This is Addendum No. 1 to a Request for Qualifications issued by the City of Baton Rouge–Parish of East Baton Rouge's Office of the Mayor–President Purchasing Division for general contractors to establish a qualified contractor pool for community development projects. The solicitation, numbered RFP 2026-04-6110, seeks a minimum of 15 qualified contractors to perform work across three program areas: Home Renovation, Commercial Corridor Facade Improvement, and New Construction. All work will be performed on City-owned properties in East Baton Rouge Parish with emphasis on low-to-moderate income areas. Qualifications were due July 27, 2026 at 2:00 p.m. CST, with notice of acceptance to the contractor pool anticipated by August 5, 2026. The actual contract execution process requires 8–10 weeks following selection and involves Grants & Contract Review, Purchasing and Parish Attorney review, and Metropolitan Council approval. Contractors must hold both residential and commercial licenses and may subcontract work without limitation.
Home Renovation projects are estimated at $500,000 total funding with individual project costs ranging from $10,000 to $35,000 per home and master contracts not to exceed $100,000 annually. Commercial Corridor Facade Improvement is in pilot phase with estimated funding of $150,000 for 3–8 building facades annually, with individual awards ranging from $10,000 to $49,999 and master contracts not to exceed $49,999 annually. New Construction projects are estimated not to exceed $200,000 per home with master contracts not to exceed $200,000 annually. Funding sources include HUD HOME, CDBG-DR, CDBG programs, general fund, and other community development sources. Selected contractors are required to carry general liability insurance with a $2 million general aggregate limit, automobile liability coverage of $1 million combined single limit, workers' compensation per Louisiana statute, and excess umbrella liability of $1 million. There is no minimum guaranteed work for selected contractors, and no limit exists on the number of contract awards issued to a single contractor. Utility costs during construction are the contractor's responsibility unless otherwise specified in the project-specific contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20008-RFQ2026-04-6110-2.pdf | ||
| 20008-RFQ2026-04-6110.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Office of the Mayor-President Purchasing Division
City of Baton Rouge Phil Gore
Parish of East Baton Rouge Interim Director of Purchasing
222 St. Louis St. 8th Floor Room 826
P.O. Box 1471
Baton Rouge, Louisiana 70821
225-389-3259
FAX 225-389-4841
purchasinginfo@brgov.com
ADDENDUM NO. 1
July 17, 2026
Your reference is directed to:
Solicitation Number: RFP 2026-04-6110 General Contractors Pool for Community Development
Scheduled to open: July 27, 2026 02:00 pm CST
The following questions and answers are hereby officially made a part of the referenced solicitation and should be attached to the bidder's proposal or otherwise acknowledged therein.
If you have already submitted your proposal and this addendum causes you to revise your original bid, please indicate changes herein and return to Purchasing prior to bid opening in an envelope marked with the file number, bid opening date, and time. If this addendum does not cause you to revise your bid, please acknowledge receipt of the addendum by signing your name and company below and returning it in accordance with the provisions above.
dsstewart@brla.gov 225-389-3259 x 3264
Signature Date Company mailto:purchasinginfo@brgov.com
RFP 2026-04-6110
General Contractors Pool for Community Development
Questions & Answers
Question 1 Through this RFQ, will contractors be able to act as developers and build new homes on property not owned by the city? Can the area in which these homes are to be built be picked by the developer? As a non-profit, Habitat for Humanity builds homes on property we acquire and then sell the homes and the property on which they sit to low to moderate income individuals under 80% MFI.
Answer 1 This RFQ is intended to establish a pool of qualified contractors that may be utilized by OCD for
City-owned rehabilitation and new construction projects. Selection into the contractor pool does not authorize contractors to independently serve as developers, identify projects, or construct homes on privately owned property outside of projects approved, funded, and administered by
OCD.
Question 2: Is the 15-page submission limit intended to apply to the entire proposal across all three project types, or is it 15 pages per project type (Renovations, Commercial Facades, and Reconstruction)?
Answer 2: The 15-page limit applies only to the Statement of Qualifications and Experience required under
Section 1.5(I). The limit does not apply to the entire qualifications package, but does not mean
15 pages per program e ither.
