

EXISTING

MATCH

SECTIONS

VARIES SEE CROSS

EXISTING ROADWAY

VARIES 20.7' TO 22.0' TO 12.0'

VARIES 10.7'

DEEP POST

GUARDRAIL WITH

2'

VARIES

SLOPE

SLOPE AT 10:1 MAX.

2" MISC. ASPH. PAVT.

PLASTIC EROSION MAT APPLICATION*

3. RESURFACE WITH FRICTION COURSE FC-9.5 (1")

TYPE SP (TRAFFIC C) (0.75" AVERAGE DEPTH)

2. OVERBUILD WITH STRUCTURAL COURSE

1. MILLING DEPTH = 1"

NOTES:

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

TYPICAL SECTION NO. 7

SAM SENTER ROAD

� CONSTRUCTION

12' 12'

2%

LINE

GRADE

PROFILE

2%

STA. 12+50.00 TO STA. 14+00.00

SP (TRAFFIC C) (1 1/2")

STRUCTURAL COURSE TYPE

TYPE FC-9.5 (1")

FRICTION COURSE

ROADWAY\TYPSRD07.DGN

TYPICAL SECTION

1"=10'

& OVERBUILD

RESURFACE

MILL,

6% 6%

3'

6"

TACK COAT

COAT AND

R-70 PRIME

SP (TRAFFIC C) (1 1/2")

STRUCTURAL COURSE TYPE

TYPE FC-9.5 (1")

FRICTION COURSE

TACK COAT

COAT AND

R-70 PRIME

2'

WIDENING WIDENINGSOD

8.67' TO 4'

WIDTH VARIES

PAVED SHOULDER

3'

GUARDRAIL

:1

PAVEMENT

2" MISC.

4'

6"

AND GRUBBING

STANDARD CLEARING

STANDARD CLEARING AND GRUBBING

8.67' TO 4'

WIDTH VARIES

PAVED SHOULDER

VARIES 34.9' TO 37.1'

DISTRICT R/W LINE

WATER CONTROL

HIGHLAND GLADES

130'

DISTRICT R/W LINE

WATER CONTROL

HIGHLAND GLADES

GUARDRAIL

EXISTING

REMOVE

SOD

VARIES

VARIES

DESIGN SPEED = 45 MPH

(98% T180)

SUBGRADE

12" COMPACTED

(98% T180)

SUBGRADE

12" COMPACTED

GROUP 13

OPTIONAL BASE

GROUP 13

OPTIONAL BASE

N CANAL

HGWCD

SECTIONS

VARIES SEE CROSS

GRADE

EXISTING

MATCH

GRADE

EXISTING

MATCH

EXISTING ROADWAY

VARIES 16.0' TO 20.7'

10.7'

6.0' TO

VARIES

AT 10:1

SLOPE

DEEP POST

GUARDRAIL WITH

2'

SLOPE AT 10:1 MAX.

2" MISC. ASPH. PAVT.

VARIES

SLOPE

PLASTIC EROSION MAT APPLICATION*

3. RESURFACE WITH FRICTION COURSE FC-9.5 (1")

TYPE SP (TRAFFIC C) (0.75" AVERAGE DEPTH)

2. OVERBUILD WITH STRUCTURAL COURSE

1. MILLING DEPTH = 1"

NOTES:

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

SUMMARY OF PAY ITEMS

ROADWAY\SUMMARY OF PAY ITEMS.DGN

LS

LS

CY

CY

SY

SY

TN

TN

TN

SY

SUMMARY OF PAY ITEMS

DESCRIPTION UNIT

MOBILIZATION

CLEARING AND GRUBBING

SY

SY

AC

OPTIONAL BASE GROUP 7

OPTIONAL BASE GROUP 13

SUPERPAVE ASPHALT CONCRETE (TRAFFIC LEVEL C)

NO.

ITEM

QUANTITY

CYREGULAR EXCAVATION

5 LFFLOATING TURBIDITY BARRIER

EA

CYCLASS I CONCRETE (GRAVITY WALL)

CY9

TYPE B STABILIZATION (LBR 40) (12")

COMPACTED SUBGRADE (98% T-180) (12")

ASPH. CONCRETE FRICTION COURSE (1.0") (FC-9.5)

3 LFSEDIMENT BARRIER (SILT FENCE)

1.00

1.00

CY

LB

LF

LF

CF

LF

REINFORCING STEEL (SUPERSTRUCTURE)

LF

BRIDGE ITEMS

UNITDESCRIPTION

NO.

ITEM

QUANTITY

SUMMARY OF PAY ITEMS (CONTINUED)

LF

CONTROL STRUCTURES (DITCH BOTTOM INLET TYPE C) (SPECIAL)

MAINTENANCE OF TRAFFIC

CONCRETE PIPE CULVERT (18") LF

RIGID INCLUSIONS SF

SY

77.0LFSHOULDER CONCRETE BARRIER

LFCONCRETE BARRIER WITH JUNCTION SLAB

EAMITERED END SECTION 18" (2:1)

MISCELLANEOUS ASPHALT PAVEMENT (2" THICK)

LFROADWAY GUARDRAIL

EA 676SPECIAL GUARDRAIL POST - DEEP POST FOR SLOPE BREAK CONDITION

EA

EAGUARDRAIL END TREATMENT - PARALLEL APPROACH TERMINAL

EAGUARDRAIL END TREATMENT - TRAILING ANCHORAGE

EA

GUARDRAIL REMOVAL LF 4550

SY

TN

TNBEDDING STONE (SECT. 530)

RIP-RAP (RUBBLE)

SODDING

CYFLOWABLE FILL

EA

EA

LF

EA

PREMIUM FOR CONFLICT CONDITION (SEE SP'S)

STRUCTURE BOTTOM TYPE J

STORM SEWER CLEANING (EXIST.) (24" OR LESS) (SEE SP'S)

EDCHANGEABLE (VARIABLE MESSAGE) SIGN (NON MOT)

TREE SPADE UNITS (TSU) (SEE SP'S)

EAPALM RELOCATION UNITS (SEE SP'S)

EATREE RELOCATION UNITS (SEE SP'S)

HRTRAFFIC CONTROL OFFICER (NON MOT)

CYCLASS I CONCRETE (MISCELLANEOUS)

UNITDESCRIPTION

NO.

