This document consists of detailed construction plans and specifications for Pump Station 215 Discharge Piping Replacement, a capital improvement project for the City of Sioux Falls, South Dakota (CIP No. 23044). The project involves the complete removal and replacement of discharge piping for four submersible pumps within two separate wet wells, along with associated infrastructure upgrades. The scope includes removing and replacing two existing submersible pumps and their discharge piping in the east wet well, replacing discharge piping for two previously installed pumps in the west wet well, installing electric actuators on four existing gate valves, replacing the facility's air compression system with stainless steel piping connections, and applying high-performance coating to exposed concrete and piping surfaces. The estimate of quantities includes 48 bid line items covering mobilization, equipment removal and installation, piping materials and fittings in various diameters (16-inch, 8-inch, and 6-inch), guide rail components, valve actuators, air compression equipment, and surface preparation and coating work. The project plans comprise detailed design sheets covering floor plans, piping layouts, electrical and instrumentation wiring, compressed air systems, process plans, and coating specifications across multiple sheets (A, B, D, H, L, M, N, R, U, and V series).

The project is estimated at approximately $993,000 and will be funded through City of Sioux Falls capital improvement funds. The City will furnish two submersible pumps and associated appurtenances for installation within the east wet well, as well as provide support services including wet well isolation, pumping down, and rinsing operations. The contractor assumes full responsibility and liability for all City-furnished materials upon receipt and must accept them in "as-is" condition with no warranty of serviceability. A separate bid item accounts for use tax on City-furnished materials valued at $10,313.70 (calculated at 6.2% of $166,350.00). The contractor is required to obtain a building permit from City of Sioux Falls Building Services at no cost, provide a construction schedule for approval prior to the preconstruction meeting, conduct bi-weekly coordination meetings with subcontractors and the engineer, and submit shop drawings and operation and maintenance manuals for approval. The project requires coordination with Water Reclamation operations staff to minimize disruption to facility operations, and the contractor must complete all work while the lift station remains operational with flow diverted between individual wet wells.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Airport

85th Street

I-90

M in ne so ta A ve nu e

So ut he as te rn

A ve nu e

El lis

R oa d

26th Street26th Street

I-90

I-2

I-229 C lif f

Av en ue

57th Street

Ri ce

S tre et

Benson Road

St at e H ig hw ay

Lo ui se A ve nu e

Ki w an is

A ve nu e

C :\U se rs

\J

PE

TE

R

SE

N

\D C

\A C

C D oc s\

H D

R \1

1_

Sx Fa lls _P

S2

_D is ch ar ge _P ip e_

R \P ro je ct F ile s\

H D

R \0

5_ C iv il_

C \0

3_ Sh ee ts

\1

1-

C -A

S H

EE

TS

.d w g

PL

O T

D

AT

E:

/1 1/

:0

AM

P et er se n, J ak e

City of Sioux Falls

PUMP STATION 215

Plans for Discharge Piping Replacement

Minnehaha County

Bid Request No. 26-1090

3301 W. 12TH STREET

SIOUX FALLS, SOUTH DAKOTA

CIP No. 23044

Providing a Better Quality of Life for You!

PUBLIC WORKS

CITY OF SIOUX FALLS

Name S.D. No. 12760

I, Kyle J. Lentsch, hereby certify that these plans were prepared by me, or under my direct supervision and that I am a duly registered engineer under the laws of the State of South Dakota.

Plans By:

Date

101 S. PHILLIPS AVENUE

SUITE 401

SIOUX FALLS, SOUTH DAKOTA 57104

(605) 977-7740

FAX: (605) 977-7747

Section 13 - T101N, R50W

Section 24 - T101N, R50W

Section 18 - T101N, R49W

Section 19 - T101N, R49W

SHEET NO. A001 TITLE SHEET

SHEET NO. A101 OVERALL FLOOR PLAN - UPPER LEVEL

SHEET NO. A102 HOIST PLAN & ELEVATIONS - WET WELL

SHEET NO. A103 HOIST PLAN & SECTIONS - LOWER LEVEL

SHEET NO. B101 ESTIMATE OF QUANTITIES

SHEET NO. D101 - D104 GENERAL NOTES

SHEET NO. H101 PIPING PLAN - BELOW PLATFORM (LL)

SHEET NO. H102 PIPING PLAN & DETAILS - ABOVE PLATFORM (LL)

SHEET NO. H301 PIPING SECTION & DETAILS - EAST WET WELL

SHEET NO. H302 PARTIAL PIPING SECTION - WEST WET WELL

SHEET NO. H303 PIPING SECTIONS - LOWER LEVEL & WET WELL

SHEET NO. L101 ELECTRICAL PLAN - LOWER LEVEL

SHEET NO. L102 I&C WIRING PLAN - UPPER & LOWER LEVEL

SHEET NO. M101 COMP. AIR PLAN - UPPER LEVEL

SHEET NO. M102 COMP. AIR PLAN - LOWER LEVEL

SHEET NO. N501 PIPE SUPPORT & MISC. DETAILS

SHEET NO. R101 COATING PLAN & SECTIONS - WET WELL

SHEET NO. U101 PROCESS PLAN - WET WELL

SHEET NO. U102 PROCESS PLAN - BELOW PLATFORM (LL)

SHEET NO. U301 PROCESS SECTION - WEST WET WELL

SHEET NO. U302 PROCESS SECTION - EAST WET WELL

SHEET NO. U303 PROCESS SECTION - WET WELL

SHEET NO. U501 PROCESS DETAILS

SHEET NO. V101 - V104 EXISTING SITE PHOTOGRAPHS

Project Location

Vicinity Map

Index of Sheets

Drawing indicates general utility locations only. Neither the correctness or completeness of locations are guaranteed.

Prior to excavation contact:

SOUTH DAKOTA ONE CALL (1-800-781-7474) Location Map

PUMP STATION 215

W. 12TH STREET

S.

K

IW

AN

IS

A

VE

N

U E

BIG SIOUX RIVER

S.

L

YO

N

S

AV

EN

U

E

W. 10TH STREET

SHERMAN

PARK

ACCESS ROAD ACCESS PATH

HINGED CHAIN

LINK GATES

CHAIN LINK FENCE (ALL)

AROUND PERIMETER)

SHEET NO.

B101

P U

M P

S T

A T

IO

N

D

IS

C H

A R

G E

P

IP

IN

G

R E

P L

A C

E M

E N

T

S

IO

U X

F A

L L S

S

O U

T H

D A

K O

A

E

T

IM

A T

E O

F Q

U A

N T

IT

IE

S

IG

N E

D B

Y

K

L E

N T

S C

H

R

A W

N B

Y

J

P E

T E

R S

A D

F

IL

E C

K E

D B

Y

K

L E

N T

S

T

E /1

/2

V

IS

IO

N

B

Y

T

D

A T

ESTIMATE OF QUANTITIES

ITEM

NO.

