This document contains special provisions for the City of Joliet, Illinois regarding the Ontario Street Drainage Improvements project, which involves construction improvements within easements across three parcels west of McKinley Avenue from Ontario Street to Singleton Place. The project encompasses storm sewer installation, water main work, sanitary sewer services, asphalt removal and replacement, aggregate base course installation, and related drainage infrastructure. Key construction requirements include notification of affected residents a minimum of two weeks prior to work commencement, with advance notice of any temporary access obstructions provided 48 to 7 days prior to work. The contractor must contact utility companies at least 48 hours before beginning construction through J.U.L.I.E. at (800) 892-0123 and the City of Joliet utilities at (815) 740-2436. All asphalt and utility improvements must be completed by November 25, 2026, with no extensions permitted. Asphalt paving and patching shall commence within five working days of storm sewer installation completion, or the contractor must provide temporary stone access to affected driveways at no additional cost.
For contracts valued greater than $100,000, contractors must maintain an aggregate workforce with minority or female participation equaling or exceeding 10 percent of total hours worked across all subcontracts, verified through monthly certified payroll submissions; non-compliance results in 2 percent retainage of the total contract amount for one year. Prevailing wage requirements under Illinois Public Act 94-0515 apply, requiring contractors to maintain detailed payroll records for three years and submit certified monthly statements to the City. Retainage is held at 10 percent of payments, potentially reduced to 5 percent after 50 percent contract completion if work progresses satisfactorily. General liability insurance of $1,000,000 (doubled for contracts exceeding $500,000) and workers' compensation insurance as required by Illinois law must be provided, with the City of Joliet named as additional insured. The contractor is responsible for GPS data collection using equipment meeting minimum accuracy of 10 millimeters horizontally and 20 millimeters vertically, real-time delivery of as-built utility information to the City's GIS system, exploratory utility excavation, and comprehensive documentation including CAD drawings and attribute data in NAD_1983 coordinate format. The contract includes a $20,000 cash allowance for miscellaneous additions at the City's discretion for work not otherwise specified in the bid documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-3009-1026 (1).pdf | ||
| 6-3009-1026 BID TABULATION.pdf | ||
| 1-LEGAL NOTICE.pdf | ||
| 3-Soil Boring Plan and Logs 2025.pdf | ||
| 4-Ontario 2026 Full Set R1 2026-09-16.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Special Provisions
The following Special Provisions supplement the latest addition of the "Standard Specifications for Road and Bridge Construction," "Supplemental Specifications and Recurring Special Provisions", "Illinois Manual on Uniform Traffic Control Devices for Streets and Highways," "Standard Specifications for Water and Sewer Main Construction in Illinois", City of Joliet Standards, latest revisions. In case of conflict with any parts of said specifications, the said Special Provisions shall take precedence and shall govern. The above-named publications shall hereinafter be referred to as the "Standard Specifications" which apply to and govern construction within the City of Joliet.
Location of Project
The project consists of improvements within easements across three parcels west of McKinley Avenue from Ontario Street to Singleton Place, within the City of Joliet, Will County, Illinois.
Minority Employment Requirements
For contracts valued greater than $100,000.00:
The Bidder's attention is called to the following Equal Employment Opportunity Construction Contract Specification:
The contractor’s aggregate workforce on all construction work covered by this contract shall include any combination of minority or female participation equaling or exceeding ten percent (10%) of the contractor's aggregate workforce. Compliance with this specification will be measured against the total hours performed, including all subcontracts.
The contractor shall submit to the Project Engineer monthly, certified payroll records in order to monitor the total work hours and those hours worked by minorities and/or females, before receiving a monthly payment. Upon completion of the contract, the contractor shall submit to the Project Engineer a summary of the total work hours and those hours worked by minorities and/or females prior to receiving any retainage reduction or final payment.
Non-compliance with this specification will result in the retainage of 2% of the total contract amount for a probationary period of one year from the completion of the contract. If within the one-year probation period the Contractor exceeds the minority employment requirements by the number of man-hours previously deficient, on another City of Joliet contract, the retainage from the prior contract will be released to the Contractor. If the Contractor fails to make up the minority hours on another contract within the probation period, the Contractor will be penalized 2% of the original contract amount.
DEFINITION
Minority shall include:
1. Black (all persons having origins in any of the Black African racial groups not of Hispanic Origin).
2. Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American or other Spanish culture or origin, regardless of race).
3. Asian and Pacific Island (all persons having origin in any of the original peoples of the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands).