ITEM

QUANTITY

SUMMARY OF CONTINGENCY PAY ITEMS

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

EACONTROL STRUCTURES (DITCH BOTTOM INLET TYPE D) (SPECIAL)

EACONTROL STRUCTURES (DITCH BOTTOM INLET TYPE H) (SPECIAL)

REMOVAL OF EXISTING STRUCTURE SF

CLASS II STRUCTURAL CONCRETE (FLAT SLAB)

CY 236CLASS IV STRUCTURAL CONCRETE (SUBSTRUCTURE)

CYCLASS II STRUCTURAL CONCRETE (APPROACH SLAB)

CYCONCRETE CLASS II TOPPING (OVERLAY)

SY 827BRIDGE DECK GROOVING

SY 827BRIDGE DECK PLANING

LBREINFORCING STEEL (SUBSTRUCTURE)

LBREINFORCING STEEL (APPROACH SLAB)

PLAIN NEOPRENE BEARING PADS

CONCRETE TRAFFIC RAILING BRIDGE (36" SINGLE-SLOPED)

BRIDGE DECK EXPANSION JOINTS

STRUCTURAL CONCRETE (18" PRESTRESSED PILES)

FLORIDA SLAB BEAM NEW/WIDENING (55"X12")

LF 424FLORIDA SLAB BEAM NEW/WIDENING (50"X12")

GUARDRAIL ATTACHMENT TO BARRIER - APPROACH TRANSITION TO RIGID BARRIER

PAY ITEM NOTES:

TNASPH. CONCRETE FRICTION COURSE (1.75") (FC-9.5)

SFWMD 20' WIDTH VEHICLE BARRIER TWO SPAN GATE

TN 287.3

326.0

44.7

148642

2030.1

729.3

GEOTEXTILE GEOGRID REINFORCEMENT TYPE R-2 33031.6

20444

13153

33268" PRECAST CONCRETE PANELS SF

3995.9

18398.9

16887.7

3333.1

9.77

3893.3

1668.2

1326.3

20.4

103.0

23926.4

85303

TEST PILES (18" PRESTRESSED PILES)

14111

39223

CANAL EXCAVATION

EMBANKMENT

CANAL EMBANKMENT

NO.ITEM

FDOT PAY

101-1

430-175-118

NO.ITEM

FDOT PAY

110-3

NO.ITEM

FDOT PAY

104-10-3

285-707

285-713

327-70-1

334-1-13

334-1-13

337-7-82

337-7-82

400-0-11

521-8-7

536-1-1

536-7-1

530-3-3

570-1-1

400-2-4

400-4-5

400-2-10

400-2-47

400-7-1

400-9-1

415-1-4

415-1-5

415-1-9

400-148

450-8-11

450-8-13

455-34-3

458-1-11

521-5-13

400-1-30

121-70

N/A

102-99

102-14

N/A

N/A

N/A

N/A

N/A

455-143-3

400-72

104-11

120-1

120-5

120-6

102-1

110-1-1

N/A

N/A

160-4

339-1

425-1-529

425-1-549

425-1-589

430-982-125

N/A

145-71

521-72-40

536-73

536-8-112

536-85-24

536-85-20

N/A

530-74

MILL EXISTING ASPHALT PAVEMENT (1")

STRUCTURAL OVERBUILD (SP) (TRAFFIC C)

- ITEM NO. 38 INCLUDES THE COSTS FOR FILTER FABRIC

- ITEM NO. 36 INCLUDES THE COSTS FOR OBJECT MARKERS

- ITEM NO. 20 INCLUDES THE COSTS FOR REINFORCING STEEL

- ITEM NOS. 15, 17, 18 AND 19 INCLUDE THE COSTS FOR PRIMECOAT AND TACKCOAT

40 SY571-1-11

3228.7

7462.5

PLASTIC EROSION MAT, TURF REINFORCED MAT, TYPE 1

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

NONE

SUMMARY OF QUANTITIES

ROADWAY\SUMMARY OF QUANTITIES 01.DGN

SIDE P F

TOTALS :

LOCATION

P F

(LF)

BARRIER

TURBIDITY

FLOATING

SEDIMENT CONTROL DEVICES

SUMMARY OF EROSION AND

Station

LOCATION

Sta. TO Sta.

P F

SIDE

TOTAL :

THICKNESS

AVERAGE TONS

YARDS

SQUARE

LT & RT

SUMMARY OF TYPE SP OVERBUILD

SUMMARY OF EARTHWORK

DESCRIPTION

F

CY

P

REGULAR EXCAVATION(LF)

BARRIER

SEDIMENT

SQ-1

REMARKS

RT

LT

LOCATION

Sta. TO Sta. SIDE P F

TONS

(In.)

THICK

TOTAL :

SY

ASPHALT PAVEMENT

SUMMARY OF MISCELLANEOUS

LT

RT

REMARKS

2RT

2RT

CR 880

SAM SENTER ROAD

CR 880

SAM SENTER ROAD

CR 880

SAM SENTER ROAD

LT & RT

2LT

LT

LT & RT

326.0

1.75"

3.50"

0.75"

76+00.00 TO 80+00.03

109+00.11 TO 118+85.53

1034.8

1122.1

99.6

216.0

11+73.35 TO 14+00.00 251.8 10.4

76+00.00 TO 98+60.00 2284' ALONG NORTH R/W LINE

RT

RT

LT

ALONG SOUTH R/W LINE

ALONG NORTH R/W LINE

ALONG SOUTH R/W LINE

ALONG SOUTH R/W LINE

76+00.00 TO 91+43.84 1516'

91+92.38 TO 99+11.59 690'

99+50.94 TO 118+85.53 1936'