STD. BID

ITEM NO.

ITEM DESCRIPTION UNIT

ESTIMATED

QUANTITY

1 9.0010 Mobilization LS 1

2 9.0550 Tax on City Furnished Materials LS 1

3 Special Remove Submersible Pump, Motor, & Support Base Each 2

4 Special Remove 8" FL Elbow 90 Degree Each 2

5 Special Remove 16" x 8" FL Reducer Each 2

6 Special Remove & Reset Pump Support Base Elbow Each 2

7 Special Remove 16" x 12" FL Reducer Each 2

8 Special Remove Flanged Sewer Pipe Ft 81

9 Special Remove 16" FL Elbow 90 Degree Each 4

10 Special Remove S.S. Guide Rails & Components (Per Pump) Each 4

11 Special Remove 16" Steel Pipe and 30" Steel Ring Flange Assembly Each 3

12 Special Install Submersible Pump, Motor, Base Elbow, & Appurtenances Each 2

13 Special Pipe Supports for 16" Pump Discharge (Sanitary) Each 12

14 Special 1 " FL Elbow 11.25 Degree Each 8

15 Special 16" x 12" FL Eccentric Reducer Each 4

16 Special 16" FL x MJ Ductile Iron Pipe (Min. 8" Long) Each 4

17 Special 16" PE x PE Ductile Iron Pipe w/ Tie Rods & Restraint Devices Each 4

18 Special 16" FL x MJ Ductile Iron Pipe Ft 44

19 Special 16" FL x FL Wall Pipe w/ Seep Ring Each 3

20 Special 16" FL x FL Ductile Iron Pipe Ft 8

21 Special 16" FL Elbow 90 Degree Each 4

22 Special Provide Additional Intermediate Guide Rail Bracket Each 10

23 Special Install Intermediate Guide Rail Brackets and Upper Bracket (6 per Pump) Each 4

24 Special Install 2" Guide Rails (2 Per Pump) Each 4

25 Special Pump Start-up & Testing Each 4

26 Special Pipe Supports for 6" Grit Suction Each 10

27 Special 6" FL x Flare Fitting Each 2

28 Special 6" FL x FL Ductile Iron Pipe Ft 81

29 Special 8" x 6" FL Concentric Reducer Each 2

30 Special 8" FL x Clamp Adaptor for Vacuum Truck Each 2

31 Special Cast-in-Place Reinforced Concrete Thrust Block Each 3

32 Special Temp. Air Connection & Salvage Air Compressor to Owner LS 1

33 Special Increase Size of Air Compressor Housekeeping Pad LS 1

34 Special Air Compressor w/ External Air Dryer & Filter LS 1

35 Special S.S. Air Compressor Header w/ Drip Trap and I&C Connections LS 1

36 Special 1-1/4" OR 1" S.S. Compressed Air Piping Ft 114

37 Special 3/4" OR 1/2" S.S. Compressed Air Piping Ft 40

38 Special 1-1/4" S.S. Elbow/Tee/Union/Reducer Each 10

39 Special 1" S.S. Elbow/Tee/Union/Reducer Each 12

40 Special 3/4" S.S. Elbow/Tee/Union/Reducer Each 5

41 Special 1/2" S.S. Elbow/Tee/Union/Reducer Each 15

42 Special 1" S.S. Full Port Ball Valve Each 2

43 Special 1/2" S.S. Full Port Ball Valve Each 4

44 Special 1/2" Air Regulator/Condensation Trap Assembly Each 4

45 Special Electric Actuator for 16" Gate Valve Each 1

46 Special Electric Actuator for 30" Gate Valve Each 3

47 Special Prepare & Coat Exposed Concrete Below PVC Liner in Wet Well SqFt 1,640

48 Special Prepare & Coat Pump Discharge Piping in Lower Level Valve Room SqFt 752

ESTIMATE OF QUANTITIES

SANITARY SEWER

GRADING

6"

M P

S T

A T

IO

N

C H

A R

G E

P

IP

IN

G

R E

P L

A C

E M

E

U X

F A

L L S

S

O U

T H

D A

K O

G

N E

R A

L N

O T

S

IG

N

E D

B Y

K

L E

N T

S

A W

N B

Y

J.

P

E T

E R

S

A D

F

IL

E C

K E

D B

Y

D P

E T

E

T

E /1

/2

V

IS

IO

N

T

D

A T

D101

GENERAL NOTES

PROJECT SCOPE

This project consists of the complete removal and replacement of two (2) existing submersible pumps complete with pump discharge piping (east wet well), as well as the complete replacement of pump discharge piping for two (2) of the new pumps (west wet well) installed by the City of Sioux Falls (City). For this project, the City will be furnishing the two (2) submersible pumps as well as all appurtenances for installation within the east wet well. The City has previously completed installation of two (2) of the four (4) new pumps and now would like to replace the discharge piping for all of the pumps as it does not align with the new pumping equipment bases.

The project requires preparation (pipe draining, wastewater pumping, & cleaning), and various items necessary for the completion of the work. Permanent vactor truck connections are included with the project to improve future ease of draining the wet well.

Location of all the pumps should be set to line up with the center of the monorail crane located above the hatches. It is recognized that modifications to the guide rail support system will need to occur for the new Sulzer pumps to be removed from the wet well smoothly.

All four (4) of the previously procured pumps, discharge bases, guide rails, brackets, etc. have been delivered to the City (with two being temporarily installed) and information regarding them can be found in Appendix C of the specification booklet. Staff from Water Reclamation will transport the pumping equipment and parts to Pump Station 215 upon Contractor’s request.

Contractor to confirm all parts required for the installation of the pumps are available and shall order any additional parts required for installation. Notify the City or Engineer immediately of any missing parts that were required to be provided within the items procured.

This project also includes application of a high-performance coating (HPC) to the exposed concrete within each of the wet wells that is present below the existing PVC liner.

Electric actuators will be added to the three (3) existing 30-inch diameter double disc gate valves and the one (1) 16-inch diameter double disc gate valve located in the lower-level Valve Room. There are currently Easytork pneumatic actuators located on the four (4) existing 16-inch diameter plug valves, which are acting as check valves. The City will replace these four

(4) actuators located on the pump discharges prior to the project commencing and the Contractor will need to make permanent compressed air connections to them.

The existing air compressor will be removed and replaced with a rotary screw air compressor and all air lines between the air compressor and the actuators are to be replaced with stainless steel lines.

The City will assist with the following tasks:

1. Isolating the wet wells by operating the influent slide gates and any discharge valves.

2. Pumping down the wet wells.

3. Rinsing of the wet well walls and piping (pressure washing, if necessary, is to be performed by the Contractor).

Power is available at the site for the Contractor to use free of charge, if performing work associated with the project.