4. American Indian or Alaskan Native (all persons having origins in any of the original peoples of North American and maintaining identifiable tribal affiliations through membership and participation or community identification).
For contracts valued less than or equal to $100,000.00:
The contract does not contain a specific minority employment requirement; however, the City of Joliet encourages the contractor to maximize the amount of minority participation.
Material Inspection
All hot mix asphalt and Portland Cement Concrete (PCC) materials that are part of this project shall be tested and inspected in accordance with the Illinois Department of Transportation’s Project Procedures Guidelines (PPG) and the process and frequency of testing under the QC/QA specifications.
The Contractor shall provide documentation verifying that the mix designs to be used on the project for hot mix asphalt and PCC meet IDOT specifications for the materials shown in the contract documents. This documentation as well as the mix designs shall be provided at the pre-construction meeting for the project.
The City’s consultant will perform the City’s QA testing of asphalt and concrete materials on-site and at the plant and act as the City’s QA Manager. The City’s consultant’s name and contact information will be provided at the project preconstruction meeting. The contractor shall provide a request for material testing by the City’s consultant by 4pm by email and copy the City Engineer, 48 hours in advance of construction for inspection of all hot mix asphalt and Portland Cement Concrete materials used on this project.
This work shall not be paid for separately and shall be considered incidental to MOBILIZATION.
Notification of Residents
It shall be the responsibility of the contractor to notify the residents of the upcoming construction. The contractor shall notify the residents in multiple steps as provided below:
1. Flyers, door hangers, or message boards shall be provided a minimum of two (2) weeks prior to the start of construction to residents being affected by construction.
2. Advanced notification to any affected residence or business shall be required prior to any temporary or short-term obstruction of access to adjoining roadway. If notification of temporary loss of access (date, time, and duration) has not been made at least forty-eight (48) hours, but no more than seven (7) days prior to, the Contractor shall not be allowed to proceed with that particular work item.
a. Loss of access shall not exceed seven (7) days for any residence or business.
Basis of Payment:
This work shall not be paid for separately and be considered included in the cost of TRAFFIC CONTROL AND PROTECTION. The Contractor shall be responsible for all damage to public or private property done during paving operations. Failure to perform the above work satisfactorily shall result in the contractor being liable for any damages attributable to non-notification.
Protection of Property and Surface Structures
Trees, shrubbery, fences, poles, right-of-way pins, and all other property and surface structures shall be protected during construction operations unless the Engineer authorizes their removal for purposes of construction. Any fences, poles or other manmade surface improvements, which are moved or disturbed by the Contractor, shall be restored to the original conditions, after construction is completed, at the Contractor's expense. Any trees, shrubbery, or other vegetation, which are approved for removal or ordered for removal by the Engineer in order to facilitate construction operations, shall be removed completely, including stumps and roots, by the Contractor. Responsibility for any damage or claims for damage caused by construction operations to shrubbery or other landscape improvements, which were not authorized for removal by the Engineer, shall be included in the cost of associated pay items. .
Existing Utilities
Existing utilities are shown on the plans according to information obtained from Utility Companies and surveys. The Engineer and the City of Joliet does not guarantee the accuracy or completeness of this information. The Contractor shall make his own investigation to determine the existence, nature and location of all utility lines and appurtenances within the limits of the improvements. The Contractor will be responsible for performing exploratory excavation to expose any underground utility- including services- with a City representative present and identifying all possible utility conflicts within the proposed public improvement prior to excavating for the roadway. The Contractor shall backfill these exploratory excavation sites with trench backfill and shall maintain the roadway until all the identified utility conflicts are resolved. The cost of this exploratory excavation shall be considered incidental to the contract. No other compensation shall be allowed for this work.
The Contractor will be required to cooperate with all Utility Contractors, Utility Companies and the City of Joliet involved with the removal, temporary relocation, reconstruction or abandonment by these agencies of any and all services or facilities owned or operated by them within the limits of this improvement. Before doing any work which will damage, disturb or leave unsupported or unprotected any utility lines or appurtenances encountered, the Contractor shall notify the respective owner thereof, who will make all arrangements for relocating, adjusting or otherwise maintaining or abandoning service on lines that fall within the limits of the proposed construction without cost to the Contractor, including the removal of all cables, manhole covers and other appurtenances which the owner desires to salvage. After such arrangements have been made, the Contractor will proceed with the work as directed by the Engineer.