100+00.00 TO 118+85.53 1885'

ALONG WEST R/W LINE

RT

L-13 CANAL

SAM SENTER ROAD

RT

8511' 890'

247'

365'

LT 278'

12+00.00 TO 14+00.00 200'

ALONG S. SIDE OF L-13 CANAL

ALONG N. SIDE OF L-13 CANAL

ALONG W. SIDE OF N CANAL

20+00.00 TO 23+60.00

20+00.00 TO 22+47.00

11+60.00 TO 14+00.00

2LT

76+00.00 TO 98+17.65 984.8 98.5

78+93.12 TO 91+59.91 287.8 28.8

91+79.58 TO 99+24.53 392.4 39.2

99+37.04 TO 109+07.28 290.0 29.0

100+31.00 TO 118+50.00 800.6 80.1

6.7

287.3

67.1

EMBANKMENT

CANAL EXCAVATION

CANAL EMBANKMENT

14111

39223

12+49.00 TO 14+00.00 RT 2 50.0 5.0

11+98.59 TO 14+00.00

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

NONE

SUMMARY OF QUANTITIES

LOCATION

Sta. TO Sta. SIDE

TOTAL :

P F

ROADWAY\SUMMARY OF QUANTITIES 02.DGN

SQ-2

LOCATION

Sta. TO Sta.

P F

CY

SIDE

HEIGHT

WALL

BEGIN

HEIGHT

WALL

END

(LF)

LENGTH

SCHEME

SUMMARY OF GRAVITY WALL

TOTAL :

ELEV.

WALL

TOP OF

BEGIN

ELEV.

WALL

TOP OF

END * *

LT98+17.74 TO 98+55.40 3.5' 3.5' 39.0 3 21.8

CONCRETE

CLASS I

PER FDOT INDEX NO. 400-011

WALL HEIGHT IS MEASURED FROM TOP OF WALL TO GROUND SURFACE

LOCATION

SIDE

P F

SUMMARY OF GUARDRAIL

STATION

ROADWAY

FROM

TO

FROM

TO

FROM

TO

P F P FP F P F

TOTALS:

FROM

TO

FROM

TO

FROM

TO

FROM

TO

FROM

TO

FROM

TO

FROM

TO

FROM

TO

FROM

TO

FROM

TO

FROM

TO

FROM

TO

FROM

TO

FROM

TO

FROM

TO

FROM

TO

FROM

TO

FROM

TO

LT

RT

FROM

TO

(SY)

AREA

LOCATION

Sta. TO Sta.

SIDE

TOTAL :

P F

LT 2290

SUMMARY OF GUARDRAIL REMOVAL

(LF)

LENGTH

ANCHORAGE

TRAILING

END TREATMENT (EA)

TERMINAL

APPROACH

PARALLEL

ATTACHMENT TO BARRIER (EA)

TO RIGID BARRIER

APPROACH TRANSITION

CR 880

GUARDRAIL (LF) SPECIAL POST (EA)

CONDITION

SLOPE BREAK

DEEP POST FOR

SAM SENTER RD

CR 880

44.7

SAM SENTER ROAD

LT11+64.87 TO 11+68.02 1.4' 1.0' 13.3 3 1.7

RT & LT

CR 880

CR 880

SAM SENTER RD

LT

LT 2.9' 2.7' 48.2 3 21.2

17.6' 17.6'

99+83.93 TO 100+31.00 17.0' 16.8'

15.5' 15.1'

80+00.03 TO 109+00.11

LT 1890

LT

RT 271

LT

76+00.00 TO 98+73.00

99+60.00 TO 118+50.00

11+29.00 TO 11+52.00

11+29.00 TO 14+00.00

11+44.00 TO 11+68.00

11+80.00 TO 12+30.00

400.0 64

1275.0 1 1

LT 1837.0

RT 775.0

RT 981.5

LT 869.0

LT 400.0

LT 550.0

LT

RT 150.0

76+00

80+00

79+03

91+58

80+00

98+18

91+83

99+25

99+39

108+97

1 1

100+31

109+00

109+00

113+00

113+00

118+50

11+86

12+24 37.5

12+50

14+00

7462.5 676 3 3 5

33031.6

33031.6

AREA OF RIGID INCLUSIONS = 148642 SF

AREA OF RIGID INCLUSIONS = 148642 SF X 2 LAYERS = 297284 SF

297284 SF / 9 = 33031.6 SY

SUMMARY OF GEOTEXTILE GEOGRID REINFORCEMENT TYPE R-2

LOCATION

Sta. TO Sta.

SIDE

CR 880

SUMMARY OF PERFORMANCE TURF

EROSION MAT

PLASTIC

FP

SY

0571 - 1 - 11

TOTAL :

SAM SENTER RD

LT

LT76+00.00 TO 118+50.00

12+00.00 TO 13+50.00

3057.9

170.8

3228.7

13+92

12+04

187.5LT 1 130

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

NONE

SUMMARY OF QUANTITIES

LOCATION

SIDE

TOTAL :

P F

LT

ROADWAY\SUMMARY OF QUANTITIES 03.DGN

SQ-3

TOTAL :

P F

SUMMARY OF RIP-RAP (RUBBLE)

(SF)

AREA

P F

(CF)

VOLUME

L-13 CANAL

VEHICLE BARRIER TWO SPAN GATE

SUMMARY OF SFWMD 20' WIDTH

(EACH)

SUMMARY OF BEDDING STONE

SAM SENTER ROAD

LOCATION

STATION TO STATION

SIDE

RT20+76.67 TO 23+23.33

SAM SENTER ROAD

STATION

11+75.5

12799

LT20+76.67 TO 22+65.13 8841

38050.5

19198.5

13261.5

LT11+64.35 TO 12+49.94 3727 5590.5

= 2030.1 TONS

4060140.5 LBS DIVIDED BY 2000 LBS/TON

= 4060140.5 LBS

W(LBS) = 38050.5 CF X 1.9 X 62.4 X 0.9

Vf = VOID FACTOR = 0.9 Ww = WEIGHT OF WATER = 62 LBS/CF

SG = SPECIFIC GRAVITY FOR DITCH LINING = 1.9

VOLs = VOLUME OF STONE (CF) W(LBS) = VOLs X SG X Ww X Vf

TOTAL :

