200512 SIOP SS Attach.pdf

PDF 35 KB Posted

Attached to
SOURCES SOUGHT AND REQUEST FOR INDUSTRY INPUT FOR SHIPYARD DRY DOCK AND WATERFRONT PRODUCTION FACILITY
Solicitation number
N6274220RSS01
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC PACIFIC ACQ33

SOURCES SOUGHT QUESTIONNAIRE - N6274220RSS01

QUESTIONNAIRE FOR SHIPYARD DRY DOCK AND WATERFRONT PRODUCTION

FACILITY

Firm Name: _________________________

Firm Address: ________________________

Phone Number: _______________________

DUNS #: ____________________________

Name/Title of Person Completing Questionnaire: ________________________

1. Type of business concern (check all that applies):

___ Section 8(a) (Submit a copy of the letter from the Small Business Administration certifying as a Section 8(a) concern) Geographic Area ___________

___ HUBzone Small Business (Submit a copy of the letter from the Small Business Administration certifying as a HUBZone SBC)

___ Woman-Owned Small Business

___ Service Disabled Veteran Owned Small Business

___ Small Business

___ Large Business

2. Submit information on projects to demonstrate experience in (1) new construction of waterfront facilities or buildings and (2) early contractor involvement; of similar dollar value and complexity, completed or substantially completed within the past 10 years.

Renovation/alteration projects will not be considered relevant. Substantially complete means at least 90% physically complete as of the date of proposal submission. Use the attached form (Attachment A), “Construction Experience Project Data Sheet”.

3. Describe your firm’s experience with Fixed Price Incentive (Successive Targets) type contracts.

4. Describe your firm’s financial capacity to perform a construction project of this magnitude.

SOURCES SOUGHT QUESTIONNAIRE - N6274220RSS01

5. Provide a letter from your corporate surety indicating the single contract bonding capacity and the aggregate bonding capacity.

6. Is it sufficient to provide 15% basis of design to establish a target price?

7. What is a reasonable time for estimating an initial target price for a $2B - $4B project?

8. What percentage of the work would the prime self-perform?

9. What percentage of the total contract value would you expect to be performed by small business through teaming or subcontracting?

10. Does your firm have an adequate accounting system for providing data to support negotiation of final cost (DFARS 252.242-7006)?

11. Does your firm have a CAS Disclosure Statement?

12. Any other information that the Government should consider in its acquisition strategy?

13. Due to the magnitude of the project, is it your opinion that the local labor pool can support the construction of these projects, along with other anticipated construction projects in Hawaii? If additional labor needs to be brought onto the island, are the current housing resources available sufficient to support the incoming labor?

14. It is contemplated that the construction duration for both projects will be approximately 4 years after exercising the construction option. How can the Government assist the contractor in completing the work on time regardless of encountering unforeseen conditions?

15. Are local concrete suppliers capable to support the amount of concrete and aggregate needed for the projects?

SOURCES SOUGHT QUESTIONNAIRE N6274220RSS01

ATTACHMENT A

CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : CON #1 CON #2

1. Name of Firm that Performed Project*:

Address:

Phone Number: _____________ DUNS NUMBER:_________________

Point of Contact: Contact Phone Number:

Name of Firm Experience is Claimed for* (i.e.; if the project was performed by a J/V and Offeror is claiming experience of one of the J/V members, state the exact legal name of the JV member Offeror claims experience for):

Address:

Phone Number: _____________ DUNS NUMBER:_________________

Point of Contact: Contact Phone Number:

*If firm that experience is claimed for is not exactly as stated in Block 14 of the SF1442, complete Block 10 below.

2. Work Performed as*: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Construction Completion Date (mm/dd/yy):

5. Type of work:

New Construction Renovation Repair Alteration Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

Firm-Fixed Price Cost/Time and Material Other (explain):

SOURCES SOUGHT QUESTIONNAIRE N6274220RSS01

Complete Block 7 for Construction Projects.

7. Construction Project:

Total Award Amount: $_____________________ Final Price: $__________________________

Type of Contract/Task Order: (Check ALL that apply)

Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

9. Provide a detailed description of what work your firm performed on this project:

File details come from the government source that posted it. Updated .