The Contractor shall contact the involved utility companies not less than 48 hours prior to beginning construction. The majority of these utilities may be contacted through J.U.L.I.E. at (800) 892-0123. In addition, the Contractor shall be responsible to contact the City of Joliet utilities 48 hours prior to beginning the construction at (815) 740-2436. It shall remain the Contractor's responsibility to contact all utilities.
No extra compensation will be allowed the Contractor for any expenses incurred by complying with these requirements, or because of delays, inconvenience or interruptions in his work resulting from the failure of any Municipality or Utility Company to remove, relocate, reconstruct or abandon their services when required by the Contractor's operations. An extension of time may be granted to the extent the Contractor's operations were affected. The Contractor shall be responsible for coordinating his work with that of these agencies and ensure that this improvement is not delayed because of necessary changes in the existing utilities, public or private.
The Contractor shall take whatever precautions which may be necessary to protect the property of the various public utilities which may be located underground or above ground, at or adjacent to the site of this improvement. The contractor will be required to repair or replace at his own expense or bear the cost of having the utility repair or replace any public utility property which has been damaged through his efforts. The procedure and specifications of repair will be in accordance with the regulations and/or policy of the utility. The utilities shall be given notice by the Contractor to locate and identify all their installations at the site of this improvement.
Work to be Done by Others
The City of Joliet Public Works and Utilities Department, Commonwealth Edison Company, NICOR, Ameritech, Inc., and others may be adjusting their facilities during construction of this section. In such event, it will be necessary for the Contractor to cooperate with the various organizations and the City while they are doing this work.
Interruption to Utilities
The Contractor shall proceed with caution in the excavation and preparation of the trench so that the exact location of underground structures may be determined. Prior to proceeding with trench excavation, the Contractor shall contact all utility companies in the area to aid in locating their underground services.
The Contractor shall take all reasonable precautions against damage to existing utilities. However, in the event of a break in an existing watermain, gas main, sewer or underground cable, he/she shall immediately notify the responsible official of the organization operating the utility interrupted. The Contractor shall lend all possible assistance in restoring services and shall assume all cost, charges, or claims connected with the interruption and repair of such services.
Structure Protection
Temporary support, adequate protection and maintenance of all underground and surface structures, drains, sewers and other obstructions encountered in the progress of the work shall be furnished by the Contractor at his expense and under the direction of the Engineer. The structure, which may have been disturbed, shall be restored to its prior condition upon completion of the work.
Control of Work and Prosecution of Progress
The Contractor shall perform all work in an orderly, timely and diligent manner. The Contractor shall cooperate with and conform to the requests of the City to expedite particular portions of the work insofar as to complete certain phases of work in a timely manner.
The asphalt and utility improvements shall be completed by November 25, 2026. No extensions will be permitted Should the Contractor fail to complete the work, he will be held liable to the City of Joliet pursuant to amounts specified in Article 108.09 of the Standard Specifications.
Contractor shall submit a project schedule showing coordination of sub-contractors and sequencing of work.
Asphalt paving and patching shall begin within five (5) working days of the completion of the storm sewer installation. If the contractor cannot meet these requirements, he/she shall provide a temporary stone access to all affected driveways. No additional compensation will be allowed for the providing, placing and removing all temporary access stone.
Partial Payments and Retainage
Partial payments and retainage shall be calculated in accordance with Section 109.07 of the “Standard Specifications”, with the addition of the following:
· Retainage held shall be ten (10%) percent of any payment made.
· At the Engineer’s discretion, retainage may be reduced to five (5%) percent after the contract is fifty (50%) percent complete and if the Contractor has completed all contract work except items delayed by circumstances beyond the Contractor’s control.
Incidental Work
All work shown on the Plans, described in the applicable specifications or in these Special Provisions and not covered by a pay item, will be considered as incidental to the Contract.
Additional Insured
During the Contracting phase of this project, the Contractor shall Contact City of Joliet to determine the extent of the agencies that shall be named as additionally insured on this project. At a minimum, the following shall be named:
The City of Joliet, and Resident Engineering Firm, and all other agencies and representatives on-site under the direction of those entities shall be listed.
Certified Payroll Requirements
Per Public Act 94-0515, Contractors and Subcontractors on public works projects must submit certified payroll records on a monthly basis to the Village, along with a statement affirming that such records are true and accurate, that the wages paid to each worker are not less than the required prevailing rate and that the Contractor is aware that filing records he or she knows to be false is a Class B misdemeanor.