P F

(SF)

AREA

P F

(CF)

VOLUME

L-13 CANAL

LOCATION

STATION TO STATION

SIDE

RT20+76.67 TO 23+23.33

SAM SENTER ROAD

12799

LT20+76.67 TO 22+65.13 8841

12683.5

LT11+64.35 TO 12+49.94 3727 1863.5

6399.5

4420.5

= 729.3 TONS

1458602.5 LBS DIVIDED BY 2000 LBS/TON

= 1458602.5 LBS

WEIGHT (LBS) = 12683.5 CF X 115 LBS/CF

P F

(TONS)

WEIGHT

298.3

1024.3

707.5

2030.1

P F

(TONS)

WEIGHT

107.2

368.0

254.1

729.3

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

STRUCTURES

SUMMARY OF DRAINAGE

DRAINAGE\SUMMARY OF DRAIN STRUCTS.DGN

NONE

P

F

P

F

P

F

P

F

F

P

F

P

DESCRIPTIONSTATION

S I D

E

QTY.

REMARKS

18"

CULVERT (LF)

CONCRETE PIPE

NO.

STR

RT INLET, PIPE

B A

R R

E L S

185+00.00

85+00.00

98+50.00

RT

98+50.00

RT INLET, PIPE

INLET, PIPE

S-10

S-11

S-12

S-13

S-14

S-15

102+00.00

102+00.00

MES

MES

MES

(EA)

CONTROL STRUCTURE

TYPE C TYPE D TYPE H

(EA)

SECTION 2:1

MITERED END

TOTALS:

36 1 1 1

RT

RT

RT

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

ROADWAY\GNNTRD01.DGN

GENERAL NOTES

ABBREVIATIONS

IN A DETERIORATED CONDITION.

ENGINEER, IN WRITING, PRIOR TO COMMENCING CONSTRUCTION IF SAID ITEMS ARE DAMAGED, MISSING OR

OF ALL EXISTING ITEMS NOTED TO REMAIN OR TO BE RELOCATED. THE CONTRACTOR SHALL NOTIFY THE

17. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION AND/OR REMOVAL, STORAGE AND REINSTALLATION

CONTACT PERSON UTILITY PHONE NUMBER

FP&L TRANSMISSION

FP&L DISTRIBUTION

COMCAST

AT&T DISTRIBUTION

561-803-7942

321-214-3814

561-436-9034

561-540-9263

INFORMATION PRIOR TO FINAL CERTIFICATION OF THE PROJECT.

UPON COMPLETION AND PROVIDED WITH FIELD NOTES, CERTIFIED CORNER RECORDS AND ALL SUPPORTING

AUTHORIZATION NUMBER OF THE PARTY IN RESPONSIBLE CHARGE. PALM BEACH COUNTY SHALL BE NOTIFIED

SURVEYOR AND MAPPER WITH A MONUMENT BEARING THE FLORIDA LICENSE NUMBER OR CERTIFICATE OF

ARE TO BE REFERENCED PRIOR TO CONSTRUCTION AND RESET AFTER CONSTRUCTION BY A PROFESSIONAL

CONTROL MONUMENTS AND ALL OTHER PERMANENT MONUMENTS LOCATED WITHIN PROPOSED CONSTRUCTION

18. EXISTING SECTION, QUARTER SECTION CORNERS, PROPERTY CORNERS, PALM BEACH COUNTY SURVEY

YR = YEAR

W/L = WATER SURFACE LINE

W/ = WITH

VPI = VERTICAL POINT OF INTERSECTION

U.S. = UNITED STATES

TWNP. = TOWNSHIP

TEL = TELEPHONE

T/B = TOP OF BANK

STA. = STATION

SP = SUPERPAVE

SFWMD = SOUTH FLORIDA WATER MANAGEMENT DISTRICT

SEC. = SECTION

S/B = SLOPE BREAK

R/W = RIGHT OF WAY

RT = RIGHT

RPB = RECORD PLAT BOOK

RGE. = RANGE

RD. = ROAD

RCP = REINFORCED CONCRETE PIPE

R = RADIUS

PT = POINT ON TANGENCY

PI = POINT OF INTERSECTION

PGL = PROFILE GRADE LINE

PG. = PAGE

PC = POINT OF CURVATURE

PAVT. =PAVEMENT

ORB = OFFICIAL RECORDS BOOK

OH = OVERHEAD

ARE TO REMAIN UNLESS OTHERWISE NOTED.

16. ALL EXISTING DRAINAGE STRUCTURES, PIPES AND APPURTENANCES WITHIN THE LIMITS OF CONSTRUCTION

15. STATIONS AND OFFSET REFER TO THE CENTERLINE OF CONSTRUCTION, UNLESS OTHERWISE NOTED.

TO, OR BETTER THAN, THE EXISTING CONDITION AT THE TIME CONSTRUCTION BEGAN.

14. THE CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED BY THIS CONSTRUCTION TO A CONDITION EQUAL

TELEPHONE NO. (301) 713-3242

SILVER SPRINGS, MARYLAND 20910

SSMC 3 STATION 09202

NOAA NATIONAL GEODETIC SURVEY N/CG 17

NATIONAL GEODETIC INFORMATION SERVICE CENTER

DANGER OF DAMAGE THE CONTRACTOR SHOULD NOTIFY:

13. ANY N.G.V.D. OR N.A.V.D. MONUMENT WITHIN THE LIMITS OF CONSTRUCTION IS TO BE PROTECTED. IF IN

12. BENCHMARK DATUM IS NORTH AMERICAN VERTICAL (NAVD 88).

UNSUITABLE FOR CONSTRUCTION ARE ENCOUNTERED.