A submitter applying for more than one program shall provide one Statement of Qualifications and Experience that does not exceed 15 pages total. Within the 15-page limit, the submitter must provide the requested qualifications and project examples for each program for which it is applying.
Documents required under the other subsections of Section 1.5, including the cover letter, Contractor Form, table of contents, registration documentation, safety plan, references, and required forms or attachments, are not included in the 15-page limit.
Question 3: What is the anticipated applicant pool for each project type (Renovations, Commercial Facades, and Reconstruction)?
Answer 3: The City-Parish has not established a specific number of contractors to be selected for each individual program category.
The RFQ states that the City-Parish intends to select a minimum of 15 qualified contractors for the overall contractor pool. However, the final number selected, and the distribution of contractors among Home Renovation, Commercial Façade Improvements, and New
Construction, may increase or decrease based on the number and quality of responsive submissions, contractor qualifications, licensing, capacity, availability, and anticipated program needs.
Questions & Answers (continued)
Question 4: Is there a limit on the number of contract awards that may be issued to a single contractor, either overall or by project type?
Answer 4: No predetermined limit has been established on the number of project awards that may be issued to an individual contractor, either overall or within a particular program category.
However, the RFQ also states that acceptance into the contractor pool does not guarantee a contract and/or project. : Project assignments may also consider contractor workload and the City's interest in maintaining timely project delivery.
Question 5: Will homes be occupied during construction? If so, will occupants be required to vacate during any phase of the work?
Answer 5: The homes will be vacant.
Question 6: Who will be responsible for utility costs (water and electricity) during construction for each project type?
Answer 6: The contractor shall be responsible for all utility costs necessary to perform the work, unless otherwise specified in the project-specific contract or Notice to Proceed. Contractors are expected to include any anticipated utility costs in their pricing.
Question 7: Will pre-construction site walks be conducted for Renovation and Commercial Facade projects to identify potential scope gaps and determine whether change orders may be necessary before construction begins?
Answer 7: Yes. Prior to construction, OCD and/or its authorized representative will generally conduct a pre-construction meeting and site review to discuss the approved scope of work, project expectations, existing site conditions, and any identified issues.
Question 8: Is there a limit on the number of dumpsters allowed per project, and will dumpster costs be included in the base scope of work? Is at least one dumpster included per project? If additional dumpsters are required, what documentation or justification will be required for approval?
Answer 8: Dumpster requirements will vary based on the scope and nature of each project. Contractors should include all anticipated disposal costs in their project pricing. Requests for additional dumpsters beyond the approved scope must be submitted in writing with justification and receive prior written approval from OCD before the additional cost is incurred.
Question 9: Will a portable toilet be included in the base scope of work for each project?
Answer 9: Portable toilet requirements will be determined based on the duration and nature of each project, applicable OSHA requirements, and site conditions. Contractors are responsible for complying with all applicable safety and regulatory requirements. Prior to accepting a project, contractors will have the opportunity to review the project scope and site conditions. If a contractor determines that a portable toilet is necessary but is not included in the scope of work, they may present that request to OCD for consideration before accepting the project.
Question 10: Is there a maximum funding cap for Renovation projects based on the scope of rehabilitation?
Answer 10: Renovation projects are generally subject to a maximum funding limit of $35,000 per property.
However, OCD recognizes that unforeseen conditions may be discovered during construction.
When justified, contingency funds or approved change orders may be utilized to address eligible work necessary to complete the project. Any additional funding beyond the initial award is subject to OCD review, available funding, and written approval prior to the work being performed.
Question 11: What is the average turnaround time for change order review and approval?
Answer 11: The anticipated turnaround time for the review and approval of change orders is approximately six (6) weeks. OCD recognizes that timely resolution of change orders is critical to maintaining project schedules. Accordingly, the program has established procedures to minimize construction delays while change orders are under review, allowing work to continue, when appropriate, without unnecessarily impacting project progress. All change orders remain subject to OCD's review and written approval prior to payment for any additional work.
Question 12: What project management or construction management system will be used for project tracking, document management, and reporting?
Answer 12: Neighborly
Question 13: Are contractors required to self-perform a minimum percentage of the work, or may work be subcontracted without limitation?
Answer 13: Work can be subcontracted without limitation
Question 14: What is the required project completion timeframe for each project type?