The certified payroll records must include for every worker employed on the public works project the name, address, telephone number, social security number, job classification, hourly wages paid in each pay period, number of hours worked each day, and starting and ending time of work each day. These certified payroll records are considered public records and public bodies must make these records available to the public under the Freedom of Information Act, with the exception of the employee’s address, telephone number and social security number. Any Contractor who fails to submit a certified payroll or knowingly files a false certified payroll is guilty of a Class B misdemeanor.
Prevailing Wage Requirements
In accordance with the Public Act 94-0515, the Contractor shall be responsible for the following requirements:
Maintain records for three (3) years of all laborers or workers employed on this project including their name, address, phone number, social security number, classification, hourly wages paid in each pay period, and the number of hours worked each day.
Submit these records to the village clerk in either hard copy or electronically.
Certify in writing these records are true and accurate; that the rate paid is not less than the Applicable Prevailing Wage.
These records shall be made available for inspection by the Illinois Department of Labor on two (2) business days notice.
The Contractor shall note that filing a false Certified Payroll is a class B misdemeanor.
This contract calls for the construction of a “public work,” within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the “prevailing rate of wages” (hourly cash wages plus fringe benefits) in the county where the work is performed.
For prevailing wage information, go to the City of Joliet website:
https://www.joliet.gov/government/departments/finance/purchasing/prevailing-wage-information
For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor’s website at: https://labor.illinois.gov/laws-rules/conmed/current-prevailing-rates.html
All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage, notice and record keeping duties.
General Conditions and Insurance
Please see the City of Joliet General Conditions Booklet Adopted October 15, 2020.
Section 2-448(c). Insurance; all construction and demolition contracts.
1. The successful bidder in all construction and demolition contracts shall submit, with other required contract documents, a certificate of insurance, issued by an insurance company licensed to do business in Illinois, indicating the bidder as the insured and naming the City of Joliet (and its officers and employees) as additional insured with right of notice of cancellation for the duration of the contract in at least the following amounts:
a) General Liability Insurance – One Million Dollars ($1,000,000) general liability insurance covering injuries, deaths and property damage.
b) Workers Compensation Insurance – amount required by Illinois law.
2. The successful bidder shall require the same amounts and coverages as in sub-section (1) from all subcontractors.
3. The amounts stated in sub-section (1)(a) shall be doubled for contracts exceeding Five Hundred Thousand Dollars ($500,000).
4. The minimum amount of insurance may be modified and other insurance-related terms and conditions may be required in specific contracts as the Mayor and City Council may deem appropriate
GPS Collection and Data Requirements
The City of Joliet uses GIS (Geographical Information System) technologies to store, manage, and maintain geographic/spatially related data. Likewise, most of the civil engineering community has evolved to the point where the predominating design environment is computer aided design and drafting (CAD). It is the goal of the City to use GIS and CAD technologies to acquire as-built data for all infrastructure installed. It is the responsibility of the contractor to deliver complete and accurate GIS data prior to acceptance of any improvements. The standards below will guide integration of digital engineering CAD drawings into the GIS environment, while maintaining the integrity and positional accuracy of the data.
Blank attribute tables in geodatabase format will be provided by the City for storm, water, sanitary, electric, and dry utility systems. The fields are already formatted and are to be used for providing attribute information that corresponds to the infrastructure.
Requirements for Digital CAD and GIS As-Built Submittals:
· All data shall be in coordinate system: NAD_1983_StatePlane_Illinois_East_FIPS_1201 Feet.
· The scope of mapped infrastructure is to include water main, sanitary sewer, storm sewer, storm sewer outflows, electrical, streetlights, and all other appurtenances required by the City of Joliet.
· Do not rename any of the attribute tables.
· Do not alter the original formatting and structure of the attribute tables or replace them with similar tables.
· Use the correct table for each sewer line, structure type, or other feature.
· All required fields filled in with appropriate data. Additional information entered in the non-required fields is also helpful.
· Correct units and precision used for pipe diameter, pipe length, upstream elevation, etc.
· Correct code from the lookup tables used when required. The lookup tables can be found in in the metadata associated with the geodatabases. Whenever possible use the code that most accurately describes the item.
· Removed or abandoned features need to be denoted as such within the attribute table.
· All sanitary and storm sewer shall be drawn in the direction of flow.
· Collect GPS points of structures prior to burying.
General Notes:
· The lookup tables are not linked to the attribute tables, so they are used as a reference.
· Adhere to the requirements in any “type” column in the Attribute Table Requirements.