11. THE CONTRACTOR SHALL NOTIFY THE COUNTY'S REPRESENTATIVE IF SOIL OR SUBSURFACE CONDITIONS

553.105 FOR THE PROTECTION OF UNDERGROUND GAS PIPELINES.

10. PRIOR TO COMMENCEMENT OF ANY EXCAVATION THE CONTRACTOR SHALL COMPLY WITH FLORIDA STATUTE

LINES AND UNDERGROUND UTILITIES.

9. THE CONTRACTOR IS TO USE CAUTION WHEN WORKING IN OR AROUND AREAS OF OVERHEAD TRANSMISSION

UTILITY COMPANY.

8. UTILITY LOCATIONS MAY ALSO BE DETERMINED BY CALLING SUNSHINE ONE-CALL AND THE RESPECTIVE

OE = OVERHEAD ELECTRIC

NWL = NORMAL WATER LEVEL

NO. = NUMBER

NGVD 29 = NATIONAL GEODETIC VERTICAL DATUM OF 1929

NAVD 88 = NORTH AMERCAN VERTICAL DATUM OF 1988

N = NORTH

MISC. = MISCELLANEOUS

MAX. = MAXIMUM

LT = LEFT

KV = KILOVOLTS

HGWCD = HIGHLAND GLADES WATER CONTROL DISTRICT

FT. = FOOT

FL = FLOW LINE

FDOT = FLORIDA DEPARTMENT OF TRANSPORATION

FC = FRICTION COURSE

EXIST. = EXISTING

EOP = EDGE OF PAVEMENT

EL. = ELEVATION

E = EAST

DHW = DESIGN HIGH WATER

CR = COUNTY ROAD

CONST. = CONSTRUCT

CMP = CORRUGATED METAL PIPE

¡ = CENTERLINE

CATV = CABLE TELEVISION

B/B = BOTTOM OF BANK

£= BASELINE

ASPH. = ASPHALT

ac or AC. = ACRE

NONE

CRAIG LEDBETTER

DAVID FUCHS

STEVE ROSA

GARTH BEDWARD

7. UTILITY AGENCY OWNERS:

PRESENT.

ANY CONSTRUCTION INVOLVING THEIR FACILITIES SO THAT THEIR COMPANY REPRESENTATIVE CAN BE

6. THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES A MINIMUM OF 3 WORKING DAYS IN ADVANCE OF

5. UTILITIES ARE TO BE ADJUSTED BY OTHERS UNLESS OTHERWISE NOTED.

IRRIGATION SYSTEMS, SIGNS, ETC.) THAT ARE IN CONFLICT WITH THE PROPOSED ROADWAY CONSTRUCTION.

ALLOW PROPERTY OWNERS THE OPPORTUNITY TO RELOCATE ANY PRIVATE PROPERTY (LANDSCAPING,

4. THE CONTRACTOR SHALL NOTIFY ALL PROPERTY OWNERS 14 DAYS IN ADVANCE OF ANY CONSTRUCTION TO

REQUIRED.

INFORM THE ENGINEER AND NOTIFY THE RESPECTIVE UTILITY OWNERS TO RESOLVE UTILITY CONFLICTS, AS

WITHIN THE AREA OF CONSTRUCTION. SHOULD THERE BE UTILITY CONFLICTS, THE CONTRACTOR SHALL

CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY IF OTHER UTILITIES (NOT SHOWN IN THE PLANS) EXIST

LOCATIONS SHALL BE DETERMINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. THE

3. THE LOCATIONS OF EXISTING UTILITIES SHOWN IN THE PLANS ARE APPROXIMATE ONLY; THE EXACT

AND DUDA RD.

OF NEW BRIDGE WILL TEMPORARILY SHUT DOWN SAM SENTER RD, REQUIRING TRAFFIC DETOUR TO AIRPORT RD

APPROVAL OF THE PLAN FROM THE COUNTY PRIOR TO BEGINNING CONSTRUCTION OF THE PROJECT. CONSTRUCTION

PLAN TO PALM BEACH COUNTY DEPARTMENT OF ENGINEERING AND PUBLIC WORKS AND SHALL RECEIVE WRITTEN

& HIGHWAYS (MUTCD). THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SEQUENCE AND TRAFFIC CONTROL

TRANSPORTATION STANDARD PLANS AND FHWA "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS

SIGNS, BARRICADES AND LIGHTS SHALL BE PROVIDED IN ACCORDANCE WITH FLORIDA DEPARTMENT OF

2. VEHICULAR TRAFFIC SHALL BE MAINTAINED AND PROTECTED AT ALL TIMES.

STANDARDS WHERE APPLICABLE.

SPECIFICATIONS, FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD PLANS AND PALM BEACH COUNTY

1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD

FOR RESOLUTION.

19. THAT IN THE EVENT OF ANY CONFLICTING DATA, REFER TO THE SURVEY (SHEETS SUR1 THRU SUR13)

SR 880 & ATLANTIC SUGAR MILL RD, BELLE GLADE, FL 33430.

ANTONIO DE CORRAL, SR. MANAGING HYDRAULIC ENGINEERING, FLORIDA CRYSTALS CORPORATION., FOR THE DURATION OF THE CONSTRUCTION PROJECT. THE CROP SPRAYING POINT OF CONTACT IS:

26. THE CONTRACTOR SHALL ACTIVELY COORDINATE THE CROP SPRAYING ACTIVITIES PERFORMED BY THE FARMERS

OTHERWISE NOTED.

25. INTERSECTING ROADS AND DRIVEWAYS ARE TO BE GRADED AS DIRECTED BY THE ENGINEER, UNLESS

THE COSTS FOR CLEARING AND GRUBBING.