SPECIFICATIONS TO BE USED

The most current edition of the City of Sioux Falls General Conditions for Public Improvements and Supplemental Standard Specifications, together with Division II and Division III of the most current edition of the South Dakota Department of Transportation Standard Specifications for Roads and Bridges with Supplemental Specifications and Errata, City and DOT Standard Plates and required provisions, supplemental specifications, and/or special provisions as included in the Project Manual are hereby made a part of these specifications in its entirety unless otherwise revised, deleted, or supplemented herein.

The City of Sioux Falls Engineer’s Office will provide a copy of the City of Sioux Falls General Conditions for Public Improvements and the City of Sioux Falls Supplemental Standard Specifications free of charge to all prospective bidders upon request. The Supplemental Standard Specifications can also be downloaded from the City of Sioux Falls website at https://www.siouxfalls.gov/business-permits/development-projects/construction-management-and-design/specs-policies-manuals. The South Dakota Department of Transportation Standard Specifications for Roads and Bridges with Supplemental Specifications and Errata can be downloaded from the SDDOT’s website at https://dot.sd.gov/

ELECTRONIC DESIGN FILES

Electronic design files WILL NOT be available to the Contractor. Contractor shall rely on the contract documents to prepare their bid. Original As-Recorded drawings of Pump Station 215 dated 1997 can be provided to potential bidders upon request.

CHANGE ORDER ITEMS

The Engineer may request a breakdown of costs for change order items, and the Contractor must supply the breakdown, if requested, prior to proceeding with the work. Unit bid prices are firm for the entire duration of the contract. For new work items, all costs must be approved by the City prior to proceeding with the work.

CONSTRUCTION LIMITS

The construction limits shall be within the right-of-way and easement areas. Material storage and vehicle and equipment traffic shall be limited to the construction limits. All paved streets adjacent to the project are to be cleaned at the end of each working day.

Contractor shall immediately repair or replace any physical damage to private property not in the Contract at Contractor’s expense.

The Contractor will not be allowed to store materials, equipment, etc. on structures or use structures as a staging area.

SUBMITTALS

The following documents shall be submitted by the Contractor. Documentation requirements elsewhere in the contract are not waived if not listed in the following table.

Submittals Date

Submitted

Shop drawings

Operation & Maintenance Manuals

Construction schedule

South Dakota State sewer and water plumbing contractor’s license

Shop drawings, samples, and informational submittals shall be submitted and approved prior to installation of the component. Contractor shall include a stamp indicating that submittal contents have been reviewed and approved by them, prior to submitting to Engineer.

Contractor shall not use red color for marks on transmittals; the Engineer will use red marks or enclose marks in a cloud.

Transmit hard copy submittals to:

HDR

101 S. Phillips Avenue, Suite 401 Sioux Falls, SD 57104 Attn: Kyle Lentsch, PE

Transmittals can also be made electronically in PDF format to:

Kyle.Lentsch@hdrinc.com.

Items within transmittals will be reviewed for overall design intent and will receive one (1) of the following actions:

A - FURNISH AS SUBMITTED.

B - FURNISH AS NOTED (BY ENGINEER).

C - REVISE AND RESUBMIT.

D - REJECTED.

E - ENGINEER'S REVIEW NOT REQUIRED.

Submittals returned with Action "A" or "B" are considered ready for fabrication and installation.

CONSTRUCTION SCHEDULE

The Contractor shall prepare a construction schedule for approval by the Engineer that will ensure the completion of the project within the time frame specified. This schedule must be provided to the Engineer for review a minimum of 3 days prior to the preconstruction meeting. The notice to proceed will not be issued until the schedule has been approved by the City. The construction schedule shall be in bar or network diagram form and show the start and completion dates for significant items of work in their respective phases. Significant items of work includes but is not limited to: erosion control, removals, grading, the installation of watermain, sanitary sewer, storm sewer, street lighting, traffic signals, base course, curb and gutter, paving, sidewalk, and pavement markings. When applicable the schedule shall include submission dates for shop drawings, manufacturing and installation of materials, supplies, equipment, and testing for various parts of the work.

The construction schedule shall be updated on a bi-weekly basis. If it appears the rate of progress is such that the contract will not be completed within the time frame allowed the Contractor will be required to provide written documentation as to what measures they will take to complete the project within the specified time frame or to prosecute work in a satisfactory manner. Failure to submit the schedule on a bi-weekly basis will result in the City withholding the pay applications until the updated schedule is submitted.

COORDINATION MEETINGS

The Contractor shall conduct coordination meetings with the subcontractors, the Engineer, and the City of Sioux Falls. These meetings shall be held bi-weekly at a location on or near the project. The Contractor shall determine the time and location and as approved by the Engineer. The Contractor will give a brief summary of the project schedule, answer any questions, discuss construction coordination, and deliberate other issues as needed.

All costs to conduct the coordination meetings shall be incidental to the project.

Failure to hold these meetings or failure for the Contractor or subcontractors to attend shall be subject to a $500 price adjustment per occurrence as determined by the Engineer.

BUILDING PERMIT

A building permit is required for the lift station and has been created internally within the City’s permitting system. The Contractor shall obtain the building permit from City of Sioux Falls Building Services (605-367-8670). No fee will be required.

PRODUCT SUBSTITUTIONS

The procedure for requesting approval for substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria shall follow the same mechanics as for Shop Drawings. Written approval or rejection of substitution shall be given by the Engineer.

In making a request for substitution or when using an approved product, Contractor assures that he/she has investigated proposed product, has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended. Guarantee for substitute item will match that as for product specified. Contractor agrees to coordinate installation of accepted substitution into work and to make such changes as may be required for work to be complete in all respects. Any and all claims for additional costs related to substitution shall be waived.

OPERATION AND MAINTENANCE MANUALS

Equipment Operation and Maintenance Manuals contain the technical information required for proper installation, operation and maintenance of process, electrical, and mechanical equipment and systems. Submit approvable draft manuals in electronic format (PDF) to Engineer following approval of the respective Shop Drawing. Final approval of Operation and Maintenance Manuals in electronic format (PDF) must be obtained 45 days prior to equipment start-up. Provide two (2) paper copies and two (2) USB Flash Drives of approved final Operation and Maintenance Manuals in electronic format (PDF), a minimum of 30 days prior to equipment start-up.

PROPOSED PROJECT ISOLATION PLAN

The City will isolate the lift station piping from the 36-inch diameter force main by closing the existing double disc gate valves and thereby stopping the wastewater from draining back toward the existing pipe being replaced. The Contractor is responsible for draining the individual pump piping and the proper disposal of the wastewater. The City is only able to isolate one of the individual wet wells at a time so the lift station can remain in operation, with flow diverted toward the other individual wet well via the slide gate.

M P

S T

A T

IO

N

C H

A R

G E

P

IP

IN

G

R E

P L

A C

E M

E

U X

F A

L L S

S

O U

T H

D A

K O

N E

R A

L N

O T

S

IG

N

E D

B Y

K

L E

N T

S

A W

N B

Y

J.