· This formatting must be adhered to for the attribute information to be used properly.
· Excel (.xls) files can be accepted for the attribute tables if the formatting is kept the same and none of the field names are changed or deleted, however the original geodatabase file format is preferred.
· If it is unclear which attribute tables should be used or how to code any of the required fields, please consult with the City prior to delivering your digital data submission.
· Data shall be submitted in full GIS geodatabase format or AutoCAD drawings with Civil 3D Models.
· Refer to external City documents regarding more detailed CAD and GIS standards and guidelines.
· All files are to be submitted at as-built stage (upon completion of construction).
GIS General Requirements:
The Contractor is to provide real-time utility and infrastructure asset data for delivery into the City of Joliet’s Geographic Information System (GIS) for all improvements and appurtenances. The Contractor is required to utilize GPS equipment to obtain selected project datapoints, assets, and real-time as-built utility information during construction.
Equipment Requirements:
Equipment requirements for data collection shall include GPS Rovers that meet the minimum accuracy and real-time GIS integration requirements. Equipment used to collect this data shall be properly calibrated and capable of meeting a minimum accuracy of 10 mm horizontally and 20 mm vertically (Trimble R2, DA2, or equal).
In addition to the GPS Rover, a dedicated smart phone or tablet with 5G cellular connectivity to be provided by the Contractor is needed for the GPS unit to communicate. The City will not provide technical support of operation of the GPS units. If support is needed, contractors can hire a GIS consultant approved by the City knowledgeable of the process.
The GPS equipment shall integrate and utilize the Esri ArcGIS Field Maps Application (downloadable from App Store and Google Play) with a City provided Project Map. The Contractor will provide real-time connectivity and data updates using a cellular data connection with the GPS unit. GPS units must be able to deliver real time, cellular networked data to an ESRI ArcGIS Online portal established by the City. The Contractor will have access to collected data and can utilize this GIS information to assist them throughout the project. The Contractor will use a City provided ESRI license.
Setup and Collection Requirements:
Contractor shall obtain survey data during or immediately after installation of the utility. For open trench and exposed water main or sewer utilities, data points shall be obtained at intervals of 50 feet and at directional changes with a minimum of 2 points. Utilities that are bored (trenchless) will be surveyed at the exposed pit locations at both ends and along the boring route with depths manually inputted every 10 feet from the above ground locating devices. For water, sanitary, and storm services, data points shall be obtained at intervals of 10 feet and at directional changes with a minimum of 2 points.
Data collection with the GPS device shall be completed by the Contractor on a real-time basis as the project is being constructed. The Contractor shall verify that data is being collected in real-time in the provided GIS portal (simple website link) on a regular basis, no less than two times per day.
Contractor shall have a surveyor establish GPS control points, and the contractor shall check in daily (beginning of day) to verify and maintain calibration of the device.
At least 95% of collected data must meet GPS accuracy requirements. Data not meeting this standard will be required to be exposed and surveyed again until this standard is met.
Data Collection Features
The following features are required to be collected by the Contractor during construction for the purpose of delivering GIS Digital As-Builts:
1. Water main, services, fittings, valves, hydrants, corporation stops, curb stops, structures, b-boxes, and related features (horizontal, vertical elevation, top of pipe, sizes, model data)
2. Sanitary sewer, services, manholes, cleanouts, and related features (horizontal, vertical elevation, top of pipe, sizes, model data)
3. Exposed Sanitary Services (horizontal, vertical elevation, sizes, regardless of type)
4. Storm sewer services, manholes, sump, and related features (horizontal, vertical elevation, top of pipe, sizes, model data)
5. Electric lines including but not limited to streetlights, handholes, connection points, and all appurtenances (horizontal, vertical elevation, sizes, regardless of type)
6. Dry utility exposed during construction (horizontal, vertical elevation, sizes, regardless of type)
7. Connections to existing utilities
8. Any other proposed or modified underground utility work or related feature
9. All City owned facilities shall be provided in GIS and As-builts
Final GPS survey code and data input requirements will be provided at project start-up.
Submittals:
Digital Data Collection will be conducted in real-time during construction and visible within the ArcGIS Online portal. No final GIS package delivery will be required of the contractor (final as-built survey is still required).
The City will finalize data collection by completing final utility connected linework for the purpose of delivering GIS feature classes or shapefiles compatible with ESRI. Utility lines connected shall include all identified attributes. If needed, the Contractor will assist the City and clarify final pipe data and connections within GIS.