CONSTRUCTION AND SHALL REMAIN UNTIL CONSTRUCTION IS COMPLETE. COSTS FOR THIS ARE INCLUDED IN

TREE PROTECTION FENCE. THE FENCE SHALL BE ERECTED AT THE TREE DRIP LINE PRIOR TO BEGINNING

ALL ASPECTS OF THE WORK. PROTECTION SHALL INCLUDE THE ERECTION AND MAINTENANCE OF AN APPROVED

24. THE CONTRACTOR SHALL PROTECT ALL TREES TO REMAIN, AS DIRECTED BY THE PROJECT ENGINEER, DURING

THE EDGE OF PAVEMENT UNLESS OTHERWISE NOTED.

23. CALLOUTS FOR PAVEMENT AND CURBING RADII, STATIONING, OFFSETS AND ELEVATIONS REFER TO

IN AN AREA PROVIDED BY THE CONTRACTOR.

22. ALL VEGETATION, DEBRIS, CONCRETE OR OTHER UNSUITABLE MATERIAL SHALL BE DISPOSED OF OFF-SITE

21. GRADES SHOWN ARE FINISH GRADES, UNLESS OTHERWISE NOTED.

CLEAN, STRAIGHT EDGE.

20. IN AREAS OF PAVEMENT WIDENING ALL EXISTING PAVEMENT EDGES ARE TO BE MECHANICALLY SAWCUT TO A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

DITCH

DITCH

DITCH DITCH DITCH

DITCH

DITCH

DI

TCH

DI

TCH

DI

TCH

DI

TCH

D

IT

CH

D

IT

CH

D

IT

CH

DITCH DITCH

D

IT

C H

T/B

B/B

B/B

T/B

T/B

T/B

B/B

B/B

T/B

B/B

T/B

B/B

T/B

B/B

T/B

B/B

B/B

T/B

B/B

T/B

T/B

B/B

B/B

T/B

T/B

B/B

B/B

T/B

T/ B

T/ B

B/ B

B/ B

T/ B

T/ B

B/

BB/

B

T/ B

T/ B

B/ B

B/ B

T/ B

T/ B

B/ B

B/ B

T/ B

T/ B

B/

BB/

B

T/ B

T/ B

B/ B

B/ B

T/ B

T/ B

B/ B

B/ B

T/B

S/B

EOP

EOP

T/B

W/L

W/L

T/ B

S/ B

EOP

EOP

T/ B

W /L

T/ B

S/ B

EOP

EOPT/

B

W /L

T/ B

S/ B

EOP

EOP

T/ B

W /L

T/ B

S/ B

EOP

EOP

T/

B

W /L

S/ B

T/ B

EOP

EOP

T/ B

W /L

W /L

S/ B

T/B

EOP

EOP

T/

B

T/ B

S /B

EOP

T/B

T/B

W/L

W/L

S/B

EOP

EOP

EOP

EOP

T/B

S/B

W/L

T/B

W/L

T/B

EOP

EOP

T/B

S/B

T/B

T/B

B/B

B/B

W/L

T/B

EOP

EOP

T/B

S/B

DITCH

T/B

B/B

T/B

B/B

W/L

T/B

EOP

EOP

T/B

S/B

W/L

W/L S/B

T/B

T/B

S/B

T/B

T/B

S/B

W/L

T/B

EOP

T/B

S/B

EOP

W/L

T/B

EOP

T/B

S/B

EOP

W/L

T/B

EOP

T/B

S/B

EOP

W/L

T/B

EOP

T/B

S/B

EOP

W/L S/B

W/L

W/L

S/B

UNPAVED ROAD

U N P

A V E

D

R

O A

D

S B

W L

U N P

A V E

D R

O A

D

E O P

E O P

S B

S B T B

W L

W L

S B

T B

T/B

T/B

T/B

E O P

E O P

T B

W L

W L

S B

T B

S B

S B

COM

O R

B

P

G

W .5

E .2

.1

S

O F

S

R

KING RANCH, INC.

THE EAST 1/2 OF SECTION 3/44/38

TRACT TWO ORB 11524 PG.441

00-38-44-03-00-000-1010

C M

P

C M

P

36" CMP

24" RCP

PI STA. 11+85.00

P I S

T A .0 3 8

P C S

T A . 8

.3

P T

S

T A

.8

P I

S

T A

.0

100 105 P

A

.1

110 115

20 25

P T S

T A . 1

.5

P I

S T A .2 5 1

P C S

T A . 1

.2

P T

S

T A

.5

P I

S

T A

.2

200 205 210 215 220

N

1"=400'