P

E T

E R

S

A D

F

IL

E C

K E

D B

Y

D P

E T

E

T

E /1

/2

V

IS

IO

N

T

D

A T

D102

PROPOSED PROJECT PHASING PLAN

Below is a proposed phasing plan for this project:

1. Replace 215PUM003 and 215PUM004, associated discharge piping, and guide rail components (East Wet Well):

a. City will close 215VAL003 and 215VAL004 to isolate the pumps.

b. City will close 42” x 42” influent slide gate to isolate the wet well.

c. Check valves 215CHV003 & 215CHV004 can be held open to drain wastewater from the piping back into the wetwell.

d. City will drain wet well and rinse walls with Vactor truck and Contractor can pressure wash and clean areas as required.

e. Contractor to complete pump, guide rail, and piping replacement work per contract documents.

f. The two (2) submersible pumps, two (2) pump bases, and two (2) sets of guide rails w/ mounting brackets are furnished by the City. Any additional parts required for installation to be provided by the Contractor.

g. Contractor to coat interior of wet well with specified product.

h. Once work is completed and has been approved, City will open slide gate and isolation valves so pump operation can be tested by Contractor.

2. Check positioning of 215PUM001 and 215PUM002 with the hoist above, reinstall bases as necessary, and replace associated discharge piping & guide rail components (West Wet Well):

a. City will close 215VAL001 and 215VAL002 to isolate the pumps.

b. City will close 42” x 42” influent slide gate to isolate the wet well.

c. Check valves 215CHV001 & 215CHV002 can be held open to drain wastewater from the piping back into the wetwell.

d. City will drain wet well and rinse walls with Vactor truck and Contractor can pressure wash and clean areas as required.

e. Contractor to complete pump modifications & guide rail and piping replacement work per contract documents.

f. The two (2) submersible pumps, two (2) pump bases, and two (2) sets of guide rails w/ mounting brackets have been temporarily installed by the City. Any additional parts required for installation to be provided by the Contractor.

g. Contractor to coat interior of wet well with specified product.

h. Once work is completed and has been approved, City will open slide gate and isolation valves so pump operation can be tested by Contractor.

3. The City can only shut down flow from each individual wet well separately to allow work to take place.

a. Any additional costs for operations related to isolation of the pump station that are performed by the City (other than those described above) but requested by the Contractor shall be reimbursed back to the City (i.e.

additional wet well-draining or utilizing specialized equipment).

b. Contractor to confirm & verify dimensions of exposed piping as necessary to prepare for removal and replacement of the existing DI pipe.

4. Install the electric actuators on the appropriate valves:

a. Furnish and install four (4) electric actuators on the double disc gate valves as shown in the plans and details.

b. City will furnish and install four (4) pneumatic actuators for the plug valves, which are acting as check valves, for the individual pump discharges prior to this contract commencing.

c. Maintain normal operation of the lift station while completing this work.

5. Remove and replace the existing air compressor located in the control room with the model and type specified. Also, replace all existing air lines between the air compressor and the actuators with stainless steel piping and make connections to existing equipment as required.

a. Provide a temporary source of compressed air to maintain operation of all pneumatic equipment while work is occurring.

6. Clean (sweep and wash) all floors and any disturbed areas. Disinfect restroom and clean toilet weekly during periods of active construction.

a. Replenish toilet paper, paper towels, and soap as needed if restroom is used by Contractor during construction.

7. Work on multiple items may be completed concurrently to maximize schedule.

However, work on the valve actuators located in the lower level of the lift station should be suspended if the actuators cannot be installed and made operational prior to the work in the wet well being completed as City crews will need to manually control flow at this location in order to isolate the pumps from the force main header piping.

CONTRACTOR SAFETY REQUIREMENTS

The Contractor is responsible for following all local, state, and federal rules and regulations regarding site safety. The Contractor is solely responsible for site safety from the issuance of the Notice to Proceed until Final Acceptance. The City shall not be responsible for the Contractor’s failure to follow all applicable rules and regulations.

CITY TOBACCO POLICY

The use of tobacco products is prohibited in all City-owned and City-shared buildings, facilities, vehicles, parking lots, equipment, worksites, and walkways leading into City facilities. This policy does not extend to work occurring within the right of way.

For purposes of this policy, tobacco is defined as any product made or derived from tobacco that is intended for human consumption, including any component, part, or accessory of a tobacco product. Tobacco is also defined and includes all forms of nicotine delivery devices, which may or may not include actual tobacco (such as electronic cigarettes).

PORTABLE TOILET FACILITIES

The Contractor will be responsible for providing portable toilet facilities for the project at no cost to the City. Use of the existing restroom located within the lift station can be utilized by Contractor and their staff, contingent upon the restroom remaining clean and neat. If concerns arise regarding the cleanliness of the restroom, the door will remain locked, and the use of a portable toilet facility will be strictly enforced.

WASTE DISPOSAL SITE

All material generated from this project for disposal must be disposed of at a state-permitted solid waste disposal site. Depending on what material is generated and whether it is contaminated or uncontaminated will determine which permitted facility can accept

it. Permitted facilities include construction and demolition debris sites, restricted use sites, and regional landfills. The Contractor can contact the Sioux Falls Regional Sanitary Landfill at

(605) 367-8162 to identify locally permitted disposal sites for various categories of contaminated and uncontaminated materials. The Contractor shall follow all applicable federal, state, and local laws for the proper disposal of construction debris removed which includes sanitary sewer pipe and fittings.

All costs associated with disposing of waste shall be incidental to the various contract items.

VALVE OPERATION

Contractor shall not operate any existing sanitary valves or slide gates. If proposed work requires operation of any existing valve or gate, Contractor shall contact Engineer and Engineer will coordinate operation with Owner.

VERIFYING LENGTHS AND DIAMETERS

The Contractor shall field verify the lengths and diameters shown in the plan documents as well as the ability to position the pump before fabrication and procurement of the materials.

Before commencing with any work, or ordering any materials, physically measure the length and diameter and inspect the existing pipe(s) designated to be removed to verify that the replacement plan is appropriate.

All work listed here not specifically paid for under a separate bid item shall be considered incidental to the project.

WATER FOR CLEANING

Water for cleaning the wet well and associated components is available from the City of Sioux Falls’ lift station at no cost. Hoses and equipment must be positioned and secured appropriately to prevent damage to the spigots during use. Water supply hoses shall be free from leaks.

The Contractor shall use a “ramp type” device on both sides of any and all water supply hoses which cross the access roadway. If using the City’s water supply is not adequate for the Contractor’s needs, the Contractor shall provide storage of water via tanks. However, no separate payment will be made for any storage tanks needed to maintain a sufficient water supply.

REMOVALS

REMOVE SANITARY SEWER FITTING (BID ITEMS NO. 3, 4 ,6, & 8)

Payment will be per each and shall be full compensation for all costs to remove, load, and dispose of existing sanitary sewer fittings and appurtenances, regardless of materials and configuration. Fittings shall be removed as shown on the Drawings.