Data Acceptance:
At time of project completion, the City will verify that all data has been collected satisfactorily. Failure to do so will be grounds for not accepting the project or releasing retainage until the data is satisfactory. If, at any time, the Contractor fails to perform this work, the City reserves the right to utilize an outside provider and charge the work to the project owner prior to releasing the retainage/contract bond and/or accepting the project.
Drawing Requirements:
All drawings prepared for the City of Joliet Public Utilities Department will include the general notes found in Appendix D – General Notes and the Standard Details as Provided in Appendix B of this Design Manual All drawings shall be in compliance with the design criteria as outlined in this manual and formatted for 24” x 36” full-size production. Drawings will be submitted via digital (PDF) in the City of Joliet ProjectDox System.
All projects shall require the submittal of As-Built drawings. As-built drawings shall be red-line updated monthly during construction and will be subject to review by City inspectors. Drawings submitted upon project completion shall show the as-built location of all utilities and utility structures and be provided in AutoCAD and PDF format.
This work shall not be paid for separately but be considered incidental to the contract, and include all materials, labor, and equipment needed to complete the GPS data capture.
Sawcutting
Sawcutting shall not be paid for separately but shall be included in the cost for removal items.
Mobilization
This Contract contains no provisions for Mobilization. Therefore, Section 671 of the Standard Specifications is deleted.
Trench Backfill
This work shall be in accordance with Section 208 of the IDOT Standard Specifications except that the trench backfill material shall be CA-6, meeting the requirements of Section 1003 & 1004.
Trench backfill shall be installed in nine (9) inch lifts, loose measure, and mechanically compacted to 95% Modified Proctor Density.
This work shall not be paid separately and shall be considered incidental to the removal items or associated pipe installation.
Pay Item Special Provisions
RESTORATION (TOPSOIL AND SEED)
For any disturbed turf area within the construction easements or as directed by the Engineer, the topsoil shall be placed such that a minimum depth of four (4”) inches shall be achieved prior to seeding activities. Any additional material required beyond a depth specified shall be reclaimed from any excavated, suitable material located onsite. No compensation will be provided for the placement of this material, unless agreed to by the Engineer. Backfill of this kind shall be considered incidental to this Contract. If sufficient depth to place the topsoil is not available, the Contractor will be required to excavate the additional depth to place the required thickness, this shall be considered incidental to this pay item.
The Contractor shall be responsible for maintaining all restored areas until such a time as the City accepts these areas. This acceptance will be granted after the Contractor has both fulfilled the minimum required maintenance items and has established a stand of grass (where required) which meets the acceptance standards set forth in these Special Provisions.
Acceptance of seeded areas will be determined by inspection by the City and Engineer. In order for an area to be accepted, it shall conform the following:
a) Grass shall display a reasonably uniform distribution of grass plants
b) Grass shall display vigorous growth and be green and healthy in appearance.
Vegetation shall be established to a minimum of 70% of the area, any areas smaller than 70% growth will not be accepted. Bare spots must be re-seeded in accordance with seeding and maintenance specifications.
In addition, watering shall be completed by the contactor as requested by the engineer and the watering shall be considered incidental to this item.
This work will be paid for at the contract unit price per square yard for RESTORATION (TOPSOIL & SEED), and includes any necessary excavation work, disposal of excess material, shaping, topsoil, seed, repair, and all other labor, equipment, and material necessary to complete this item.
INLET FILTERS
This item shall be in accordance with Section 280 of the Standard Specifications and consists of installing and maintaining inlet filters as provided in the plans and as directed by the Engineering.
Flexstorm inlet filters manufactured by Inlet & Pipe Protection, Inc. (or approved equal) with woven monofilament geotextile filter fabric sediment bags shall be installed on the storm sewer inlet structures at all drainage discharge points during the installation of the storm sewer and prior to the excavation of the roadway. Also, metal plates of adequate size, shape and thickness shall be installed directly on all drainage structures providing a clean seal hindering debris from entering the drainage system.
Once the curb and gutter has been installed, Flexstorm inlet filters shall be installed on all storm sewer inlet structure castings with open lids or grates, within or adjacent to the project limits, and shall remain in place until the asphalt and sod have been placed and the sod watering by the contractor has been completed. The entire frame and sediment bag shall be removed, and the structure cleared of all debris, prior to the City accepting this project.