PROJECT LAYOUT

CR 880

S A

M

S

E N

T E

R

R

D

CR 880

¡ CONSTRUCTION

PI STA. = 92+59.01

T = 750.63

L = 1,430.43

R = 1,910.00

PC STA. = 85+08.38

PT STA. = 99+38.81

SAM SENTER RD

¡ CONSTRUCTION

STA 76+00.00

CR 880

¡ CONSTRUCTION

BEGIN

STA 118+85.53

CR 880

¡ CONSTRUCTION

END

NORTHING EASTING DESCRIPTION

� PI

CURVE 1 PI

CURVE 1 PC

CURVE 1 PT

BEGIN � CONSTRUCTION

� PI

� STATION

END � CONSTRUCTION

CR 880 � CONSTRUCTION DATA TABLE

76+00.00

80+00.03

851342.257 804896.690

851611.416 805192.626

85+08.38 851958.129 805564.389

92+59.01 852470.091 806113.339

99+38.81 852471.314 806863.971

109+00.11 852472.881 807825.266

118+85.53 852487.385 808810.581

NORTHING EASTING DESCRIPTION

� PI

BEGIN � CONSTRUCTION

� STATION

END � CONSTRUCTION

10+00.00

11+85.00

852471.179 806844.162

852656.179 806843.861

852871.160 806840.834

SAM SENTER RD � CONSTRUCTION DATA TABLE

14+00.00 e = 7.70%

STA. 14+00.00

SAM SENTER ROAD

END ¡ CONSTRUCTION

LEGEND

ROADWAY PLAN SHEET NUMBERXX

27 29

C R

0 100 400

Feet

ROADWAY\PROJECTLAYOUT.DGN

SFWMD L-13 CANAL

H G

W

A N

A L

£ SURVEY STATION/OFFSET

£ SURVEY STATION/OFFSET

176+00.00/4.02'RT

192+31.17/121.64'LT

219+00.56/7.10'RT

199+35.27/164.95'LT

199+33.97/20.05'RT

199+34.28/379.95'LT

179+99.96/13.46'RT

185+08.36/18.24'RT

199+53.93/20.00'RT

209+15.22/20.00'RT

NORTHING EASTING DESCRIPTION

851032.346 804570.538

851286.567 804831.282

851537.539 805095.372

851965.816 805545.976

852490.065 806097.583

199+48.56 852491.305 806858.573

222+00.00 852494.978 809109.936

CR 880 £ SURVEY DATA TABLE

£ SURVEY CR 880

STA 171+50.00

CR 880

£ SURVEY

BEGIN

STA 222+00.00

CR 880

£ SURVEY

END

£ STATIONNORTHING EASTING DESCRIPTION� STATION

18+00.00

26+00.00

852567.550 806444.004

852568.854 807244.003

£ SURVEY STATION/OFFSET

171+50.00

£ CURVE 1 PI175+14.25

CURVE 1 PT178+78.50

CURVE 2 PC185+00.23

CURVE 2 PI

BEGIN £ SURVEY CURVE 1 PC

192+61.22

CURVE 2 PT

END £ SURVEY

BEGIN � CONSTRUCTION

END � CONSTRUCTION

195+55.80/119.69'LT

203+34.12/76.92'LT

SFWMD L-13 CANAL

¡ CONSTRUCTION

� CONSTRUCTION SFWMD L-13 CANAL DATA TABLE

¡ CONST. CR 880 CURVE 1 DATA:

STA. 18+00.00

SFWMD L-13 CANAL

BEGIN ¡ CONSTRUCTION

STA. 26+00.00

SFWMD L-13 CANAL

END ¡ CONSTRUCTION

£ SURVEY CR 880 CURVE 2 DATA:

£ SURVEY CR 880 CURVE 1 DATA:

PI STA. = 175+14.25

T = 364.25

L = 728.50

R = 57,295.36

PC STA. = 171+50.00

PT STA. = 178+78.50

PI STA. = 192+61.22

T = 760.99

L = 1,448.33

R = 1,909.86

PC STA. = 185+00.23

PT STA. = 199+48.56

STA. 10+00.00

SAM SENTER ROAD

BEGIN ¡ CONSTRUCTION

DITCH

T/B

T/B

B/B

B/B

T/B

T/B

B/B

B/B

T/B

S/B

EOP

EOP

T/B

W/L

T/B

S/B

EOP

EOP

T/B

W/L

76 77 78 79 80 81

OH CATV 13 KV OE

OH TEL

U.S. SUGAR CORPORATION

PARCEL B (ORB 27063 PG.1015)

00-38-44-04-00-000-5000

00-38-44-04-00-000-1020

SECTION 4/44/38

SFWMD L-13 (OCEAN CANAL R/W)

PUBLIC R/W PER RPB 7 PG. 186

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

8.5

8.5

10.5

10.5

10.5

8.5

8.5

10.5

10.5

10.5

N

R/W LINE

CR 880

ROADWAY\PLANRD01.DGN

M A

T C

H

L I N

E

S

T A

.0

STA. 76+00.00

ROADWAY PLAN

¡ CONSTRUCTION CR 880

SFWMD R/W LINE

SFWMD R/W LINE

DENOTES ROADWAY WIDENING

DENOTES SHOULDER CONSTRUCTION

GUARDRAIL

EXISTING

REMOVE

4' WIDE

PAVEMENT

2" MISC.

4.5' WIDE

PAVEMENT

2" MISC.

GUARDRAIL TL-3

12.00' RT

+00.03

12.00' LT

+99.96

WIDTH

SHOULDER

BEGIN 10'

WIDTH

SHOULDER

BEGIN 10'

22.55' RT

+03.14

12.00' RT

+00.00

WIDTH SHOULDER

BEGIN VARIABLE

12.00' LT

+00.00

WIDTH SHOULDER

BEGIN VARIABLE

18.00' LT

+00.00

GUARDRAIL

CONNECT TO EXISTING

BEGIN GUARDRAIL TL-3

MATCH EXISTING

BEGIN CONSTRUCTION

BEGIN PROJECT

0 10 40

Feet

.9

.1

.1

.7

.5

.5

PI STA. 80+00.03

¡ CONSTRUCTION

GUARDRAIL TL-3

LEGEND:

OVERBUILD EXISTING ROADWAY

DENOTES MILL/RESURFACE/

SFWMD L-13 CANAL

SWALE BOTTOM

+50.00

BEGIN SWALE

TRAVELWAY

EXISTING

EDGE OF

TRAVELWAY

EXISTING

EDGE OF

USING RIGID INCLUSIONS

DENOTES SHOULDER RECONSTRUCTION

USING RIGID INCLUSIONS

DENOTES ROADWAY RECONSTRUCTION

.0

.0

.0

.0

.0

.0

.0

.0

22.00' RT

+00.03

22.00' LT

+01.00

16.00' RT

+00.00

16.00' LT

+00.00

FDOT INDEX 536-001

PARALLEL APPROACH TERMINAL

BEGIN GUARDRAIL TL-3

ROADWAY PROFILE

SCALE

1" = 4' Vertical

1" = 40' Horizontal

ROADWAY\PROFRD01.DGN

M A

T C

H

L I N

E

S

T A

1+

.0

81+0080+0079+0078+0077+0076+00

CR 880

EL. 17.92

STA. 76+00.00

MATCH EXISTING

BEGIN CONSTRUCTION

BEGIN PROJECT

AT ¡ CONSTRUCTION

EXISTING GRADE

LINE

GRADE

PROFILE

.9

.9

.9

.4

E 804782.84 N 851204.41

STA 174+22.33, 24.36' RT

CR 880 B/L SURVEY

ELV. 16.70 (NAVD88)

BROWN & PHILLIPS 1/2" IRC

BENCHMARK:

E 805067.03 N 851485.88

STA 178+22.42, 17.91' RT

CR 880 B/L SURVEY

ELV. 17.18 (NAVD88)

NAIL AND TIN-TAB

BENCHMARK:

STA 78+22.65, 8.36' RT

CR 880 C/L CONSTRUCTION

BEGIN CR 880 C/L CONSTRUCTION

BENCHMARK IS BEFORE

NOTE:

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

1"=40'

A.A.