REMOVE FLANGED SEWER PIPE (BID ITEM NO. 7)

The unit price payment will be per foot and shall be full compensation for all costs to remove, load, and properly dispose of existing sanitary sewer pipe off-site, regardless of the variation in material and diameter and shall include the removal of any couplings or other appurtenances not shown specifically on the Drawings. Pipe shall be removed as shown on the Drawings.

REMOVE AND DISPOSE OF EXISTING SUBMERSIBLE PUMP, MOTOR, SUPPORT

BASE, AND GUIDE RAIL COMPONENTS (BID ITEMS NO. 2 & 9)

The unit price payment will be per each and shall be full compensation for all costs to remove and dispose of the existing submersible pump, discharge base, dual guide rails, guide rail support brackets, and other appurtenances located within the wet well in its entirety. Pictures and a description of the items located within each pumping system is included as Appendix A within the project specifications.

REMOVE & RESET PUMP SUPPORT BASE ELBOW (BID ITEM NO. 5)

The Contractor shall provide all labor, materials, and equipment necessary to verify the placement of the pump support base elbow aligns with the centerline of the hoist located above. If it does not, Contractor to remove and reset the base elbow at the location shown in the plan documents to align with the hoist and per the manufacturer's detail. Payment shall be made at the contract unit price per each and shall include any non-shrink grout and 316 S.S.

epoxy anchors required.

REMOVE 16” STEEL PIPE AND 30” STEEL RING FLANGE ASSEMBLY (BID ITEM NO.

10) The unit price payment will be per each and shall be full compensation for all costs to remove and properly dispose of the existing 16” diameter steel pipe, 30” blind flange w/ 16” penetration, restraining devices, and other appurtenances as shown in the plans, regardless of variations in materials and construction. The bid item shall include all costs, labor, materials, and equipment necessary to complete the work as shown in the Section H details.

TEMP. AIR CONNECTION & SALVAGE AIR COMPRESSOR TO OWNER (BID ITEM NO.

31) The Contractor will need to relocate the Owner’s existing 110V spare air compressor within the Control Room and provide a temporary connection to the compressed air header in order to actuate the existing pneumatic actuators throughout construction. Refer to Section V Photographs in the plans for more information. Once temporary air has been provided, remove the existing air compressor and air compressor header and salvage to the Owner.

Payment at the contract unit price per lump sum shall be full compensation for providing all labor, materials, and equipment necessary to remove and salvage air compressor to the Owner and implement a temporary air connection.

M P

S T

A T

IO

N

C H

A R

G E

P

IP

IN

G

R E

P L

A C

E M

E

U X

F A

L L S

S

O U

T H

D A

K O

N E

R A

L N

O T

S

IG

N

E D

B Y

K

L E

N T

S

A W

N B

Y

J.

P

E T

E R

S

A D

F

IL

E C

K E

D B

Y

D P

E T

E

T

E /1

/2

V

IS

IO

N

T

D

A T

D103

SANITARY SEWER

WALL PIPE AND CAST-IN-PLACE REINFORCED CONCRETE THRUST BLOCK

CONNECTION (BID ITEMS NO. 18 & 30)

The Contractor shall provide all labor, materials, and equipment necessary to construct the cast-in-place thrust block around the wall pipe w/ seep ring as shown in the detail. Payment shall be made at the contract unit price per each. All exposed concrete shall be coated as required by Specification Section 09 96 05.

Carefully cut out the steel pipe that is welded to the wall pipe in a manner approved by the Engineer.

SANITARY SEWER FORCE MAIN PIPING & FITTINGS (BID ITEMS NO. 13 THRU 17, 19,

20, & 26 THRU 28)

The Contractor shall only provide components that meet the material and strength requirements listed in Specification Section 40 05 19 and has been approved by the Engineer prior to installation. Provide all parts, labor, materials, equipment, and incidentals necessary to furnish and install the flanged piping, restrained flange adapters, and fittings at locations shown in the plans.

• Nuts and Bolts:

o 316 Stainless steel.

• Gaskets:

o Full face, EPDM.

• Interior Lining:

o Ceramic Epoxy

• Exterior Coating:

o HPC per Specification Section 09 96 05

Payment for the fittings shall be per each of the size of fitting indicated, and shall be full compensation for providing all parts, labor, materials, equipment, and incidentals necessary to furnish and install the fittings at locations shown in the plans. Respective bid items are based on type of fitting, which includes elbows, reducers, etc.

Flanged piping shall be measured by the lineal foot of the size of pipe, as shown in the bid tabulation. Payment for each respective pipe bid item will be full compensation for furnishing the pipe and all appurtenances necessary for the proper installation of it. Bidders are encouraged to visit the site and determine their own considerations for challenges with installing the pipe as shown, given surrounding conditions.

Coat all new piping and fittings installed on the project per Specification Section 09 96 05.

PIPE SUPPORTS FOR VERTICAL DISCHARGE PIPING AND GRIT SUCTION (BID ITEMS

NO. 12 & 25)

Pipe supports, saddles, and fasteners shall be 316 stainless steel. All anchor bolts, assembly bolts, screws, nuts, etc. shall be of ample size to safely withstand the loads created by operation of the pumps or vacuum truck as required.

It is the Contractor’s responsibility to install the piping to meet the pipe manufacturer’s recommended procedures and spacing. Final position of the actual grit suction piping shall be discussed with the Engineer prior to installation and acceptance.

PIPE HYDROSTATIC PRESSURE TESTING

Reference Specification 40 05 19 for testing requirements of all ductile iron piping installed on this project. For the new piping inside the wet well, Contractor will be unable to pressure test against the pump, so visual inspection of this piping will be required during pump testing. All materials, equipment, and labor necessary to complete pressure testing shall be incidental to the appropriate ductile iron pipe or fitting, regardless of the pipe diameter tested. Any costs for obtaining water for hydrostatic testing and the subsequent proper disposal of it are the responsibility of the Contractor.

FLANGED X CLAMP ADAPTER FOR VACUUM TRUCK (BID ITEM NO. 29)

Contractor to provide flanged by clamp adapter at the top of the wet well grit suction pipe(s).

City Vactor truck utilizes an 8” aluminum tube with a 10 1/2-inch O.D. flange. The clamp shown in the picture below illustrates how tubes are coupled together. Payment for this fitting per each shall be full compensation for providing all parts, labor, materials, equipment, and incidentals necessary to furnish and install the fitting at the location shown in the plans.

EAST INDIVIDUAL WET WELL PUMP, PIPING, AND GUIDE RAIL REPLACEMENT (BID

ITEMS NO. 11 & 22 THRU 24)

The Contractor shall install two (2) new submersible pumps inside the existing 26 FT by 15 FT by 43.5 FT foot deep wet well as shown on the Drawings and outlined in the Specifications. The applicable per each bid items shall be full compensation for providing all labor, materials, equipment, and incidentals necessary to remove two (2) existing pumps, install two (2) new pumps, replace both sets of guide rails, and replace the discharge piping inside the wet well as shown in the plans. The bid items shall include, but are not limited to the following items required to complete the work:

• Safe access and entry into the pump station influent wet well.