It is the Contactor’s responsibility to review the plans and/or worksite to determine the quantity of each drainage structure casting type. The foundry casting number or the exact grate size and clear opening size will provide the information necessary to identify the required FLEXSTORM Inlet Filter part number.
The contractor shall be responsible for inspecting the sediment bags once per week and after every major rain event (1/2” or more) and removing and cleaning the sediment bag if it is more than half full or damaged. This shall be done until the Flexstorm inlet filters are permanently removed.
Excess/waste construction material shall be properly disposed of off-site. No cleaning of equipment or tools, including concrete trucks, will be allowed within the project limits or into the City’s storm sewer drainage system.
This item shall also include all labor, materials, and equipment necessary to mechanically clean all existing paved surfaces used as egress points from the construction zone at the end of each working day.
This work will be paid for at the contract unit price per each for INLET FILTERS and includes all labor, materials, and equipment necessary to install and maintain storm sewer sediment control devices in accordance with the manufacturer’s specifications and as directed by the engineer. . No other compensation shall be allowed for this work. Failure of the contractor to comply with this specification will result in progress payments being withheld for the project until the terms of this specification are met to the satisfaction of the Engineer.
AGGREGATE BASE COURSE
This work shall be performed in accordance with Section 351 of the Standard Specifications with the exception that the first layer be constructed immediately following the roadway excavation. The Contractor shall place the first layer of base course before the end of each work day so that the limits of the excavation are accessible to vehicular traffic. The first layer of base course shall be a minimum thickness of three inches, and the width shall extend to the limits of the roadway as shown in the plans. Aggregate ramps shall be constructed at the limits of the excavation at the end of each work day to allow vehicular access to the roadway. All material used in providing access shall be utilized in the final base course and shall be considered incidental to this item.
Upon completion of the first layer of base course and after the installation of the curb and gutter, a proof roll shall be performed to locate any unsuitable sub-grade material that will require removal. This proof roll shall be accomplished in the presence of the engineer and shall be done with a loaded semi-truck.
Upon completion of the final lift of base course and prior to the placement of the hot mix asphalt pavement, the contractor shall perform another proof roll.
Upon completion of the final lift of base course, an aggregate ramp shall be constructed at each end of the project and cross streets. This aggregate ramp shall consist of material equal to in type B of the aggregate base course and shall be constructed the entire width of the street. The length of the ramp shall be 12 inches for every 2 inches of drop-off in elevation between the existing roadway surface and the aggregate base course. On a typical construction project, the length of the aggregate ramp shall be approximately twenty-four feet (24’).
A perpendicular saw cut across the existing asphalt roadway pavement will be performed as necessary by the contractor to provide a clean, even joint prior to the installation of the asphalt binder course The Contractor shall saw cut the pavement and remove the aggregate ramp within 24 hours after notice is given by the engineer.
Aggregate used for base course will be measured for payment in square yards of the thickness specified. Material used in providing roadway access will not be measured separately but shall be considered incidental to the plan quantity for Aggregate Base Course, of the type specified. Material used in constructing the aggregate ramp will not be measured separately but shall be considered incidental to this item. Also, no additional compensation will be made for the performance of the two (2) proof roles.
This work will be paid for at the contract unit price per square yard for AGGREGATE BASE COURSE, of the type and thickness specified and shall include all labor, materials, equipment, and all other appurtenances required to install the aggregate base course. The saw cutting of asphalt will be not paid for separately and be included in all the removal items. .
HOT MIX ASPHALT REMOVAL AND REPLACEMENT
This item includes the labor, equipment and materials necessary for the removal of the existing roadway and replacement with Hot Mix Asphalt Surface Course, IL 9.5, Mix C, N 50, of the thickness specified and as shown on the plans. This work shall be performed in accordance with Sections 442 and 406 of the "Standard Specifications". Comment by Mikos, Sean: Might need to update with your spec
This work will be paid for at the contract unit price per square yard for HOT MIX ASPHALT REMOVAL AND REPLACEMENT, of the thickness specified, as measured in place.
PAVEMENT REMOVAL – PARKING LOT
This work shall include the removal of a portion of the existing parking lot within the temporary construction limit only.
If additional pavement is removed or damaged due to negligence on the part of the Contractor, the additional quantities shall not be measured for payment, but shall be done at the Contractor’s expense.
This work shall be paid for at the contract unit price per square yard for PAVEMENT REMOVAL – PARKING LOT. No additional compensation will be granted for any additional hand work required adjacent to the drainage structures.