D.H.

A.A.

08/22/24

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

V P I

.0

E L

.7

(+) 0.08%(-) 0.05%

T/B

T/B

B/B

B/B

T/B

T/B

B/B

B/B

T/B

S/B

EOP

EOP

T/B

W/L

T/B

S/B

EOP

EOP

T/B

W/L

82 83 84 85 86

OH CATV

13 KV OE

OH TEL

U.S. SUGAR CORPORATION

PARCEL B (ORB 27063 PG.1015)

00-38-44-04-00-000-5000

00-38-44-04-00-000-1020

SECTION 4/44/38

SFWMD L-13 (OCEAN CANAL R/W)

PUBLIC R/W PER RPB 7 PG. 186

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

10.5

10.5

10.5

10.5

8.5

8.5 8.5

8.5 10.5

10.5

N

ROADWAY\PLANRD02.DGN

M A

T C

H

L I N

E

S

T A

.0

ROADWAY PLAN

M A

T C

H

L I N

E

S

T A

.0

CR 880

¡ CONSTRUCTION CR 880

R/W LINE

SFWMD R/W LINE

SFWMD R/W LINE

4.5' WIDE

PAVEMENT

2" MISC.

4' WIDE

PAVEMENT

2" MISC.

GUARDRAIL TL-3

GUARDRAIL TL-3

GUARDRAIL

EXISTING

REMOVE

12.00' RT

+69.40

12.00' LT

+08.38

0 10 40

Feet e = 7.70%

PI STA. = 92+59.01

T = 750.63

L = 1,430.43

R = 1,910.00

PC STA. = 85+08.38

PT STA. = 99+38.81

.7

.1

.1

.9

.8

.5

LEGEND:

PC STA. 85+08.38

¡ CONSTRUCTION

R = 1,910.00

PI STA. = 87+96.08, 9.74' LT

L = 647.82

PC STA. = 84+69.40, 12.00' RT

PT STA. = 91+23.02, 24.00' RT

T = 327.05

CURVE 3

TRAVELWAY

PC EDGE OF

CURVE 2 DATA:

EDGE OF TRAVELWAY

CURVE 2

TRAVELWAY

EDGE OF

SFWMD L-13 CANAL

S-10

S-11

OF 18" RCP

CONST. 12'

SWALE BOTTOM

CURVE 2

TRAVELWAY

PC EDGE OF

USING RIGID INCLUSIONS

DENOTES ROADWAY RECONSTRUCTION

USING RIGID INCLUSIONS

DENOTES SHOULDER RECONSTRUCTION

.0

.0

.0

.0

CR 880 CURVE 1 DATA:

¡ CONSTRUCTION

CURVE 1

¡ CONSTRUCTION

22.00' RT

+69.40

22.00' LT

+08.38

.0

.0

.0

.0

BY OTHERS

TO BE REPLACED

GUY ANCHORS

UTILITY POLE

BY OTHERS

TO BE REPLACED

GUY ANCHORS

UTILITY POLE

ROADWAY PROFILE

SCALE

1" = 4' Vertical

1" = 40' Horizontal

ROADWAY\PROFRD02.DGN

M A

T C

H

L I N

E

S

T A

.0

86+0085+0084+0083+0082+00

M A

T C

H

L I N

E

S

T A

1+

.0

CR 880

AT ¡ CONSTRUCTION

EXISTING GRADE

LINE

GRADE

PROFILE

.4

.9

.7

.2

E 805361.86 N 851756.21

STA 182+22.37, 25.09' RT

CR 880 B/L SURVEY

ELV. 16.84 (NAVD88)

BROWN & PHILLIPS 1/2" IRC

BENCHMARK:

E 805651.46 N 852032.65

STA 186+24.13, 20.25' RT

CR 880 B/L SURVEY

ELV. 17.52 (NAVD88)

NAIL AND TIN-TAB

BENCHMARK:

STA 82+22.55, 9.53' RT

CR 880 C/L CONSTRUCTION

STA 86+23.04, 1.45' RT

CR 880 C/L CONSTRUCTION

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

1"=40'

A.A.

D.H.

A.A.

08/22/24

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

.5

.7

.5

T R

A N

S I T I O

N

.0

S U

P E

R E

L E

V A

T I O

N B

E G I N

REVERSE CROWN (+.02)

FROM (-.02) TO

SUPERELEVATION

TRANSITION

FULL SUPERELEVATION (+.077)

CROWN (+.02) TO

FROM REVERSE

SUPERELEVATION

TRANSITION

FULL SUPERELEVATION (+.077)

.0

S U

P E

R E

L E

V A

T I O

N B

E G I N

F

U L L

.0

C R

O W

N R

E V

E R

S E

V P I

.0

E L

.3

(+) 0.25%

(-) 0.24%

V P I

.0

E L

.0

(+) 0.08%

(-) 0.24%

18" RCP

S-11

S-10

FL=6.80

001-Roadway Plans
002-Roadway Plans
003-Roadway Plans
006-Roadway Plans
007-Roadway Plans
008-Roadway Plans
009-Roadway Plans
Summary of Pay Items
summary of quantities 01
summary of quantities 02
summary of quantities 03
014-Roadway Plans
015-Roadway Plans
016-Roadway Plans
017-Roadway Plans
018-Roadway Plans
019-Roadway Plans
020-Roadway Plans
Keysrd01
Typsrd03
Typsrd02

File details come from the government source that posted it. Updated .