• Placing sandbags at the base of the gate for isolating the work area from the active flow.

• Install Submersible Pump, Motor, Base Elbow, & Appurtenances o Including any grout or existing concrete as required to install new base.

o Contractor shall supply the epoxy and anchor bolts required for installation.

o Reconstruction of concrete floor once base is installed.

• Provide Discharge Piping and Fittings Within the Wet Well

• Pipe Supports for 16” Pump Discharge

• Install Intermediate Guide Rail Brackets and Upper Bracket

• Install 2” 316 SS Pump Guide Rails o Vertical pipe deflection for the guide rails should never exceed the maximum value indicated in the manufacturer’s published literature.

• Pump Start-up & Testing o Water for testing pumps and controls o Contractor personnel on-site for pump testing and acceptance (one day at 8 HRS each).

• All brackets, supports, nuts, anchors, bolts, and fasteners shall be 316 S.S. inside wet well.

• Miscellaneous items to provide a complete and fully functional pumping system.

WEST INDIVIDUAL WET WELL PUMP, PIPING, AND GUIDE RAIL REPLACEMENT (BID

ITEMS NO. 5 & 21 THRU 24)

The Contractor shall verify placement of and remove and reset the two (2) new submersible pumps inside the existing 26 FT by 15 FT by 43.5 FT foot deep wet well as shown on the Drawings and outlined in the Specifications, if needed. The applicable per each bid items shall be full compensation for providing all labor, materials, equipment, and incidentals necessary to remove and reset two (2) new pumps, replace both sets of guide rails, and replace the discharge piping inside the wet well as shown in the plans. The bid items shall include, but are not limited to the following items required to complete the work:

• Safe access and entry into the pump station influent wet well.

• Placing sandbags at the base of the gate for isolating the work area from the active flow.

• Remove & Reset Pump Support Base Elbow o Including any grout or existing concrete as required to install new base.

o Contractor shall supply the epoxy and anchor bolts required for installation.

o Reconstruction of concrete floor once base is installed.

• Provide Discharge Piping and Fittings Within the Wet Well

• Pipe Supports for 16” Pump Discharge

• Provide Additional Intermediate Guide Rail Bracket

• Install Intermediate Guide Rail Brackets and Upper Bracket

• Install 2” 316 SS Pump Guide Rails o Vertical pipe deflection for the guide rails should never exceed the maximum value indicated in the manufacturer’s published literature.

• Pump Start-up & Testing o Water for testing pumps and controls o Contractor personnel on-site for pump testing and acceptance (one day at 8 HRS each).

• All brackets, supports, nuts, anchors, bolts, and fasteners shall be 316 S.S. inside wet well.

• Miscellaneous items to provide a complete and fully functional pumping system.

INCREASE SIZE OF AIR COMPRESSOR HOUSEKEEPING PAD (BID ITEM NO. 32)

The Contractor shall provide all labor, materials, and equipment necessary to increase the size of the existing concrete housekeeping pad to fit the new air compressor as shown in the plans and specified in Section 22 15 00. This includes, but is not limited to, roughening of existing concrete floor, forming, placing, and finishing the concrete per Specification Section 03 00 05.

Payment: The bid item shall be paid as lump sum and shall be compensation for all labor, equipment, materials, and incidentals necessary to complete this work.

AIR COMPRESSOR W/ EXTERNAL AIR DRYER & FILTER (BID ITEM NO. 33 & 34)

The Contractor shall furnish and install a screw type air compressor (mounted on an air receiver tank) which is to be located inside the existing Control Room as shown on the Drawings and conforming to the requirements of Specification Section 22 15 00. The lump sum bid item shall be full compensation for providing all labor, materials, equipment, and incidentals necessary to procure and install compressor, provide any spare parts, certify installation, and assist with operation, training, and startup as shown in the plans.

Contractor shall provide the services of a factory representative for one (1) day who has complete knowledge of proper operation and maintenance to inspect the final installation and supervise a test run of the equipment.

The contract documents do include a separate lump sum bid item named “S.S. Air Compressor Header w/ Drip Trap and I&C Connections” which should include providing a new stainless-steel header and any other miscellaneous items to provide a complete and fully functional compressed air system as described in Section M and Section V.

City will perform all electrical, controls, and instrumentation work related to powering the air compressor, as well as programming and SCADA integration. Contractor shall assist City through miscellaneous tasks and items to provide complete and fully operational air compressor.

M P

S T

A T

IO

N

C H

A R

G E

P

IP

IN

G

R E

P L

A C

E M

E

U X

F A

L L S

S

O U

T H

D A

K O

N E

R A

L N

O T

S

IG

N

E D

B Y

K

L E

N T

S

A W

N B

Y

J.

P

E T

E R

S

A D

F

IL

E C

K E

D B

Y

D P

E T

E

T

E /1

/2

V

IS

IO

N

T

D

A T

D104

REPLACE COMPRESSED AIR PIPING WITH STAINLESS STEEL (BID ITEMS NO. 35

THRU 43)

The existing threaded steel compressed air piping located within the lift station is to be replaced with stainless steel piping of the same diameter between the air compressor and the valve actuators. All labor, equipment, and materials necessary to complete this work shall be paid for under the per foot bid item for the size of compressed air piping or the per each bid item for the size of elbow, tee, union, reducer, ball valve, or air regulator/condensation trap assembly. The compressed air routing is shown in Section M, and there are photos in Section V. Scope of work includes, but is not limited to:

1. Determine new routing of compressed air piping to minimize conflicts

2. Provide pipe supports per Specification Section 22 15 00.

3. Provide S.S. piping of the same diameter with similar connections and valve locations as the existing.

a. Identify piping per Specification Section 22 15 00.

4. Reinstatement of air tool assemblies and pneumatic actuators to new S.S. piping.

5. Remove existing compressed air piping once new piping has been routed.

a. Includes sealing any vacant wall or floor penetrations

6. Remove existing pipe saddles and pipe supports.

7. All other miscellaneous items shown on the detail sheets.

ELECTRIC VALVE ACTUATORS (BID ITEMS NO. 44 & 45)

The Contractor shall provide valve actuators where shown on the plan sheets and as specified in Specification Section 40 05 57. The actuators must be sized by the Supplier or Manufacturer using appropriate safety factors. All costs to provide actuator, complete in place, and install adapter mounting plate (furnished by Owner), all fittings, appurtenances, labor, equipment, materials, and incidentals necessary for operation of the existing double disc gate valve via electric actuator shall be paid per each.

Provide Manufacturer’s standard warranty that the actuators will operate trouble-free when installed as recommended. If a problem exists, Manufacturer shall correct the problem at no cost to the City.