Answer 14: Project completion timeframes will vary depending on the project type, scope of work, and funding source. The required completion schedule for each project will be established in the project-specific Notice to Proceed or scope of work. Additionally, project schedules, milestones, and completion expectations will be reviewed and discussed with the contractor during the pre-construction meeting prior to the start of work.
Question 15: Will liquidated damages be assessed? If so, will there be defined excusable delay categories (such as municipal delays, utility delays, homeowner-caused delays, weather events, and program-directed changes) that may warrant schedule extensions?
Answer 15: The RFQ does not establish liquidated damages for failure to complete an individual construction project within a specified period. Any project-specific liquidated damages, required completion period, or related schedule requirements will be stated in the project’s scope of work, after the contracting period.
Any extension must be supported by timely written notice and documentation demonstrating the cause, duration, and effect of the delay on the project schedule. Extensions are not automatic and must be approved in writing by the City-Parish or its authorized program representative.
Question 16: What are the anticipated timelines for contract award and issuance of the Notice to Proceed
(NTP) following the RFQ selection process?
Answer 16: The anticipated date for issuing Notices of Acceptance to the contractor pool is August 5, 2026, as stated in Section 1.3, Schedule of Events. This date is an estimate and remains subject to change
A Notice of Acceptance into the contractor pool is not a Notice to Proceed for an individual construction project. Following selection into the contractor pool, contract execution is subject to the City-Parish process of Grants & Contract Review, Purchasing and Parish
Attorney review, Metropolitan Council approval, and execution by the required parties. This process is roughly 8-10 weeks.
Contract execution is subject to the City-Parish's Grants and Contract Review process, Metropolitan Council approval (if required), and final execution through the Purchasing and
Parish Attorney review process.”
Question 17: What are the invoicing milestones and payment application requirements for each project type?
Answer 17: The RFQ does not establish invoicing milestones and/or payment application requirements for the project types. This will come at the contracting phase if you are selected to the contractor pool.
Question 18: What are the payment terms? (e.g., Net 30)
Answer 18: The RFQ does not establish payment terms. This will come at the contracting phase if you are selected to the contractor pool.
Question 19: Will the scopes of work for the Renovation and Commercial Facade projects be developed using
Xactimate pricing?
Answer 19: OCD may utilize Xactimate as one of several tools to assist in developing scopes of work and evaluating cost reasonableness; however, its use is not required for every project. The methodology used to develop the scope of work and establish reasonable pricing will be determined based on the specific project, funding source, and program requirements. OCD reserves the right to utilize Xactimate, independent cost estimates, contractor proposals, or other accepted estimating methods, as appropriate
Question 20: How will pricing be established for Reconstruction projects?
Answer 20: Pricing for reconstruction projects will be established based on the approved plans and specifications, applicable procurement requirements, and the negotiated construction contract for each project.
Question 21: Will the contractor be responsible for architectural and engineering design services for
Reconstruction projects, or will the Program provide the design documents?
Answer 21: Project-specific scope of work, which would come after acceptance into the contractor pool, would identify the architectural and engineering documents to be provided by the City-Parish and any design services to be furnished by the contractor. Submitters that provide architectural, engineering, surveying, design-build, or related professional services should identify those capabilities in their qualifications submission.
Question 22: For Renovation projects involving roof replacement, will the roofing system be required to meet the FORTIFIED Roof standard? If so, will the required designation be FORTIFIED Silver or FORTIFIED Gold?
Answer 22: No. FORTIFIED Roof certification is not a requirement under this RFQ.
Question 23: Will Reconstruction projects be required to meet a FORTIFIED standard? If so, will the required designation be FORTIFIED Silver or FORTIFIED Gold?
Answer 23: No. The RFQ does not establish a FORTIFIED construction standard for reconstruction projects.
Question 24: If FORTIFIED certification is required for Renovation or Reconstruction projects, will the associated cost be included in the base scope of work?
Answer 24: See answers to #22 and #23. Not applicable.
Question 25: Through this RFQ, will contractors be able to renovate or rehab primary residences on private property, similar to the CDBG home rehabilitation program we have participated in through OCD.
Answer 25: Regarding rehabilitation activities, all renovation and rehabilitation work performed under this
RFQ will be assigned by OCD and will be limited to City-owned properties identified for redevelopment.