P.V.C. (POLY VINYL CHLORIDE STORM SEWER, C900)
The P.V.C. pipe shall conform to ASTM D1784, Class 12454, C900. Pipe conforming to ASTM D1784 shall be made of P.V.C. Plastic having a minimum cell classification of 12454. A minimum wall thickness of DR25 is required for all pipe sizes diameter, in accordance with the "Standard Specifications".
All material shall be protected from ultraviolet degradation until placed in trench and backfilled.
Construction of PVC Storm Sewer shall be done in accordance with Section 550 of the Standard Specifications.
This work will be paid for at the contract unit price per linear foot for STORM SEWERS C900 P.V.C. of the type and size specified, measured in place. This price shall include the cost of all pipe fittings required, all other materials, except trench backfill within the limits of the specified trench, and all sheeting and shoring required. The cost of connecting proposed storm sewers to existing storm sewers at existing drainage structures shall be considered as incidental to the cost of the proposed storm sewers. No additional compensation will be allowed.
STORM SEWER, SLOTTED PIPE
The P.V.C. pipe shall be slotted Durapipe, with end cap, within the level spreader cross section as shown on the plan details.
All material shall be protected from ultraviolet degradation until placed in trench and backfilled.
Construction of PVC Storm Sewer shall be done in accordance with Section 550 of the Standard Specifications.
This work will be paid for at the contract unit price per linear foot for STORM SEWERS SLOTTED PIPE, of the type and size specified, measured in place. This price shall include the cost of all pipe fittings required, all other materials within the limits of the specified trench including geotextile fabric and all aggregate backfill, and any sheeting and shoring required. The cost of connecting proposed storm sewers to drainage structures shall be considered as incidental to the cost of the proposed storm sewers. No additional compensation will be allowed.
TRAFFIC CONTROL AND PROTECTION
This item shall include furnishing, installing, maintaining, relocating and removing all traffic control devices used for the purpose of regulating, warning or directing traffic during the construction or maintenance of this improvement.
Traffic Control and Protection shall be provided as called for in the plans, these Special Provisions, applicable Highway Standards, applicable sections of the Standard Specifications or as directed by the Engineer.
The governing factor in the execution and staging of work for this project is to provide the motoring public with the safest possible travel conditions along the roadway through the construction zone. All traffic control devices used on the project shall conform to the plans, special provisions, traffic control standards, traffic specifications and the "Illinois Manual on Traffic Control Devices for Streets and Highways" and the "Traffic Control Devices Handbook." No modification of these requirements will be allowed without prior written approval of the Engineer.
The Contractor shall be responsible for the proper location, installation and arrangement of all traffic control devices. All traffic control devices shall remain in place until specific authorization and relocation or removal is received from the Engineer.
The Contractor shall ensure that all traffic control devices installed by him are operational 24 hours a day, including Sundays and holidays.
This work will be paid for at the contract unit price per lump sum for TRAFFIC CONTROL AND PROTECTION.
MISCELLANEOUS ADDITIONS TO PROJECT AT CITY’S DISCRETION
Description of Work
This item is to provide for adequate budget to cover items not specifically included in the contract prior to the bidding process.
Construction Requirements
All work shall conform to appropriate articles of the Standard Specifications, City ordinances, city details and specifications that are considered industry standards or standards set forth by a governing body (i.e. FRWRD, MUTCD, etc.) for the furnishing, fabrication, installation or removal of the included items.
Materials
All furnished material shall conform to appropriate articles of the Standard Specifications, City ordinances, city details and specifications that are considered industry standards or standards set forth by a governing body (i.e. FRWRD, MUTCD, etc.) for the furnishing, fabrication, installation or removal of the included items.
Disposal of Material & Safety
All materials resulting from this extra work shall be disposed of at the contractor’s expense, outside the limits of the job, at locations acceptable to the Engineer and in accordance with Section 107.01 of the Standard Specifications, as amended by Public Act 90-761. A sample of the required load ticket is included in this contract.
Method of Measurement
This item shall be measured for payment in the appropriate dimensions for the work performed.
Basis of Payment
The Contractor will include in his bid a sum of $20,000.00 for miscellaneous additions to the project at the City’s Discretion. Only additional work, not covered by existing Pay Items, indicated on the Drawings or in the Project Specifications will be eligible for payment under the Cash Allowance. Additional work may consist of items such as additional connection to an existing water service of an odd size, or handrail installation, or other construction that may be deemed necessary by the City to add to the project.
City of Joliet Special Provisions 2