City will perform all electrical, controls, and instrumentation work related to powering the electric valve actuators, as well as programming and SCADA integration. Contractor shall assist City through miscellaneous tasks and items to provide complete and fully operational valve(s).

PREPARE AND COAT EXPOSED CONCRETE BELOW PVC LINER IN WET WELL (BID

ITEM 46)

Prepare surface by removing loose particles of grit, concrete, and other debris, prior to installing coating per Specification Section 09 96 05. The price provided by the Contractor per square foot will be considered as full compensation for furnishing and applying all coatings, labor, tools, and equipment, cleaning, preparation, repairs, grit removal, inspection, and phasing, protecting, executing, and any other work necessary to complete the task.

PREPARE AND COAT PUMP DISCHARGE PIPING IN LOWER-LEVEL VALVE ROOM

(BID ITEM 47)

Initially prepare surface by pressure washing existing piping to remove dust, dirt, and other debris. Abrasive blasting per NAPF 500-03 is preferred as the next step; however, if abrasive blast is not practical, mechanical preparation using a wire wheel or similar that gets down into the valleys of the coating is required to roughen the substrate and produce a surface profile that facilitates adhesion of newly applied coatings. Due to the uneven surface of ductile iron, use of a sanding wheel or grinder would only abrade the peaks and is not acceptable. Other options may include a chemical surface prep, water jetting, or dry ice jetting, at the Contractor’s option.

Contractor is only required to remove loose coatings and roughen the remaining intact coating prior to installing subsequent overcoating per Specification Section 09 96 05.

Remove all grease, oil, and surface contaminants prior to coating application, but use care to avoid damaging the substrate. Surface preparation may include solvents, hand tools, power tools, or abrasive blast cleaning as required to remove loose materials and to produce a surface suitable for coating adhesion. Care shall be taken to avoid damage to the ductile iron surface from overly aggressive blasting/cleaning methods. Existing firmly attached oxide layers may remain where intact. The Contractor shall establish acceptable surface preparation standards that are representative of ductile iron surfaces. Refer to NAPF 500-03 for further details on the guidelines for surface preparation for ductile iron pipe.

The price provided by the Contractor per square foot will be considered as full compensation for furnishing and applying all coatings, labor, tools, and equipment, cleaning, preparation, repairs, dust removal, inspection, and phasing, protecting, executing, and any other work necessary to complete the task.

Provide pipe identification labels and arrows per Specification Section 10 14 00.

CITY MATERIAL PROCUREMENT

The Contractor assumes all responsibility and liability for the City furnished material upon the Contractor’s receipt of the material as though the Contractor had ordered it himself. The City furnished material is provided to Contractor in an “as-is” condition and the City makes no warranty with respect to the serviceability and/or suitability of the materials for contract performance. Any issues with quality, workmanship, etc. of the material necessitating repair, replacement, or refurbishment of the material will be handled by the Contractor at no additional cost to the City.

The Contractor is required to sign for Contractor’s acceptance of the City furnished material.

The Contractor will send an employee authorized to accept the material on behalf of the Contractor. By signing for the material, the Contractor’s employee certifies he is accepting the material on behalf of the Contractor and is authorized to do so. Failure to accept and/or take possession of the City furnished material does not absolve the Contractor for assumption of all responsibility and liability for the City furnished material as described above. The Contractor shall use the City furnished material only for performing this contract unless otherwise approved by the City.

TAX ON CITY FURNISHED MATERIALS

The bid item “Tax on City Furnished Materials” is included in the Estimate of Quantities to account for the use tax owed by the Contractor. The value of the Tax on City Furnished Materials has been calculated to be $10,313.70, which is based on 6.2% of the $166,350.00 that the City paid for the materials. The bid item “Tax on City Furnished Materials” shall, at a minimum, include the 6.2% use tax owed by the contractor for the materials furnished by the City. Any excise tax owed by the contractor on the value of the City-furnished materials, as well as any bond costs, insurance costs, etc., can be added to the minimum amount shown to account for any additional costs incurred by the contractor.

No additional compensation will be allowed for additional overhead or profit.

:\D

AR

oo t\J ob s\

9a c9 be fc

9f f7 7f ba \a ds kf ile s\ b.

e8 b3 b4 b7 -5 c-

-9

9-b0

3c d4 da d3

\P ro je ct F ile s\

H D

R \0

5_ C iv il_

C \0

3_ Sh ee ts

\1

1-

C -A

_H _N

_R S

H

EE

TS

.d w g

PL

O

T D

AT

E:

/7

/2

4:

P

M a ce su se r

-0 1C

-A _H

_N _R

S H

EE

TS

.D W

G

O

VE

R A

LL

F

LO

O

R P

LA

N

U

PP

ER

L

EV

EL

J.

P

ET

ER

SE

N D

. P

ET

ER

S

K.

L

EN

TS

C H

A101

SHEET NO.

R

EV

IS

IO

N S:

C H

EC

KE

D B

Y:

D

R

AW

N B

Y:

D

ES

IG

N

ED

B Y:

D

AT

E:

BY

BY

D

AT

E:

P ro vi di ng a

B et te r Q ua lit y of

L ife fo r Y ou

PU

B

LI

C

W O

R K

S C

IT

Y

O F

S

IO

U X

F A

L L

S

D

AT

E:

AC

AD

F

IL

E:

5/ 7/

SI

O

U X

FA

LL

S, S

O U

TH

D

AK

O

TA

PU

M

P

ST

A

TI

O N

D

IS

C H

A R

G E

PI

PI

N G

R

EP

LA

C

EM

EN

T

GENERAL NOTES

KEYNOTES ##

5 5 5 5

1. REFER TO PLAN SHEETS AND SPECIFICATION

BOOKLET FOR SUBMERSIBLE PUMP AND

DISCHARGE PIPING REMOVAL, REPLACEMENT,

AND MISCELLANEOUS IMPROVEMENTS.

FURNISH AND INSTALL ALL NECESSARY

MATERIALS TO COMPLETE INSTALLATION AS

SHOWN IN CONTRACT DOCUMENTS.

2. CONTRACTOR SHALL PROVIDE OWN MEANS

OF OFFLOADING MATERIALS AND EQUIPMENT

AT THE SITE AND HAVE THE ABILITY TO

TRANSPORT IT WHERE NEEDED.

3. CONTRACTOR TO CONFIRM ALL NEW PIPING,

FITTINGS, ETC. WILL FIT IN THE EXISTING

HATCH OPENINGS THAT ARE AVAILABLE.

4. BACKGROUND DRAWINGS ARE SCANNED

FROM 1997 AS-BUILT DRAWINGS AND INCLUDE

NOTES RELATED TO THE ORIGINAL

CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR FAMILIARIZING

THEMSELVES WITH EXISTING CONDITIONS OF

THE PUMP STATION AND IDENTIFYING ANY

CONSTRAINTS THAT EFFECT THE COST OF

CONSTRUCTION AND INCLUDE IN THEIR BID.

1 STAIRWAY ACCESS TO LOWER LEVEL AS A

PORTION OF DISCHARGE PIPING IS LOCATED

IN THE LOWER LEVEL.

2 EXISTING INTERIOR OVERHEAD CRANES AND

HOISTS IN THE UPPER LEVEL CONTROL ROOM

AND LOWER LEVEL VALVE ROOM DO EXIST

FOR THE REMOVAL AND REPLACEMENT OF

VALVE EQUIPMENT AND PIPING. THE

CONTRACTOR IS ALLOWED TO USE THE

CRANES TO COMPLETE THE WORK, BUT THE

CONDITION OF THE CRANES WILL BE

DOCUMENTED BY THE CITY AND ENGINEER

PRIOR TO WORK COMMENCING. ANY

DAMAGES THAT OCCUR TO THE CRANES OR

HOISTS DURING CONSTRUCTION WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR TO

REPAIR OR REPLACE AT NO ADDITIONAL COST

TO THE CITY.

3 AN EXISTING EXTERIOR OVERHEAD CRANE

AND HOIST DOES EXIST FOR THE REMOVAL

AND REPLACEMENT OF PUMPS AND PIPING.

THE CONTRACTOR IS ALLOWED TO USE THE

CRANE TO COMPLETE THE WORK, BUT THE

CONDITION OF THE CRANE WILL BE

DOCUMENTED BY THE CITY AND ENGINEER

PRIOR TO WORK COMMENCING. ANY

DAMAGES THAT OCCUR TO THE CRANE OR

HOIST DURING CONSTRUCTION WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR TO

REPAIR OR REPLACE AT NO ADDITIONAL COST

TO THE CITY.

4 ACCESS FOR GETTING PIPE AND EQUIPMENT

TO THE LOWER LEVEL IS BY WAY OF A HATCH

LOCATED WITHIN THE CONTROL ROOM.

5 ACCESS TO SUBMERSIBLE PUMPS IS BY WAY

OF A HATCH LOCATED EXTERIOR TO THE

BUILDING.

AR

oo t\J ob s\

9a c9 be fc

9f f7 7f ba \a ds kf ile s\ b.

e8 b3 b4 b7 -5 c-

-9

9-b0

3c d4 da d3

\P ro je ct F ile s\

H D

R \0

5_ C iv il_

C \0

3_ Sh ee ts

\1

1-

C -A

_H _N

_R S

H

EE

TS

.d w g

PL

O

T D

AT

E:

/7

/2

4:

P

M a ce su se r

-0 1C

-A _H

_N _R

S H

EE

TS

.D W

G

H O

IS

T

PL

A

N

E

LE

VA

TI

O N

S

- W

ET

W

EL

L

J.

P

ET

ER

SE

N

D . P

ET

ER

S

K.

L

EN

TS

C H

A102

SHEET NO.

R

EV

IS

IO

N S:

C H

EC

KE

D B

Y:

D

R

AW

N B

Y:

D

ES

IG

N

ED

B Y:

D

AT

E:

BY

BY

D

AT

E:

P ro vi di ng a

B et te r Q ua lit y of

L ife fo r Y ou

PU

B

LI

C

W O

R K

S C

IT

Y

O F

S

IO

U X

F A

L L

S

D

AT

E:

AC

AD

F

IL

E:

5/ 7/

SI

O

U X

FA

LL

S, S

O U

TH

D

AK

O

TA

PU

M

P

ST

A

TI

O N

D

IS

C H

A R

G E

PI

PI

N G

R

EP

LA

C

EM

EN

T

GENERAL NOTESKEYNOTES ##

1. REFER TO PLAN SHEETS AND SPECIFICATION

BOOKLET FOR SUBMERSIBLE PUMP AND

DISCHARGE PIPING REMOVAL, REPLACEMENT,

AND MISCELLANEOUS IMPROVEMENTS.

FURNISH AND INSTALL ALL NECESSARY

MATERIALS TO COMPLETE INSTALLATION AS

SHOWN IN CONTRACT DOCUMENTS.

2. CONTRACTOR SHALL PROVIDE OWN MEANS

OF OFFLOADING MATERIALS AND EQUIPMENT

AT THE SITE AND HAVE THE ABILITY TO

TRANSPORT IT WHERE NEEDED.

3. BACKGROUND DRAWINGS ARE SCANNED

FROM 1997 AS-BUILT DRAWINGS AND INCLUDE

NOTES RELATED TO THE ORIGINAL

CONSTRUCTION. CONTRACTOR IS

RESPONSIBLE FOR FAMILIARIZING

THEMSELVES WITH EXISTING CONDITIONS OF

THE PUMP STATION AND IDENTIFYING ANY

CONSTRAINTS THAT EFFECT THE COST OF

CONSTRUCTION AND INCLUDE IN THEIR BID.

1 CONTRACTOR TO CENTER ALL PUMPS BASED

UPON THE CENTER OF HOIST LOCATED

ABOVE.

2 AN EXISTING EXTERIOR OVERHEAD CRANE

AND HOIST DOES EXIST FOR THE REMOVAL

AND REPLACEMENT OF PUMPS AND PIPING.

THE CONTRACTOR IS ALLOWED TO USE THE

CRANE TO COMPLETE THE WORK, BUT THE

CONDITION OF THE CRANE WILL BE

DOCUMENTED BY THE CITY AND ENGINEER

PRIOR TO WORK COMMENCING. ANY

DAMAGES THAT OCCUR TO THE CRANE OR

HOIST DURING CONSTRUCTION WILL BE THE

RESPONSIBILITY OF THE CONTRACTOR TO

REPAIR OR REPLACE AT NO ADDITIONAL COST

TO THE CITY.

AR

oo t\J ob s\

9a c9 be fc

9f f7 7f ba \a ds kf ile s\ b.

e8 b3 b4 b7 -5 c-

-9

9-b0

3c d4 da d3

\P ro je ct F ile s\

H D

R \0

5_ C iv il_

C \0

3_ Sh ee ts

\1

1-

C -S

S H

EE

TS

.d w g

PL

O T

D

AT

E:

/7 /2

4:

P M a ce su se r

-0 1C

-S S

H

EE

TS

.D

W G

H O

IS

T

PL

A

N

S

EC

TI

O

N S

- L O

W

ER

L

EV

EL

J.

P

ET

ER

SE

N D

. P

ET

ER

S

K.

L

EN

TS

C H

A103

SHEET NO.

R

EV

IS

IO

N S:

C H

EC

KE

D B

Y:

D

R

AW

N B

Y:

D

ES

IG

N

ED

B Y:

D

AT

E:

BY

BY

D

AT

E:

P ro vi di ng a

B et te r Q ua lit y of

L ife fo r Y ou

PU

B

LI

C

W O

R K

S C

IT

Y

O F

S

IO

U…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .